HomeMy WebLinkAboutArticle 3 Tab 4 Site Utility Study� BRICKELL CITICENTRE
•
•
South Miami Avenue and SE 8th Street
Site Utility Study
CTE Project No. 05-0210-40
Prepared by:
CONSUL -TECH DEVELOPMENT SERVICES, INC.
Florida Certificate of Authorization No. 9008
10570 N.W. 27th Street, Suite 101
Miami, Florida 33172
Tel. 305-599-3141
Fax. 305-599-3143
May, 2005
•
•
•
I. INTRODUCTION
The proposed project site is composed of two parcels bound by SE 7 ' and SE $' street and
divided by South Miami Avenue.
The proposed project will include three residential towers with parking garages, restaurants.
office and retail spaces. The three towers will have a combined total of 2,424 condominium units. a
15.000 sq-ft restaurant, 130.823 sq-ft of office space, and 75.336 sq-ft of retail space.
II. DRAINAGE SYSTEM
For drainage design purposes, the site will be considered 100% impervious. Landscape and
green areas are provided, but these areas will not be considered in the calculations in an effort to be
conservative in the storm water management design. Storm water discharge will consist of runoff
from rooftops, vertical building faces and pedestrian areas. Miami -Dade DERM requires that the
proposed drainage system take into account 1/3 of the largest vertical building face for the DERM 5-
year, 24-hour design storm only. The building faces exposed to the north will produce the largest
amounts of runoff and will be accounted for in the calculations. The site land use can be summarized
as follows:
Total Net Impervious Vertical Total
Lot Area Area Building Faces Drainage Area
(Acres) (Acres) (33%) (Acres)
(Acres)
5.55 5.55 3.40 8.95
The proposed drainage plan calls for all pavement runoff to be collected in catch basins
capable of detaining the peak inflow from the Miami -Dade County DERM 5-year. 24-hour design
storm for 90 seconds. These basins also contain baffles to prevent all oil, grease and foreign
matter from flowing into the proposed system. The runoff will then flow into eight proposed
drainage wells based on calculations found in Table 1. Runoff from building rooftops and
vertical faces are uncontaminated by oil and grease and may be piped directly into to the drainage
wells. The use of drainage wells is permitted by Dade County DERM in this area due to the high
•
•
level of salinity found in the groundwater. Since the proposed system is using drainage wells to
dispose of excess runoff, an exfiltration trench system will be designed to treat the larger of the
first inch of runoff generated before disposing of any runoff. or 2.5 inches over the impervious
area. The proposed well and exfiltration trench systems will keep the site dry during the DERM
years - 24 hours storm, and keep the flooding below the site perimeter elevation during the
SFWMD 25 years - 72 hours storm. The 100 years — 72 hours storm stage elevation should
remain just below the building's Finished Floor Elevation.
Both SW 7th and SW 8th Street are Florida Department of Transportation Right -of -
Ways. According to Depai anent rules, additional calculations must be performed to prove to the
Department that there will be no discharge into the State Right -of -Way. The drainage well
system will be designed to retain the maximum storm stage of the 100-year, 1, 2. 4, 8, 24, 72.
168. and 240-hour storm events.
IIh WATER DISTRIBUTION MASTER PLAN
The Miami -Dade Water and Sewer Department (M-DWASD) provides the water
service in this area. Currently, there is a 20-inch water main along SE g,h street. a 12-inch
water main along South Miami Avenue. and a 6-inch and 8-inch water main along SE 7°'
Street. Refer to the attached Water Atlas for additional information. According to the
Miami -Dade Water and Sewer Rules and Regulations. at least two frontages of the property
will have to be covered by a 12-inch water main. Therefore_ we estimate that the M-
DWASD will not require the construction of any new water main for this project.
Nevertheless, it will probably require the developer to make a contribution towards the
construction of a new 12-inch water main along SE 7th Street for the entire frontage of the
property.
The anticipated average daily water consumption for the entire project is 535,049
GPD, and is calculated as shown in Table 2.
•
•
I\'. SANITARY SEWER MASTER PLAN
The Miami -Dade Water and Sewer Department (MD-WASD) also provides the
sanitary sewer service in this area. There is an existing 8-inch gravity sanitary sewer main
running along SE 8T. Street and a 10-inch along SE 7"' Street. It appears that the sanitary
sewer services to the proposed development will be provided by sanitary laterals connected
to the existing sewer main surrounding the property. Nevertheless. we are not sure if the
existing sewer lines have adequate capacity for this project. This information will be
available only after M-DWASD completes their modeling analysis. Depending on the
outcome of the M-DWASD modeling, it is possible that new sanitary sewer main will be
required for this project.
