HomeMy WebLinkAboutExhibit 1CONSULTANT WORK ORDER PROPOSAL
FOR
THE CITY OF MIAMI
HURRICANE KATRINA DEBRIS REMOVAL SERVICES
Prepared For:
City of Miami
Solid Waste Department
1290 NW 20th Street
Miami, Florida 33142
Submitted By:
ha 1
HDR Engineering, Inc.
15450 New Barn Road
Suite 304
Miami Lakes, Florida 33014-2169
ON 1. COM PAN
October 4, 2005
Diane E, Johnson
Governmental Affairs and Contracts Administration
City of Miami
Department of Capital Improvements
444 S.W. 2nd Avenue
8th Floor
Miami, Florida 33130
RE: Hurricane Katrina Recovery
HDR Engineering, Inc., Proposal for Monitoring Services
Dear Ms Johnson;
Please find attached a complete scope of services and fee proposal for the above services.
HDR's fee proposal includes a detailed summary of the labor hours and expenses for each of
our subcontractors, The subcontractors utilized for this project include the following:
Subconsultant
Project Role
GBF Engineering, Inc.
Field supervision and hauler monitoring
ADA Engineering, inc.
Hauler monitoring
Ambro, Inc.
Hauler monitoring
Aerotek Environmental
Hauler monitoring and data input
According to the requirements of FEMA, one hauler monitor is required to supervise and
document each loading operation and disposal location, The monitors are also required to
work the same shift hours as the loading and disposal operations. Therefore the fee schedule
indicates 12 hour shifts for seven days per week until loading and disposal operations cease
for this project. The fee proposal also takes into account the gradual reduction in monitoring
labor as loading operations draw to a close.
Please contact me directly at (8I3) 205-7681 or my Tampa office (813) 282-2392 with any
questions,
Sincerely,
HDR ENGINEERING, INC.
William B. Embree
Sr, Project Manager
Attachment
cc: Neal Poteet, Program Manager, HDR/City of Miami CIP
File
HDR Engineering, Inc.
CO1.110200SA.doc
2202 North West Shore Blvd.
Suite 250
Tampa, Florida 33807.5755
Phone (813) 282.2300 retie 1 el 1
Fax (813)282.2440
CONSULTANT WORK ORDER PROPOSAL
HURRICANE KATRINA DEBRIS REMOVAL SERVICES
HDR Engineering, Inc.
September 28, 2005
HDR Engineering, Inc. proposes to provide the services identified below for the project entitled
"Hurricane Katrina Debris Removal Program", Project B No. , pursuant to Its
Professional Service Agreement with the City of Miami for Capital Improvement Program services,
which has been approved on September 8, 2005.
I. GENERAL
The City of Miami Solid Waste Department requires the support of contract debris monitoring services
and FEMA reporting assistance following the damaged incurred by Hurricane Katrina. The City of
Miami requested HDR to provide this proposal due to HDR's demonstrated expertise in Disaster Debris
Recovery programs and familiarity with FEMA reporting requirements.
The debris removal monitors are needed to verify and document the debris removal from public rights -
of -way and public property and monitor the reduction and disposal sites. Monitoring services also
include reporting of progress to City officials as well as represent the City to the public.
Site monitors will be utilized to observe and document all information necessary to report to the Federal
Emergency Management Agency (FEMA). Field documentation is necessary to ensure that the
emergency hauling contractors pick up and remove collected debris from Hurricane Katrina and ensure
that the loads delivered to the temporary disposal sites are accurately recorded. Field documentation is
also required to quantify the actual volumes of debris collected as well as other documentation that may
be required by FEMA.
HDR will provide all field labor to accomplish this task and provide supervision and coordination
between the emergency haul contractors and the City of Miami.
Additionally, the City has requested that HDR assist in the preparation of all documents and reports on
behalf of the City for the Solid Waste Department as required by FEMA.
II. SCOPE OF WORK
The following is an outline of the scope to document and report the information required by FEMA in
preparation of reimbursement costs to the City.
