TRAFFIC i M PACT
STUDY
Brisas Del Rio
MUSP Traffic Impact Study
Prepared by:
David Plummer & Associates, Inc.
December 2004
DPA Project #04199
Brisas Del Rio
MUSP Traffic Impact Study
TABLE OF CONTENTS
Page
List of Exhibits ii
EXECUTIVE SUMMARY 1
1.0 INTRODUCTION 2
1.1 Study Area 2
1.2 Study Objective 2
2.0 EXISTING TRAFFIC CONDITIONS 4
2.1 Data Collection 4
2.1.1 Roadway Characteristics 4
2.1.2 Traffic Counts 4
2.1.3 Intersection Data 6
2.2 Corridor Capacity Analysis 8
2.3 Intersection Capacity Analysis 11
3.0 PLANNED AND PROGRAMMED ROADWAY IMPROVEMENTS 12
4.0 FUTURE TRAFFIC CONDITIONS 13
4.1 Background Traffic 13
4.2 Committed Developments 13
4.3 Project Traffic 13
4.3.1 Project Trip Generation 13
4.3.2 Project Trip Assignment 15
4.4 Future Corridor Capacity Analysis 19
4.5 Future Intersection Capacity Analysis 19
4.6 Site Access 23
5.0 CONCLUSIONS 24
Appendix A:
Appendix B:
Appendix C:
Appendix D:
Appendix E:
Approved Transportation Methodology & Site Plan
Traffic Counts & Signal Timing
FDOT's Quality/LOS Handbook — Generalized Tables
Metrobus Transit Ridership
Intersection Capacity Analysis Worksheets & Queuing Analysis
Committed Development Information
Page i
Brisas Del Rio
MUSP Traffic Impact Study
LIST OF EXHIBITS
Exhibit Paae
1 Location Map 3
2 Existing PM Peak Traffic Volumes 5
3 Existing Lane Configurations 7
4 Existing Corridor and Transit Conditions 9
5 Person -trip Volume and Capacity — Existing Conditions Matrix 10
6 Existing Intersection Capacity Analysis Results 11
7 Future PM Peak Hour Traffic Volumes without Project 14
8 PM Peak Hour Project Trip Generation 16
9 Cardinal Distribution 17
10 PM Peak Hour Project Vehicular Trips Assignment 18
11 Person -trip Volume and Capacity — Future Conditions Matrix 20
12 Project PM Peak Hour Vehicular Volumes 21
13 Future with project PM Peak Vehicular Volumes 22
14 Future Intersection Capacity Analysis 23
Page ii
Brisas Del Rio
MUSP Traffic Impact Study
EXECUTIVE SUMMARY
The Brisas Del Rio project is a proposed mixed use development located north of NW 15 Street
between 23 and 24 Avenues along the Miami River (see Exhibit 1). The project consists of
4,407 SF of retail space, 698 residential units and 40 marina berths. Primary access to the site is
proposed on NW 24 Avenue with additional driveways on NW 16 Street Road, NW 24 Avenue
and NW 15 Street. Build out for the project is planned for 2006.
Existing and future traffic conditions for the project area corridors were established using the
person -trip based corridor capacity method. This method, consistent with the City's
Comprehensive Plan, promotes improved transportation efficiency through increased private
vehicle occupancies and makes mass transit a full partner in the urban transportation system.
Analysis results show that the project area corridors are projected to operate within the
established corridor LOS thresholds.
The intersection capacity analysis was performed at the intersections under study using vehicular
volumes and the Highway Capacity Software (HCS), based on the procedures of the 2000
Highway Capacity Manual. Analysis of future traffic conditions with the project during the PM
peak hour shows that the City of Miami's adopted Level of Service standards will not be
exceeded. Minor signal timing modifications are recommended for the intersection of NW 22
Avenue / NW 14 Street in order to enhance overall intersection operations under existing
conditions. Adequate capacity during the PM peak hour is available to accommodate the
proposed project trips within the study area at the intersections and on the transportation
corridors segments analyzed.
Page 1
Brisas Del Rio
MUSP Traffic Impact Study
1.0 INTRODUCTION
The Brisas Del Rio project is a proposed mixed use development located north of NW 15 Street
between 23 and 24 Avenues along the Miami River (see Exhibit 1). The project consists of
4,407 SF of retail space, 698 residential units and 40 marina berths. Primary access to the site is
proposed on NW 24 Avenue with additional driveways on NW 16 Street Road, NW 24 Avenue
and NW 15 Street. Build out for the project is planned for 2006.
1.1 Study Area
Consistent with the approved methodology for this project (See Appendix A) the traffic study
was performed for PM peak conditions. For traffic analysis purposes, the study area has been
defined as NW 20 Street to the north, NW 11 Street to the south, NW 27 Avenue to the west and
NW 22 Avenue to the east. Corridor capacity analysis was performed for the segments of NW
14 Street and NW 22 Avenue. Intersection capacity analysis was performed for the following
intersections:
• NW 15 Street / NW 24 Avenue
• NW 15 Street / NW 23 Avenue
• NW 14 Street / NW 23 Avenue
• NW 14 Street / NW 22 Avenue
1.2 Study Objective
The objective of this traffic study is to assess possible PM peak hour impacts on the project area
corridors using the person -trip corridor capacity method. This method is designed to meet the
challenges posed by Florida's growth management laws: to promote compact urban
development, discourage suburban sprawl and improve urban mobility. This method is
consistent with the City's Comprehensive Plan and promotes improved transportation efficiency
through increased private vehicle occupancies, making mass transit a full partner in the urban
transportation system.
Page 2
dPa
PROJECTS
BRISAS DEL RIO
MUSP TRAFFIC IMPACT STUDY
TITLE:
LOCATION MAP
EXHIBIT No.
1�
Page 3
Brisas Del Rio
MUSP Traffic Impact Study
2.0 EXISTING TRAFFIC CONDITIONS
2.1 Data Collection
Data collection for this study included roadway characteristics, intersection data, intersection
volumes, and signal timing. The data collection effort is described in detail in the following
sections.
2.1.1 Roadway Characteristics
NW 22 Avenue
NW 22 Avenue is a major arterial that provides north/south access throughout Miami Dade
County. NW 22 Avenue within the study limits is a four -lane roadway. On -street parking is
prohibited on the roadway. There is no posted speed limit sign within the study area.
NW 14 Street
NW 14 Street is two-way, two-lane, undivided roadway which provides east/west access in the
study area. On -street parking is permitted within the study limits and there are no posted speed
limit signs within the study area.
2.1.2 Traffic Counts
Consistent with the methodology submitted to and approved by the City, peak period vehicle
turning movement counts and 24-hour directional counts were collected at the intersections and
segments under study. Seasonal adjustment factors were obtained from the Florida Department
of Transportation (FDOT). Traffic counts are included in Appendix B. Exhibit 2 shows the
adjusted 2004 PM peak season, peak period hour traffic volumes at the study intersections.
Page 4
dPa
PROJECTS
BRISAS DEL RIO
MUSP TRAFFIC IMPACT STUDY
TITLE:
EXISTING PM PEAK
TRAFFIC VOLUMES
EXHIBIT No.
2
Page 5
Brisas Del Rio
MUSP Traffic Impact Study
2.1.3 Intersection Data
A field survey was conducted to determine the lane configurations for the roadways and
intersections under study. Existing signal timing data was obtained from Miami -Dade County
for the analyzed intersection. Signal information is included in Appendix B. This information
provided the signal phasing and timing used in the intersection capacity analysis. Exhibit 3
shows the existing lane configurations for the intersections and roadways studied.
Page 6
dPa
PROJECTS
BRISAS DEL RIO
MUSP TRAFFIC IMPACT STUDY
TITLE:
EXISTING
LANE CONFIGURATION
EXHIBIT No.
3�
Page 7
Brisas Del Rio
MUSP Traffic Impact Study
2.2 Corridor Capacity Analysis
Existing traffic conditions for the project area corridors have been established using the person -
trip based corridor capacity method. The methodology for this analysis is outlined in the Miami
Comprehensive Neighborhood Plan. The existing traffic conditions analysis identifies the
person -trip volumes and person -trip capacities of the corridors, establishes existing person -trip
usage and identifies whether or not person -trip deficiencies exist. An adopted standard of LOS E
applies to the transportation corridors as measured by the person -trip method.
The existing conditions analysis establishes the multi -modal corridor conditions within the
project area. The person -trip capacities and volumes for the study corridors have been developed
consistent with the approved methodology for this project as described below:
Person -Trip Volumes
Link volumes collected were adjusted to peak season traffic conditions using seasonal
adjustment factors provided by FDOT. Peak hour maximum service volumes were obtained
from FDOT's 2002 Quality/Level of Service Handbook. Transit (metrobus) ridership and
capacity were obtained from Miami Dade County. An analysis of existing vehicle roadway and
transit conditions is shown in Exhibit 4, supporting information included in Appendix C.
Person -Trip Capacity
Vehicle occupancy for the person -trip capacity calculations is based upon a comprehensive study
performed for the City of Miami. The vehicle occupancy factor of 1.6 persons per vehicle is
approved for use as the practical capacity of a private passenger vehicle to determine the person -
trip capacity of the vehicular traffic system.
The bus capacity for each corridor was determined based on the number of transit vehicles per
hour and the person -trip capacity of each transit vehicle.
Available Person -Trip Capacity
The available person -trip capacity for each corridor is shown in Exhibit 5 based on the
following: Person -trip capacity — Person -trip volume = Available Person -trip capacity. A
Page 8
Exhibit 4
Existing Corridor and Transit Conditions
Corridor
From To
Roadway Conditions (vehicles)
Transit Conditions (persons)
Dir
Existing
Lanes
Count
Source!
Period
Raw PM
Peak Hour
Volume
Peak
Season
Faotor
PM
Peak Hour
Volume
Dir Max
Service
Volume La
Total
Bus.
Ridership
[2]
Bus
Capacity
121
Total
Metrorail
Ridership
121
Metrorail
Capacity
[21
Total
Metromover
Ridership
[21
Metromover
Capacity
[21
Total
Transit
Ridership
I21
Transit
Capacity
[21
NW 22 AVENUE
NW 14 STREET NW 20 STREET
NW 14 STREET
NW 24 AVENUE NW 22 AVENUE
NB
SB
EB
WB
2L
2L
1L
1L
DPA - PM
DPA - PM
1191
1250
414
561
1.03
1.03
1.03
1.03
1226
1287
426
578
1660
1660
810
810
19
4
2
0
152
152
52
52
19
4
2
0
152
152
52
52
Notes;
[1] Peak Hour Directional Maximum Service Volumes are obtained from FDOTs Quality/Level of Service Handbook
[2] Transit and roadway information obtained from Miami Dade County
Exhibit 5
Person -Trip Volume and Capacity
Existing Conditions Matrix
CORRIDOR
FROM TO
Roadway Mode
Transit Mode
Segment Total
Dir
(a)
Roadway
Vehicular
Capacity
(b)
Pers-Trip
Capacity
@PPV=1.6
(a)' 1.6
(c)
Roadway
Vehicular
Volume
(d)
Pers-Trip
Volume
JPPV=1.4
(51' 1.4
(e)
Excess
Pers-Trip
Capacity
ib) - (d)
(f)
Total
Pers-Trip
Capacity
(g)
Total
Pers-Trip
Volume
(h)
Pers-Trip
Excess
Capacity
(f)-(g)
(i)
Segment
Pers-Trip
Capacity
(b)+(f)
0)
Segment
Pers-Trip
Volume
(d)+(g)
(k)
Pers-Trip
Excess
Capacity
(i)-(j)
(I)
Segment
Person
Trip
LOS
vlc
il)/(i)
NW 22 AVENUE
NW 14 STREET NW 20 STREET
NW 14 STREET
NW 24 AVENUE NW 22 AVENUE
NB
SB
EB
1 WB
[1]
1660
1660
810
810
[21
2656
2656
1296
1296
_
[31
1226 1
1287
426
578
_
(41
1717
1802
597
809
939
854
699
487
t5]
152
152
52
52
[6]
19
4
2
0
133
148
50
52
2808
2808
1348
1348
1736
1806
599
809
1072
1002
749
539
0.62
0.64
0.44
0.60
M
D
D
D
D
Notes:
[1 ] The Roadway Vehicular Capacity is obtained from Exhibit 4.
[2] Person -Trip capacity is derived by applying a 1.6 vehicle occupancy to the vehicular capacity.
[3]) The Roadway Vehicular Volume is obtained from Exhibit 4.
141 Person -Trip Volume is derived by applying a 1.4 vehicle occupancy to the vehicular capacity.
[5] The Total Transit Person -Trip Capacity is obtained by adding bus, metrorail and metromover capacities (see Exhibit 4).
[6] The Total Transit Person -Trip Volume is obtained by adding bus and metromover volumes (see Exhibit 4).
[7] The Person Trip LOS is provided consistent with the FDOT's Quality/Level of Service Handbook (see Appendix C).
Brisas Del Rio
MUSP Traffic Impact Study
general level of service designation is provided for each study corridor based on the calculated
available person -trip capacity. A person -trip level of service look -up table was developed based
on the ratios derived from the FDOT's 2002 Quality/Level of Service Handbook (see Appendix
C). Based upon the person -trip evaluation for existing traffic conditions, no study corridor
operates below the acceptable "person -trip" level of service standards.
