HomeMy WebLinkAboutExhibitAMENDMENT NO. 1 TO CONSTRUCTION CONTRACT
CORAL WAY BEAUTIFICATION UPLIGHTING, PHASE I
PROJECT B-6450-A
This Amendment No. 1 to the Contract dated March 3, 2004 (the "Contract") between
the City of Miami, a municipal corporation of the State of Florida ("CITY"), and Gancedo
Technologies, Inc. ("CONTRACTOR") for the Project entitled "Coral Way Beautification
Uplighting Phase I", Project No. B-6450-A, ("PROJECT") is entered into this day of
, 2006.
RECITALS
WHEREAS, the Contract was entered into pursuant to the approval of the City
Commission by Resolution No. 04-0035 dated January 22, 2004 in the total amount of
$673,031.00 for the Scope of Work included in the original Contract Documents for the
PROJECT; and
WHEREAS, it has been determined that additional work and costs associated with the
additional work is required to complete the project; and
WHEREAS, the City and the Contractor have agreed to the scope and associated costs
for the additional work; and
WHEREAS, the City Commission has adopted Resolution No. on
to approve such additional work and the associated costs;
NOW THEREFORE, for the considerations hereinafter set forth:
The Agreement dated March 3, 2004 is hereby amended as follows:
Scope of Work
Cost
1. Increase in construction cost due to a difference in the specified conduit elevation after
contract bid. This difference was a result of a permit stipulation from FDOT after contract
bid. The required conduit excavation was increased from the specifiedA22d $ 4" to306in depth. ,05d
2. Credits to the City for the following items: PVC used in lieu of galvanized sleeves;
cadwelds not required; ground rods not required due to use of approved polymer lids in lieu
of the specified metal lids. <Deduct $8,290.00>
3. Increase in contract due to concrete repair required at service point.
Add $1,716.00
4. Furnish and install 423 tunnel visors at all existing and new up -lights. Includes labor,
equipment, materials, profit, overhead, and incidentals. Add $33,209.00
(ROD-4 Co -dub
Hurricanes Katrina and Wilma Damage
b. Repair eight (8) light fixtures that were knocked over during the hurricanes. Includes
labor, equipment, materials, profit, overhead, and incidentals.
6. Furnish and install four (4) new light fixtures damaged during hurricanes. Re -pipe and re-
wire as necessary to achieve an acceptable installation. Includes labor, equipment,
materials, profit, overhead, and incidentals.
7. Repair and re -plumb two (2) concrete bases that were knocked over during hurricanes. Re -
pipe and re -wire as necessary to achieve an acceptable installation. Includes labor,
equipment, materials, profit, overhead, and incidentals.
8. Furnish and install one (1) new concrete base that was destroyed during Hurricane Wilma.
Re -pipe and re -wire as necessary to achieve an acceptable installation, Includes labor,
equipment, materials, profit, overhead, and incidentals.
Subtotal items 4 through 8
Total Amended Value
* * * *
*
Add $40.313.73
$82,003.68
All other terms and conditions of the Contract remain in full force and effect and remain
unchanged.
(SEAL)
ATTEST:
THE CITY OF MIAMI, FLORIDA
CITY OF MIAMI, FLORIDA, a municipal
Corporation of the State of Florida
By: By:
Priscilla A. Thompson, City Clerk • Joe Arriola, City Manager
APPROVED AS TO INSURANCE
REQUIREMENTS:
APPROVED AS TO LEGAL FORM AND
CORRECTNESS FOR THE USE AND
RELIANCE OF THE CITY OF MIAMI,
FLORIDA, ONLY
By: By:
Dania Carrillo, Jorge L. Fernandez, City Attorney
Risk Management Administrator
CONTRACTOR
ATTEST:
By:
Corporate Secretary Carlos Gancedo, Jr.
Gancedo Technologies, Inc.
(Affix Corporate Seal)