TASK 1 — INITIAL EMERGENCY RESPONSE (First 72 hours)
1. Mobilize existing construction contractors to clear roadways
Upon notification from City officials, HDR contacted existing CIP construction contractors to
mobilize haul trucks and loaders to clear the debris from City streets. The time and expenses
for this effort will be documented and maintained separately from the CIP projects. These costs
will be included on reimbursement request to FEMA.
2. Mobilize site monitor labor
October 19, 2005
WORK ORDER PROPOSAL
Page 2
HDR staff experienced in the hurricane debris collection effort will be utilized for the
management of this project. This staff will Include overall project management, accounting,
data input, and administrative support. Site monitor labor will be comprised of staff provided by
existing subconsultants to HDR and supplemented with temporary labor from a staffing
company. HDR will Identify field supervisors from our subconsultants. HDR will coordinate with
the emergency debris collection contractors to ensure the appropriate coverage of site monitors.
3. Site supervision of contractors and field monitors
HDR will check daily with site monitor supervisors to check progress reporting, data quality and
other management issues. HDR will also coordinate with the debris collection contractors to
verify that they are completing their work according to the FEMA guidelines and providing the
appropriate documentation.
4. Coordination with City officials for temporary disposal locations for collected debris
It will be the responsibility of the City to determine the location for the temporary debris disposal
locations. HDR will coordinate with City staff any requirements for these sites to complete the
collection, processing and final disposal shipping from these sites.
5. Certify payload volume of collection vehicles
FEMA requires that all collected debris be documented by volume. Each collection vehicle must
therefore be measured and the full volume of the payload calculated. The HDR team will
witness and participate in the measurements of each load vehicle and verify that each vehicle is
uniquely identified with numbering system displayed on the vehicle. HDR will also verify all
calculations independently and make the appropriate corrections on the delivered load data
base as required.
TASK 2 — LOADING SITE MONITORING SERIVES
1. Observe loading of debris from public right-of-way onto haul vehicles
The loading site monitors (LSM) are responsible for observing the collection contractor loading
debris from the public right-of-way into the Haul trucks. LSMs will not interfere with the loading
operations other than to identify safety issues.
2. Document damage to property from loading operations
The LSM will identify on each haul ticket any damage to property caused by the loading
operation and the specific location of the damage. The location may be indicated by a street
address. Additional notes may be taken on a log and turned into the field supervisor.
3. Complete information required on site load tickets
The LSM will be provided loading haul tickets that have been preprinted by each debris hauling
contractor. The LSM will complete the field information required on these tickets and keep a
copy of the ticket. Each haul truck shall not leave the collection site without a haul ticket. The
information required to be completed on the haul ticket will include but limited to the following:
• Applicant Name (City of Miami)
• Loading location
October 19, 2005
WORK ORDER PROPOSAL
Page 3
• Driver name
• Date vehicle left the loading site
• Time of day
• Truck Capacity
• Truck number
• Debris type
• Signature of monitor
4. One (1) monitor will be assigned to each loading operation and will follow that loading operation
throughout its collection areas.
In order to facilitate the coordination of monitoring labor, HDR will assign one monitor to each
loading operation. A loading operation Is comprised of the equipment and crew that physically
loads the debris into the haul trucks. Several haul trucks may be assigned to each loading
operation. HDR will replace monitors as required and monitoring staff will be reduced as each
loading operation is released.
5. Site Monitors are anticipated to work up to approximately 14 hours per day, seven days per
week until project completion.
Loading operations typically work one-12 hour shift per day, seven days per week until their
collection area has been completed. Field monitors will work the same schedule to provide the
field observation and documentation as required.
6. Keep one copy of five part ticket for each transaction
Each Toad ticket is comprised of colored five -part copies. Upon completion of a ticket, the LSM
shall remove one copy and keep for City records. The remainder of the ticket copies are
returned to the haul truck driver for presentation at the temporary disposal site.
7. Turn in copies of field load tickets to the Monitor Field Supervisor
The LSM shall provide all daily copies of the field tickets to the monitor Field supervisor. The
monitor field supervisor shall deliver these tickets to the HDR project manager located in the
City's offices.
