HomeMy WebLinkAboutExhibit 4Agenda -3-
ATTACHMENT E-4
WATERWAYS ASSISTANCE PROGRAM
APPLICATION EVALUATION AND RATING WORKSHEET
The applicant is to complete this worksheet by entering the project title, applicant name
and answers to the applicable questions. **Do not answer with more than three
sentences.**
All applicants must answer a total of ten questions. All applicants will complete
Attachment E-4 of the worksheet, which includes questions 1 through 6.
Each applicant will then complete one and only one sub -Attachment (E-4 A, B, C, D or
E, questions 7-10) according to the applicant's project type in reference to Attachment B.
The applicant should determine their project type (if the project incorporates more than
one project type) by determining which project type is dominant in terms of project cost.
All other sub -attachments that are not applicable to an applicant's project should not
be included in the submitted application.
APPLICATION TITLE:
APPLICANT:
CATEGORY RATING
& RATING POINTS
POINTS
AVAILABLE
EVALUATION CRITERIA
1) PRIORITY LIST;
a) List the priority list category of this project from Attachment C in the application. (The
application may only be of one type based upon the predominant cost of the project elements.)
b) Explain how the project fits this priority category.
(For reviewer only)
Max. Available Score
Range of Score
(0to8points)
1
Agenda -4-
2) WATERWAY RELATIONSHIP:
a) Explain how the project directly relates to the ICW and the mission of the Navigation
District.
b) How does the project benefit public navigation or access to the ICW or adjoining waterways?
(For reviewer only)
(0-6 points)
3) PUBLIC USAGE & BENEFITS:
a) How is the public usage of this project clearly identified and quantified?
b) Discuss the regional local public benefits and access to be provided by the project.
c) Estimate the amount of total public use.
d) Can residents from other counties of the District reasonably use the project? Explain.
(For reviewer only)
(0-8 points)
2
Agenda -5-
4) TIMELINESS
a) Describe current status of the project and present a reasonable and effective timeline for the
completion of the project consistent with Attachment E-8.
b) Briefly explain any unique aspects of this project that could influence the project timeline.
(For reviewer only)
(0-3 points)
5) COSTS & EFFICIENCY:
a) List any additional funding sources and the status and amount of the corresponding funding
that will be utilized to complete this project.
b) Identify and describe any project costs that may be increased because of the materials
utilized or specific site conditions.
c) Describe any methods to be utilized to increase the cost efficiency of this project.
(For reviewer only)
(0-6 points)
3
Agenda -6-
6) PROJECT VIABILITY:
a) Does the project fill a specific need in the community?
b) Clearly demonstrate how the project will continue to be maintained after District funding is
completed.
c) Will the program result in significant and lasting benefits?
(For reviewer only)
(0-7 points)
SUB -TOTAL
FIND FORM NO. 91-25
(Effective Date: 3-21-01, Revised -J
Agenda -7-
ATTACHMENT E-4A
WATERWAYS ASSISTANCE PROGRAM
APPLICATION EVALUATION AND RATING WORKSHEET
DEVELOPMENT & CONSTRUCTION PROJECTS
THIS ATTACHMENT IS TO BE COMPLETED IF YOUR PROJECT IS A
DEVELOPMENT OR CONSTRUCTION PROJECT BUT IS NOT AN INLET
MANAGEMENT OR BEACH RENOURISHMENT PROJECT.
CATEGORY RATING
& RATING POINTS
POINTS
AVAILABLE
EVALUATION CRITERIA
7) PERMITTING:
a) Have all required environmental permits been applied for? If permits are NOT required,
explain why not.
b) If the project is a Phase I project, list the tasks scheduled to obtain the necessary permits and
engineering work.
c) Detail any significant impediments that may have been identified that would potentially delay
the timely issuance of the required permits.
(For reviewer only)
(0-4 points)
5
Agenda - 8 -
8) PROJECT DESIGN:
a) Has the design work been completed? If this is a Phase I project, has a preliminary design
been developed?
b) Are there unique beneficial aspects to the proposed design that enhance public usage or
access, decrease environmental impacts, improve water quality or reduce costs?
(For reviewer only)
(0-2 points)
9) CONSTRUCTION TECHNIQUES:
a) Briefly explain the construction techniques to be utilized for this project.
b) How are the construction techniques utilized appropriate for the project site?
c) Identify any unusual construction techniques that may increase or decrease the costs of the
project.
(For reviewer only)
(0-3 points)
6
Agenda -9-
10) CONSTRUCTION MATERIALS:
a) List the materials to be utilized for this project. What is the design life of the proposed
materials?
b) Describe any recyclable material to be utilized. How does the recyclable material (if any)
compare to other available material?
c) Identify any unique construction materials that may significantly alter the project costs.
(For reviewer only)
(0-3 points)
RATING POINT
TOTAL
(Note: The total maximum score possible is dependent upon the project priority category but cannot exceed
50 points unless the project qualifies as an emergency -related project. The minimum score possible is 0
points. A score of 35 points or more is required to be considered for funding.)
Form No. 91-25A
(Effective Date: 3-21-01, revised - )
7
Agenda -7-
ATTACHMENT E-4B
WATERWAYS ASSISTANCE PROGRAM
APPLICATION EVALUATION AND RATING WORKSHEET
ENVIRONMENTAL EDUCATION PROJECTS
THIS ATTACHMENT IS TO BE COMPLETED IF YOUR PROJECT IS AN
ENVIRONMENTAL EDUCATION PROJECT
CATEGORY RATING
& RATING POINTS
POINTS
AVAILABLE
EVALUATION CRITERIA
7) THOROUGHNESS:
a) Who is the primary target audience or user group for the project and bow were they
identified?
b) How have the needs of the target audience been evaluated and met?
c) How many people will the program serve on an annual basis? What will be the measurable
results?
(For reviewer only)
(0-5 points)
8
Agenda -8-
8) DELIVERABLES:
a) Describe the materials and project deliverables to be produced by this project.
b) Is there a clear and effective plan of dissemination of the materials produced through the
project?
(For reviewer only)
(0-2 points)
9) EXPERIENCE & QUALIFICATIONS:
a) Please briefly describe the qualifications of the program administrator(s), including prior
experience, and areas of expertise.
b) How is the program manager sufficiently capable and qualified to conduct the proposed
project successfully?
c) What previous projects of this nature have been completed by the program manager?
(For reviewer only)
(0-3 points)
9
Agenda -9-
10) PROJECT GOALS:
a) What are the long -terms goals of this project as it relates to the ICW?
(For reviewer only)
(0-2 points)
RATING POINT
TOTAL
(Note: The total maximum score possible is dependent upon the project priority category but cannot exceed
50 points unless the project qualifies as an emergency -related project. The minimum score possible is 0
points. A score of 35 points or more is required to be considered for funding.)
Form No. 91-25B
(Effective Date: 3-21-01, Revised _-_-06)
10