Loading...
HomeMy WebLinkAboutSie Utility Study• • • February 2006 Marquis West MAJOR USE SPECIAL PERMIT SITE UTILITY STUDY PREPARED FOR Eagle Garage, LLC KHA Project No.: 042681000 Prepared by: KIMLEY-HORN AND ASSOCIATES, INC. 1691 Michigan Ave.. Suite 400 MIAMI BEACH, FL 33139 and Associa, • • • Site Utility Study Introduction The Marquis West project is a proposed mixed -use development to be located east of NE 1s` Ave, north of NE 11`h St. about 70' west of NE 2nd Ave and south of 1-395 Expressway., on approximately 1.43 acres, in the City of Miami, Miami -Dade County, Florida (see Attachment "A" Site Location Map). The site currently consist of a surface parking lot, which will be demolished as part of this project. The Marquis West project consists of a 41-story high rise residential tower. It will include approximately 430 residential apartment units, 78,699 S.F. of common space, 29,232 S.F. of retail, 8,688 S.F. of service space and approximately 503 parking spaces. See Table 1, below for further details of the proposed project. Table 1: Project Summary Residential 430 Common Spaces 78,699 Non -Residential ( Retail) 29,232 Non -Residential ( Service) 8,688 Parking 503 spaces Marquis West Site Utility Study Page 1 Drainage Relative to the above -referenced project, the following information should be used during the storm water management design and site grading. Flood Criteria: The proposed project site grade elevations will be designed to meet flood os fdllowscriteria according to Federal State, Miami -Dade County and City of Miami standards Y-PANEL NUMBER 1. The subject project is located in PANEL 18f ��M� A arding to the National 12025C0183 J of the Flood Insurance Rate MapFIRM Flood Insurance Program, the project is in Zone XID, for which a base sft NGVD elevation has not been undetermined. The closest base flood elevation is 11.0 2. Miami -Dade County Flood Criteria elevation as per Amended Plat ofFod be usedCritis Map, plat book 120, page 13 is estimated to be 5.0 ft. NGVD. This will to determine proposed site grading minimum grade elevations. 3. The average October ground water level elevation is estimated to be2.0 ft. eG V D. ice. This car elevation will be used to compute drainage well capacity ta Resourand ce roadway Mana ement & (Source: Dade County Department of Environmen Miami - Dade County Public Works Manual, Volume II - Design Standard Detail WC 2-2). Existin Drama e Presently, the site is partially developed. Based on site observations and availableng information, there is an existing drainage system which currently serves the asphalt parking lot. The existing drainage system will be aen the runoff generated by the molished and a new storwater management system will be constructed to r proposed improvements, as required by code (see below). Pro osed Draina e S stem d The drainage system for the proposed development will consist of drainage runoff nde 5 exfiltration trench, if possible, to facilitate on -site disposal of storm water year design storm event will be used to design the storm water management system, in • • Department (MDWASD) criteria, the developer may be required to connect to the proposed 12-inch water main along NE 11`h St. and extend a new 12-inch ductile iron (DI) water main along NE 11`h St. and connect it to the existing I2-inch water main along NE 1st. Ave. However, a final determination of the points of connection and