Loading...
HomeMy WebLinkAboutAnalysisANALYSIS MAJOR USE SPECIAL PERMIT for 5220 BISCAYNE BOULEVARD located at approximately 5220 Biscayne Boulevard CASE NO. 2005-086 Pursuant to Ordinance 11000, as amended, the Zoning Ordinance of the City of Miami, Florida, the subject proposal for 5220 Biscayne Boulevard project (MU-2005-029) has been reviewed to allow a Major Use Special Permit per Articles 5, 9, 13 and 17, located at approximately 5220 Biscayne Boulevard, Miami, Florida, to construct an approximate 120-foot, 11-story high mixed use structure to be comprised of approximately 183 total multifamily residential units with recreational amenities; approximately 10,300 square feet of retail space; and approximately 322 total parking spaces; providing for certain floor area ratio ("FAR") bonuses. This Permit also includes the following requests: MAJOR USE SPECIAL PERMITS MUSP, as per Article 5, Section 502, PUD Districts; to increase the floor area by twenty percent, for a total of 27,774 square feet of bonus; MUSP, as per Article 17, Section 914.1, a development bonus of 34,718 square feet of additional floor area, and to pay into the Affordable Housing Trust Fund an amount of $12.40 per square foot = $430,503.20; Per City Code, Chapter 36, construction equipment request for waiver of noise ordinances while under construction for continuous pours. The Major Use encompasses the following Special Permits: CLASS II SPECIAL PERMITS CLASS 11 SPECIAL PERMIT, as per Article 6, Section 609.3.2, for development of new construction within the Biscayne North Overlay District; CLASS II SPECIAL PERMIT, as per Article 4, Section 401, to allow a construction fence and covered walkway; CLASS 11 SPECIAL PERMIT, as per Article 10, Section 10.5.4.3.32, for signage approval; CLASS II SPECIAL PERMIT, as per Article 9, Section 908.2, for access from a public street roadway with driveway greater than twenty five feet in width; CLASS 11 SPECIAL PERMIT, as per Article 9, Section 920.1, to allow a trailer(s) for construction and other temporary offices such as leasing and sales; CLASS II SPECIAL PERMIT, as per Article 9, Section 927, to allow temporary off -site parking during construction. CLASS I SPECIAL PERMITS CLASS I SPECIAL PERMIT, as per Article 9, Section 918.2, for parking and staging of construction during construction; Page 1 of 5 CLASS! SPECIAL PERMIT, as per Article 9, Section 920.1, to allow a construction trailer and watchman's quarters. REQUEST for applicable MUSP conditions to be satisfied at the time of shell permi instead of at issuance of foundation permit: a) The requirement to record in the Public Records a Declaration of Covenants and Restrictions providing that the ownership, operation and maintenance of all common areas and facilities will be by the property owner or a mandatory property owner association; and b) The requirement to record in the Public Records a unity of title or covenant in lieu of unity of title. Pursuant to Articles 5, 9, 13 and 17 of Zoning Ordinance 11000, approval of the requested Major Use Special Permit shall be considered sufficient for the subordinate permits requested and referenced above as well as any other special approvals required by the City which may be required to carry out the requested plans. In determining the appropriateness of the proposed project, the Planning Department has referred this project to the Large Scale Development Committee (LSDC) and the Planning internal Design Review Committee for additional input and recommendations; the following findings have been made: • It is found that the proposed development project will benefit the area by creating additional residential opportunities in the Upper East Side NET District, located between Biscayne Boulevard and Federal Highway north of NE 52nd Terrace. • It is found that the subject property is located in the "Governmental Lots" Plat within the Morningside neighborhood of the City. • It is found that the zoning designation of the property is C-1 (Restricted Commercial) with a SD-9 (Biscayne Boulevard North Overlay District). • It is found that pursuant to the Comprehensive Neighborhood Plan of the City of Miami, Florida, the existing Future Land Use category for the property is "Restricted Commercial". • It is found that the residential density of the project (183 units at 146 units per acre) is below the maximum 187 units (150 units per acre) on the 1.25± net acre site. • Pursuant to Article 17 and Section 914.1, the proposed project is requesting a development bonus of 34,718 square feet of additional floor area, and shall pay into the Affordable Housing Trust Fund at amount of $12.40 per square foot = $430,503.20. • It is found that the project is expected to cost approximately $54,200,000, and to employ approximately 424 workers during construction (FTE-Full Time Employees); The project will also result in the creation of approximately 36 permanent new jobs (FTE) and will generate approximately $579,008 annually in tax revenues to the City (2005 dollars). Page 2 of 5 • It is found that on June 28, 2005, the Miami -Dade Aviation Department provided a Height Analysis review of the proposed project and found that it conforms to the Miami -Dade County Height Zoning Ordinances. The proposed building height requires the applicant to file with the Federal Aviation Administration (FAA) Form 7460-1, "Notice of Proposed Construction Alteration for Determination of Known Hazards". In addition, construction cranes for this project exceeding 200 feet in height must be filed using the same form. • It is found that Miami -Dade Public Schools provided a revised review of the proposed project on July 24, 2005, The student population generated by this development is estimated at 41 students. The schools serving this area of application are Momingside Elementary (19 students) — 73% Florida Inventory School Houses (FISH) Capacity with the proposed project; Miami Edison Middle (10 students) — 74% FISH; and Booker T. Washington Senior High (12 students) - 58% FISH. Pursuant to the interlocal agreement, none of the schools listed meet the review threshold of 115%. At an average of $6,549 per K-12 student, the total annual operating cost for the additional students residing in this development, if approved, would total $268,509. Based on the State's July 2005 student station cost factors, capital costs for the estimated additional students to be generated by the proposed development is $660,664. • It is found that the Large Scale Development Committee reviewed the project on July 27, 2005 to address the expressed technical concerns raised at said Large Scale Development Committee meeting. • It is found that the proposed project was reviewed for design appropriateness by the Urban Development Review Board on September 21, 2005, which recommended Approval (UDRB Reso. 9-21-05-3) with