This project is anticipated to generate an average daily sewage flow of 535,049
GPD, and is calculated as shown in Table 2.
The wastewater produced by the site will travel via the existing sanitary sewer
system to the MD-WASD Regional Pump Station No. 1. Pump station No. 1 is currently
operating for 4.87 hours per day. According to DERM, the additional 535,049 GPD flow
from this project together with reserved flows from other projects proposed in the area will
put the pump station NAPOT at 6.07 hours per day. Thus, the pump station is deemed
capable of handling the proposed flow from the project. Pump Station No. 1 transmits all
flows directly to the MD -NASD treatment plant on Virginia Key for final treatment before
discharge into the Atlantic Ocean. Refer to the attached Miami -Dade DERM projections for
more information.
•
•
•
' '. SOLID WASTE GENERATION
Solid waste generated will be placed in standardized on -site containers for refuse and
recvclables per the City of Miami Code, for regular pickup by private hauling companies
and/or the City of Miami Solid Waste Depaitiiient. The solid waste will then be transported
to Miami-Dade's Disposal Facilities. Actual waste pick-up locations will be shown in the
architectural plans.
This project is anticipated to generate an average daily solid waste volume of 8.889
Cu. Yd/month, and is calculated as shown in Table 3. Generation rates were determined
from data provided by the Miami -Dade County Department of Solid Waste.
•
•
•
TABLE 1
BRICKELL CITICENTRE
DRAINAGE CALCULATIONS
Total Net Lot Area = 5.55 Acres
Total Drainage Area = 8.95 Acres
1. Impervious = 100% or 8.95 Acres
2. Pervious = 0% or 0.00 Acres
2. Average Runoff Coefficient
3. SFWMD Design Storm Information
0.98
1. 5-Year 24-Hour Storm (Miami -Dade County W.C. 1.1)
Rainfall Intensity = 6.10 inches per hour
Purpose = Flood Protection
Peak Runoff = CIA = (0.98)(6.10)(8.95)
= 53.5 cfs
2. SFWMD 25 Year - 72 Hour Storm (Miami -Dade County W.C. 1.1)
Rainfall Intensity = 7.30 inches per hour
Purpose = Perimeter Berm
Peak Runoff = CIA = (0.98)(7.30)(5.55)
39.7 cfs
3. SFWMD 100 Year - 72 Hour Storm (Miami -Dade County W.C. 1.1)
Rainfall Intensity = 8.50 inches per hour
Purpose = Finished Floor Elevation
Peak Runoff = CIA = (0.98)(8.50)(5.55)
= 46.2 cfs
4. FDOT 100 Year - 1 Hour Storm
Rainfall Intensity = 5.00 inches per hour
Purpose = Discharge to Biscayne Blvd.
Peak Runoff = CIA = (0.98)(5.00)(5.55)
= 27.2 cfs
FDOT Design Storm Information
Storm Duration Rainfall Amount (Inches)
•
•
•
1 Hour
2 Hour
4 Hour
8 Hour
24 Hour
72 Hour
168 Hour
240 Hour
Well Data
5.0 (Figures 5-1 & 5-11)
6.3 (Figures 5-1 & 5-1 1)
7.8 (Figures 5-1 &'z 5-111
9.6 (Figures 5-1 & 5-11)
14.0 (Figure 5-13)
19.0 (Figures 5-14 & 5-15)
20.0 (Figure 5-16)
23.0 (Figure 5-17)
1. Well Diameter
Assumed Well Capacity
5. Mean High Tide Elevation
6. Specific Gravity Head Loss
7. Proposed Number of Wells
24 Inches
= 500 gprni t. of Available Head
= 2.00 ft. (taken from WC.. 20_034-A)
= 2.00'
=
5. Hydraulic Grade Line Elevations at Well Structure
1. 5 Year DERM Storm