requirements will not be provided by MDWASD until a Water and Sewer Agreement is requested by the owner and/or the Hydraulic Analysis done by MDWASD is completed. Water service meters will be installed by MDWASD forces at owner's expense. Service lines for domestic water, fire sprinkler systems and irrigation could be connected from the existing water distribution system. See Attachment "C" for a copy of the MDWASD water atlas sheet for the project area. ITT. Sanitary Sewer Collection System Table 4 depicts the sanitary sewer mains owned and operated by Miami -Dade Water and Sewer Department (MDWASD), within the vicinity of the project. Table 4: Existing Sanitary Sewer Mains (Per MDWASD Sewer Atlas Sheet) Location Sanitary', Sewer Mains) NE 11` Street NE l't Avenue and NE 2'd Avenue 8" Gravity Main NE 151 Avenue NE I ld` St. & NE l ld' Terrace 8" Gravity Main Just north of subject project NE 151 Avenue and NE 2kd Avenue 8" Gravity Main Similar to the watermain, an agreement with M-Dade County Water and Sewer Department (MDWASD) will be required for final determination of the points of connection. Public improvement requirements will not be provided by MDWASD until a Marquis West Site Utility Study Page 2 • • • Water and Sewer Agreement is requested by the owner. The proposed on -site sanitary sewer system for the property can be connected to either of the existing mains abutting the property; provided that the line has capacity to handle the existing flows plus the additional flows contributed by the proposed project. A letter of availability and further coordination with MDWASD is recommended to verify the proposed sanitary sewer service connection points and requirements for this project. It is unlikely MDWASD will require upgrades to the sanitary sewer system, but this can not be determined without a request for a water and sewer agreement. A copy of the MDWASD Sewer Atlas sheet has been attached (See Attachment C). The flows from the existing MDWASD sanitary sewage mains adjacent to the proposed development are received by MDWASD Regional Pump Station #2, which is located at 925 Biscayne Boulevard. Pump Station No. 2 is currently operating at an average yearly NAPOT of 3.02 hours/day, and is presently not under any type of moratorium (see attached pump station report). It is not anticipated that any improvements to the regional pumping and/or transmission systems will be required to connect the proposed project. However, a final determination regarding the status of the existing transmission system and the need for possible improvements will not be made until construction plans are submitted to the Miami - Dade County DERM Wastewater Section and a Sanitary Sewage System Capacity Certification Letter is issued. The flows created by this project have been determined and are shown in Table 5. Table 5: Water & Sewer Flow Generation Type of O cupanc Quaff tlt ? sage a x ,4..g �' s� l C 1 Apartment 430 units 200 gpd per unit 86,000 Non -Residential ( Retail) 29,232 sf 5 gpd per 100sf 1,462 Total Anticipated Flow 87,462 gpd Marquis West Site Utility Study Page 3 • • • IV. Solid Waste Generation Solid waste generated by this project will be collected in standard on -site containers for refuse and recyclables. Regular pick-up service will be provided either by private hauling companies andlor by the City of Miami Solid Waste Department, who will transport the waste to Miami -Dade