2.3 Intersection Capacity Analysis
The intersection capacity analysis was performed using vehicular volumes and the Highway
Capacity Software (HCS), based on the procedures of the 2000 Highway Capacity Manual. All
intersections operate within the LOS E standard adopted by the city. Exhibit 6 shows the
resulting LOS for existing conditions at the intersections under study, analysis worksheets are
included in Appendix D.
Exhibit 6
2004 Intersection Capacity Analysis
Weekday PM Peak Hour Conditions
Intersection
S/U
LOS Existing
Signal Timing
LOS Modified
Signal Timing
NW 14 Street / NW 22 Avenue
S
C
C
NW 14 Street / NW 23 Avenue
U*
C
-
NW 15 Street / NW 23 Avenue
U*
A
-
NW 15 Street / NW 24 Avenue
U*
A
-
U= unsignalized S= signalized
*Minor street approach LOS reported for unsignalized HCM analysis.
Source: DPA
Page 11
Brisas Del Rio
MUSP Traffic Impact Study
3.0 PLANNED AND PROGRAMMED ROADWAY
IMPROVEMENTS
The 2003 Miami -Dade County Transportation Improvement Program (TIP) and the 2025 Metro -
Dade Transportation Plan Long Range Element, were reviewed to identify any programmed or
planned projects within the limits of the study area established. These documents show no
officially programmed or planned capacity improvement projects within the study area prior to
completion of the proposed project.
Page 12
Brisas Del Rio
MUSP Traffic Impact Study
4.0 FUTURE TRAFFIC CONDITIONS
4.1 Background Traffic
Consistent with other traffic studies performed in the area, a conservative one-half (0.5) percent
growth factor was added to existing traffic volumes. This growth rate is intended to account for
future growth due to additional developments that have not been identified at this time but occur
within the study period.
4.2 Committed Developments
A list of projects was obtained from city staff, City of Miami Planning and Zoning Department
Report on Private Development From 1996 Updated through August 2004. These projects are
approved and are either under construction or about to break ground. Other projects are
approved by City Commission but with no building permits, or in the application stage. There is
one major project in the study area, Terrazas de Miami River, which is east of NW 22 Avenue.
The committed development project information is included in Appendix E. Traffic generated
by this development was distributed using the traffic report provided by the City of Miami.
Future traffic volumes were projected for the build -out year 2006. Exhibit 7 shows the projected
turning movement volumes without the project.
4.3 Project Traffic
4.3.1 Project Trip Generation
Project trip generation will be based on the calculation of person -trips consistent with the City of
Miami Comprehensive Plan. Person -trips generated by the project were established using the
Page 13
dPa
PROJECTS
BRISAS DEL RIO
MUSP TRAFFIC IMPACT STUDY
TITLE:
FUTURE WITHOUT PROJECT
PM PEAK
TRAFFIC VOLUMES
EXHIBIT No.
7�
Page 14
Brisas Del Rio
MUSP Traffic Impact Study
using Increment II of the Downtown DRI as a guideline together with the approved
methodology:
• The gross vehicular trip generation for each land use was determined using the Institute of
Transportation Engineers (ITE) Trip Generation rates or formulas.
• Gross vehicular trips were reduced by 16% based upon the use of the ITE trip rates (City of
Miami's 1.4 vs. ITE's 1.2 pers/veh).
• Gross vehicular trips were reduced by 10% for transit/pedestrian/bicycle based on transit
service provided.
• The net external vehicle trips were converted to person -trips using 1.4 persons per vehicle
pursuant to City standards.
• The vehicular trips assigned to transit were converted back to person -trips using 1.4 persons
per vehicle pursuant to City standards.
• The net external person -trips were obtained by adding together the project net external
person -trips for the vehicle and transit modes.
A trip generation summary for the project is provided in Exhibit 8.
4.3.2 Project Trip Assignment
Project traffic was distributed and assigned to the study area using the Cardinal Distribution for
TAZ 750, shown in Exhibit 9. The Cardinal Distribution gives a generalized distribution of trips
from a TAZ to other parts of Miami -Dade County.
For estimating the trip distribution for the project location, consideration was given to conditions
such as the roadway network accessed by the project, roadways available to travel in the desired
direction, and attractiveness of traveling on a specific roadway. Exhibit 10 shows the project
vehicular trip assignment to the impacted roadway segments and intersections.
Page 15
Exhibit 8
PM Peak Hour Trip Generation Analysis
USES
UNITS
ITE Land Use Code
PM PEAK HOUR TRIPS
IN
OUT
TOTAL
%
Trips
%
Trips
Trips
Residential Condominium/Townhouse
Retail
Marina
698 DU
4,407 SQ. FT.
40 Berths
230
814
420
67%
44%
60%
198
14
4
33%
56%
40%
98
18
3
296
32
7
GROSS VEHICLE TRIPS _ 1640/0
216 1
36%
119
I 335
Internalization (1)
I
-2
I
-1
I -3
SUBTOTAL VEHICLE TRIPS
1 64%
214
I 36%
118 I
332
Vehicle Occupancy Adjustment @ 16% of Gross External Trips (2)
Transit/Pedestrian / Bicycle Trip Reduction @ 10,00% of Gross Extemal Trips (3)
64%
64%
34
21
36%
36%
19
11
53
33
NET EXTERNAL VEHICLE TRIPS
64%0
159
36%
87
246
1
I
I
Net External Person Trips in Vehicles C 1.40 Persons/ Vehicle 1
64%
222 I
36%
122 1
344
Notes
(1) Per ITE Trip Generation Handbook, October 1998
(2) A 16% reduction to adjust for the difference between ITE auto occupancy and local data (Miami's 1.4 vs. ITE's 1.2 pers/veh)
(3) Transit/Pedestrian / Bicycle Trip Reduction based transit service provided.
Brisas Del Rio
MUSP Traffic Impact Study
Exhibit 9
Cardinal Distribution of Trips
Cardinal Direction
Distribution
TAZ 750
NNE
11.16%
ENE
11.66%
ESE
13.10%
SSE
7.13%
SSW
13.58%
WSW
15.85%
WNW
13.86%
NNW
13.66%
Total
100%
Source: Miami Urban Area Transportation Study
Page 17
dPa
PROJECTS
BRISAS DEL RIO
MUSP TRAFFIC IMPACT STUDY
TITLE:
PROJECT TRIP ASSIGNMENT
EXHIBIT No.
10�
Page 18
Brisas Del Rio
MUSP Traffic Impact Study
4.4 Future Corridor Capacity Analysis
The existing person -trip volumes were combined with the committed development and
background growth person -trips to obtain the total year 2006 person -trip volume without project.
The net external project person -trips were then added to get the future person -trip volumes with
project. These volumes were compared to the future person -trips capacities to determined future
level of service. The future person -trip volume and capacity matrix is shown in Exhibit 11. All
corridors analyzed are projected to operate within the established LOS E threshold.
4.5 Future Intersection Capacity Analysis
Background growth and committed development trips were combined with the adjusted 2004
existing traffic to get the total year 2006 vehicular traffic without project on the study
intersections. The project trips were then added to obtain the future with traffic volumes.
Exhibit 12 shows the project PM peak hour project volumes and Exhibit 13 shows the total (with
project) PM peak hour vehicular traffic volumes at the intersections under study.
All intersections operate within the LOS E standard adopted by the city. However, in order to
enhance overall intersection operations under future without project conditions, minor signal
timing modifications are recommended at NW 14 Street / NW 22 Avenue. Exhibit 14 shows the
resulting LOS at the intersections under study. Intersection capacity analysis worksheets are
provided in Appendix D.
Page 19
Exhibit 11
Person -Trip Volume and Capacity
Future Conditions Matrix
Without Project
With Project
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
Existing
Future
Committed
Future
Future
Future wlout Proj
Project
Total
Future
Future with Proj
Corridor
Dir
Pers-Trip
Bkg.
Development
Pers-Trip
Pers-Trip
Pers-Trip
Pers-Tnp
Pers-Trip
Pers-Trip
Pers-Trip
Volumes
Pers-Trip
Pers-Trip
Volumes
Capacity
v/c
LOS
Volume
Volumes
Capacity
v/c
LOS
0.5%
In=223
From To
2
(b)+(c)
(d)/(e)
Out=121
Sd)+(g)
(h)/(i)
[1l
[2]
[3]
[4]
[5]
13]
[4]
NW 22 AVENUE
NW 14 STREET NW 20 STREET
NB
1736
1753
10
1763
2808
0.63
D
24
1787
2808
0.64
D
SB
1806
1824
16
1840
2808
0.66
D
45
1884
2808
0,67
D
NW 14 STREET
NW 24 AVENUE NW 22 AVENUE
ES
599
605
0
605
1348
0.45
D
42
647
1348
0.48
D
WB
809
817
0
817
1348
0.61
D
78
695
1348
0.66
D
Notes:
[1 ] The Existing Person Trip Volume is obtained from Exhibit 5, column (j)
[2] Year 2006 Background Person Trip Volume is derived by applying a 0.5% growth factor to the existing person -trip volume
[3] The Total Future Peak Hour Person Trip Capacity is obtained by adding all modes of transportation
[4] The Person Trip LOS is provided consistent with the FDOTs Quality/Level of Service Handbook (see Appendix C)
[5] Project Person Trip Volumes are derived from Trip Generation Analysis (Net External Person Trips(Vehicles + Transit))
X - DRIVEWAY LOCATION
XX - ENTER
(XX) - EXIT
dPa
PROJECTS
BRISAS DEL RIO
MUSP TRAFFIC IMPACT STUDY
TITLE:
PM PEAK
PROJECT TRAFFIC VOLUMES
EXHIBIT No.
12
Page 21
dPa
PROJECTS
BRISAS DEL RIO
MUSP TRAFFIC IMPACT STUDY
TITLE:
FUTURE WITH PROJECT
PM PEAK
TRAFFIC VOLUMES
EXHIBIT No.
13
Page 22
Brisas Del Rio
MUSP Traffic Impact Study
Exhibit 14
Future Intersection Level of Service
Weekday PM Peak Hour Conditions
Intersection
S/U
Future w/o Project
Future w/ Project
NW 14 Street / NW 22 Avenue
S
D
D
NW 14 Street / NW 23 Avenue
U*
C
D
NW 15 Street / NW 23 Avenue
U*
A
A
NW 15 Street / NW 24 Avenue
U*
A
A
U= unsignalized S= signalized
*Minor street approach LOS reported for unsignalized HCM analysis.
4.6 Site Access
Source: DPA
Access to the site is proposed on NW 24 Avenue with additional driveways on NW 16 Street
Road, NW 24 Avenue and NW 15 Street via two-way driveways. The project trips were assigned
to the driveway and analyzed. Unsignalized HCS analysis results show adequate operations. A
queuing analysis for both entering and exiting vehicles was done at the driveway access control
points. Results show that sufficient queuing area is provided. The analysis worksheets are
included in Appendix D.
Page 23
Brisas Del Rio
MUSP Traffic Impact Study
5.0 CONCLUSIONS
An assessment of the PM peak hour traffic associated with the development of Brisas Del Rio
was performed in accordance with the approved methodology submitted to the city. Analysis of
future (2006) traffic conditions with the project during the PM peak hour shows that the City of
Miami's adopted Level of Service standards will not be exceeded. Minor signal timing
modifications are recommended for the intersection of NW 22 Avenue / NW 14 Street in order to
enhance overall intersection operations under future without project conditions. Adequate
capacity during the PM peak hour is available to accommodate the proposed project trips within
the study area at the intersections and on the transportation corridors segments analyzed.
MUSP September 2004.doc
Page 24
Appendix A
Approved Transportation
Methodology
&
Site Plan
DAVID PLUMMER & ASSOCIATES, INC.
TRANSPORTATION • CIVIL • STRUCTURAL • ENVIRONMENTAL
To:
Affiliation:
From:
RE:
cc:
Facsimile Transmission
Mr. Raj Shanmugam, PE
URS Corporation
Sonia Shreffler-Bogart, PE
Brisas Del Rio- #04199
Lilia Medina, B. Benach Jr., file
Fax #:
Phone #:
Date:
Pages:
(954) 739-1789
(954) 739-1881
August 6, 2004
3 page(s), including cover
The Merco Group is pursuing City of Miami approvals for a mixed use project located north of NW 15 Street between
23 and 24 Avenues along the Miami River, in Miami, Florida. The project consists of approximately 4,000 SF of retail
space, 698 residential units and 40 marina slips. Primary access to the site is proposed on NW 24 Avenue with
additional driveways on NW 16 Street Road, NW 24 Avenue and NW 15 Street via two-way driveways, a site
development plan has been attached. The subject site is located outside the limits of the Downtown Miami Area -wide
DRI.
This will serve as our methodology for the subject MUSP traffic impact study.
• • Turning movement traffic counts are to be collected during the PM (4:00-6:00) peak period at three intersections in
the immediate project vicinity.
1. NW 15 Street / NW 24 Avenue
2. NW 15 Street / NW 23 Avenue
3. NW 14 Street / NW 23 Avenue
In addition to these intersections, we will analyze the project driveways.
•• Segment traffic volumes will be collected as 24-hour machine counts at the following locations:
1. NW 22 Avenue north of NW 14 Street
2. NW 14 Street between NW 24 Avenue and NW 22 Avenue
•• Available Florida Department of Transportation (FDOT) counts will be consulted where appropriate.