= (53.5 cfs)/[(500 gpm/ft head)(0.002228 cfsigprn)(12 wells)} + (2.00 + 2.00)
= 8.00' NGVD
SFWMD 25 Year - 72 Hour Stotts
(39.7)4(500 gpm)(0.002228 cfsigpm)(12 wells)] + (2.00 + 2.00)
= 6.97' NGVD
3. SFWMD 100 Year - 72 Hour Storm
= (46.2)4(500 gpm)(0.002228 cfsigpm)(12 wells)] ± (2.00 + 2.00)
= 7.46' NGVD
4. FDOT 100 Year - 1 Hour Storm
(27.2 cfs)f[(500 gpm)(0.002228 cfsigpm)(12 wells)] + (2.00 + 2.00)
=6.03'NGVD
•
•
•
Residential Towers
2,424 units
Restaurant
668 Seats
Office Space
130,823 SF
Retail Space
75.336 SF
TABLE 2
BRICKELL CITICENTR.E
ANTICIPATED AVERAGE DAILY FLOW
OF WATER AND WASTEWATER
200 gpdiunit = 484,800 gpd
(Zu 50 gpd. seat = 33.400 gild
(r 10 gpd/100 SF = 13.082 gpd
L' 5 gpd,%100 SF = 3.767 gpd
Total = 535,049 gpd
ANTICIPATED AVERAGE DAILY FLOW WASTEWATER
Average Flow 0.535 mgd
Peak Flow — 2.006 mgd
NOTES:
l . Peak flow uses a factor of 3.75 times average flow (Recommended Standards for Wastewater
Facilities, 1990 Edition)
2. gpd = gallons per day
3. No industrial wastewater is anticipated to be generated
4, mgd = million gallons per day
•
•
•
TABLE 3
BRICKELL CITICENTRE
SOLID WASTE GENERATION
Residential Towers
2.424 units a` 1.25 cu. yds %month per unit = 3,030 cu. vds.: month
Office and Retail Space
206,159 SF of office / retail space 0.25 cu. yds per 100 SF /month = 515 cu. yds month
Restaurant
668 seats restaurant (4.) 0.80 cu. yds per seatfmonth = 5,3= 4 cu. yds.-month
Total anticipated Solid Waste generation = 8,889 Cu. Yds. /month
•
4111
Pearly.
MIAMI-DADE COUNTY DERM
Pump Station No.1 Usage and Projections
kPump Station MonthlW
Station..30 -0001 Atlas Pg..F14
MIAMI DADE WIlTER 6 SEWER DEPFRTMENT
flddr...390 HW NORTH RIVER DR
Sec -Township -Range 1-54-41
Genr. ET clock.Y Telm.'t #Pumps. 8
Pump lype.f •5tn class.M 5pee0.2 Hrspwr.+
Res fl3m(gp0) Proj Hapot
Plans.. 6,120,087 5srs
Plats.. 0 4.87 tars
Extens. 0 4.67 hrs
% Cep
59.70
48.70
48.70
Oats
•
01/28/2005
12/28/2004
11 /I'.3/2004
10/25/2004
09/24/2004
08/25/2004
07/27/2004
Mo . HAPOT Avg Deil 9 rl oius
4.35 30.48
4.33 30.34
5.54 38.79
6.18 43.29
5.81 40.70
6.50 46.51 0.00
3,64 25.50 0.00
Signature.. 3RRC1M
•
0.00
0.00
0.00
0.00
0.00
Information
N. 27E Review,
moratorium..OK
Moratorium effective since / /
Yeerlw NAPOT (hr s) .
Stn Gross Cepecity(gpd).
Station Reduction Factor
Stn Het Cep Certif(gpd).
5tn Nat Capacity(W)-
Indicated Flows(gpd)
4.87
. 221.750,000
0. 60
0
. 133,056,000
25,999,28
Rgd # Comments
Fig Pmp
Y 8
Y 8
Y 8
Y 8
Y 8
Y 8
Y 8
Sign Lake..12/20/2004 17:40:49.89
oCac. ..34)-k- 6,l7-0,0E7 (? zccr
+ 555,O'i ( 6541,416 6rf)
�3,65`,yt6 x 133,056font::,
PS
6.07
C. .
i
WATER ATLAS
(M-DWASD)
•
;TATION .
3070
•
T""'" " . 114
3085 r,
i47 161
48 149
15c
3108
1
a
209A 209,
< 12`
841A
0
5964
1
840
4055 egg.
5949 \
SEWER ATLAS
(M_BWASD)
1
48
193
o' I z
r:.-
Q u' 1 ��*
_s*
3'i94
157,iZ
208
5968
832
PRc Ecr S rr
834 8�__.._ 830
; s•
835 836
1
'3052
48
__SW
10^
4915
1
SI
127
sal
5927
829
s
3022
1
183
84
85
186
2850
5927
30231
1 3025
1
15'�15" ,.
182
SEfiST
'3050
1
SE 7 ST •
-201
821 a 1
64
-s B20
827 824 822
5628 823
.__ 823
5950
1
819
2