8. Photo documentation as required by FEMA for limb, tree and stump removal
LSM shall document all damage to property caused by loading operations. This documentation
shall include a written description as well as a photograph. Photographs shall be taken by
35mm film camera, Polaroid, or digital as available. Each photograph shall be identified on a
field log for 35mm or digital. Comments shall be written directly on Polaroid photos. Other
photo documentation shall be required for other debris removal such as trees and hanging
limbs.
9. Coordination meetings as required
Each LSM will be required to attend a brief training of their responsibilities. HDR will coordinate
and conduct this training meeting. The location of the training meeting will be determined later.
Coordination and training meetings will be conducted before or after collection times so as not
to interfere with debris collection operations.
October 19, 2005
WORK ORDER PROPOSAL
Page 4
TASK 3 — DEBRIS REDUCTION/DISPOSAL SITE MONITORING SERVICES
1. Inspect incoming loads of collected debris
The primary responsibility of the disposal site monitor (DSM) is to verify the delivered volume of
debris. The DSM will visually inspect each delivered load from an elevated platform. This
platform will allow the DSM to see into the payload of the haul vehicle. The elevated platform
shall be provided by the City. This platform could be scaffolding, scissors lift, temporary wood
structure or other elevated equipment.
2. Visually estimate the volume of debris contained In the haul vehicle
The remaining four parts of the load ticket will be handed to the DSM. The DSM will indicate on
a percent basis the actual volume of debris delivered. It is likely that void spaces in the load
may exist and therefore the load is corrected to indicate this.
3. Complete the load ticket indicating the inspected delivered volume
The DSM will complete the load ticket with the following information:
• Arrival date
• Arrival time
• Disposal site location
• Debris Estimate (% of total volume)
• DSM signature
4. One (1) monitor will be located at each disposal site inspection structure
HDR will locate one DSM at each debris disposal site. The DSM will remain in the elevated
platform (inspection tower) for the duration of each working day. It is expected that a
representative of the debris collection contractor and the City will also be present at this
location. It is possible that all three Individuals may also be in the inspection tower. It is
recommended that a representative of the City be present with the DSM to verify the delivered
load recorded on the haul ticket.
5. Disposal site monitors are anticipated to work approximately 14 hours per day, seven days per
week until project completion
In order to ensure accurate documentation of all debris delivered to the temporary disposal
sites, the DSM will be required to work as long as the debris collection contractors are delivering
loads. It is anticipated that the debris collection contractors will work approximately 12 hour
shifts but could extend longer.
6. Maintain one copy of the load tickets for HDR/City files
Upon completing the required information on the load tickets, the DSM will remove one copy for
the City's records and HDR data input. One copy will be removed and provided to the debris
collection contractor representative.
7. Turn in copies of completed Toad tickets to the Monitor Field Supervisor
VVU1c1 IVY GUVO
WORK ORDER PROPOSAL
Page 5
At the end of each working day, the DSM shall provide all collected load tickets to the field
supervisor. The field supervisor will deliver the tickets to HDRts project office.
TASK 4 — ROVING DEBRIS MONITOR SERVICES
1. Verify that eligible debris is being removed from the designated public rights -of -way and public
property
The roving debris monitors (RDM) also serve as the field supervisors. •FEMA will only reimburse
the City for debris removed from public roads. The RDM will coordinate with HDR's Project
Manager and the City of Miami to define the private streets throughout the collection area. A
LSM will contact the RDM to verify or confirm If a particular street is private.
The City will determine if the debris collection contractors will collect and remove the debris from
private roads.
2. One roving monitor will be assigned to each emergency response contractor
The City of Miami currently has under contract two (2) emergency debris collection contractors.
The City has been divided into two major areas (north and south). One debris collection
contractor will be assigned to each collection area. One roving monitor will be assigned to each
debris collection contractor to facilitate coordination and communications.
3. Coordinate the assignment of loading site monitors to collection loading operations
The RDM will be responsible for meeting with the LSMs assigned to that collection area and
assigning them to each loading operation for that debris collection contractor. The RDM will
monitor the performance of the LSM and replace as required to assure accurate data and
continuous monitoring coverage as required.
