Loading...
HomeMy WebLinkAboutSchool Impact Review Analysis**REVISED** SCHOOL IMPACT REVIEW ANALYSIS January 30, 2006 FOR INFORMATINAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE THE APPLICANT IS NOT REQUESTING ADDITIONAL RESIDENTIAL DENSITY OVER WHAT IS CURRENTLY ALLOWED IN THE PORPERTY'S ZONING CLASSIFICATION. APPLICATION: Intown Village REQUEST: Major Use Special Permit (PAB Meeting February 1, 2006) ZONING: ACRES: LOCATION: C-1 "Little Havana Target Area" (200 DU/acre) + 2.0890 net acres Approximately 45 SW 8 Avenue, 715, 717, 727 and 735 SW l • and 702 and 720 West Flagler Street, Little Havana MSAIMULTIPLIER: 4.710.27 Multifamily NUMBER OF UNITS: 395 units (Existing zoning allows 417 maximum units) ESTIMATED STUDENT POPULATION: 107 ELEMENTARY: MIDDLE: SENIOR HIGH: 49 27 31 SCHOOLS SERVING AREA OF APPLICATION ELEMENTARY: MIDDLE: SENIOR HIGH: Riverside Elementary — 1190 SW 2 Street Frederick Douglass Elementary — 314 NW 12 Street Jose De Diego Middle — 3100 NW 5 Avenue Booker T. Washington Senior High — 1200 NW 6 Avenue All schools are located in Regional Center IV. *Based on Census 2000 information provided by Miami -Dade County Department of Planning and Zoning. The following population and facility capacity data are as reported by the Office of Information Technology, as of October 2005: STUDENT POPULATION" FISH DESIGN CAPACITY PERMANENT % UTILIZATION FISH DESIGN CAPACITY PERMANENT NUMBER OF % UTILIZATION FISH PORTABLE DESIGN CAPACITY STUDENT PERMANENT AND I CUMULATIVE STATIONS RELCOATABLE STUDENTS"" Riverside Elementary Frederick Douglass Elementary Jose De Diego Midd€e Booker T. Washington Senior 1,178 599 1,046 1,073 1,566 ................... 1,597 749 772 1,043 2,270 157% 161% 74% 78% 100% 103% 69% 70% 0 172 157% 161% 61% 63% 100% 0 2,834 69% 0 4,678 70% 2,041 1,449 *Student population increase as a result of the proposed development **Estimated # of students (cumulative) based on zoning/land use log (2001- present) and assuming all approved developments are built; also assumes none of the prior cumulative students are figured in current population. Notes: 1) Figures above reflect the impact of the class size amendment. 2) Pursuant to the Interlocal Agreement, only Riverside Elementary meets the review threshold. PLANNED RELIEF SCHOOLS IN THE AREA (Information included in proposed 5-Year Capital Plan, 2005-2009, dated April 2005) Projects in Planning, Design or Construction Projected School Status Occupancy Date N/A Proposed Relief Schools School Funding year State School "I-1" FY 07-08 (Shenandoah/Citrus Grove/ Riverside Elem. schools relief) (826 student stations) State School "GG-1" (Jose de Diego Middle School relief) (1,241 student stations) FY 06-07 OPERATING COSTS: Accounting to Financial Affairs, the average cost for K-12 grade students amounts to $6,549 per student. The total annual operating cost for additional students residing in this development, if approved, would total $700,743, CAPITAL COSTS: Based on the State's February 2006 student station cost factors*, capital costs for the estimated additional students to be generated by the proposed development are: ELEMENTARY MIDDLE SENIOR HIGH 49 27 31 Total Potential Capital Cost x 14,378 = $704,522 x 16,485 = $445,095 x 21,815 = $676,265 $1,825,882 *Based on Information provided by the Florida Department of Education, Office of Educational Facilities Budgeting. Cost per student station does not include land cost.