SCHOOL IMPACT REVIEW ANALYSIS
July 19, 2005
**Continued from the June 15, 2005 PAB Meeting**
FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE
INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED
SINCE THE APPLICANT IS NOT REQUESTING ADDITIONAL RESIDENTIAL DENSITY
OVER WHAT IS CURRENTLY ALLOWED UNDER EXISTING ZONING CLASSIFICATION
FOR SUBJECT PROPERTY.
APPLICATION: 600 Biscayne Blvd. (MU-2005-020)
REQUEST: Major Use Special Permit - (PAB Mtg. July 20, 2005)
CURRENT CBD (Central Business District) that allows 1,000 DU/acre
ZONING:
ACRES: Approximately 1.509 net acres
LOCATION: 600 and 666 Biscayne Boulevard and 215 NE 6th Street, Miami
NUMBER OF 685 units proposed
UNITS: (1.509 net acres x 1,000 DU/acre = 1,509 maximum units allowed)
MSA/
MULTIPLIER: 4.7 / 0.27 Multifamily
ESTIMATED
STUDENT
POPULATION: 185 students*
ELEMENTARY: 85
MIDDLE: 46
SENIOR HIGH: 54
SCHOOLS SERVING AREA OF APPLICATION:
ELEMENTARY: Frederick Douglas E lem. - 314 N.W 12 Street
Riverside Elementary -1190 S.W. 2 Street
MIDDLE: Jose De Diego Middle — 3100 N.W. 5 Street
SENIOR HIGH: Booker T. Washington Senior — 1200 N.W . 6 Ave
All schools are located in Region 1V.
*Based on Census 2000 Information provided by Miami -Dade County Department of Planning
and Zoning.
The following population and facility capacity data are as reported by the Office of Information
Technology, as of October 2004:
STUDENT FISH DESIGN % NUMBER OF % UTILIZATION CUMULATIVE
POPULATION CAPACITY UTILIZATION PORTABLE FISH DESIGN STUDENTS'"
PERMANENT FISH DESIGN STUDENT CAPACITY
CAPACITY STATIONS PERMANENT AND
PERMANENT RELOCATABLE
Frederick
Douglas
Elementary
523/ T46 70%I 190 56%/
566* 76%* 60%*
Riverside 1,114/ 773 143°/o/ 143%/
Elementary 1,156* 149%* 0 149%*
Jose De Diego
Middle
1,482
2,072
1,036 0 2,869
Booker T. 1,502/ 57°/a/ 57%i 4,722
Washington 1,556* 2,624 59%* 0 59%*
Senior High
* increased student population as a result of the proposed development
** Estimated # of students (cumulative) based on zoning/land use log (2001- present) and
assuming all approved developments are built; also assumes none of the prior cumulative
students are figured in current population
1,170/
1,216*
113%/
117%'
113%I
117%*
Notes:
1) Figures above reflect the impact of the class size amendment.
2) Pursuant to the interlocal Agreement, Riverside Elementary and Jose De Diego Middle
schools meet the review threshold.
PLANNED RELIEF SCHOOLS IN THE AREA
(Information included in proposed 5-Y ear Capital Plan, 2005-2009, dated January 2005)
Projects In Planning, Design or Construction
Projected
School Status Occupancy Date
N/A
Proposed Relief Schools
School Funding Year
State School "GG-1" FY 06-07
(Jose De Diego Middle Relief)
(1,241 student stations)
OPERATING COSTS: According to Financial Affairs, the average cost for K-12 grade students
amounts to $6,549 per student. The total annual operating cost for additional students residing
in this development, if approved, would total $1,211,565.
CAPITAL COSTS: Based on the State's July 2005 student station cost factors*, capital costs for
the estimated additional students to be generated by the proposed deveiopm ent are:
ELEMENTARY 85 X
MIDDLE 46 X
SENIOR 54 X
Total Potential Capital cost
$13,574 = $1,153,790
$15,563 = $ 715,898
$20,594 = $1,112,076
$2,981,764
* Based on Information provided by the Florida Department of Education, Office of Educational
Facilities Budgeting. Cost per student station does not include land cost.