December 21, 2004
Ms. Lilia 1, Medina, AICP
Assistant Transportation Coordinator
City of Miami, Office of the City Manager/Transportation
444 SW 2nd Avenue (10th Floor)
Miami, Florida 33130
Re: Brisas Del Rio
Sufficient Letter — W.O. # 83
Dear Ms. Medina:
Via Fax and US Mali
Subsequent to our November 4, 2004 review comments for the subject project, we have
received a revised traffic impact report along with a formal response to our comments from
David Plummer and Associates (DPA) dated December 10, 2004. A copy of the response letter
is attached herewith.
We have reviewed the revised study. Six of the eight issues raised in the original review
comments have been adequately addressed. As per our second and third comments related to
the operation of water taxi and maneuvering of the delivery vehicle respectively, the response
from DPA indicates that the project architect would address these two issues as the project
progresses through the review process.
At this time, we conclude that the revised traffic impact report along with the formal response
meets all the traffic requirements and the report is found to be sufficient. However, as this
project progresses through the review process, the applicant must submit an acceptable site
circulation plan to be approved by the City staff.
Should you have any questions, please call Quazi Masood or me at 954.739.1881.
Since
U
option Southern
Ra Shan ' ugam, .E.
Se for Tra neer
cc: Mr. Kevin Watford, Planner 1 City of Miami
Ms. Sonia Shreffler-Bogart, PE, David, Plummer & Associates
Attachment:
URS Corporation
Lakeshore Camolex
5100 NW 33rd Avenue, Sutte 150
Fort Lauderdale, FL 33309-6375
Tel: 954.739.1881