•• Raw traffic counts will be adjusted to peak season (for the peak hour period).
•• The signal timing and phasing at the study signalized intersections will be obtained from Miami -Dade County.
•• Existing and future traffic conditions for the project area corridors (NW 22 Avenue and NW 14 Street) will be
established using the person -trip method The methodology for this method is outlined in the Miami
1750 PONCE DE LEON BOULEVARD
CORAL GABLES, FLORIDA 33134
TELEPHONE: 305 447-0900, FAX: 305 444-4986
E-MAIL: dpa@dplummer.com
Comprehensive Neighborhood Plan. Rubber tire and fixed rail transit capacity of the study corridors will be
established based on available information Miami Dade County Transit.
Corridor capacity will be estimated using generalized vehicular capacities (converted to person -trips) from the
Downtown DRI, FDOT LOS Manual, or other acceptable equivalent.
Project Traffic — project trip generation will be based on the calculation of person -trips consistent with the city of
Miami Comprehensive Plan. Person -trips generated by the project will be established using the following procedure
consistent with Increment II of the Downtown DRI:
1. Determine the gross vehicular trip generation for each land use using the Institute of Transportation
Engineers (I 1E) Trip Generation rates or formulas.
2. Reduce gross vehicular trips by a vehicle occupancy adjustment based upon the use of the I lE trip rates
(City of Miami's 1.4 vs. I l'E's 1.2 pers/veh).
3. Reduce gross vehicular trips by a transit reduction based on projected modal splits from Increment II of
the Downtown DRI.
4. Reduce gross vehicular trips by a pedestrian/bicycle reduction based on estimates from Increment II of
the Downtown DRI.
5. Establish the net external vehicle trips.
6. Convert the net external vehicle trips to person -trips using 1.4 persons per vehicle pursuant to City
standards.
7. Convert the vehicular trips assigned to transit back to person -trips using 1.4 persons per vehicle pursuant
to City standards.
8. Add together the project net external person -trips for the vehicle and transit modes.
Background Traffic. A growth factor consistent with historical annual growth in the area will be applied to the existing
traffic volumes.
Committed Developments. Will be based on list of relevant projects provided by the city. Committed development
trips will also be converted to person -trips based on the methodology described above.
Highway Capacity Software (HCS) based on the 2000 Highway Capacity Manual (HCM) will be used for existing
and future intersection capacity analysis. Project and committed development net external vehicle trips (adjusted for
transit, pedestrian and occupancy as described above) will be used for the intersection capacity analysis. Intersection
capacity analyses will be performed at the four study intersections and the proposed project driveways.
Trip Assignment. Net new external project traffic will be assigned to the adjacent street network using the
appropriate cardinal distribution from theMetro-Dade Long Range Transportation Plan Update, published by the
Metropolitan Planning Organization. Normal traffic patterns will also be considered when assigning project trips.
If you have any questions you can contact me at (305) 447-0900.
traffic meth fax.doc
1750 PONCE DE LEON BOULEVARD
CORAL GABLES, FLORIDA 33134
TELEPHONE: 305 447-0900, FAX: 305 444-4986
E-MAIL: dpa@dplummer.com
Sonia Shreffler Bogart
From:
Sent:
To:
Cc:
Subject:
Sonia,
Quazi_Masood URSCorp.com
Wednesday, August 11, 2004 3:41 PM
Sonia Shreffler Bogart; Raj_ShanmugamigURSCorp.com
benachb@bellsouth.net; bfernandez@brzoninglaw.com; Coral Gables Filing; Walford, Kevin
C; Medina, Lilia i; Juan Espinosa
Re: Brisas Del Rio #04199
Please be adviced that the faxed copy of the methodology letter (dated
8/6/04) for developing the Traffic Impact Analysis report along with the following
modifications meets the requirement.
Thanks
Quazi Masood
Transportation Engineer
URS Corporation
5100 NW 33rd Avenue, Suite 150
Fort Lauderdale, FL 33309-6375
T: 954.739.1881 (X236)
F: 954.739.1789
quazi_masood@urscorp.com
http://www.urscorp.com/
"Sonia Shreffler
Bogart" To: eguazi masood@URSCorp.com>
<sonia.shreffler@dp cc: "Walford, Kevin C"
< KWalford@ci miami.fl.us>, "Medina, Lilia I"
lummer.com> <1imedinaaci.miami_fl.us>,
< Raj_Shanmugam@URSCorp.com>, <bfernandez@brzoninglaw.coma,
ebenachb@bellsouth.net>, "Coral Gables
Filing" edpa2@dplummer_com>
08/11/2004 10:38 AM Subject: Brisas Del Rio #04199
Quazi:
Per our telephone conversation regarding the transportation methodology for the Brisas Del
Rio MUSP traffic impact study; in addition to NW 15 Street / NW 24 Avenue, NW 15 Street /
NW 23 Avenue, and NW 14 Street / NW 23 Avenue, the signalized intersection of NW 14
Street/NW 22 Avenue will also be
analyzed. The study area for this project will be NW 20 Street to the
north, NW 11 Street to the south, NW 27 Avenue to the west and NW 22 Avenue to the east.
Please confirm your agreement.
Thank you for your attention,
Sonia
Sonia Shreffler-Bogart, PE
David Plummer & Associates
1750 Ponce de Leon Boulevard
Coral Gables, FL 33134
phone: (305) 447-0900
fax: (305) 444-4986
sonia.shreffler@dplummer.com
2
Site Development Plan
Appendix B
Traffic Counts
&
Signal Timings
Raw Traffic Counts
MN 14TE STREET 5 NW 22ND AVIN
MIAMI, FLORIDA
COUNTED BY: N. MALONE & I. GONZALEZ
srGN1iLI8Eb
8N 22RD AVBBuE
From North
Peda Right
Date 08/24/04
16100
16.15
16;30
Hr Total
0 113
0 95
0 117
1 92
1 416
17:00 0 100
1?:15 0 87
17:30 0 85
Er Total 0 368
TRAFFIC SURVEY SFHC1AL33TS, INC.
624 GARDEN/A TERRACE
DELRAY BEACH, FLORIDA 33444
f561; 272-3255 FAX ,561j 171-4382
ALL VEHICLES & PEDS
Site Code : 00040173
Start Date: 04124104
Fi1e I,D, 1 143T22av
Page 1
NW 14TH ST13ET 11NV 22140 AVENUE
From Past iFrom South
Thru Left Pedt Right Thru Left Peds Right Thrtt
247 3 1 5 2
193 14 1 2 0
259 5 0 3 3
277 6 IL 6 1
976 24 2 16 6
1
6
5
1
13
248 4 0 1] 1 1
150 3 2 3 1 6
232 2 1 5 3 1
205 5 0 1 J 1
935 14 4 20 7 9
'TOTAL' 1 784 1911
Left
NW 14TH 5TREET
From West
Vehicle
Peds Right Thru Left Total
0 2 248
0 4 263
0 1 255
2 3 253
0 10 1029
0
6
3
3
1
290
259
229
2.31
44
42
27
43
156
41
54
39
41
2
0
0
- 4
6
51 7 44 67
39 3 52 703
50 3 S3 781
39 l 47 , .128
179 14 196 3C35
2 56 3 52 821
0 69 2 62 199
0 48 2 41 696
D 45 _ 47 6E1
13 1010 174 3 218 8 209 ?985
38 E 6 36 13 22 2 23 2039 330 I 6 397 22 405 1 6020
NW /4Tfi STREET Hif 22ND *WI
MIANI, PLMRIDA
COUNTED 5Y. N. iWLU! & I. GONZALdz
SIGNALIZED
NK 2210 AVENUE
From ROrtd
Peds Right Thru Left
Date O11124/04 -...
NW 14TH STREET
330
13 1,127
784
TRAFFIC SURVEY SPECIALISTS, INC.
424 GARDENIA TERRACE
DELRAY BEACH, FI,CEIDA 33444
561) 272-325! FAX (5 1) 272-43E1
ALL VRNELES & PSDS
NW 14TA STREET INN 22ND AVE
From Easi iftom SOuth
Peds Right Thru Left 4 ?eh Right.
1 784
1 784
405
405
22
NW 22ND AVENUE
• 1,911
38
1, 911 38
E 2,733
5,213
22 824
397
397
l
1, 951
Site Code : 0004:173
Start pate: 08/24/04
Pile I.D. : 14ST22Av
Page : 2
IN 14TR STREET
Iron West
vehicle
Thru Left Peds nigh; Thru Let: Tote;
405
2,039
36
2,480
ALL VEHICLES & PBDS
Intersection Total
6,020
22
1,911
397
2,330
4,722
•
330
330
NW 22ND AVENUE
154
36 36
71 13
2,392 -- -----
2,039 23 2
13
22
22
83
NW 14TH STREET
2,039
23 2
38
22
23
1 14T1 STREET a EN 22ND 1VEEE
MXI, FLORIDA
"OUTS>} BY. N. NALOIs & I. GONZALBZ
IGIAL'. ID
TA:AFPIC SOR7EY SPECIAL1SrS, INC.
624 GARDIINIA TEUACI
DELRAY BEAU, FLORIDA 33444
(561) 272.3255 FAX 1561) 272-4381
ALL VIRICI,BS i AIDS
Sate Code : 00640173
Start Date: 08/24/04
File I.D. 145112AV
Page : 3
8R 22ND AMU
Prom North
Ptds Right Trim Left
Jets Oa/24/04. -
NW 14TE STUNT
Proms East
Peds Right Thru Lett
,NM 22ND AY3i1tUR
From South
Pede Right Thra
Left
INR 14TR STREET
IlFron Nest
Vetit:e
Peds Right ,Ihry Lett Total.
'eat Sour Analysis By Entire Intersection for the Period: 16:00 to 18:00 on 08124/04
Teak start 16:30 16:30 16.30
rc2 re 403 1034 19 - 23 6 13
'ercent 281 73% it - 551 141 314
=k total 1455 42
Iighest 16:30 17:00
Iolume 117 259 5 11 1
(L total 381 13
UHF .95 .91
t+IW 14TH STREET
165
6
403
214
214
574
403
1245
17:00
337
92
NW 22ND AVENUE
• 1,034 18
1 403 1,034
t. 1,455
9
214
214
437
18
2,759
13 1067 165
1.4 80 131
6 290 41
214
1,067
23
1,304
ALL VEHICLES 4k ?EDS
,011 82
Intersection Total
3,179
I
13
1,034
214
1,261
2,506
165
165
NW 22ND AVENUE
42
1,245
1,067
1,067
1
16:30
437
17:1S
133
.01
214 9 214
49t 2% 491
69 2 62
23
23
6
6
13
13
40
NW 14TH STREET
18
9
13
NN 1479 STR$ET i NV 231D AYIN
KIAN1, FLDRIDA
COUNTED B} : JACK Mum
NOT SIGNALISED
NW 23RL AV6N1J0
Prom North
TRAPPIC SCRVBT SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY EWE, FIAPIOA 33444
561) 272.3255 FAX (561) 272-4381
ALL VYSICLES & P$OS
Peds Right Thru Lett
Date 05/24/04
1600
16:15
16:30
16 :4S_
Er Total
17:00
17:15
17:30
17:45
Sr Total
0
1
2
0
3
4
0
0
1
5
0
0
0
Il
5
0
0
1
0 2
0 1
0 5
0 3
0 6
0 0
0 2
0 4
0 1
0 7
'TOTAL' 8 1 0
NN 14T1 SMUT
From Yost
Redo Right Thu left
DRIVIVAY
Prom South
Redo Right Thra
1 2 167 0
0 1 143 0
0 1 153 0
0 2 13fi D
1 6 599
0
0 0
0 0
0 1
0 3
159 0
146 0
126 0
126
557 0
2
0
1
0
2
0
0
0
2
Site Code : 00040173
Start Date: 08/24/04
File I,D. , 14ST23AV
Page :1
NV 14TR STUNT
Frot West
Left PedE light Thru Lett
0
0
0
0
0
0
0
0
0
0
0
0
0
9
Vehicle
Total
0 102 0
D 94 1
0 113 0
0 11 1
273
240
267
223
0 0 390 2 1003
0 0 109 0
0 0 131 0
0 0 93 0
D 0 94 1
0 0 427 1
13 1 1 5 1156
269
280
223
;15
997
5 1 0 0 0 0 817 3 1 2000
IN 14TA STREET 4 1I1i 23RD AVENUE
M1AMI, F10YIDA
COPTED ET: JAC! AP!4AINE
NOT SIGNALISED
RN 23RD AVENUE
Prot Worth
Peds Right Thru Left
Date 01/24'04
g
8
TRAFFIC SURVEY SPECIALISTS, INC,
S24 GARDENIA TERRACE
DELRAY MACE, FLORIDA 33444
6561J 272-3255 FAA 6561} 272.4381
ALL HEMS A PDS
Site Code : 000401Ts
Start Date: 08/24/04
File I.D. 14ST23A4
Page : 2
VW 1111 STRIP DRIYINAT
Prom last iProm Sot
Peds Right Thre Left j Pede Right Thru
OW 14TR STREET
Prom west
Left , Peds Right Thrt Left , Total
1
NW 14TH STREET
0
1,156
1
1,157
3
3
817
1
NW 23RD AVENUE
0
14
817 820
0
0
1,977
13
13
26
3
0
9
12
ALL VEHICLES & PEDS
1,99
Intersection Total
2,000
0
0
0
0
1
0
DRIVEWAY
0
Vehicle
9
9
1,165 1,156
1
0
0
1,156
0
0
831
NW 14TH STREET
13
817
1
NW 14TF STRUT i NV I5RD RVSk7E
MU NI, FLORIDA
CCCNT8D BY: CA.T IRNAI I
NOT SIINAIIZLD
NI 23RD AVENUE
From North
Peels Right Thru Lett
Date 08/24/04 ----
Peak Nor Aaa13•aia ay
Peak Start 14:30
Volame 1
Percent - 179 Di
Pk total 6
Highest :4:45
%hale - 0 0
Hi total 1
PHF ,50
NW 14TH STREET
0
594 595
1
fflf 14TH STREET
Prod East
TRAFFIC SURVEY SPICIAL:STS, INC.
