HomeMy WebLinkAboutArticle II - Project Description600 BISCAYNE
MAJOR USE SPECIAL PERMIT
PROJECT DESCRIPTION
ARTICLE H.
Project Description
A. Zoning Ordinance No. 11000
1. Section 1304.2.1 Application forms; supplementary
materials
2. Section 1702.2.1 General Report
3. Section 1702.2.2 Major Use Special Peunit Concept Plan
4. Section 1702.2.3 Development Impact Study
•
•
•
MAJOR USE SPECIAL PERMIT
Section 1304.1.1 Application forms; supplementary materials
(a)
Statements of ownership and control of the proposed development
of activity.
The Disclosure of Ownership and Ownership Affidavit are provided in
Article 1.
(b) Statement describing in detail the character and intended use of
the development or activity.
600 Biscayne is a mixed -use development that consists of one tower
that is 62 stories with a total of 685 residential units along with related
parking spaces. The project is located at 600 Biscayne Blvd, Miami,
Florida. The development consists of three parcels: the North property
which starts from N.E. 7t St. and extends down to the F.E.C. right of
way with a net lot area of 27,658 square feet (0.658 acres). The F.E.C.
property has a net lot area of 22,719.45 square feet (0.523 acres), and
the south parcel that extends down from the F.E.C. parcel down to N.E.
6th St. has a net lot area of 33,307.55 square feet (0.766.) These parcels
are bordered on the east side by Biscayne Blvd. and on the west by
N.E. 2nd Ave. The zoning designation for the property is CBD / Biscayne
Blvd. Area Central Business District which allows a maximum of 1000
units / acre. The FAR is unlimited.
The property fronts Biscayne Blvd. across the street from the AAA to the
east, N.E. 6th St. to south, N.E. 2nd Ave. to the west, and N.E. 7th St. to
the north.
The project includes the following amenities: 6,500 sq. ft restaurant in
close proximity to the historical Freedom Tower and Biscayne Blvd., a
12,000 sq. ft. museum along with a food and beverage component in
the historic building, residential liner units along N.E. 7h St., with views
of the City of Miami and Biscayne Bay, a landscaped pool deck with
views of the City of Miami and Biscayne Bay, and full -service spa and
gym.
Building height is as follows:
Tower: +650'-4"
Podium +133'-0"
Drawings showing the architectural character and location of the
intended uses are included under Tab 6 of the Supporting
Documents.
•
•
o
(c) General location map, showing relation of the site or activity for
which special permit is sought to major streets, schools, existing
utilities, shopping areas, important physical features in and
adjoining the project or activity and the like.
The following exhibits are included with the Major Use Special Permit
Application:
(1) Aerial: Aerial photograph of the surrounding area indicating the
project site.
(2) Area Context Map/Site Aerial: Map of the project area
indicating buildings and their functions that surround the site.
(3) Location Map: Map of the surrounding street system indicating
the project location.
(d) A site plan containing the title of the project and the names of the
project planner and developer, date, and north arrow and, based on
an exact survey of the property drawn to a scale of sufficient size
to show:
The general information requested is shown on the Ground/Site Plan,
Sheets A0.01 and A1.01, provided under Tab 6 of the Supporting
Documents. The site plan includes the following:
(1) Boundaries of the project, any existing streets, buildings,
watercourses, easements and section lines;
The boundaries of the project and the location of existing
streets and easements are shown on the Survey located
under Tab 5 of the Supporting Documents.
(2) Exact location of all buildings and structures;
The exact location of all existing buildings located on the
property is shown on the Boundary Survey under Tab 5. The
location of the building to be constructed is shown on the Site
Plan, Sheet A0.01 , located under Tab 6 of the Supporting
Documents.
(3) Access and traffic flow and how vehicular traffic will be
separated from pedestrian and other types of traffic;
Vehicular access to the parking garage is from both N.E. 6th
and N.E. 7th St. including a covered drop-off at both locations.
The service drive for the project, as well as the loading areas,
is located at N.E. 2nd Ave. along the west side of the property.
•
•
•
A detailed analysis of the site access and traffic flow is
provided in the Traffic Impact Analysis located under Tab 2 of
the Supporting Documents.
(4) Off-street parking and off-street loading areas;
The off-street parking facility will include an 11-level parking
structure with 1,010 parking spaces. The garage is shown on
Sheets A1.00 through A1.10, provided under Tab 6 of the
Supporting Documents.
The Zoning Ordinance requires eight (4) loading bays 12 ft. x
35 ft. and (1) loading bay 12 ft. x 55 ft.. There will be eight (4)
loading bays 12 ft, x 35 ft. The clearance for all loading bays is
15 feet. Service areas are shown on the A1.00 Plan, under
Tab 6 of the Supporting Documents.