County's or private disposal and recycling facilities. The volumes of solid waste projected to be generated by the project are shown in Table 6. Table 6: Solid Waste Generation Total Solid Waste Generated .' (Tons/1)ay) Apartment 430 units 51bs/unit/day 1.075 Non -Residential ( Retail) 29,232 sf 6lbs/1000 sf/day 0.09 Total Anticipated Solid Waste Generated 1.165 Marquis West Site Utility Study Page 4 • • • Marquis West Site Utility Study Attachment A Site Location Map Page 5 • Attachment B Preliminary Drainage Well Calculations • • • Attachment C Existing Utility Records • • • Attachment D Pump Station Monthly Information • • • Attachment A Site Location Map • 0 LU N . 1 0 TH NE 17 H TE 7TH ST N ii J N NE I7TH Ill 6TH ST Z NE 6TH Q I inal si d J stelmailmJfri NE 13TH ST Q I 3 9 / �sT I �r ST ST 18TH ST z 0 xi NE" 5TH ET TE PR sT LOCATION 0 SORT BD 15TH ST curl Kimley-Ham and Associates, Inc. 1691 Michigan Avenue Suite 400 Miami Beach, Florida 33139 Phone: 305-673-2025 Fax: 305-673-4682 MARQUIS WEST SITE LOCATION MAP ci...amin imley-Dorn and Associates, KInc..3...,...,s,..7.7......4.a......7_,..L.L,:.=.7.5...,„s7:::-=-7.7:-,.: 1691 Michigan Avenue Suite 400 iarni Beach, Florida 33139 Phone: 305— 673— 2025 Fax: 305-673-4882 MARQUIS WEST FLOOD CRITERIA MAP • Kimley-Horn and Associates, 1691 Michigan Ave Suite 400 Miami Beach, Florida 33139 Phone: 305-673-2025 Fax: 305-673-4882 MARQUIS WEST AVERAGE OCTOBER GROUND WATER LEVEL 1960-75 • Curl Kimley-Horn and Associates, Inc. 1691 Michigan Avenue Suite 400 Miami Beach, Florida 33139 Phone: 305--673--2025 Fax: 3005---673--4882 MARQUIS WEST FLOOD CRITERIA MAP • Attachment B Preliminary Drainage Well Calculations • • MARQUIS WEST City of Miami, Florida DRAINAGE CALCULATIONS: DRAINAGE WEDS (MASS DIAGRAM 'DERM CRITERIA) • • 1. Site Data: A. Average October Water Table Elevation = B. County Flood Criteria Elevation = C. F.LR.M. Base Flood Elevation = D. Average Crown Elevation = E. Average Existing Onsite Grade Elevation = F. Proposed drainage inlet grate elevation = 2. Total Site Area (A) (See Drainage Area Map in Appendix B): A. Impervious Areas: a) Asphalt and concrete pavement = b) 1/3 of North-East corner = c) Roof areas = Total Impervious Area (Al) = NGVD NGVD (County Flood Criteria Map, see Appendix A) Zone X (lvlap No 12025C€t1831, Sep Appendix A) NGVD NGVD NGVD 2.53 Acres Acres Acres Acres 2.46 Acres (97%) B. Pervious areas: a) Green Areas = {l D7.<Acres (3%) 3. Weighted Runoff Coefficient (C): Runoff Coefficient Impervious (C1) = Runoff Coefficient Pervious (C2) = C=[(A1 xC1)+(A2xC2)]/A; C= C x A = Total Contributing Area; C x A 0.88 2.24 Acres 4. Time required to generate one inch of runoff (per DERM Water Control Section D-4) Rainfall Intensity (I) = 308.5 / [(48.6 x F° ") + t (0.5895 + F2'3)] Frequency (F) = years - Frequency Curve Q = CIA, V = Qt; V(i �,.) = Qt(1 in.), t(t = Time to generate 1 inch of runoff V(1 in.) = CIAt(l in-) 1" x A = CIAto in.) ; Solving for to in.), to in.) = 1" / (IC) Time to Generate one inch of run-off t(in) Time to reach the inlet (tc.) Total Time required to generate 1 in of runoff: = 11.28 Min. = 10.00 Min. = 21.28 Min. DRAINAGE WELLS -Marquis west BASIN 5. Cumulative Runoff (Inflow Mass Diagram Time: CicA (acres) 1 '. (inches) Q . , . (CFS) Accumulated' Storm Runoff (CF) (Min.) (Sec.) 8 480 2.236 6.405 14.32 6,873 10 600 2.236 6.166 13.79 8,271 15 900 2.236 5.641 12.61 11,350 21.28 1277 