624 GARDRNIA TERPACF
D$LM BEACR, PLORXDL 33444
15611 272-3255 PAI (5611 2.72-4381
AIL V81I1CL1S & PEDS
DRIVEWAY
Froa Smith
Ped$ Right Thru Left Peds Right
Entire Intersection for
16.3D
839
590
17:00
140
.93
Site Code : t0040173
Start Date: 08/24/04
File I.C. : 14ST23AV
Page 3
f11 14111 STREET
From Kest
Veti:1e
Tbru Lett Peds aright Thru Left Total
the Fe:iod: 16:0D to i1:00 on 08124104
14;30
4 594 0 - 0 0
It 99# 01 Ot 01
0
16:00
1 155 C
0
.0
NW 2 3 RD AVENUE
6 •. 1 0 5
6 1 0 5
t 6 1
t 11
1
1
1
434
,030
434 435
0
0
0
1
0
4
5
ALL VEHICLES & PEDS
1,03
Intersection Total
1,039
0
0
0
0
0
0
DRIVEWAY
0
0
01
16:30
0 434 I
• 01 :00t 0
435
17:15
131
.83
0 131
4
4
598 594
0
0
0
L
594
0
0
439
NW 14TH STREET
5
434
0
15TE STRBBT & IN 231D AVINUE
.AMI, FLORIDA
CL'h"$D BI: LUIS PALOMINO
,SOT , IC1ALIIID
TRAFFIC SORVfl SPECIALISTS, INC.
624 GARDENIA TORRACB
DILRAT BRACL FLORIDA 33444
(561) 272-3255 PAX (5611 272.4381
ALL MUCUS CLSS & PEDB
NI 23RD AVMS 1111 15TH STA$IT
Prom South From Beet
Vehicle Other
Veda Kett Palls Right Total Total
Date O8/24/04 -
16:00 0 2 1 2 4 1
16:15 1 2 0 1 3 0
16:30 0 1 2 1 2 2
16;45 0 3 J 2 5 2
Or Total 0 8 5 6 14 5
17:00 0 1 2 0 1 2
17:15 0 0 2 3 3 2
17:30 0 0 t 5 5 0
IL IL 3 0 1 I, Q
Er Total 0 4 4 9 13 4
=TOTAL* 0 12 9 15 1 17 9
Site Code 00040/73
Start Date: 08/24/C4
File I.D. : 15ST23AV
Page : 1
W 15TH STEM i NW 3RD AVENUE
4,AMI, FORIDA
20UNTED BY: LJIS PALOMINO
+f7T SIGNALIZED
NW 23RD ARM
Prom South
Peds Left
Date 09/24/ 4
El 15TE STREET
Prom hest
1 Vehicle
Pede Eight I Total
71APFIC SURVEY SPECIALISTS, INC.
624 GARDEN:A TEkRACB
DELRAY BEACH, FLORIDA 33444
(551; 272.3255 FAX f5E1) 272-43 1
ALL VEHICLES 6 PEDS
Other
fatal
Site Code : 00040113
Start Dale: OP/24;54
File I.D. : 15STI3kY
Pace
NW 15TH STREET
12
0
0
12
0
0 15
15
15
g
9
7
- ALL VEHICLES & PEDS
Intersection Total
27
27
0 12
0
15
15 12
NW 23RD AVENUE
12-�----i
0
0
w 15TH STREET A NM 23 RD AVMS
LAk3, FLORIN
OWED BY: LUIS PALOMINO
0T SIGNALIZED
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BRACE, FLORIDA 33444
(561) 272.1255 FAX (561) 272.4381
ALL VBRICLES it PEDS
Site Code 0004O:73
Start Date: 26/ 4fO4
File I.D. . 15ST23AV
Page 3
NV 23RD AViEDE
From South
Pedi Left
ate 08/24/04
lilt 15TE STREET
Fro' Nest
Peda Eight
Vehicle Other
Total Total
elk Hour Analysis Ey Entire ?demotion for the Period: 1610 to 16:00 on 06/24/O4
eaX Ftart 16:45 16:45
glum 4
anent - 104i
Yt total 4
ighest 16:45
olutce 3
i total 3
iiF .13
- 1001
10
17:10
5
5
50
rW 15TH STREET
4
0
0
4
10
10
4
ALL VEHICLES & PEDS
Intersection Total
14
0
0
10
10
14
4
4
Nw 23RD AVENUE
4
0
0
0
0
iTR STREET i NW 24TA AVEAOE
I, FLORIDA
!ID 87; PRANA SAl3CF88
SIGNALIZED
TRAFFIC SLMRVHT SPItiCIALISTS, :NC.
624 GARD&2A TERRACE
DILRAT E2ACA, PLO ICA 33444
(561) 272-3755 FAX (5611 272.43E1
NW 24T1 40188U6
Prom North
flight Thru Left
08/24R4
0 0
5 1
0 0
5 0
`ota1 1
9
5
7
77
10 1
15 2 5
36 3 8
0 11
Total S 32
11
0
1
21
1
3
1
1
6
Nil 15TO STREET
Prom last
ALL VEP.ICLES i ?IDS
lilt 24TH AVSI (J
Frca South
Right Thru Left j Right Thru Left j Night
IW ISTII STREET
From Hest
Thru Left Total
Situ Code ; :0040173
;tart Date; 08/24if4
Pile I.D, 155724AV
Page : !
0 1
1 C 1
1 0 1
3 k 2
5 1 5
2 7 4
3 9 ?
'. 7 3
2
8 28 ;1
0 0 1 0 6 1
0 1 1 3 6 3
0 C i 1 4 4
0 1 2 9 4
0 1 4 6 15 12
TAL' 7 59 8 I 9
0
5
0
0
0
0
0
27
22
26
96
3 0 0 21
3 1 0 28
3 3 0 78
0 E I
9 4 1 r 10E
14 53 21 1 16 4 2 202
NV 15TH MIST i NW 24Td AV!<NVI
N1AN1, FLDRIDA
COVNTRD SY! PRANK SANCRYZ
NOT SIGNALIZED
TRAFFIC SURVEY SPECIALISTS. INC.
624 GARDENIA TERRACiI
DELRAY IIACR, FLORIDA 33444
(561) 772-3255 FAX .t5413 272.4381
NW 2478 AVENUE
From Borth
NW 1575 STREIT
From Past
Right Thru Lett 1 Right Ttru ;,eft
Date OB{24/S4
NW 15TH STREET
23
2
7
32
2
4
4 22
16
16
r
4
ALL VESICLES 6 PUS
t116 24T1 AMUR
From South
Right Thru Left
Site Code ; 0000173
Start Date; OE/24J04
File ..C. ] D24AV
Page : 2
Eli ISTE STREET
Frca hest
Right Thru Left
NW 24TH AVENUE
59
59
8
8
74 - r
134
2
53
5
60
ALL VEHICLES & PH S
Inte3rseCtion Total
202
174
9 23
59
16
84 23
NW 24TH AVENUE
4
Total
16
90
53
53
5
5
2
2
9
9
26
NW 15TH STREET
8
4
14
NW 25TH STREET i Ali 24TH AVENUE
MIAMI, FLORIDA
COVETED BY: FUER SWEET
NOT SIGRAL.UED
TRA?FIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY H ACE, FLORIDA 33444
(561) 272-3255 FJI (561) 272-4381
ALL VEHICLES !x PID8
N4 24TE AVBNUE 'NW i5?9 STREET
Pram North Prom Raft
Right Thru Left 1 Right Thru Left
Date 06/24/04
Peak Roar Analysis
Peak start 17:0O
totate 6 32
?anent 141 731
Pk total 44
Hignest 11:30
Volume 3 8
Hi total 12
PRP .9/
By Entire intersection
1700
6 0
I41 01
5
17:15
1 D
2
.62
0
NV 14T1 AVRNDH
Prom South
INV 15TE STREET
Prom xeat
Right Thu Left ! Right Thri Lett
for the Period: 16:00 to 11:00
17:DC
1 4 5 25 12
201 801 141 5H1 281
41
27:45
1 I 2 4 4
IS
.72
0 6
NW 15TH STREET
12
1 19
6
1
4
4
9
NW 24TH AVENUE
32
32
44
3
14
70
Total
n 00;24/04
17:DD
9 4 1
641 281 71
14
17:30
3 3 0
6
. 58
1
25
0
26
ALL VEHICLES & PEDS
Intersection Total
106
88
i"--'
4 12
32
9
45 12
NW 24TH AVENUE
2
43
25
25
1
5
Site Code : 00040113
Start Date: 01/24j84
File I.D. : 15ST240
Page : 3
0
1
1
4
4
16
NW 15TH STREET
5
4
6
Adjusted Traffic Counts
DAVID PLUMMER & ASSOCIATES, INC.
Project Name:
Location:
Observer:
24-HOUR COUNTS
Brisas del Rio
Nw 14 Street West of NW 23 Avenue
Traffic Survey Specialists, Inc.
BEGIN
TIME
Eastbound
lst 1/4
2nd 1/4
3rd 1/4
4th 1/4
TOTAL
12:00 AM
23
26
12
9
70
01:00 AM
10
2
3
9
24
02:00 AM
3
2
3
5
13
03:00 AM
2
7
4
3
16
04:00 AM
5
7
4
10
26
05:00 AM
11
10
20
20
61
06:00 AM
44
66
100
119
329
07:00 AM
97
102
114
142
455
08:00 AM
136
114
123
130
503
09:00 AM
131
84
95
80
390
10:00 AM
83
83
85
94
345
11:00AM
87
104
88
84
363
12:00 PM
85
85
83
79
332
01:00 PM
86
95
89
90
360
02:00 PM
81
105
102
87
375
03:00 PM
102
90
110
95
397
04:00 PM
107
100
106
87
400
05:00 PM
107
134
94
93
428
06:00 PM
111
110
86
77
384
07:00 PM
69
80
53
57
259
08:00 PM
62
53
40
65
220
09:00 PM
42
48
47
37
174
10:00 PM
62
42
26
27
157
11:0o PM
22
26
21
20
89
I24-HOUR TOTAL II
6,170
AM Peak Hour:
PM Peak Hour:
Eastbound
Project No.:
Count Date:
BEGIN
TIME
WESTBOUND
lst 1/4
2nd 1/4
3rd 1/4
4th 1/4
TOTAL
12:00 AM
16
6
5
10
37
01:00 AM
10
9
14
5
38
02:00 AM
2
1
10
3
16
03:00 AM
3
5
5
2
15
04:00 AM
6
11
8
10
35
05:00 AM
13
18
21
24
76
06:00 AM
34
49
52
61
196
07:00 AM
64
66
79
93
302
08:00 AM
90
86
91
78
345
09:00 AM
54
71
72
73
270
10:00 AM
68
63
67
69
267
11:00 AM
78
77
84
79
318
12:00 PM
100
70
71
76
317
01:00 PM
91
86
79
79
335
02:00 PM
91
119
108
111
429
03:00 PM
89
104
136
122
451
04:00 PM
159
140
145
136
580
05:00PM
156
139
124
123
542
06:00 PM
140
111
127
99
477
07:00 PM
97
86
87
76
346
08:00 PM
69
55
60
53
237
09:00 PM
48
44
49
42
183
10:00 PM
23
38
31
21
113
11:00 PM
22
19
22
15
78
II24-HOUR
TOTAL II
6,003
DAILY TRAFFIC COUNT SUMMARY
Time: 07:45 AM Volume: 515
Time: 04:30 PM Volume: 434
AM Peak Hour:
PM Peak Hour:
04199
8/24/04
TWO-WAY
TOTAL
107
62
29
31
61
137
525
757
848
660
612
681
649
695
804
848
980
970
861
605
457
357
270
167
12,173
AM Peak Hour: Time: 07:45 AM Volume: 360
PM Peak Hour: Time: 04:00 PM Volume: 580
EASTBOUND AND WESTBOUND
Time:
K-factor:
D-factor:
Time:
K-factor:
D-factor:
07:45 AM
7.2%
58.9% EB
04:30 PM
8.3
57.0% WB
Volume: 875
PHF: 0.93
Volume: 1,010
PHF: 0.92
14 st_west_23 ave.xls
DAVID PLUMMER & ASSOCIATES, INC.
