Loading...
HomeMy WebLinkAboutSchool Impact Review Analysis• • **REVISED** SCHOOL IMPACT REVIEW ANALYSIS December 13, 2005 FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE SCHOOLS THAT WOULD SERVE THE PROPOSED DEVELOPMENT ARE UNDER THE 115% THRESHOLD CAPACITY. APPLICATION: 2005-030 Oasis on the Bay (PAB Meeting December 21, 2005) REQUEST: Major Use Special Permit ACRES: ±6.246 gross acres (net acres not provided) LOCATION: Approximately 7921 N. Bayshore Drive, 7950 and 7951 NE Bayshore Court, 1165, 1169, 1173, 1177 and 1199 NE 79 Street, Miami MSA/ MULTIPLIER: NUMBER OF UNITS: 4.1 10.23 Multifamily 467 multifamily ESTIMATED STUDENT POPULATION: 107 ELEMENTARY: 49 MIDDLE: 27 SENIOR HIGH: 31 SCHOOLS SERVING AREA OF APPLICATION ELEMENTARY: Little River Elementary -- 514 NW 77 Street MIDDLE: Horace Mann Middle — 8950 NW 2nd Avenue SENIOR HIGH: Miami Edison Senior High — 6161 NW 5 Ct. All schools are located in Region IV. *Based on Census 2000 information provided by Miami -Dade County Department of Planning and Zoning. • • • The following population and facility capacity data are as reported by the Office of Information Technology, as of August 2005: STUDENT POPULATION FISH DESIGN CAPACITY PERMANENT % UTILIZATION FISH DESIGN CAPACITY PERMANENT NUMBER OF PORTABLE STUDENT STATIONS % UTILIZATION FISH DESIGN CAPACITY PERMANENT AND ' CUMULATIVE RELCOATABLE STUDENTS* Little River Elementary 637 656 97% 44 91% 666 686 105% 98 /0 Horace Mann Middle 1,013 1,399 72% 0 72% 1,174 1,040 74% 74% Miami Edison Senior High 1,240 1.696 73% 166 67% 1,566 1,271 75% 68% *Student population i ncrease as a result of the proposed developm ent **Estimated # of students (cumulative) based on zoning/land use log (2001- present) and assuming all approved developments are built; also assumes none of the prior cumulative students are figured in current population. Notes: 1) Figures above reflect the impact of the class size amendment. 2) Pursuant to the Interloca I Agreement, none of the schools meet the review threshold. PLANNED RELIEF SCHOOLS IN THE AREA (Information included in proposed 5-Year Capital Plan, 2005-2009, dated January 2005) Projects in Planning, Design or Construction School Status Projected N/A Proposed Relief Schools $ School N/A Occupancy Date Fundinct year OPERATING COSTS: Accounting to Financial Affairs, the average cost for K-12 grade students amounts to $6,549 per student. The total annual operating cost for additional students residing in this development, if approved, would total $700,743. CAPITAL COSTS: Based on the State's December 2005 student station cost factors*, capital costs for the estimated additional students to be generated by the proposed development are: ELEMENTARY 49 x 13,933 = $682,717 MIDDLE 27 x 15,974 = $431,298 SENIOR HIGH 31 x 21,139 = $655,309 Total Potential Capital Cost $1,769,324 *Based on Information provided by the Florida Department of Education, Office of Educational Facilities Budgeting. Cost per student station does not include land cost.