(5)
Recreational facilities locations;
One restaurant is planned at the drop-off level facing Biscayne
Bay to enhance the Blvd and serve as an amenity to the public.
The area for the restaurant component is 6,500 SF.
An 18,600 SF of amenities is located at Levels 13 and 14 and
includes.
A deck of 21,100 SF for outdoor amenities. It will include two
pools surrounded by a lush landscaped rooftop garden.
These facilities are shown on the A1.01 and A1.08-A1.11
located under Tab 6 of the Supporting Documents.
(6) Screens and buffers;
Landscaped areas are indicated on the Landscape Plans,
Sheet L1.0, L2.0 and A1.01, located under Tab 6 of the
Supporting Documents.
(7) Refuse collections areas;
Waste collection will be provided by a containerized compactor
system located within the service area. In addition, the project
will have a high rise recycling system. The building will include
a dry wash, refrigerated garbage rooms and can wash. These
facilities are shown on the A1.01 Plan, located under Tab 6 of
the Supporting Documents.
(8) Access to utilities and points of utilities hookups.
•
•
•
Access and connections to site utilities are discussed in the
Site Utility Study located under Tab 3 of the Supporting
Documents.
(e) Tabulations of total gross acreage in the project and the
percentages thereof proposed to be devoted to:
(1) The various permitted uses:
Residential Sq. Ft. = 886,837.00 SF = 20.40 acres
Retail Sq. Ft. = 6,500 SF = 0.15 acres
(2) Ground coverage by structures:
Building Footprint = 32,524.54 SF
Ground coverage by the structures is 51.9% of the total gross lot area.
(f) Tabulation showing the following:
(1) The derivation of numbers of off-street parking and off-
street loading spaces shown in (d) above;
The total number of off-street parking spaces:
Residential parking (1/unit) — 678 spaces
Museum Parking (1/1000 SF) —12 spaces
Museum Restaurant parking (111000SF) — 4 spaces
Condo Restaurant parking (1/1000) — 6.5 spaces
Less 10% reduction (Peoplemover) — 51
Required = 758 spaces
Provided = 1,010 spaces
Derivation of the number of off-street parking is shown within the Project
Summary, located under Tab 6.
(2) Total project density in dwelling units per acre.
As per CBD the maximum project density is 1000 units per
acre. The designated site, which for density purposes consists
of only 1.921 acres, which allows for the construction of 1,921
units. This project will provide only 678 units.
(g) If common facilities (such as recreation areas of structures, private
streets, common open space, etc.) are to be provided for the
development, statements as to how such common facilities are to
be provided and permanently maintained.
All common facilities provided will be maintained by the Owner.
•
•
•
(h) Storm drainage and sanitary sewerage plans.
Storm drainage, water distribution, waste water and solid waste
generation provisions are discussed in the Site Utility Study located
under Tab 3 of the Supporting Documents.
(i) Architectural definitions for buildings in the development; exact
number of dwelling units, sizes, and types, together with typical
floor plans of each type.
Detailed information and breakdown of square footage of all uses are
found under Project Criteria within The Project Summary, included
under Tab 6 of the Supporting Documents. Typical floor plans for
residential units are shown on the Typical Residential Floor Plans. All
drawings are located under Tab 6 of the Supporting Documents.
(j) Plans for signs, if any.
The project will obtain signage approval at a later date.
(k) Landscaping plan, including types, sizes and locations of
vegetation and decorative shrubbery, and showing provisions for
irrigation and future maintenance.
The landscape plans showing vegetation are found on the L1.0 and
L2.0. NI landscape plans are located under Tab 6 of the Supporting
Documents.
(I) Plans for recreation facilities, if any, including location and general
description of buildings for such use.
The Levels 13 or 14 will contain 18,600 sq. ft. of:
-heated lap and relaxation/therapy pools
-landscaped rooftop garden.
-wet bar, spa cafe, and cabanas
-Fitness spa: massage, sauna, steam and exercise rooms
(m) Such additional data, maps, plans, or statements as may be
required for the particular use or activity involved.
The details of the spaces and calculations used to compute the Floor
Area Ratio (FAR) are shown on the Sheet A0.07, provided under Tab 6
of the Supporting Documents.
(n) Such additional data as the applicant may believe is pertinent to
the proper consideration of the site and development plan.
Elevations depicting the architectural character of the building are
shown on the Buildings Elevations, Sheets A3.01 through A3.07. AU
elevations are located under Tab 6 of the Supporting Documents.
2. Section 1702.2.1 General Report.
(1) Property ownership and beneficial interest within the boundaries of
the area proposed for Major Use Special Permit.
Statement of Ownership and beneficial interest within the boundaries of
the area proposed for Major Use Special Permit are provided in Article I.