Project Name:
Location:
Observer:
24-HOUR COUNTS
Brisas del Rio
NW 22 Avenue North of NW 18 Terrace
Traffic Survey Specialists, Inc.
BEGIN
TIME
NORTHBOUND
1st 1/4
2nd 1/4
3rd 1/4
4th 1/4
TOTAL
12:00 AM
49
32
14
20
115
01:00 AM
17
18
16
14
65
02:00 AM
18
8
8
14
48
03:00 AM
14
19
18
12
63
04:00 AM
12
14
26
30
82
05:00 AM
33
42
75
87
237
06:00 AM
102
163
212
230
707
07:00 AM
215
247
291
304
1,057
08:00 AM
266
225
215
246
952
09:00AM
216
214
187
176
793
10:OOAM
230
181
188
188
787
11:00 AM
172
219
226
235
852
12:OOPM
213
185
211
205
814
01:00 PM
218
214
212
193
837
02:00 PM
192
262
225
252
931
03:00 PM
262
245
262
257
1,026
04:00 PM
288
302
293
303
1,186
05:00 PM
336
344
260
255
1,195
06:00 PM
299
296
360
236
1,191
07:00 PM
221
181
184
172
758
08:00PM
166
149
109
118
542
09:00 PM
132
120
120
96
468
10:00 PM
109
105
79
60
353
11:00 PM
57
74
56
37
224
I24-HOUR TOTAL II
15,283
AM Peak Hour:
PM Peak Hour:
NORTHBOUND
Project No.:
Count Date:
BEGIN
TIME
SOUTHBOUND
1st 1/4
2nd 1/4
3rd 1/4
4th 1/4
TOTAL
12:00 AM
30
28
14
22
94
01:00 AM
21
11
17
13
62
02:00 AM
9
8
7
9
33
03:00 AM
13
9
5
6
33
04:00 AM
13
11
15
15
54
05:00 AM
23
32
50
55
160
06:00 AM
86
113
138
148
485
07:00 AM
204
245
264
260
973
08:00AM
288
245
235
250
1,018
09:00AM
228
207
234
179
848
10:OOAM
199
202
173
184
758
11:OOAM
179
215
199
191
784
12:00 PM
216
199
201
196
812
01:00PM
199
175
191
213
778
02:00 PM
196
236
223
231
886
03:00 PM
229
264
278
284
1,055
04:00 PM
326
294
352
315
1,287
05:00 PM
341
341
280
250
1,212
06:00 PM
306
353
336
245
1,240
07:00 PM
220
165
171
175
731
08:00 PM
144
115
106
95
460
09:00 PM
97
93
104
99
393
10:00 PM
67
53
79
46
245
11:00 PM
43
62
38
20
163
II24-HOUR
TOTAL II
14,564
DAILY TRAFFIC COUNT SUMMARY
Time: 07:15 AM Volume: 1,108
Time: 04:30 PM Volume: 1,276
AM Peak Hour:
PM Peak Hour:
AM Peak Hour:
PM Peak Hour:
NORTHBOUND AND SOUTHBOUND
Time:
K-factor:
D-factor:
Time:
K-factor:
D-factor:
07:15 AM
7.3
51.2% NB
04:30 PM
8.8
51.4% SB
04199
8/24/04
TWO-WAY
TOTAL
209
127
81
96
136
397
1,192
2,030
1,970
1,641
1,545
1,636
1,626
1,615
1,817
2,081
2,473
2,407
2,431
1,489
1,002
861
598
387
29,847
Time: 07:15 AM Volume: 1,057
Time: 04:30 PM Volume: 1,349
Volume: 2,165
PHF: 0.96
Volume: 2,625
PHF: 0.96
22 ave_north_18 terrace.xls
DAVID PLUMMER & ASSOCIATES,
Project
Location:
Observer:
INC.
Name:
TURNING MOVEMENT COUNTS
Brisas del Rio
Project Number:
Count Date:
Day of Week:
Tuesday
04199
NW 22 Avenue and NW 14 Street
8/24/04
Traffic Survey Specialists, Inc.
NW 22 Avenue
NW 14 Street
TIME
INTERVAL
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
GRAND
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
04:00 PM
04:15 PM
44
248
2
294
3
247
113
363
44
7
51
102
1
2
5
8
767
04:15 PM
04:30 PM
42
263
4
309
10
193
95
298
52
3
39
94
6
0
2
8
709
04:30 PM
04:45 PM
27
255
1
283
5
259
117
381
53
3
50
106
5
3
3
11
781
04:45 PM
05:00 PM
43
263
3
309
6
277
91
374
47
1
39
87
1
1
6
8
778
05:00 PM
05:15 PM
41
290
6
337
4
248
108
360
52
3
56
111
1
1
11
13
821
05:15 PM
05:30 PM
54
259
3
316
3
250
87
340
62
2
69
133
6
1
3
10
799
05:30 PM
05:45 PM
38
229
3
270
2
232
85
319
48
2
48
98
1
3
5
9
696
05:45 PM
06:00 PM
41
232
1
274
5
205
88
298
47
1
45
93
1
2
1
4
669
PM PEAK PERIOD HOUR TURNING MOVEMENT COUNT SUMMARY
PEAK SEASON DAILY TRAFFIC CONDITIONS
NW 22 Avenue
NW 14 Street
TIME
INTERVAL
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
GRAND
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
04:00 PM
06:00 PM
170
1050
12
1,232
20
984
404
1,407
209
11
204
424
11
7
19
37
3,100
PEAK HOUR FACTOR
0.89
0.90
0.77
0.68
0.97
Note: 2003 FDOT Seasonal Weekly Volume Factor =
1.03
22 ave_14 st.xls
DAVID PLUMMER & ASSOCIATES,
Project
Location:
Observer:
INC.
Name:
TURNING MOVEMENT COUNTS
Brisas del Rio
Project Number:
Count Date:
Day of Week:
Tuesday
04199
NW 23 Avenue and NW 14 Street
8/24/04
Traffic Survey Specialists, Inc.
NW 23 Avenue
NW 14 Street
TIME
INTERVAL
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
GRAND
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
04:00 PM
04:15 PM
0
0
0
0
2
0
0
2
0
102
0
102
0
167
2
169
273
04:15 PM
04:30 PM
0
0
0
0
1
0
0
1
1
94
0
95
0
143
1
144
240
04:30 PM
04:45 PM
0
0
0
0
0
0
0
0
0
113
0
113
0
153
1
154
267
04:45 PM
05:00 PM
0
0
0
0
3
0
0
3
1
81
0
82
0
136
2
138
223
05:00 PM
05:15 PM
0
0
0
0
0
0
0
0
0
109
0
109
0
159
1
160
269
05:15 PM
05:30 PM
0
0
0
0
2
0
1
3
0
131
0
131
0
146
0
146
280
05:30 PM
05:45 PM
0
0
0
0
4
0
0
4
0
93
0
93
0
126
0
126
223
05:45 PM
06:00 PM
0
0
1
1
1
0
0
1
1
94
0
95
0
126
2
128
225
PM PEAK PERIOD HOUR TURNING MOVEMENT COUNT SUMMARY
PEAK SEASON DAILY TRAFFIC CONDITIONS
NW 23 Avenue
NW 14 Street
TIME
INTERVAL
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
GRAND
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
04:00 PM
06:00 PM
0
0
1
1
7
0
1
7
2
421
0
422
0
595
5
600
1,030
PEAK HOUR FACTOR
0.13
0.44
0.78
0.86
0.93
Note: 2003 FDOT Seasonal Weekly Volume Factor =
1.03
23 ave_14 st.xls
DAVID PLUMMER & ASSOCIATES,
Project
Location:
Observer:
INC.
Name:
TURNING MOVEMENT COUNTS
Brisas del Rio
Project Number:
Count Date:
Day of Week:
Tuesday
04199
NW 23 Avenue and NW 15 Street
8/24/04
Traffic Survey Specialists, Inc.
NW 23 Avenue
NW 15 Street
TIME
INTERVAL
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
GRAND
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
04:00 PM
04:15 PM
2
0
0
2
0
0
0
0
0
0
2
2
0
0
0
0
4
04:15 PM
04:30 PM
2
0
0
2
0
0
0
0
0
0
1
1
0
0
0
0
3
04:30 PM
04:45 PM
1
0
0
1
0
0
0
0
0
0
1
1
0
0
0
0
2
04:45 PM
05:00 PM
3
0
0
3
0
0
0
0
0
0
2
2
0
0
0
0
5
05:00 PM
05:15 PM
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
05:15 PM
05:30 PM
0
0
0
0
0
0
0
0
0
0
3
3
0
0
0
0
3
05:30 PM
05:45 PM
0
0
0
0
0
0
0
0
0
0
5
5
0
0
0
0
5
05:45 PM
06:00 PM
3
0
0
3
0
0
0
0
0
0
1
1
0
0
0
0
4
PM PEAK PERIOD HOUR TURNING MOVEMENT COUNT SUMMARY
PEAK SEASON DAILY TRAFFIC CONDITIONS
NW 23 Avenue
NW 15 Street
TIME
INTERVAL
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
GRAND
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
04:00 PM
06:00 PM
6
0
0
6
0
0
0
0
0
0
8
8
0
0
0
0
14
PEAK HOUR FACTOR
0.50
N/A
0.38
N/A
0.70
Note: 2003 FDOT Seasonal Weekly Volume Factor =
1.03
23 ave_15 st.xls
DAVID PLUMMER & ASSOCIATES,
Project
Location:
Observer:
INC.
Name:
TURNING MOVEMENT COUNTS
Brisas del Rio
Project Number:
Count Date:
Day of Week:
Tuesday
04199
NW 24 Avenue and NW 15 Street
8/24/04
Traffic Survey Specialists, Inc.
NW 24 Avenue
NW 15 Street
TIME
INTERVAL
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
GRAND
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
04:00 PM
04:15 PM
4
7
2
13
1
9
0
10
1
0
1
2
1
1
0
2
27
04:15 PM
04:30 PM
2
9
3
14
0
5
1
6
0
0
0
0
1
0
1
2
22
04:30 PM
04:45 PM
3
7
1
11
1
7
0
8
0
0
5
5
1
0
1
2
26
04:45 PM
05:00 PM
2
5
2
9
0
6
0
6
0
0
1
1
2
0
3
5
21
05:00 PM
05:15 PM
1
6
0
7
1
8
1
10
0
0
3
3
1
0
0
1
21
05:15 PM
05:30 PM
3
6
3
12
3
5
2
10
0
1
3
4
1
1
0
2
28
05:30 PM
05:45 PM
4
4
1
9
1
8
3
12
0
3
3
6
1
0
0
1
28
05:45 PM
06:00 PM
4
9
2
15
1
11
0
12
1
0
0
1
1
0
0
1
29
PM PEAK PERIOD HOUR TURNING MOVEMENT COUNT SUMMARY
PEAK SEASON DAILY TRAFFIC CONDITIONS
NW 24 Avenue
NW 15 Street
TIME
INTERVAL
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
GRAND
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
04:00 PM
06:00 PM
12
27
7
46
4
30
4
38
1
2
8
11
5
1
3
8
104
PEAK HOUR FACTOR
0.75
0.77
0.46
0.40
0.91
Note: 2003 FDOT Seasonal Weekly Volume Factor =
1.03
24 ave_15 st.xls
Signal Timings
Signal Timings
PATTERN SCHEDULE FOR 4490 NW 22 AVE & 14 ST FOR DAY # 4 (SECTION 65)
TIME PT OFF NSW F Y R EWW F G Y R NL Y S Y M CYC
MIN: 7 19 14 1 5
0 19 7 11 18 4 2 7 14 1 4 1 5 3 70NITE 0/3
100 23 0 8 19 4 2 7 14 1 4 1 5 3 7 68LATE NIG
500 9 7 11 18 4 2 7 14 1 4 1 5 3 70EARLY MO
530 4 12 15 19 4 2 7 14 1 4 1 5 3 75PRE AM
630 5 8 34 19 4 2 7 14 7 4 1 5 3 100AM PEAK
800 2 8 34 19 4 2 7 14 7 4 1 5 3 100AM PEAK
930 6 56 24 19 4 2 7 14 7 4 1 5 3 90MID-DAY
1330 3 56 24 19 4 2 7 14 7 4 1 5 3 90AFT SCH
1530 10 110 35 19 4 2 7 14 26 4 1 5 3 120PM PEAK
1615 7 110 35 19 4 2 7 14 26 4 1 5 3 120PM PEAK
1830 8 61 20 19 4 2 7 14 1 4 1 5 3 80POST PM
2000 12 58 20 19 4 2 7 14 1 4 1 5 3 80EVENING
Appendix C
FDOT's Quality/LOS Handbook
Generalized Tables
Metrobus
Transit Ridership
Lanes Divided
1 Undivided
2 Divided
3 Divided
4 Divided
TABLE 4 - 7
GENERALIZED PEAK HOUR DIRECTIONAL VOLUMES FOR FLORIDA'S
URBANIZED AREAS*
UNINTERRUPTED FLOW HIGHWAYS
Lanes Divided
1 Undivided
2 Divided
3 Divided
Level of Service
A B C D
100 340 670 950
1,060 1,720 2,500 3,230
1,600 2,590 3,740 4,840
E
1,300
3,670
5,500
STATE TWO-WAY ARTERIALS
Class I (>0.00 to 1.99 signalized intersections per mile)
Level of Service
A B C D
** 220 720 860
250 1,530 1,810 1,860
380 2,330 2,720 2,790
490 3,030 3,460 3,540
Class II (2.00 to 4 50 signalized intersections per mile)
Level of Service
Lanes Divided A B C D
1 Undivided
2 Divided
3 Divided
4 Divided
**
* *
* *
**
I as
220
340
440
590
1,360
2,110
2,790
810
1,7 ID
2,570
3,330
890
***
***
***
E
850
1,800
2,710
3,500
Class III (more than 4.5 signalized intersections per mile and not
within primary city central business district of an
urbanized area over 750,000)
Lanes Divided
1 Undivided
2 Divided
3 Divided
4 Divided
A
**
**
**
B
**
**
**
Level of Service
C D
280
650
1,020
1,350
660
1,510
2,330
3,070
E
810
1,720
2,580
3,330
Class IV (more than 4.5 signalized intersections per mile and within
primary city central business district of an urbanized area
over 750,000)
Lanes Divided
1 Undivided
2 Divided
3 Divided
4 Divided
A
**
**
* *
Level of Service
8 C D
**
**
**
**
270 720
650 1,580
1,000 2,390
1,350 3,130
E
780
1,660
2,490
3,250
NON -STATE ROADWAYS
Major City/County Roadways
Level of Service
Lanes Divided A B C D
1 Undivided
2 Divided
3 Divided
Lanes Divided
1 Undivided
2 Divided
it* **
** 4*
** **
480 760
1,120 1,620
1,740 2,450
Other Signalized Roadways
(signalized intersection analysis)
Level of Service
A B C D
** 250 530
** ** 580 I,140
E
810
1,720
2,580
E
660
1,320
Lanes
2
3
4
5
6
Interchange spacing a 2 rni. apart
Level of Service
B C D
A
1,270
1,970
2,660
3,360
4,050
FREEWAYS
2,110 2,940
3,260 4,550
4,410 6,150
5,560 7,760
6,710 9,360
3,580
5,530
7,480
9,440
11,390
Interchange spacing <2 mi. apart
Level of Service
Lanes A B C D
2 1,130 1,840 2,660 3,440
3 I,780 2,890 4,180 5,410
4 2,340 3,940 5,700 7,380
5 3,080 4,990 7,220 9,340
6 3,730 6,040 8,740 11,310
E
3,980
6,150
8,320
10,480
12,650
E
3,910
6,150
8,380
10,620
12,850
BICYCLE MODE
(Note. Level of service for the bicycle mode in this table is based on roadway
geometries at 40 mph posted speed and traffic conditions, not number of
bicyclists using the facility.) (Multiply motorized vehicle volumes shown below
by number of directional roadway lanes to determine maximum service volumes.)
