Loading...
HomeMy WebLinkAboutR-05-0628City of Miami Legislation Resolution: R-05-0628 City Hall 3500 Pan American Drive Miami, FL 33133 www.miamigov.com File Number: 05-01159 Final Action Date: 11/3/2005 A RESOLUTION OF THE MIAMI CITY COMMISSION, BYA FOUR -FIFTHS (4/5) AFFIRMATIVE VOTE, RATIFYING, APPROVING, AND CONFIRMING THE CITY MANAGER'S FINDING OF AN EMERGENCY, WAIVING THE REQUIREMENTS FOR COMPETITIVE SEALED BIDDING PROCEDURES AND APPROVING AN INCREASE IN THE CONTRACT WITH MEF CONSTRUCTION, INC., PURSUANT TO RESOLUTION NO. 03-926, ADOPTED SEPTEMBER 11, 2003, FURTHER AMENDED PURSUANT TO RESOLUTION NO. 04-0789, ADOPTED DECEMBER 9, 2004, IN AN AMOUNT NOT TO EXCEED $317,681.88, INCREASING THE CONTRACT FROM $1,715,658 TO $2,033,339.88, FOR ADDITIONAL WORK REQUIRED FOR THE PROJECT ENTITLED "ROADWAY REHABILITATION, B-40656 (FORMERLY B-4656)," COMMONLY KNOWN AS THE NORTHWEST 19TH TERRACE PROJECT; ALLOCATING FUNDS FOR SAID INCREASE FROM CAPITAL IMPROVEMENT PROJECT NO. B-30228, ENTITLED "NORTHWEST 19TH TERRACE SWALE RESTORATION;" AUTHORIZING THE CITY MANAGER TO EXECUTE AN AMENDMENT TO THE CONTRACT, IN SUBSTANTIALLY THE ATTACHED FORM, FOR SAID PURPOSE. WHEREAS, MEF Construction, Inc., entered into a contract dated November 3, 2003, to perform the reconstruction of road pavement and construction of drainage improvements as described in plans and specifications for the project entitled "Roadway Rehabilitation, B-40656 (formerly B-4656)," commonly known as the Northwest 19th Terrace Project, pursuant to Bid No. 02-03-207 and approved by Resolution No. 03-926, adopted September 11, 2003; and WHEREAS, the contract was subsequently amended to provide for additional unforeseen work pursuant to Resolution No. 04-0789, adopted December 9, 2004; and WHEREAS, in the course of reconstructing the roadway pavement and drainage improvements, the City of Miami and MEF Construction, Inc., identified additional work required immediately to properly complete the job and restore disrupted streets in the neighborhood and this work involved concrete sidewalk restoration, drainage structure adjustments, swale reconstruction and driveway reconstruction; and WHEREAS, the City Manager has made a finding of an emergency approving an increase in the contract by $317,681.88, from $1,715,658 to $2,033,339.88, for the additional work; and WHEREAS, funds to cover the increase are available from Capital Improvement Project ("CIP") No. B-30228 entitled "Northwest 19th Terrace Swale Restoration;" NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted by City of Miami Page 1 of 2 File Id: 05-01159 (Version: 1) Printed On: 12/7/2016 File Number: 05-01159 Enactment Number: R-05-0628 reference and incorporated as if fully set forth in this Section. Section 2. By a four -fifths (4/5) affirmative vote, the City Manager's finding of an emergency, waiving the requirements for competitive sealed bidding procedures and approving an increase in the contract with MEF Construction, Inc., pursuant to Resolution No. 03-926, adopted September 11, 2003, further amended pursuant to Resolution No. 04-0789, adopted December 9, 2004, in an amount not to exceed $317,681.88, increasing the contract from $1,715,658 to $2,033,339.88, for additional work required for the project entitled "Roadway Rehabilitation, B-40656 (formerly B-4656)," commonly known as the Northwest 19th Terrace Project, is ratified, approved and confirmed, with funds for said increase, allocated from CIP No. B-30228, entitled "Northwest 19th Terrace Swale Restoration." Section 3. This increase is necessitated by repair or maintenance of an existing public facility, namely the drainage facility structures, located within the project boundaries, and this work is therefore exempted from the requirements of Chapter 255.20, Florida Statutes, by subsection (1) (c) (5). Section 4. The City Manager is authorized{1} to execute an Amendment to the contract, in substantially the attached form, for said purpose. Section 5. This Resolution shall become effective immediately upon its adoption and signature of the Mayor.{2} Footnotes: {1} The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter and Code provisions. {2} If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. City of Miami Page 2 of 2 File Id: 05-01159 (Version: 1) Printed On: 12/7/2016