Loading...
HomeMy WebLinkAboutProject Data Sheet and SummaryMetropolitan Miami ZONING ANALYSIS November 7, 2005 ZONING DISTRICT CBD LOT AREA Tract B Tract C Tract D FLOOR AREA GROSS SF ACRES NET SF 163,785 3.78 107,343 119,790 2.75 75,780 122,159 2.80 75,776 Maximum Allowed: Unlimited Floor Area Ratio Actual: SF GROSS LOT AREA FAR Tract B 717,745 _ 163,785 = 4.38 Tract C 1,133,361 - 119,790 = 9.46 Tract D 855,071 = 122,159 = 7.00 LOT COVERAGE Required: Not Applicable Actual: BLDG COVERAGE GROSS AREA PERCENT COVERAGE Tract B 72,425 - 163,785 = 44% Tract C 52,640 - 119,790 = 44% Tract D 67,375 - 122,159 = 55% OPEN SPACE Required: One SF of open space per 50 SF of floor area over 50,000 SF Actual: SF REQ'D SF PROV'D Tract B 717,745 - 50,000 = 667,745 = 50 = 13,355 39,164 Tract C 1,133,361 - 50,000 = 1,083,361 _ 50 21,667 48,461 Tract D 966,209 - 50,000 = 916,209 _ 50 = 18,324 55,248 Project 2271 File: MetroMiamiZoningAnalysis_051107- Tab: ZoneAnalysis Page 1 of 3 Metropolitan Miami ZONING ANALYSIS HEIGHT Allowable: Unlimited Actual: Tract B 400'-0" (top of roof) Tract C 617'-0" (top of roof) Tract.D 803'-0" (top of roof) SETBACKS Required: 5'-0" from all streets Provided: NORTH SOUTH EAST WEST Tract B 15'-0" 0'-0" 5'-0" t 10'-0" Tract C 23'-0" 5'-0" 5'-0" 16'-0" Tract D 5'-0" 5'-0" 7'-0" 5'-0„ DENSITY Allowable: 1,000 units per acre Provided: Tract B Tract C Tract D USE SF UNITS UNITS /ACRE Retail 81,275 Theaters 61,300 Residential 602,245 447 447 _ 3.78 = 118 Retail 16,700 Office 700,000 Hotel 456,571 400 400 = 2.75 = 145 Retail 57,781 Health Club 30,000 Residential 865,949 ,696 696 _ 2.79 = 249 Project 2271 File: MetroMiamiZoningAnalysis_051107- Tab: ZoneAnalysis Page 2 of 3 Metropolitan Miami ZONING ANALYSIS PARKING Required: No minimum parking requirements Maximum: Tract B Tract C Tract D Provided: Tract B Tract C Tract D Office 1 space per 1,000 SF over 10,000 SF Residential 1 spaces per unit Retail 1 space per 1,000 SF Restaurant 1 space per 100 SF Meeting Space 1 space per 1000 SF USE SF or UNITS SPACES REQUIRED Retail + Cinema 142,575 + 1,000 = 143 Residential 447 x 1 = 447 Total Spaces Required Tract B = 590 Retail 16,700 - 1,000 = 17 Restaurant 13,700 + 1,000 = 14 Meeting Space 28,230 - 1,000 = 28 Office 700,000 + 1,000 = 700 Residential 400 + 4 100 Total Spaces Required Tract C = 859 Retail 56,999 + 1,000 = 57 Health Club 34,036 1,000 = 34 Residential 696 x 1 = . 696 Total Spaces Required Tract D = 787 Total Spaces Required = 2,235 PROVIDED SPACES 641 1,500 1,548 Total Parking Provided = 3,689 Total Loading Spaces Provided = 14 Project 2271 File: MetroMiamiZoningAnalysis_051107- Tab: ZoneAnalysis Page 3 of 3 ZONING DISTRICT CBD LOT AREA Met 2 (Tract C) ZONING ANALYSIS October 28, 2005 Tract C FLOOR AREA Tract C LOT COVERAGE Tract C GROSS SF 119,790 SF 1,133,361 ACRES 2.75 GROSS LOT AREA FAR 119,790 9.46 OPEN SPACE Required: One SF of Tract C HEIGHT Tract C BLDG. COVERAGE GROSS AREA % COVERAGE 52,640 119,790 44% open space per 50 SF of floor area over 50,000 SF. 1,133,361 1,083,361 = Open spce provided = 50,000 50 119,790 1,083,611 21,667 SF (required) 52,640 = 67.150 SF SETBACKS Office tower 617' to top of the roof. Hotel tower 342' to top of the roof. Required: 5'-0" from all streets• NORTH • SOUTH 18' dedication+5' 5' DENSITY. EAST 5' WEST 16' USE OFFICE HOTEL (400 KEYS) RESTAURANT RETAIL MTG. SPACE PARKING SF 700,000 13,700 16,390 28,230 UNITS / ACRE OFFICE RESTAURANT RETAIL MTG. SPACE HOTEL ( 372 KEYS) SF REQUIREMENTS CAR SPACES PROVIDED 700,000 13,700 16,390 28,230 700,000 + 1,000 = 700 13,700 + 1,000 = 14 16,390 + 1,000 = 17 28,230 + 1,000 = 29 372 + 4 = 93 TOTAL = 853 1, 500 SPACES