Paved Shoulder/
Bicycle Lane
Coverage
4-49%
50-84%
85-I00%
A
*♦
**
160
Level of Service
B C
170
130 210
380 >380
*4
D
720
>210
***
E
>720
***
PEDESTRIAN MODE
(Note: Level of service for the pedestrian mode in this table is based on roadway
geometries at 40 mph posted speed and traffic conditions, not the number of
pedestrians using the facility.) (Multiply motorized vehicle volumes shown below
by number of directional roadway lanes to determine maximum service volumes.)
Sidewalk Coverage
0-49%
50-84%
85-100%
Sidewalk Coverage
0-84%
85-100%
A
**
**
**
B
**
**
120
Level of Service
C D
** 330
** 520
590 >590
BUS MODE (Scheduled Fixed Route)
(Buses per hour)
Level of Service
A B C
>5 ?4
>6 >4 >3
D
>3
>2
E
810
990
***
E
>2
>1
Source: Florida Department of Transportation
Systems Planning Office
605 Suwannee Street, MS 19
Tallahassee, FL 32399-0450
02/22/02
Lanes
1
1
Multi
Multi
ARTERIAL/NON-STATE ROADWAY ADJUSTMENTS
DIVIDED/UNDIVIDED
(alter corresponding volumes by the indicated percent)
Median Left Turns Lanes Adjustment Factors
Divided Yes +5%
Undivided
Undivided
Undivided
No
Yes
No
-20%
-5%
-25%
http:liv vvcvl 1.myflorida,eornfplatutingisystemslsmlloefdefault.htm ONE WAY FACILITIES
Increase corresponding volume 2.0%
nits table does not constitute a standard and should be used only for general planning applications The computer modes from which this table is derived should be used for more specific planning
applications. The table and denying computer models should not he used for corridor or intersection design, where more refined techniques exist. Values shown are hourly directional wlutrres for levels of
service and are for the aulomabildtruck modes unless specifically stated. Level of service letter grade thresholds are probably rot comparable across modes and therefore, crass modal comparisons should be
made with caution Furthermore, combining levels of service of different modes into one overall roadway level of senice is not recommended. To conven to annual average daily traffic volumes, these,
volumes must be divided by appropriate D and K factors. The table's input value defaults and level of service cnteria appear on the following page. Calculations are based onplarrmr g applications of the
Highway Capacity Manual, Bicycle LOS Model. Pedestrian LOS Model and Transit Capacity and Quality of Service Manual, respectively for the automobilertruck, bicycle, pedestrian and bus erodes
""Carnet be achieved using table input value defaults.
""Nat applicable for that level of service letter grade. For automobileltruck modes, volumes greater than level of service D become F because intersection capacities have been reached. For bicycle
and pedestrian modes, the level of service letter grade (including F) is aol achievable, because there is no maximum vehicle volume threshold using table input value defaults.
97
LEVEL OF SERVICE TABLE
CLASSIFICATION
TYPE
FDOTS 2002 QUALITY / LEVEL OF SERVICE
Ill
PERSON TRIP LEVEL OF SERVICE
A
B
C
D
E
A
B
C
D
E
CLASS 4
ARTERIAL
1LU
0
0
270
720
780
0
0
0.35
0.92
1.00
2LD
0
0
650
1580
1660
0
0
0.39
0.95
1.00
3LD
0
0
1000
2390
2490
0
0
0.40
0.96
1.00
4LD
0
0
1350
3130
3250
0
0
0.42
0.96
1.00
MAJOR CITY/COUNTY
ROADWAYS (NON
STATE)
1LU
0
0
480
760
810
0
0
0.59
0.94
1.00
2LD
0
0
1120
1620
1720
0
0
0.65
0.94
1.00
3LD
0
0
1740
2450
2580
0
0
0.67
0.95
1.00
OTHER SIGNALIZED
ROADWAYS
1LU
0
0
250
530
660
0
0
0.38
0.80
1.00
2LD
0
0
580
1140
1320
0
0
0.44
0.86
1.00
Source: FDOT's 2002 Quality/Level of Service Handbook
NOTES:
[1] THE PERSON TRIP LEVEL OF SERVICE IS DERIVED BY DIVIDING THE FDOT'S 2002 LEVEL OF SERVICE BY THE LOS E
FOR EACH TYPE OF ROADWAY.
BUS OCCUPANCY INFORMATION
ROUTE DIRECTION LOCATION BUS # RUN # DATE TIME PASSENGERS
6 NB NW 14 St / NW 22 Ave 2302 9202 10/10/03 16:59 1
6 NB NW 14 St / NW 22 Ave 2308 9202 2/12/03 16:58 3
6 NB NW 14 St / NW 22 Ave 2304 9202 11/20/02 17:00 1
22 NB NW 22 Ave / NW 20 St 2054 5116 1/28/04 16:40 14
22 NB NW 22 Ave / NW 20 St 2056 5023 / 5118 5/28/03 15:56 24
22 NB NW 22 Ave / NW 20 St 2055 5082 / 5116 5/15/03 14:53 19
22 SB NW 22 Ave / NW 20 St 2054 5116 1/28/04 19:14 3
22 SB NW 22 Ave / NW 20 St 2056 5023 / 5118 5/28/03 18:35 6
22 SB NW 22 Ave / NW 20 St 2055 5082 / 5116 5/15/03 17:43 2
Source: MDTA
Brisas Del Rio
Bus Ridership Information
Bus Route 6 22
PM Peak Headways 60 min. 30 min
PM Peak Vehicles 2 4
Bus Capacity 26 38
Average PM Peak Ridership2
PM Peak Capacity3
NB 2 19
SB - 4
52 152
Notes:
1 - Bus ridership and capacity information was based on information provided by MDTA
2 - Average PM Peak ridership was calculated from ridership information obtained from drivers
3 - Calculated based on number of PM Peak vehicles times bus capacity.
Appendix D
Intersection Capacity Analysis
Worksheets
Queuing Analysis
INTERSECTION
MOVEMENT
PM
PK SEASON
PK PERIOD
Background
Growth rate 0.5%
No. of years 2
Terrazas De
Miami River
Total for all
Commited
Developments
FUTURE
W/O
PROJECT
Net New Project Trips
FUTURE
WITH
PROJECT
In
159
Out
87
Total
246
NBL
170
172
0
0
172
0.150
0.000
24
196
NBT
1050
1061
10
10
1071
0.000
0.000
0
1071
NBR
12
12
0
0
12
0.000
0.000
0
12
SBL
20
20
0
0
20
0.000
0.000
0
20
SBT
984
994
16
16
1010
0.000
0.000
0
1010
NW 22 AVENUE /
SBR
404
408
0
0
408
0.200
0.000
32
440
NW 14 STREET
EBL
209
211
0
0
211
0.000
0.200
17
228
EBT
11
11
0
0
11
0.000
0.000
0
11
EBR
204
206
0
0
206
0.000
0.150
13
219
WBL
11
11
0
0
11
0.000
0.000
0
11
WBT
7
7
0
0
7
0.000
0.000
0
7
WBR
19
19
0
0
19
0.000
0.000
0
19
TOTAL
3101
3132
26
26
3158
0.350
0.350
86
3244
NBL
0
0
0
0
0
0.000
0.000
0
0
NBT
0
0
0
0
0
0.000
0.000
0
0
NBR
1
1
0
0
1
0.000
0.000
0
1
SBL
7
7
0
0
7
0.000
0.350
30
38
SBT
0
0
0
0
0
0.000
0.000
0
0
NW 23 AVENUE /
SBR
1
1
0
0
1
0.000
0.100
9
10
NW 14 STREET
EBL
2
2
0
0
2
0.100
0.000
16
18
EBT
421
425
0
0
425
0.000
0.000
0
425
EBR
0
0
0
0
0
0.000
0.000
0
0
WBL
0
0
0
0
0
0.000
0.000
0
0
WBT
595
601
0
0
601
0.000
0.000
0
601
WBR
5
5
0
0
5
0.350
0.000
56
61
TOTAL
1032
1042
0
0
1042
0.450
0.450
111
1153
NBL
6
6
0
0
6
0.000
0.000
0
6
NBT
0
0
0
0
0
0.450
0.000
72
72
NBR
0
0
0
0
0
0.000
0.000
0
0
SBL
0
0
0
0
0
0.000
0.000
0
0
NW 23 AVENUE /
SBT
0
0
0
0
0
0.000
0.450
39
39
NW 15 STREET
SBR
0
0
0
0
0
0.000
0.000
0
0
(DRIVEWAY D)
EBL
0
0
0
0
0
0.000
0.000
0
0
EBT
0
0
0
0
0
0.000
0.000
0
0
EBR
8
8
0
0
8
0.000
0.000
0
8
WBL
0
0
0
0
0
0.000
0.000
0
0
WBT
0
0
0
0
0
0.000
0.000
0
0
WBR
0
0
0
0
0
0.000
0.000
0
0
TOTAL
14
14
0
0
14
0.450
0.450
111
125
NBL
12
12
0
0
12
0.000
0.000
0
12
NBT
27
27
0
0
27
0.300
0.000
48
75
NBR
7
7
0
0
7
0.000
0.000
0
7
SBL
4
4
0
0
4
0.000
0.000
0
4
SBT
30
30
0
0
30
0.000
0.300
26
56
NW 24 AVENUE /
SBR
4
4
0
0
4
0.000
0.000
0
4
NW 15 STREET
EBL
1
1
0
0
1
0.000
0.000
0
1
EBT
2
2
0
0
2
0.000
0.000
0
2
EBR
8
8
0
0
8
0.000
0.000
0
8
WBL
5
5
0
0
5
0.000
0.000
0
5
WBT
1
1
0
0
1
0.000
0.000
0
1
WBR
3
3
0
0
3
0.000
0.000
0
3
TOTAL
104
105
0
0
105
0.300
0.300
74
179
#04124
3/7/05 10:25 AM
TMC's Intersection Assignment.xls
INTERSECTION
MOVEMENT
PM
PK SEASON
PK PERIOD
Background
Growth rate 0.5%
No. of years 2
Terrazas De
Miami River
Total for all
Commited
Developments
FUTURE
W/O
PROJECT
Net New Project Trips
FUTURE
WITH
PROJECT
In
159
Out
87
Total
246
NBL
0
0
0
0
0
0.000
0.000
0
0
NBT
31
31
0
0
31
0.000
0.000
0
31
NBR
0
0
0
0
0
0.000
0.000
0
0
SBL
0
0
0
0
0
0.000
0.000
0
0
SBT
38
38
0
0
38
0.000
0.000
0
38
DRIVEWAY A
SBR
0
0
0
0
0
0.000
0.100
9
9
EBL
0
0
0
0
0
0.100
0.000
16
16
EBT
0
0
0
0
0
0.000
0.000
0
0
EBR
0
0
0
0
0
0.000
0.000
0
0
WBL
0
0
0
0
0
0.000
0.000
0
0
WBT
0
0
0
0
0
0.000
0.000
0
0
WBR
0
0
0
0
0
0.000
0.000
0
0
TOTAL
69
70
0
0
70
0.100
0.100
25
94
NBL
0
0
0
0
0
0.000
0.000
0
0
NBT
31
31
0
0
31
0.000
0.000
0
31
NBR
0
0
0
0
0
0.100
0.000
16
16
SBL
0
0
0
0
0
0.150
0.000
24
24
SBT
38
38
0
0
38
0.000
0.000
0
38
DRIVEWAY B
SBR
0
0
0
0
0
0.000
0.000
0
0
EBL
0
0
0
0
0
0.000
0.000
0
0
EBT
0
0
0
0
0
0.000
0.000
0
0
EBR
0
0
0
0
0
0.000
0.000
0
0
WBL
0
0
0
0
0
0.000
0.100
9
9
WBT
0
0
0
0
0
0.000
0.000
0
0
WBR
0
0
0
0
0
0.000
0.150
13
13
TOTAL
69
70
0
0
70
0.250
0.250
62
131
NBL
0
0
0
0
0
0.000
0.000
0
0
NBT
31
31
0
0
31
0.000
0.000
0
31
NBR
0
0
0
0
0
0.200
0.000
32
32
SBL
0
0
0
0
0
0.000
0.000
0
0
SBT
38
38
0
0
38
0.000
0.000
0
38
DRIVEWAY C
SBR
0
0
0
0
0
0.000
0.000
0
0
EBL
0
0
0
0
0
0.000
0.000
0
0
EBT
0
0
0
0
0
0.000
0.000
0
0
EBR
0
0
0
0
0
0.000
0.000
0
0
WBL
0
0
0
0
0
0.000
0.200
17
17
WBT
0
0
0
0
0
0.000
0.000
0
0
WBR
0
0
0
0
0
0.000
0.000
0
0
TOTAL
69
70
0
0
70
0.200
0.200
49
119
#04124
3/7/05 10:25 AM
TMC's Intersection Assignment.xls
Existing Conditions
HCS2000: Signalized Intersections Release 4.1e
Analyst: DPA Inter.: NW 22 AVENUE / NW 14 STREET
Agency: Area Type: All other areas
Date: 8/30/04 Jurisd:
Period: EXISITING PM PEAK PERIOD Year : 2004
Project ID: BRISAS DEL RIO MUSP - # 04199
E/W St: NW 14 STREET N/S St: NW 22 AVENUE
SIGNALIZED INTERSECTION SUMMARY
I Eastbound Westbound I Northbound I Southbound
IL TR LTRILTRILTR
I I I
No. Lanes I 1 1 0 0 1 1 I 1 2 0 I 1 2 0
LGConfig I L TR LT R I L TR I L TR
Volume 1209 11 204 111 7 19 1170 1050 12 120 984 404
Lane Width 112.0 12.0 1 12.0 12.0 112.0 12.0 112.0 12.0
RTOR Vol I 0 1 2 I 0 I 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A 1 NB Left A A
Thru A 1 Thru A
Right A Right A
Peds Peds
WB Left A SB Left A
Thru A Thru A
Right A Right A
Peds Peds
NB Right 1 EB Right
SB Right 1 WB Right
Green 47.0 54.0 5.0
Yellow 4.0 4.0 3.0
All Red 1.0 2.0 0.0
Cycle Length: 120.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 555 1417 0.39 0.39 26.6 C
TR 638 1629 0.35 0.39 26.0 C 26.3 C
Westbound
LT 639 1632 0.03 0.39 22.5 C 22.5 C
R 633 1615 0.03 0.39 22.5 C
Northbound
L 228 1805 0.77 0.54 64.2 E
TR 1625 3612 0.67 0.45 27.1 C 32.3 C
Southbound
L 120 267 0.17 0.45 20.4 C
TR 1557 3460 0.92 0.45 40.0 D 39.8 D
