BRICKELL FIRST (SECOND RESUBMITTALI
TENTATIVE PLAT # 1647-B
Located on the East side of SW 1 Court between SW 12 Street and SW 13 Street
IOE ARRIOLA
City Manager
The City of Miami Plat and Street Committee, at its meeting of November 4, 2004,
approved the above tentative plat subject to the following revisions being made to the
tentative plat, additional information being provided and/or variances being granted.
Please be advised that the processing of your tentative plat cannot proceed until these
conditions have been satisfied.
1. Provide a copy of the recorded warranty deed.
2. Show on the main sketch the easement granted to Miami Telecommunications, Inc. by
0.B. 20274, PG 3301.
3. An opinion of title as to the reversionary rights for the right-of-way to be closed and
vacated will be required by the Zoning Board. The opinion of title must also address,
whether or not there are individuals, In addition to the abutting property owners,
having an interest in the right-of-way to be closed and vacated. A copy of the opinion
of title must be provided to the Public Works Department.
4. The Zoning Board will require a sketch and legal description with a square footage, on
an 81/2"x11"paper, for the proposed closure. Contact Teresita Fernandez, Chief of the
Hearing Boards, at 305-416-2030. Provide a copy to the Public Works Department.
5. An opinion of title in the City of Miami opinion of title form must be provided at the
time of final plat submittal. The opinion must cover from the beginning to the most
recent date.
6. Current backup documentation will be required for all who execute the final plat. A
resolution for authority to execute documents and a Certificate of Good Standing
from the Secretary of State are required, If applicable.
7. Tentative plat application must be made with Miami -Dade County after receiving
approval from the City of Miami Plat and Street Committee.
C:1Documents and Sett ingslrfindling1Desktap1Mtgiism> AMINe .L FIRST.doc
444 S.W. 2 nd Avenue / Miami, Florida 33130 / (305) 416-1200 / Fax:(305) 416-2153
Jose Milton as Trustee of the
Small Building Trust dated 7.13-93
BRICKELL FIRST (SECOND RESUBMITTAL)
TENTATIVE PLAT #1647-B
November 8, 2004
Page two
8. Before final plat submittal to the City, a copy of each the final plat and the opinion of
title must be submitted to Miami -Dade County for review and then retrieved and
submitted to the City.
9. A letter of approval is required from the Florida Department of Transportation. (SW 13
Street/Coral Way is a State Road.)
10. Obtain and provide a written determination from the City of Miami Law Department
confirming their decision that a portion of the Metrorail property does not have to be
included within the boundaries of the tentative and final plat.
11. Include the height of the existing trees in the tree legend.
12. Provide an Opinion of Title for the remnant portions of Lots 1, 2, 3, 18,19, 20.
13. The Plat and Street Committee has reviewed the tentative plat of Brickell First and
determined that all technical requirements contained in the Miami City Code
Subdivision Regulations have been met and has approved the tentative plat. The
members of the Plat and Street Committee have further considered the request for
vacation and closure of the street with respect to Miami City Code requirements and
have voted 2 in favor and 4 in denial of the vacation and closure request.
In addition to the above requirements, you should be aware of the following:
1. State and local laws require the Installation of various physical improvements in the
public rights -of -way when property is platted. These subdivision improvements
include paving, drainage, landscaping, sidewalks, etc. In some cases this could
represent a substantial investment on your part.
2. The alteration, relocation or installation of utilities such as storm and sanitary sewers,
electric, telephone, water, etc. caused by this plat will be at the property owner's
expense. Also, utility easements may be required on the property being platted.
3. A building permit will not be issued on the property being platted until the final plat
is recorded. Also, the Certificate of Occupancy for any building construction will be
issued only after all the required subdivision improvements have been completed.
4. Approval for fire flow requirements must be obtained from the Fire -Rescue
Department prior to the issuance of a building permit.
S. Additional items must be provided to the City of Miami Department of Public Works
before the final plat is submitted to the City. Commission for approval. You will be
notified in writing as to what these items are after the amount of the bond has been
determined for the necessary subdivision improvements.
6. Tentative plat approval Is only valid for one (1) year from the date of the Plat and
Street Committee meeting at which time it was approved.
C:IDocuments and Settingslrfindling\Desktop\MyDircctory\RESOLUTSIBRICKELL FIRST.doc
Jose Milton as Trustee of the
Small Building Trust dated 7-13-93
BRICKELI. FIRST (SECOND RESUBMITTAL)
TENTATIVE PLAT #1647-B
November 8, 2004
Page three
If you have any questions concerning these requirements, please refer to the attached
sheet for the appropriate person to contact.
Sincerely,
Francis Mitchell, .PE
Signing for
,, j- Stephanie Orindell, PE
Stephanie N. Grindell, P. E.
Chairman, Plat and Street Committee
SNG/LJH/rjf
Enclosure: Contact Sheet
c: SchWebke-Shiskin & Associates, Inc.
3240 Corporate Way
Miramar, FL 33025
Plat and Street Committee Members
bc: Surveys
Civil Engineering
Central
C:1Documcnls and Senings\rindling\Desktop1MyDirectory\RESOLUTSIBRICKELL FIRST.doc