HomeMy WebLinkAboutProposal Signature PageCity of Fort Laodordale Bid 562-9333
Vendor: Soil Tech Distributors, Inc.
PROPOSAL SIGNATURE PAGE
TO: The CITY of Fort Lauderdale. FL
The below signed hereby agrees to furnish the following article(s) or services at the price(s) and terms stated
subject to all Instructions, conditions, specifications addenda, legal advertisement, and conditions contained in
the RFP. I have read all attachments including the specifications and fully understand what is required. By
submitting this signed proposal I will accept a contract if approved by the CITY and such acceptance covers all
terms, conditions, and specifications of this proposal.
Proposal submitted by: LUISA WARES 12/20105
(signature)
Name (printed): Luisa Mijares Title: Secretary
Company: (Legal Registration): Soil Tech Distributors, Inc.
(Cr.ON.TRACTO.R,...IF..FARE.IO.N_.CQRPORATION,... SHALL„,E.E, REQUIRED.. TO_ OBTAIN.. A_,C.ERTIFICA_I ..QF
AUTHORITY FRQM.THE. DEPARTMENT OF ST_A. TI ,JN ACCORI]ANCE.WI.TH.FLORI.PA.. STATUE_ 0.0 ,1501
(visit http:N.Wwwtdos.state,.11.,usldocf
Address; 3355 N.W. 41 Street
CITY: Miami State: Florida Zip: 33142
Telephone No.: (305) 637-5567 FAX No,: (305) 637-5576
E-MAIL: Iuisa@soiltechdistrlbutors.com
(date)
ff f
meP
Does your firm qualify for MBE or WBE status In accordance with Section 1.08 of General Conditions? MBE
I_. WBE 1,...
AP.I E.NPUM. AC.KNOWLEDGEMENT - Proposer acknowledges that the following addenda have been received
and are included in his proposal:
Ad.dendtrn NP,. Date.ls.4,ved
VARIANCES: State any variations to specifications, terms and conditions In the space provided below or
reference in the space provided below all variances contained on other pages of RFP, attachments or proposal
pages. No variations or exceptions by the Proposer will be deemed to be part of the proposal submitted unless
such variation or exception is listed and contained within the proposal documents and referenced in the space
provided below. If no statement is contained in the below space, it is hereby implied that your proposal complies
with the full scope of this RFP.
Variances:
In regards to the 30% Clay/70% Sand, we have noted a 25 ton minimum If Tractor Trailers are used. In the
event that Dump Trailers are used, in regards to the 30% CIay170% Sand, we have quoted a $25.00 a ton
price, as well as a 23 ton minimum.
Dec 21, 2005 10:23:23 AM FIST RFP Depol, LI_C
p,5