Intersection Delay = 34.7 (sec/veh) Intersection LOS = C
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: DPA
Agency/Co.:
Date Performed: 8/30/04
Analysis Time Period: EXISTING PM PEAK PERIOD
Intersection: NW 23 AVENUE / NW 14 STREET
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2004
Project ID: BRISAS DEL RIO MUSP - 04199
East/West Street: NW 14 STREET
North/South Street: NW 23 AVENUE
Intersection Orientation: EW Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 2 421 0 0 595 5
Peak -Hour Factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93
Hourly Flow Rate, HFR 2 452 0 0 639 5
Percent Heavy Vehicles 2 -- -- 2 -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 0 0 1 7 0 1
Peak Hour Factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93
Hourly Flow Rate, HFR 0 0 1 7 0 1
Percent Heavy Vehicles 2 2 2 2 2 2
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage No / No /
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config LTR LTR I LTR I LTR
v (vph) 2 0 1 8
C(m) (vph) 941 1109 608 204
v/c 0.00 0.00 0.00 0.04
95% queue length 0.01 0.00 0.00 0.12
Control Delay 8.8 8.2 10.9 23.4
LOS A A B C
Approach Delay 10.9 23.4
Approach LOS B C
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: DPA
Agency/Co.:
Date Performed: 8/30/04
Analysis Time Period: EXISTING PM PEAK PERIOD
Intersection: NW 23 AVENUE / NW 15 STREET
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2004
Project ID: BRISAS DEL RIO MUSP - 04199
East/West Street: NW 15 STREET
North/South Street: NW 23 AVENUE
Intersection Orientation: EW Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 8
Peak -Hour Factor, PHF 0.70
Hourly Flow Rate, HFR 11
Percent Heavy Vehicles -- --
Median Type/Storage Undivided
RT Channelized? No
Lanes 1
Configuration R
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 6
Peak Hour Factor, PHF 0.70
Hourly Flow Rate, HFR 8
Percent Heavy Vehicles 2
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage
Lanes 1
Configuration L
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 1 7 8 9 I 10 11 12
Lane Config I L I
v (vph) 8
C(m) (vph) 1023
v/c 0.01
95% queue length 0.02
Control Delay 8.5
LOS A
Approach Delay
Approach LOS
8.5
A
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: DPA
Agency/Co.:
Date Performed: 8/30/04
Analysis Time Period: EXISTING PM PEAK PERIOD
Intersection: NW 24 AVENUE / NW 15 STREET
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2004
Project ID: BRISAS DEL RIO MUSP - 04199
East/West Street: NW 15 STREET
North/South Street: NW 24 AVENUE
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 12 27 7 4 30 4
Peak -Hour Factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91
Hourly Flow Rate, HFR 13 29 7 4 32 4
Percent Heavy Vehicles 2 -- -- 2 -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 5 1 3 1 2 8
Peak Hour Factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91
Hourly Flow Rate, HFR 5 1 3 1 2 8
Percent Heavy Vehicles 2 2 2 2 2 2
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage No / No /
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config LTR LTR I LTR I LTR
v (vph) 13 4 9 11
C(m) (vph) 1575 1575 901 963
v/c 0.01 0.00 0.01 0.01
95% queue length 0.02 0.01 0.03 0.03
Control Delay 7.3 7.3 9.0 8.8
LOS A A A A
Approach Delay 9.0 8.8
Approach LOS A A
Existing Conditions
With Modified Signal Timing
HCS2000: Signalized Intersections Release 4.1e
Analyst: DPA Inter.: NW 22 AVENUE / NW 14 STREET
Agency: Area Type: All other areas
Date: 8/30/04 Jurisd:
Period: EXISITING PM PEAK PERIOD Year : 2004 w/ improvement
Project ID: BRISAS DEL RIO MUSP - # 04199
E/W St: NW 14 STREET N/S St: NW 22 AVENUE
SIGNALIZED INTERSECTION SUMMARY
I Eastbound Westbound I Northbound I Southbound
IL TR LTRILTRILTR
I I I
No. Lanes I 1 1 0 0 1 1 I 1 2 0 I 1 2 0
LGConfig I L TR LT R I L TR I L TR
Volume 1209 11 204 111 7 19 1170 1050 12 120 984 404
Lane Width 112.0 12.0 1 12.0 12.0 112.0 12.0 112.0 12.0
RTOR Vol I 0 1 2 I 0 I 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A 1 NB Left A A
Thru A 1 Thru A
Right A Right A
Peds Peds
WB Left A SB Left A
Thru A Thru A
Right A Right A
Peds Peds
NB Right 1 EB Right
SB Right 1 WB Right
Green 42.0 54.0 10.0
Yellow 4.0 4.0 3.0
All Red 1.0 2.0 0.0
Cycle Length: 120.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 496 1417 0.43 0.35 30.5 C
TR 570 1629 0.39 0.35 29.8 C 30.1 C
Westbound
LT 568 1624 0.03 0.35 25.7 C 25.7 C
R 565 1615 0.03 0.35 25.7 C
Northbound
L 304 1805 0.58 0.58 47.6 D
TR 1625 3612 0.67 0.45 27.1 C 30.0 C
Southbound
L 120 267 0.17 0.45 20.4 C
TR 1557 3460 0.92 0.45 40.0 D 39.8 D
Intersection Delay = 34.4 (sec/veh) Intersection LOS = C
Future without Project
HCS2000: Signalized Intersections Release 4.1e
Analyst: DPA Inter.: NW 22 AVENUE / NW 14 STREET
Agency: Area Type: All other areas
Date: 8/30/04 Jurisd:
Period: FUTURE WO PROJ PM PEAK PERIOD Year : 2004
Project ID: BRISAS DEL RIO MUSP - # 04199
E/W St: NW 14 STREET N/S St: NW 22 AVENUE
SIGNALIZED INTERSECTION SUMMARY
I Eastbound Westbound I Northbound I Southbound
IL TR LTRILTRILTR
I I I
No. Lanes I 1 1 0 0 1 1 I 1 2 0 I 1 2 0
LGConfig I L TR LT R I L TR I L TR
Volume 1211 11 206 111 7 19 1172 1071 12 120 1010 408
Lane Width 112.0 12.0 1 12.0 12.0 112.0 12.0 112.0 12.0
RTOR Vol I 0 1 2 I 0 I 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A 1 NB Left A A
Thru A 1 Thru A
Right A Right A
Peds Peds
WB Left A SB Left A
Thru A Thru A
Right A Right A
Peds Peds
NB Right 1 EB Right
SB Right 1 WB Right
Green 47.0 54.0 5.0
Yellow 4.0 4.0 3.0
All Red 1.0 2.0 0.0
Cycle Length: 120.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 555 1417 0.39 0.39 26.7 C
TR 638 1629 0.35 0.39 26.1 C 26.4 C
Westbound
LT 639 1631 0.03 0.39 22.5 C 22.5 C
R 633 1615 0.03 0.39 22.5 C
Northbound
L 228 1805 0.78 0.54 65.5 E
TR 1625 3612 0.69 0.45 27.5 C 32.7 C
Southbound
L 114 253 0.18 0.45 20.6 C
TR 1557 3461 0.94 0.45 42.8 D 42.5 D
Intersection Delay = 36.2 (sec/veh) Intersection LOS = D
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: DPA
Agency/Co.:
Date Performed: 8/30/04
Analysis Time Period: FUTURE WO PROJ PM PEAK PERIOD
Intersection: NW 23 AVENUE / NW 14 STREET
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2004
Project ID: BRISAS DEL RIO MUSP - 04199
East/West Street: NW 14 STREET
North/South Street: NW 23 AVENUE
Intersection Orientation: EW Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 2 425 0 0 601 5
Peak -Hour Factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93
Hourly Flow Rate, HFR 2 456 0 0 646 5
Percent Heavy Vehicles 2 -- -- 2 -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 0 0 1 7 0 1
Peak Hour Factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93
Hourly Flow Rate, HFR 0 0 1 7 0 1
Percent Heavy Vehicles 2 2 2 2 2 2
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage No / No /
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config LTR LTR I LTR I LTR
v (vph) 2 0 1 8
C(m) (vph) 935 1105 604 201
v/c 0.00 0.00 0.00 0.04
95% queue length 0.01 0.00 0.00 0.12
Control Delay 8.9 8.3 11.0 23.7
LOS A A B C
Approach Delay 11.0 23.7
Approach LOS B C
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: DPA
Agency/Co.:
Date Performed: 8/30/04
Analysis Time Period: FUTURE WO PROJ PM PEAK PERIOD
Intersection: NW 23 AVENUE / NW 15 STREET
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2004
Project ID: BRISAS DEL RIO MUSP - 04199
East/West Street: NW 15 STREET
North/South Street: NW 23 AVENUE
Intersection Orientation: EW Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 8
Peak -Hour Factor, PHF 0.70
Hourly Flow Rate, HFR 11
Percent Heavy Vehicles -- --
Median Type/Storage Undivided
RT Channelized? No
Lanes 1
Configuration R
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 6
Peak Hour Factor, PHF 0.70
Hourly Flow Rate, HFR 8
Percent Heavy Vehicles 2
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage
Lanes 1
Configuration L
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 1 7 8 9 I 10 11 12
Lane Config I L I
v (vph) 8
C(m) (vph) 1023
v/c 0.01
95% queue length 0.02
Control Delay 8.5
LOS A
Approach Delay
Approach LOS
8.5
A
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: DPA
Agency/Co.:
Date Performed: 8/30/04
Analysis Time Period: FUTURE WO PROJ PM PEAK PERIOD
Intersection: NW 24 AVENUE / NW 15 STREET
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2004
Project ID: BRISAS DEL RIO MUSP - 04199
East/West Street: NW 15 STREET
North/South Street: NW 24 AVENUE
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 12 27 7 4 30 4
Peak -Hour Factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91
Hourly Flow Rate, HFR 13 29 7 4 32 4
Percent Heavy Vehicles 2 -- -- 2 -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 5 1 3 1 2 8
Peak Hour Factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91
Hourly Flow Rate, HFR 5 1 3 1 2 8
Percent Heavy Vehicles 2 2 2 2 2 2
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage No / No /
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config LTR LTR I LTR I LTR
v (vph) 13 4 9 11
C(m) (vph) 1575 1575 901 963
v/c 0.01 0.00 0.01 0.01
95% queue length 0.02 0.01 0.03 0.03
Control Delay 7.3 7.3 9.0 8.8
LOS A A A A
Approach Delay 9.0 8.8
Approach LOS A A
Future with Project
HCS2000: Signalized Intersections Release 4.1e
Analyst: DPA Inter.: NW 22 AVENUE / NW 14 STREET
Agency: Area Type: All other areas
Date: 8/30/04 Jurisd:
Period: FUTURE W PROJ PM PK PERIOD Year : 2006
Project ID: BRISAS DEL RIO MUSP - # 04199
E/W St: NW 14 STREET N/S St: NW 22 AVENUE
SIGNALIZED INTERSECTION SUMMARY
I Eastbound Westbound I Northbound I Southbound
IL TR LTRILTRILTR
I I I
No. Lanes I 1 1 0 0 1 1 I 1 2 0 I 1 2 0
LGConfig I L TR LT R I L TR I L TR
Volume 1228 11 219 111 7 19 1196 1071 12 120 1010 440
