Loading...
HomeMy WebLinkAboutTAB N - URS Sufficiency Letter04/05/2005 11:02 3054444986 DAVID PLUMMERANDASSD PAGE 02 00517 URS December 21, 2004 Ms. !..ilia'. Medina, AICP Assistant Transportation Coordinator City of Miami, Office of the City Manager/Transportation 444 SW 2nd Avenue (10th Floor) Miami, Florida 33130 Re: Brisas Del Rio Sufficient Letter — W.O. # 83 Via Fax and US Mail Dear Ms. Medina: Subsequent to our November 4, 2004 review comments for the subject project, We have received a revised traffic Impact report along with a formal response to our commeresponnts from David Plummer and Associates (DPA) dated December 10, 2004. A copy of thetter is attached herewith. We have reviewed the revised study. Six of the eight issues raised in the original review comments have been adequately addressed. As per our second and third comments related to the operation of water taxi and maneuvering of the delivery vehicle respectively, the response from DPA indicates that the project architect would address these two issues as the project progresses through the review process_ At this time, we conclude that the revised traffic Impact report along with the formal response meets all the traffic requirements and the report is found to be sufficient. However, as this project progresses through the review process, the applicant must submit an acceptable site circulation plan to be approved by the City staff. Should you have any questions, please call Quazi Masood or me at 954.739.1881. Sin u Ra Shan Se for Tra Cc: tion Southern .E. neer Mr. Kevin Watford, Planner I, City of Miami Ms, Sonia Stureffier-Bogart, PE, David Plummer & Associates Attachment, URS Corporation Lakeshora Compltsx 5100 NW 98rd Avenue. Suite 150 Fort Lauderdale, FL 33309-6375 Tel: 954.739.1881 Fax: 954.739.1789