(2) The nature of the unified interest or control.
The nature of unified interest or control is indicated in Article I.
(3) Survey of the proposed area showing property lines and
ownership.
A copy of the Surveys are included under Tab 5 of the Supporting
Documents.
(4) Map of existing features, including streets, alleys, easements,
utilities lines, existing land use, general topography, and physical
features.
The existing site features and utility lines are shown on the Boundary
Survey of the property located under Tab 5. The site features and the
utilities are also described in the Site Utility Study, located under Tab 3
of the Supporting Documents.
(5) Materials to demonstrate the relationship of the elements listed in
(4) proceeding to surrounding area characteristics.
The drawings submitted with this Application are located under Tab 6 of
the Supporting Documents.
(6) Existing zoning and adopted comprehensive plan designations for
the area on and around the lands proposed for Major Use Special
Permit.
The existing zoning designation for the property pursuant to City of
Miami Ordinance No. 11000 and Plat Book 30, at Page 12 of the Public
Records of Miami -Dade County, Florida. (Which is located in Article I),
indicates the existing and surrounding zoning. The zoning designation
for the property is CBD. The Comprehensive Plan Future Land Use
designation for the property is Office. The zoning and the
comprehensive plan designations are consistent with one another.
3. Section 1702.2.2 Major Use Special Permit Concept Plan.
•
•
•
a. Relationships of the concept plan to surrounding existing and
proposed future uses, activities, systems, and facilities
(transportation, recreation, view corridors, pedestrian systems,
service systems and similar uses.
Article II contains a written narrative of this project outlining proposed
uses, activities and architectural character. This narrative also contains
descriptions of the project's relationship to traffic, pedestrian
movements, and transportation access. Building elevations, sections
and perspectives showing the proposed materials, vertical profile and
height, and orientation to streets are included in the drawings submitted
with this Application. The list of drawings submitted is found under Tab
6 of the Supporting Documents.
b. Existing zoning and adopted comprehensive plan principles and
designations.
The project conforms to the CBD zoning district designation for the
property. The comprehensive plan future land use designation
conforms to the land use designation currently in effect for the property.
4. Section 1702.2.3 Developmental Impact Study.
(a) A traffic analysis shall be submitted for an area within
approximately 114 mile of the site, or an area including the major
intersections to be impacted by the site, whichever is larger.
The Traffic Impact Analysis is included under Tab 2 of the Supporting
Documents.
(b) Economic impact data shall be provided, including estimates for
construction costs, construction employment, and permanent
employment and shall demonstrate that the proposed development
is favorable to the economy, public services, environment and
housing supply of the City.
The Economic Impact Study is included under Tab 4 of the Supporting
Documents.
(c) A housing impact assessment.
Over the last several years prices of urban housing have increased
dramatically; despite the recent slow down in the economy.
Subsequently, a substantial amount of people within metropolitan areas
has begun to return to the city to live. This has created a shortage of
multi -family housing along with an upward surge of housing prices.
Contrarily, the cost of construction has not kept pace with these
increases, which has made it economically affordable to construct new
buildings for sale. This pattern remains the same in South Florida
•
•
where there continues to be an increased demand for housing,
particularly in Miami -Dade County.
(d) A description of proposed energy conservation measures shall be
provided, including only those measures that are proposed in
addition to the minimum requirements in State Energy Code.
Architecturally, the building envelope will be comprised of insulated
walls and roof. Tinted glass will be used throughout the building.
Electrically, all exterior and landscape lighting will be controlled by
means of time clocks and photocell switches. Energy saving lamps,
ballasts and fixtures are being considered at cores and public spaces.
(e). Historic Buildings
The Freedom Tower located on the southern parcel will remain as a
historical landmark building along the newly -emerging downtown,
residential community. However in order to simultaneously develop an
economically viable project while preserving the historically -significant
portions of the Freedom Tower, the rear (back -of -house) portion will be
modified to create:
1.) A vibrant, pedestrian -friendly urban plaza within the Biscayne
Boulevard corridor; and
2.) A new pedestrian entryway into the Freedom Tower through the
plaza.
The removal of the "non-contributing" portion (the former printing press
area) of the Freedom Tower allows for the creation of a new western
fagade. By considering existing design features and establish
proportions from the Freedom Tower facades the new western facade
will convey a bold, contemporary architectural design, with an
acknowledged sensitivity to historical architectural aesthetics. This new
western facade in conjunction with the urban plaza, will become both a
spatial and historical transition zone between the past and the present,
and thus, enhance the urban experience along Biscayne Boulevard by
creating a unique point of interest amongst the existing pedestrian
amenities in the neighborhood.
(f). Environmental Zone
Property is not within an environmental zone.