4. Participate in all progress meetings
HDR will conduct weekly progress meetings with the debris collection contractors. The RDM
will be required to participate in these meetings and provide discussion on the performance of
the collection operations and any issues that need to be addressed.
5. Measure and certify the payload volume of collection vehicles
The RDM will participate in the certification of all debris hauling vehicles. The RDM will either
measure and calculate the vehicle payload volumes or observe the measurements and confirm
the calculations.
6. Roving monitors are anticipated to work approximately 14 hours per day, seven days per week
until project completion
The RDM will remain available on the job site as long as the debris collection operations are
working each day. It is anticipated that this may be as long as 14 hours.
7. Verify completion of debris clean up reported by the emergency response contractor on a street
or area basis.
uciooer I U, 4UUb
WORK ORDER PROPOSAL
Page 6
The LSM will contact the RDM after each street has been cleared of debris. The RDM will drive
through the street and verify that the debris has been removed.
8. Document damage to property caused by loading operations
During the site verification of completed debris removal of each street, the RDM will document
any damage caused by the debris collection contractor during loading operations.
Documentation will include a written description of the damage and location as well as a
photograph.
9. Collect completed load tickets from the disposal site monitors and field monitors at the end of
each working day
The RDM will collect the completed Toad tickets from the DSM at the end of each working day.
Additionally, the RDM will set up at the monitor staging location to receive their copies of the
field tickets, ROM will turn both copies of these tickets into the HDR Project Manager.
10. Make random visits to disposal sites and collection operations
Throughout the work day the RDM will make random visits to loading sites and the disposal
sites. The purpose of these random visits is to check on the progress of the loading operations
and the LSM.
TASK 5 — DATA RECORDING
1. Match loading site tickets with the disposal tickets
HDR staff will match the field load tickets with the completed Toad tickets received at the
disposal sites. These tickets will be organized numerically by ticket number.
2. Sort tickets by Date and contractor
HDR will sort the above combined tickets by date and contractor. The sorted tickets will be
organized numerically and placed in a separate envelope for filing. The file envelope will be
labeled by date and contractor.
3. Enter ticket information into a Microsoft Excele spreadsheet
HDR will enter the load ticket information into a data base. This data base file will allow daily
summaries to be prepared for the debris delivered as well as assist with the reconciliation of the
contractor's invoices. The haul vehicle certified load volume will also be entered into the data
base and used for the calculations of delivered loads.
4. Sort daily information and prepare daily summaries
HDR will sort the load data from the above data base and prepare a summary report for use by
City staff. The summary report will include but not limited to the following information:
• Haul truck number
• Contractor name
• Truck capacity
• Number of delivered loads
WORK ORDER PROPOSAL
Page 7
• Total delivered volume per truck
• Total number of delivered loads
• Total delivered daily volume
* Total delivered volume to date
TASK 6 — FEMA DOCUMENTATION AND REPORTING
1. Collect all information required on FEMA electronic forms
HDR will obtain the electronic FEMA forms for data reporting. HDR will contact all
subcontractors and haulers as appropriate to obtain the information required to complete these
forms. HDR will maintain this information in the project files and provide copies to the City for its
files.
2. Coordinate all clarifications with FEMA representatives
!t is anticipated that throughout the project, HDR will require clarifications from FEMA
concerning specific direction to assure the proper documentation. HDR will record all
communications with FEMA representatives and copy to City staff.
3. Complete FEMA forms
Upon receipt of all information, HDR will complete the FEMA forms will all information input and
prepared in final form for review by City staff. Upon receipt of comments from City staff, HDR
will finalize the FEMA forms and prepare two (2) complete copies for the City. One copy will be
for submittal to FEMA with the other copy maintained in the City's files.
TASK 7 — PROJECT MANAGEMENT
1. Manage all subcontract agreements for monitoring labor
HDR will obtain all monitoring labor required for this project. The labor sources will include
existing local subconsultants currently teamed with HDR. Additional labor, as required, will be
provided from a local temporary labor company.
2. Coordinate weekly progress meetings with City staff
HDR will maintain regular communications with City staff to keep them apprised of progress.
