Loading...
HomeMy WebLinkAboutExhibit 2EXHIBIT A-1 SCOPE OF SERVICES Additional Services Parcel B Master Plan Master Plan Revision — Museum Location Underground Parking Operable Pedestrian Bridge Cooper, Robertson & Partners Architecture, Urban Design Work Authorization Date Project Project number 12/14/05 Museum Park 04033.00 Work authorization number 3 Original or master agreement (if any) dated Museum Park Master Plan, 4 April 2005 Other references Work Authorization numbers 1 and 2 Authorization is confirmed for Cooper, Robertson & Partners to perform the following additional services: PARCEL B & MASTER PLAN REVISION A.) Parcel B Master Plan The scope of services is to: • Prepare a master plan for Parcel B for use as a community soccer field • Coordinate the Parcel B master plan with the larger Museum Park concept design and the bay walk/river walk system • Prepare a master plan cost estimate Drawings unless otherwise agreed will be hand drawn in colored pencil on yellow trace over an AutoCAD base. Drawings will be scanned and submitted in pdf format. The existing Museum Park study model will be used for the preparation of a study model. It is assumed that presentation and client review will be undertaken as part of the regularly scheduled Cooper, Robertson & Partners meetings for Museum Park. I nis service Was Iequtsieo uil li I )lLJ uy ii B.) Master Plan Revision - Museum Location It was agreed in the 11/1/05 afternoon meeting with the City Manager and Miami Art Museum Board members that Cooper, Robertson and Partners would investigate revising the master plan for the museums area within the confines of the approved concept design to allow for the Art Museum to be located in the western parcel and the Science Museum in the eastern parcel of the 8-acre museum area. The scope of services is to: • Analyze the physical planning and design issues associated with the possible shift in location of the museums, including the phased implementation of Art • Prepare drawings illustrating the revised potential Art sculpture garden and Science Museum outdoor program space • Following direction, prepare revised master plan drawings and illustrative conceptional building plans for the museums area • Prepare revised museum parcel and coverage drawings • Present the revised master plan in Miami for agreement to proceed to design guidelines for the museums area 311 West 43 Street New York, New York 10036 Telephone 272 247 1717 Email info@cooperrabertson.com Telefax 212 245 0361 Limited Liability Partnership This proposal assumes the following, • Museum Drive remains in its current alignment and role as the primary visitor/bus drop off and service drive for the museums • The Plaza remains in its current location and role as providing a major entry for each museum and a shared exhibition/event space • Park Promenade remains in its current alignment and role as a ceremonial and/or secondary visitor drop off for the museums and as part of the normal internal road system for park visitors • The system of internal park roads linking Museum Drive to the Restaurant and Biscayne Boulevard remains generally unchanged • The B-acre museum area parcel boundaries as presented in the meeting of 10/6/05 remain generally unchanged • The museum programs remain unchanged It is assumed that presentation and client review will be undertaken as part of the regularly scheduled Cooper, Robertson & Partners Miami meeting days. Products: • Yellow trace and AutoCAD drawings • Revised illustrative plan rendering This services was requested on 11/1/05 by the City Manager. Date services are to begin Parcel B: August 2005 Masterplan Revision: December 2005 Date services to be completed Parcel B: December 2005 Masterplan Revision: February 2006 Fees Fee basis $65,500 Lump Sum, to be billed as a percentage complete Reimbursable expenses Consultants included in lee Included in the proposal Civitas, Inc., Construction Management Services Service requested by Date City Manager as per above Client, Authorization approved for client by Date Cooper, Robertson & Partners, by Date Michael Jasper 12/14/05 Cooper, Robertson & Partners Architecture, Urban Design Work Authorization Date Project Project number 12/14/05 Museum Park 04033.00 Work authorization number 4 Original or master agreement (if any) dated Museum Park Master Plan, 4 April 2005 Other references Authorization is confirmed for Cooper, Robertson & Partners to perform the following additional services. PARK UNDERGROUND PARKING The scope of services is to develop the approved master plan for an underground parking structure of approximately 240 spaces (90,000sf) to a design development level. We assume a construction budget of $10.5 million, excluding the above ground headhouses (stair and elevator access). The parking structure design is to be fully coordinated with the evolving SD and DD phases of the main Park and the master plan and guidelines for the museum area. The scope includes two (2) above ground headhouse (elevator and stair) structures. The tasks include: • Geotechnical services including review of master plan cost estimate assumptions; development of constructability options; coordination with cost estimator. NOTE: see attached detailed scope of service description. • Development of architectural, civil, structural, MEP designs for a new underground parking garage until the completion of DD stage. Documents are to be sufficiently complete to facilitate the development of a cost plan. • Traffic and parking services: review access points, connections OD ti to ptopostu rai k roadway sys-tem,Lircutatiarr, tamp grades, and geometry of the parking garage as they relate to local agency standards and acceptable industry practice; a memorandum summarizing the critical traffic issues. General Assumptions • Any works associated with Hazardous Materials is excluded. • Fire Protection design shall be performance based, with detailed fire alarm design by vendor. • No emergency generator power is required. Life safety systems (lighting and fire alarm systems) will utilize battery backup. • The schedule for this work will run concurrent with the existing schematic design and design development phases. • Presentation and client review will generally be undertaken as part of the regularly scheduled Cooper, Robertson & Partners Miami meeting days though we have allowed for one (1) additional Miami meeting day The above scope is based upon the following exclusions • Agency fees (plan check, permits, etc.) • Off -site improvements other than indicated above • Client / Contractor requested design changes following authorization to proceed to subsequent phase of work • Market analysis • Any additional items not included in above Scope of Work 311 West 43 Street New York, New York 10036 Telephone 272 247 7717 Email infoccooperrobertson.com Telefax 212 2450361 L imited Liability Partnership Date services are to begin January 2006 April 2006 Fees Fee basis $157,600 Lump Sum to be billed as a percentage complete Reimbursable expenses Consultants included in fee Included in the proposal Civitas, Inc., Spillis Candella DMJM, David Plummer Associates, Kaderabek Company Service requested by Date Director of Planning & Zoning 11/1/05 Client: Authorization approved for client by Date Date services to be completed Cooper, Robertson & Partners, by Date Michael Jasper 12/14/05