2.236 5.096 11.39 14,548 30 1800 2.236 4.493 10.04 18,081 40 2400 2.236 3.956 8.84 21,228 50 3000 2.236 3.534 7.90 23,703 60 3600 2.236 3.193 7.14 25,701 90 5400 2.236 2.477 5.54 29,902 120 7200 2.236 2.023 4.52 32,563 180 10800 2.236 1.480 3.31 35,745 6. Drainage Well Design Discharge Rate: Based on well discharge rate of: DW-1 8.00 2.00 2.50 GPM/ft. head 3.50 3.12 DW-2 DW-3 DW-4 10.00 10.00 11.00 2.00 2.00 2.00 2.50 2.50 2.50 5.50 5.50 6.50 4.90 4.90 5.79 280 440 440 520 Well Discharge Rate (CFS) 7. Detention Time: 18.72 Total Storage (CF) The drainage well structure must be designed to detain runoff for a minimum of 90 seconds prior to discharge. Qd = Design Runoff Rate (CFS) = Vd = Detention Volume (CF) = Qd x 90 sec. Vat = Detention Volume Per Well (CF) = W = Width of Well Structure (ft.) _ L = Length of Well Structure (ft.) = 11.39 CFS 1025.29 CF 205.06 CF 8.0 ft. 10.0 ft. 1680.00 H.,is the minimum depth required from the top of well casing to the floor of the well box to achieve 90 second detention time: Hroia. (ft.) = Vdt I ( W x L) w 2.60 ft. Top of Well Casing Elev. = 10 Elevation at Floor of Well Box (NGVD) w Top of Well Casing Elev. - H = 7.40 8. Excess storm water runoff excluding well structure storage: Time Well Discharge Rate (CFS) Accumulated Well Discharge Volume (CF) Accumulated Storm Runoff (CF) Total Overflow Volume (CF) (Min.) (Sec.) 8 480 18.72 8,984 6,873 -2,111 10 6€0 18.72 11,230 8,271 -2,959 15 900 18.72 16,845 11,350 -5,495 21.28 1,277.02 18.72 23,901 14,548 -9,353 30 1800 18.72 33,690 18,081 -15,609 40 2400 18.72 44,920 21,228 -23,692 50 3000 18.72 56,150 23,703 -32,446 60 3600 18.72 67,380 25,701 -41,678 90 5400 18.72 101,070 29,902 -71,167 120 7200 18.72 134,759 32,563 -102,196 180 10800 18.72 202,139 35,745 -166,395 9. Excess storm water runoff including well structure storage: 8 10 15 21,28 30 40 50 60 90 120 180 480 600 900 1,277.02 1800 2400 3000 3600 5400 7200 10800 6,873 8,271 11,350 14,548 18,081 21,228 23,703 25,701 29,902 32,563 35,745 1,680 1,680 1,680 1,680 1,680 1,680 1,680 1,680 1,680 1,680 1,680 8,984 11,230 16,845 23,901 33,690 44,920 56,150 67,380 101,070 134,759 202,139 -3,790.97 - 4,638.63 -7,174.60 -11,033.43 -17,288.87 -25,371.80 -34,126.40 - 43,358.35 -72,847.37 -103,876.01 -168,074.53 Safety Factor/ Safety Facto 1.64% • Attachment C Existing Utility Records o • • ;,‘„),„ AI, Wrrf 5 F-11 4 '4 /Yu~ )219 33 1219 32 COI f11TER / '2001 '04.1 / R • \NIA-ft A '',t+c r rnr 0506 \ 2 HtW OVER 12 369 370 �1 i 1 \ 1219 4� \ 2 (9219 ) r''377 ry 9t 1 92194 371 31 1 � ,/ GS 9219 '{ 24 / NE 11 TER fr'--� S2?9 (9219 (99) I 53 iI 2�/ ( 378 1 0 F -13 9219 12 402 7878 5 370 7r ~ — • Valve Reducer Plug Booster Statio • Attachment D Pump Station Monthly Information • • • • • Pump Station Monthly Information: MUM User. -r/turriSit PpSt WOW Atlas Page. tglia MoTatotkaw NiLktrfi DA-1>E WATER SEWER OCPARTMEIT, p BISCAYNE BLVD . otatersum in elect sm. 111,17,185a ' are, r4,400.4 0.6.fieT SE.tiOmiewnsilip-RNW • gi - Gtmeratot Te4easecty ,•_.F.1 ET inth H.P. Numbev of Pumps: 5 Yeady NAPOlihni. 3.02 Res Flowilpp.4 2,57026B Projilagot 4.411w4 Cap: 48 4ft NIFEM 1on8noc513.55 StnOnsIsCapaeityteprIl 57,134X1.010 Station fi eductica Facial .6 Stn N et Cap Cen4(epci S N CapecOyfsp4 34.560003 Indicated/10.4Tc" 4.348D013 "16E6 BRODSR „ 8a6i2zo5 12.zo 11.15 Y 5 :110/2145,",f, ecitt.s 0)fi. Date: L11:02' Ilolo.NAPOT AyDac fidqflip I New Comments-. a Oa 16a00