Loading...
HomeMy WebLinkAboutSchool Board Comments• • • **REVISED** SCHOOL IMPACT REVIEW ANALYSIS September 15, 2005 FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE SCHOOLS THAT WOULD SERVE THE PROPOSED DEVELOPMENT ARE UNDER THE 115°A° THRESHOLD CAPACITY. IN ADDITION APPLICANT IS NOT REQUESTING ADDITIONAL RESIDENTIAL DENSITY OVER WHAT IS CURRENTLY ALLOWED UNDER EXISTING ZONING CLASSIFICATION FOR SUBJECT PROPERTY. APPLICATION: Lafayette Square (MU-2005-027) REQUEST: Major Use Special Permit and Special Exemption (PAB September 21, 2005) ACRES: 2.36 net acres CURRENT ZONING: C-1 (R-4) which allows 150 DU/acre LOCATION: 141 NE 78`" Street, Miami NUMBER OF UNITS: 306 units proposed (2.36 net acres x 150 DU/acre = 354 maximum units allowed) MSA/ MULTIPLIER: 4.1 / 0.23 Multifamily ESTIMATED STUDENT POPULATION: 70 students* ELEMENTARY: 32 MIDDLE: 18 SENIOR: 20 SCHOOLS SERVING AREA OF APPLICATION: ELEMENTARY: little River Elementary — 514 NW 77th Street MIDDLE: Horace Mann Middle - 8950 NW 2nd Avenue SENIOR: Miami Edison Senior High — 6161 NW 5 Ct. Schools are located in Region IV. *Based on Census 2000 Information provided by Miami -Dade County Department of Planning and Zoning. • • The following population and facility capacity data are as reported by the Office of Information Technology, as of August 2005: STUDENT FISH DESIGN % UTILIZATION NUMBER OF % UTILIZATION CUMULATIVE POPULATION CAPACITY FISH DESIGN PORTABLE FISH DESIGN STUDENTS"' PERMANENT CAPACITY STUDENT CAPACITY PERMANENT STATIONS PERMANENT AND RELOCATABLE Little River 688/ Elementary 720* Horace Mann Middle Miami Edison Senior High ** 1,050/ 1,068* 1,303/ 1,323* 656 1,399 1,696 105%/ 125%* 75%/ 76%* 77%1 78%* 44 0 166 98%/ 103%* 75%1 76%* 70%/ 71%* Student population inc rease as a result of the proposed development 698 1,192 1,586 Estimated # of students (cumulative) based on zoning/land use log (2001- present) and assuming all approved developments are built; also assumes none of the prior cumulative students are figured in current population Notes: 1) Figures above reflect the impact of the class size amendment. 2) Pursuant to the lnterlocal Agreement, none of the schools meet the review threshold. PLANNED RELIEF SCHOOLS IN THE AREA (Information as of January 2005): (Information included in proposed 5-Year Capital Plan, 2005-2009, dated January 2005) Projects in Planning, Design or Construction School Status Occupancy Date N/A Proposed Relief Schools School Status Occupancy Date N/A OPERATING COSTS: According to Financial Affairs, the average cost for K-12 grade students amounts to $6,549 per student. The total annual operating cost for additional students residing in this development, if approved, would total $458,430. CAPITAL COSTS: Based on the State's September 2005 student station cost factors*, capital costs for the estimated additional students to be generated by the proposed developm ent are: ELEMENTARY 32 x $ 13,854 = $443,328 MIDDLE 18 x $ 15,884 = $285,912 SENIOR 20 x $ 21,019 = $420,380 Total Potential Capital Cost $1,149,620 * Based on Information provided by the Florida Department of Education, Office of Educational Facilities Budgeting. Cost per student station does not include land cost.