Additionally, HDR will hold a weekly progress meeting with City staff and the debris collection
contractors. The purpose of the meeting is to discuss progress, overall project coordination,
and any management related issues.
3. Represent the City for all debris management issues
HDR will provide the primary contact and coordination with the debris collection contractors.
HDR will act as a representative of the City for directing labor and the debris collection program.
HDR will coordinate all communications with City staff to ensure that the program is progressing
as desired by the City. HDR will also provide coordination and communications to local FEMA
staff to obtain guidance and clarification as appropriate.
4. Prepare clarification reports as required by City staff
uG[OI/er I V, Cum
WORK ORDER PROPOSAL
Page 8
HDR will provide copies of telephone conversation memorandum or other correspondence with
FEMA for City records and information. HDR will contact City staff on all directions received
from FEMA to assure that City staff have a complete understanding of the FEMA requirements
for this project.
5. Reconcile debris contractor invoices for payment by the City
The debris collection contractors will prepare their invoices and submit them with their
appropriate backup documentation to HDR. HDR will audit and verify the invoice pay request
and verify its accuracy as the data reported and the work completed. HDR will provide the City
with a letter providing recommendations as to the payment status of the contractor's invoice.
6. QAQC data input
HDR will assign a project manager that is responsible for supervising the data input operations
and auditing of contractor invoices. HDR will communicate and reconcile all data discrepancies
with the debris collection contractors.
7. Other meetings as required by County administration
It is anticipated that HDR will be requested to participate in coordination meetings with City staff
and FEMA as required. At least one of HDR's project managers will attend these meetings,
III. SUBCONSULTANTS
The below listed Sub -Consultants will assist in the performance of the Work.
Subconsultant Name
Specialty or Expertise
GBF Engineering, Inc.
Field monitors and roving monitors
ADA Engineering, Inc.
Field monitors
Ambro, Inc.
Field monitors
Aerotek
Temporary labor, field monitors
IV. SCHEDULE OF WORK — TIME OF PERFORMANCE
The City provided HDR a verbal notice to proceed immediately following the passage of Hurricane
Katrina. HDR mobilized supervisory staff and existing CIP construction contractors to initiate removal
of debris from City streets. Within 24 to 48 hours of the hurricane, the debris collection contractors
mobilized to initiate collection activities.
SCHEDULE OF DELIVERABLES
Sheet or
ID
Number
Drawing Name or Deliverable
Total Hours
Or Anticipated
Delivery Date
8/26/05
1
Emergency Response to initial clean up
2
Coordinate mobilization of debris collection contractors
8/27/05
3
Mobilize debris loading site monitors
8/26/05
4
Create load ticket data base
8/30/05
5
Progress meetings
Weekly
9/26/05
6
Collection of FEMA information
UctoDer 19, 2005
WORK ORDER PROPOSAL
Page 8
HDR will provide copies of telephone conversation memorandum or other correspondence with
FEMA for City records and information. HDR will contact City staff on all directions received
from FEMA to assure that City staff have a complete understanding of the FEMA requirements
for this project.
5. Reconcile debris contractor invoices for payment by the City
The debris collection contractors will prepare their Invoices and submit them with their
appropriate backup documentation to HDR. HDR will audit and verify the Invoice pay request
and verify its accuracy as the data reported and the work completed. HDR will provide the City
with a letter providing recommendations as to the payment status of the contractor's invoice.
6. QAQC data input
HDR will assign a project manager that is responsible for supervising the data input operations
and auditing of contractor invoices. HDR will communicate and reconcile all data discrepancies
with the debris collection contractors.
7. Other meetings as required by County administration
It is anticipated that HDR will be requested to participate in coordination meetings with City staff
and FEMA as required. At least one of HDR's project managers will attend these meetings.
III. SUBCONSULTANTS
The below listed Sub -Consultants will assist in the performance of the Work.
Subconsultant Name
GBF Engineering, Inc.
ADA Engineering, Inc.
Ambro, Inc.