Lane Width 112.0 12.0 1 12.0 12.0 112.0 12.0 112.0 12.0
RTOR Vol I 0 1 2 I 0 I 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A 1 NB Left A A
Thru A 1 Thru A
Right A Right A
Peds Peds
WB Left A SB Left A
Thru A Thru A
Right A Right A
Peds Peds
NB Right 1 EB Right
SB Right 1 WB Right
Green 47.0 54.0 5.0
Yellow 4.0 4.0 3.0
All Red 1.0 2.0 0.0
Cycle Length: 120.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 555 1416 0.43 0.39 27.3 C
TR 638 1629 0.38 0.39 26.5 C 26.9 C
Westbound
LT 628 1604 0.03 0.39 22.5 C 22.5 C
R 633 1615 0.03 0.39 22.5 C
Northbound
L 228 1805 0.90 0.54 86.5 F
TR 1625 3611 0.70 0.45 27.9 C 36.9 D
Southbound
L 107 238 0.20 0.45 20.8 C
TR 1554 3453 0.98 0.45 51.1 D 50.7 D
Intersection Delay = 41.6 (sec/veh) Intersection LOS = D
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: DPA
Agency/Co.:
Date Performed: 8/30/04
Analysis Time Period: FUTURE W PROJ PM PK PERIOD
Intersection: NW 23 AVENUE / NW 14 STREET
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2006
Project ID: BRISAS DEL RIO MUSP - 04199
East/West Street: NW 14 STREET
North/South Street: NW 23 AVENUE
Intersection Orientation: EW Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 18 425 0 0 601 61
Peak -Hour Factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93
Hourly Flow Rate, HFR 19 456 0 0 646 65
Percent Heavy Vehicles 2 -- -- 2 -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 0 0 1 38 0 10
Peak Hour Factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93
Hourly Flow Rate, HFR 0 0 1 40 0 10
Percent Heavy Vehicles 2 2 2 2 2 2
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage No / No /
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config LTR LTR I LTR I LTR
v (vph) 19 0 1 50
C(m) (vph) 888 1105 604 189
v/c 0.02 0.00 0.00 0.26
95% queue length 0.07 0.00 0.00 1.02
Control Delay 9.1 8.3 11.0 30.8
LOS A A B D
Approach Delay 11.0 30.8
Approach LOS B D
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: DPA
Agency/Co.:
Date Performed: 8/30/04
Analysis Time Period: FUTURE W PROJ PM PK PERIOD
Intersection: NW 23 AVENUE / NW 15 STREET
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2006
Project ID: BRISAS DEL RIO MUSP - 04199
East/West Street: NW 15 STREET
North/South Street: NW 23 AVENUE
Intersection Orientation: EW Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 0 0 8
Peak -Hour Factor, PHF 0.90 0.90 0.90
Hourly Flow Rate, HFR 0 0 8
Percent Heavy Vehicles 2 -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 0 0 0
Configuration LTRLR
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 6 72 39 0
Peak Hour Factor, PHF 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 6 80 43 0
Percent Heavy Vehicles 2 2 2 2
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage / No /
Lanes 0 1 1 0
Configuration LT TR
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 1 7 8 9 I 10 11 12
Lane Config LTR 1 LT I TR
v (vph) 0 86 43
C(m) (vph) 1623 895 887
v/c 0.00 0.10 0.05
95% queue length 0.00 0.32 0.15
Control Delay 7.2 9.4 9.3
LOS A A A
Approach Delay 9.4 9.3
Approach LOS A A
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: DPA
Agency/Co.:
Date Performed: 8/30/04
Analysis Time Period: FUTURE W PROJ PM PK PERIOD
Intersection: NW 24 AVENUE / NW 15 STREET
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2006
Project ID: BRISAS DEL RIO MUSP - 04199
East/West Street: NW 15 STREET
North/South Street: NW 24 AVENUE
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 12 75 7 4 56 4
Peak -Hour Factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91
Hourly Flow Rate, HFR 13 82 7 4 61 4
Percent Heavy Vehicles 2 -- -- 2 -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 5 1 3 1 2 8
Peak Hour Factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91
Hourly Flow Rate, HFR 5 1 3 1 2 8
Percent Heavy Vehicles 2 2 2 2 2 2
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage No / No /
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config LTR LTR I LTR I LTR
v (vph) 13 4 9 11
C(m) (vph) 1537 1506 810 906
v/c 0.01 0.00 0.01 0.01
95% queue length 0.03 0.01 0.03 0.04
Control Delay 7.4 7.4 9.5 9.0
LOS A A A A
Approach Delay 9.5 9.0
Approach LOS A A
Project Driveways
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: DPA
Agency/Co.:
Date Performed: 8/30/04
Analysis Time Period: pm peak period hour
Intersection: NW 16 Road St / Driveway A
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2006
Project ID: BRISAS DEL RIO MUSP - 04199
East/West Street: NW 16 Road Street
North/South Street: Driveway A
Intersection Orientation: EW Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 16 52 44 0
Peak -Hour Factor, PHF 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 17 57 48 0
Percent Heavy Vehicles 2 -- -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 0 1 1 0
Configuration LT TR
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume
Peak Hour Factor, PHF
Hourly Flow Rate, HFR
Percent Heavy Vehicles
Percent Grade (%)
Flared Approach: Exists?/Storage
Lanes
Configuration
0
0.90
0
2
0
0
0
LR
Delay, Queue Length, and Level of Service
9
0.90
10
2
No
0
Approach EB WB Northbound Southbound
Movement 1 4 1 7 8 9 I 10 11 12
Lane Config LT I I LR
v (vph) 17 10
C(m) (vph) 1559 1021
v/c 0.01 0.01
95% queue length 0.03 0.03
Control Delay 7.3 8.6
LOS A A
Approach Delay 8.6
Approach LOS A
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: DPA
Agency/Co.:
Date Performed: 8/30/04
Analysis Time Period: pm peak period hour
Intersection: NW 24 Avenue/ Driveway B
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2006
Project ID: BRISAS DEL RIO MUSP - 04199
East/West Street: NW 24 Avenue
North/South Street: Driveway B
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 31 16 24 38
Peak -Hour Factor, PHF 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 34 17 26 42
Percent Heavy Vehicles -- -- 2 --
Median Type/Storage Undivided /
RT Channelized?
Lanes 1 0 0 1
Configuration TR LT
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 9 13
Peak Hour Factor, PHF 0.90 0.90
Hourly Flow Rate, HFR 10 14
Percent Heavy Vehicles 2 2
Percent Grade (%) 0
Flared Approach: Exists?/Storage No /
Lanes 0 0
Configuration LR
0
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config LT I LR I
v (vph) 26 24
C(m) (vph) 1555 942
v/c 0.02 0.03
95% queue length 0.05 0.08
Control Delay 7.4 8.9
LOS A A
Approach Delay 8.9
Approach LOS A
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: DPA
Agency/Co.:
Date Performed: 8/30/04
Analysis Time Period: pm peak period hour
Intersection: NW 24 Avenue/ Driveway C
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2006
Project ID: BRISAS DEL RIO MUSP - 04199
East/West Street: NW 24 Avenue
North/South Street: Driveway C
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 47 32 0 38
Peak -Hour Factor, PHF 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 52 35 0 42
Percent Heavy Vehicles -- -- 2 --
Median Type/Storage Undivided /
RT Channelized?
Lanes 1 0 0 1
Configuration TR LT
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 17 0
Peak Hour Factor, PHF 0.90 0.90
Hourly Flow Rate, HFR 18 0
Percent Heavy Vehicles 2 2
Percent Grade (%) 0
Flared Approach: Exists?/Storage No /
Lanes 0 0
Configuration LR
0
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config LT I LR I
v (vph) 0 18
C(m) (vph) 1509 885
v/c 0.00 0.02
95% queue length 0.00 0.06
Control Delay 7.4 9.2
LOS A A
Approach Delay 9.2
Approach LOS A
BRISAS DEL RIO
Stacking and Queuing at Parking Garage
PM Peak Net External Trips
Direction
Peak
Entrance/Exit
Volume
(Vehicles)
Total PM Peak 15 minutes
(Vehicles)
Process Rate at
Entrance
(veh/min)
# of Lanes
# Vehicle Entering
during Peak 15
minutes before
statrt of queue
Length of Queue (Vehicles)
Driveway A
Enter
16
16 x 50% =
8
6.0 - 10.0
1
15 min x 8 veh/min =
120 veh/lane
(8 < 120)
Therefore, no queue
Exit
9
9 x 50% =
5
6.0 - 10.0
1
15 min x 6 veh/min =
90 veh/lane
(5 < 90)
Therefore, no queue
Driveway B
Enter
40
40 x 50% =
20
6.0 - 10.0
1
15 min x 8 veh/min =
120 veh/lane
(20 < 120)
Therefore, no queue
Exit
22
22 x 50% =
11
6.0 - 10.0
1
15 minx 6 veh/min =
90 veh/lane
(11 < 90)
Therefore, no queue
Driveway C
Enter
32
32 x 50% =
16
6.0 - 10.0
1
15 minx 8 veh/min =
120 veh/lane
(16 < 120)
Therefore, no queue
Exit
17
17 x 50% =
9
6.0 - 10.0
1
15 min x 6 veh/min =
90 veh/lane
(9 < 90)
Therefore, no queue
Driveway D
Enter
71
71 x 50% =
36
6.0 - 10.0
1
15 min x 8 veh/min =
120 veh/lane
(36 < 120)
Therefore, no queue
Exit
39
39 x 50% =
20
6.0 - 10.0
1
15 min x 6 veh/min =
90 veh/lane
(20 < 90)
Therefore, no queue
The Dimensions of Parking, Second Edition, Urban Land Institute.
Queuing calculations based on PM peak hour garage loading assumed 50% of peak hourly volume occurs during peak 15 minutes. With automated entrance, vehicles can
conservatively pass through the mechanical arm at a rate of six to ten vehicles per minute, eight was used for inbound, six for outbound self park(accounting for cashier).
Appendix E
Committed Development Information
XX% IN/XX
•
NW 22nd Avenue
14%111------1111.
20%/10
■---- 14%/7
�19%/9
NW llth Street
f
er
0
N
1
14% IN
Dolphin Expressway S.R.(836)
LEGEND
P.M. PEAK HOUR DISTR1BUTION/ASSIGNMENT (VEHICLES)
P.M. PEAK HOUR ❑1STRIBUTION/ASSIGNMENT (PERSON --TRIPS)
0
N
NW South River Dr.
------ 18 % I N / 17
18% 1N/17 --- s
NW 17th Avenue
24%/12
23%/11 —.4,
NW 7th Street
FIGURE 3
PROJECT TRIP
DISTRIBUTION
AND ASSIGNMENT
_ f1Kimley-Hom
and Associates. Inr
BRISAS DEL RIO
Committed Develoment Person -Trip Assignment
CORRIDOR
Project
FROM TO
Direction
Terrazas de MIAMI
River
TOTAL
NW 22 AVENUE
NW 14 STREET NW 20 STREET
NB
10
10
SB
16
16
NW 14 STREET
NW 24 AVENUE NW 22 AVENUE
EB
0
0
WB
0
0
Few
11177
q
o
David Plummer & Associates