conditions. • It is found that the Internal Design Review Committee reviewed a revised version of the proposed project on October 6, 2005 and the following pertinent comments were made: Urban Design — The vehicular/pedestrian entrance off Biscayne Boulevard should be minimized to the maximum extent possible so as to unify the pedestrian experience and maximize the retail liner use along the east fagade's ground level; Materials - Provide specifications on the materials proposed on the screening and collage along the north and south facades. Include color samples, opaque value, materials, thickness and color of mesh; Landscaping - Consider adding shrubs and groundcover along the north and south facades to help screen the garage with layers of vegetation where the mesh screen with climbing vines is proposed as the primary screening element. The Planning Department's review resulted in design modificationsthat were then recommended for approval to the Planning Director. • It is found that on October 10, 2005, the City's Traffic Consultant, URS Corp., provided a review (W.O. #112) of the Traffic Impact Analysis submitted by the applicant and has found the traffic analysis sufficient. • It is found that with respect to all additional criteria as specified in Section 1305 of Zoning Ordinance 11000, the proposal has been reviewed and found to be adequate. Page 3 of 5 Based on these findings, the Planning Department is recommending approval of the requested Development Project with the following conditions: 1) Meet all applicable building codes, land development regulations, ordinances and other laws and pay all applicable fees due prior to the issuance of a building permit including the required Affordable Housing Trust fund contribution of $12.40 per square foot for any applicable FAR increase sought under those provisions. 2) Allow the Miami Police Department to conduct a security survey, at the option of the Department, and to make recommendations concerning security measures and systems; further submit a report to the Planning Department, prior to commencement of construction, demonstrating how the Police Department recommendations, if any, have been incorporated into the PROJECT security and construction plans, or demonstrate to the Planning Director why such recommendations are impractical. 3) Obtain approval from, or provide a letter from the Department of Fire -Rescue indicating APPLICANT'S coordination with members of the Fire Plan Review Section at the Department of Fire -Rescue in the review of the scope of the PROJECT, owner re- sponsibility, building development process and review procedures, as well as specific requirements for fire protection and life safety systems, exiting, vehicular access and water supply. 4) Obtain approval from, or provide a letter of assurance from the Department of Solid Waste that the PROJECT has addressed all concerns of the said Department prior to the obtainment of a shell permit. 5) Comply with the Minority Participation and Employment Plan (including a Con- tractor/Subcontractor Participation Plan) submitted to the City as part of the Application for Development Approval, with the understanding that the APPLICANT must use its best efforts to follow the provisions of the City's Minority/Women Business Affairs and Procurement Program as a guide. 6) Record the following in the Public Records of Dade County, Florida, prior to the issuance of a Temporary Certificate of Occupancy or Certificate of Occupancy, a Declaration of Covenants and Restrictions providing that the ownership, operation and maintenance of all common areas and facilities will be by the property owner or a man- datory property owner association in perpetuity. 7) Prior to the issuance of a shell permit, provide the City with a recorded copy of the MUSP permit resolution and development order, and further, an executed, record able unity of title or covenant in lieu of unity of title agreement for the subject property; said agreement shall be subject to the review and approval of the City Attorney's Office. 8) Provide the Planning Department with a temporary construction plan that in- cludes the following: a temporary construction parking plan, with an enforcement policy; a construction noise management plan with an enforcement policy; and a maintenance plan for the temporary construction site; said plan shall be subject to the review and ap- proval by the Planning Department prior to the issuance of any building permits and shall be enforced during construction activity. All construction activity shall remain in full compliance with the provisions of the submitted construction plan; failure to comply may lead to a suspension or revocation of this Major Use Special Permit. Page 4 of 5 9) In so far as this Major Use Special Permit includes the subordinate approval of a series of Class 1 Special Permits for which specific details have not yet been devel- oped or provided, the applicant shall provide the Planning Department with all subordi- nate Class I Special Permit plans and detailed requirements for final review and ap- proval of each one prior to the issuance of any of the subordinate approvals required in order to carry out any of the requested activities and/or improvements listed in this de- velopment order or captioned in the plans approved by it. 10) If the project is to be developed in phases, the Applicant shall submit an in- terim plan, including a landscape plan, which addresses design details for the land oc- cupying future phases of this Project in the event that the future phases are not devel- oped, said plan shall include a proposed timetable and shall be subject to review and approval by the Planning Director. 11) Pursuant to design related comments received by the Planning Director, the applicant shall meet the following conditions: (a) The vehicular/pedestrian entrance off Biscayne Boulevard should be minimized to the maximum extent possible so as to unify the pedestrian experience and maximize the retail liner use along the east facade's ground level; (b) Provide specifications on the materials proposed on the screening and collage along the north and south facades; (c) Add shrubs and groundcover along the north and south facades to help screen the garage with layers of vegetation where the mesh screen with climbing vines is proposed as the primary screening element. 12) A development bonus to permit a mixed use of 34,718 square feet of floor area shall require payment to the Affordable Housing Trust Fund of an amount of $12.40 per square foot = $430,503.20. 13) Within 90 days of the effective date of this Development Order, record a certified copy of the Development Order specifying that the Development Order runs with the land and is binding on the Applicant, its successors, and assigns, jointly or severally. Page 5 of 5