Aerotek
Specialty or Expertise
Field monitors and roving monitors
Field monitors
Field monitors
Temporary labor, field monitors
IV. SCHEDULE OF WORK — TIME OF PERFORMANCE
The City provided HDR a verbal notice to proceed immediately following the passage of Hurricane
Katrina. HDR mobilized supervisory staff and existing CIP construction contractors to initiate removal
of debris from City streets. Within 24 to 48 hours of the hurricane, the debris collection contractors
mobilized to initiate collection activities.
SCHEDULE OF DELIVERABLES
Sheet or
ID
Number
1
2
3
4
5
6
Drawing Name or Deliverable
Emergency Response to initial clean up
Coordinate mobilization of debris collection contractors
Mobilize debris loading site monitors
Create Toad ticket data base
Progress meetings
Collection of FEMA information
Total Hours
Or Anticipated
Delivery Date
8/26/05
8/27/05
8/26/05
8/30/05
Weekly
_ 9/26/05
October 18, ZUU5
WORK ORDER PROPOSAL
Page 10
SUMMARY OF COMPENSATION
Task or
Activity
ID #
Molar Task Name and/or Activity Description
Fee Amount
Fee Bails
1
Initial Emergency Response
$43,400,00
Not to Exceed
2
Loading Site Monitoring Services
$1,671,000.00
Not to Exceed
3
Disposal Site Monitoring Services
$50,500,00
Noi to Exceed
4
Roving Site Monitoring Services
$120,400.00
Not to Exceed
5
Data Recording
$101,500.00
Not to Exceed
6
FEMA Documentation and Recording
$18,000.00
Not to Exceed
7
Project Management
$17,100.00
Not to Exceed
Subtotal Fee
$2,023,000.00
Not to Exceed
Subtotal Reimbursable Expenses
$130,000.00
Not to Exceed
TOTAL COMPENSATION
$2,153,000.00
Not to Exceed
This lump sum fee is based upon debris collection operations completing on approximately October 15,
2005. It is possible that additional debris collection monitoring services may be required beyond this
date. HDR will prepare an amended proposal at that time.
LABOR RATES
Name ! ConReay_
I Title Billing Rate
!,;f1DRLEnginearing,: inc.:. :!
.=..,. ,: f.-,-:_...: .....: _ '... _:.._ . ........._.
Black, Bill
Data Input / Accounting Assist
$47.75
Brittain, James
Project Engineer
$96.97
Dingman, Keith
Project Accountant
$88.69
Embree., William
Project Manager
$108.20
Herald, Edward
Project Engineer
$135.99
Vertoli, Ivis
Data Input
$32.00
Whittaker, Melanie
Administrative Assistant
$47.30
_131. ,at tali eeril?g! inq,
::: ti ..,
:r:¢ .. , ..:.t.> ,
-r '-,,,
"„1-..
Abonce, Ebllberto
Monitor
$68.27
Alvarado, David
Monitor
$42.60
Fox, Tyler
Monitor
$28.40
Knowlton, Wade
Field Coordinator
$59.64
Monti, Joseph
Inspector Coordinator
$95.57
_ Stanley, Jason
Dump Site Coordinator
$39.76
Vincente, Frolian
Field Coordinator
$65.32
Williams, Alan
Monitor
2
$51.12
rAtEng1neering,.tnc,...
:...,_. :., `.,-,.*:. _,7y.:..,._'....,....:,.....:
., ._ - -_--1
-`....:: . -
Argudin, Albert
Principal
$189,70
Argudin, Albert
Project Manager
$108.40
Rodriguez, Laura
Sr. Field Monitor
$54.20
Field Monitors
$46.20
A9rofek`. - _
Field Monitors $26.50
Ainbro;inc...
:- -•:.
f Field Monitors I $40.00
VI. PROJECT MANAGER
October 19, 2005
WORK ORDER PROPOSAL
Page 11
CONSULTANT'S Project Manager for this Work Order assignment will be:
William B. Embree
Sr. Project Manager
HDR Engineering, Inc.
2202 North West Shore Blvd.
Suite 250
Tampa, Florida 33607
Submitted by:
Prepared by:
Neal Poteet, V.P., CIP Program Manager
William B. Embree, Sr. Project Manager