HomeMy WebLinkAboutAnalysis•
•
ANALYSIS FOR LAND USE CHANGE REQUEST
Approximately 7951 NE Bayshore Court
Application No. LU- 2005-27
DISCUSSION
The proposal has been reviewed for a change to the Future Land Use Map of the Miami
Comprehensive Neighborhood Plan from "Office" to "Restricted Commercial" The
subject property consists of one lot fronting NE Bayshore Court (A complete legal
description is on file with the Hearing Boards Office).
The Miami Comprehensive Neighborhood Plan Land Use Policy 1.6.1 established future
land use categories according to the Future Land Use Plan Map and the "Interpretation of
the Future Land Use Plan Map." The subject property is currently designated "Office"
and the same designation is to the north. Land use to the west is designated "Medium
Density Multifamily Residential" and "Restricted Commercial" to the south; Biscayne
Bay is to the east.
The Office land use category allow residential uses to a maximum density equivalent to
"High Density Multifamily Residential" (up to a maximum of 150 units per acre)
subject to the same limiting conditions; transitory residential facilities such as hotels and
motels; general office use; clinics and laboratories; and limited commercial activities
incidental to principal activities in designated areas. Supporting facilities such as
auditoriums, libraries, convention facilities, places of worship, and primary and secondary
schools may be allowed with the "Office" designation.
The Restricted Commercial category allows residential uses (excepting rescue missions)
to a maximum density equivalent to "High Density Multifamily Residential" subject to
the same limiting conditions; any activity included in the "Office" designation as well as
commercial activities that generally serve the daily retailing and service needs of the
public, typically requiring easy access by personal auto, and often located along arterial or
collector roadways, which include: general retailing, personal and professional services,
real estate, banking and other financial services, restaurants, saloons and cafes, general
entertainment facilities, private clubs and recreation facilities, major sports and exhibition
or entertainment facilities and other commercial activities whose scale and land use
impacts are similar in nature to those uses described above, places of worship, and
primary and secondary schools. This category also includes commercial marinas and
living quarters on vessels as permissible.
•
•
•
The Planning Department recommends APPROVAL of the application as presented
based on the following findings:
• It is found that the application is part of a larger mixed -use development known as
Oasis on the Bay Major Use Special Permit (MUSP). Proposed land use change
requests for adjacent lots that are included in the MUSP will be consistent with this
land use change request.
• It is found that both the "Office" and "Restricted Commercial" categories allow a
maximum density of 150 residential units per acre.
It is found that Objective LU-1.3 states that the city will continue to encourage
commercial, office and industrial development within existing commercial, office and
industrial areas.
• It is found that MCNP Goal LU-1 maintains a land use pattern that (I) protects and
enhances the quality of life in the city's residential neighborhoods, and (5) promotes
the efficient use of land and minimizes land use conflicts.
These findings support the position that the existing land use pattern in this neighborhood
should be changed.
•
Proposal No 05-27
Date: 12/14/05
CONCURRENCY MANAGEMENT ANALYSIS
CITY OF MIAMI PLANNING DEPARTMENT
IMPACT OF PROPOSED AMENDMENT TO LAND USE MAP
WITHIN A TRANSPORTATION CORRIDOR
AMENDMENT INFORMATION
CONCURRENCY ANALYSIS
Applicant Javier F. Avino on behalf of River Bait & Tackle, LLC
Address: 7951 NE Bayshore Court
Boundary Streets: North: n/a
South: n/a
Proposed Change: From: Office
To: Restricted Commercial
Existing Designation, Maximum Land Use Intensity
Residential 0.3 acres @ 150 DU/acre
Peak Hour Person -Trip Generation, Residential
Other sq.ft. @ FAR
Peak Hour Person -Trip Generation, Other
Proposed Designation, Maximum Land Use intensity
Residential 0.3 acres @ 150 DU/acre
Peak Hour Person -Trip Generation, Residential
Other sq.ft. @ FAR
Peak Hour Person -Trip Generation, Other
Net Increment With Proposed Change:
Population
Dwelling Units
Peak Hour Person -Trips
Planning District
County Wastewater Collection Zone
Drainage Subcatchment Basin
Solid Waste Collection Route
Transportation Corridor Name
East: Oa
West: NE Bayshore Court
45 DU's
23
0 sq.ft.
45 DU's
23
0 sq.ft.
0
0
0
0
Upper East Side
308
D1
1
Biscayne Blvd
RECREATION AND OPEN SPACE
Population Increment, Residents
Space Requirement, acres
Excess Capacity Before Change
Excess Capacity After Change
Concurrency Checkoff
0
0.00
182.80
182.80
OK
POTABLE WATER TRANSMISSION
Population Increment, Residents
Transmission Requirement, gpd
Excess Capacity Before Change
Excess Capacity After Change
Concurrency Checkoff
0
0
>2% above demand
>2% above demand
OK
SANITARY SEWER TRANSMISSION
Population Increment, Residents
Transmission Requirement, gpd
Excess Capacity Before Change
Excess Capacity After Change
Concurrency Checkoff
0
0
See Note 1.
See Note 1.
WASA Permit Required
STORM SEWER CAPACITY
Exfiltration System Before Change
Exfrltration System After Change
Concurrency Checkoff
On -site
On -site
OK
RELEVANT MCNP GOALS, OBJECTIVES, AND POLICIES
Land Use Policy 1.1.1
CIE Policy 1.2.3
SOLID WASTE COLLECTION
Population Increment, Residents
Solid Waste Generation, tons/year
Excess Capacity Before Change
Excess Capacity After Change
Concurrency Checkoff
0
0
800
800
OK
TRAFFIC CIRCULATION
Population Increment, Residents
Peak -Hour Person -Trip Generation
LOS Before Change
LOS After Change
Concurrency Checkoff
0
0
B
B
OK
NOTES
1. Permit for sanitary sewer connection must be issued by
Metro -Dade Water and Sewer Authority Department (WASA),
Excess capacity, if any, is currently not known
CM 1 IN 03/13/90
•
ASSUMPTIONS AND COMMENTS
Population 'increment is assumed to be all new residents. Peak -period trip
generation is based on ITE Trip Generation, 5th Edition at 1.4 ppv average
occupancy for private passenger vehicles. Transportation Corridor capacities and
LOS are from Table PT-2(R1), Transportation Corridors report.
Potable water and wastewater transmission capacities are in accordance with
Metro -Dade County stated capacities and are assumed correct. Service
connections to water and sewer mains are assumed to be of adequate size: if not,
new connections are to be installed at owner's expense.
RecreationlOpen Space acreage requirements are assumed with proposed
change made.