PROJECT WORK PLAN
FY05-06
DEP Agreement # CZ613
Pro€ect Title: Watson Island Bay+valk Project
Recipient
Organization Name: City of Miami
Chief Elected Official or Agency Head: Manuel A. Diaz
Title: Executive Mayor
Address: 3500 Pan American Drive
Zip Code: 33133
Area Code and Telephone Number: (305) 250-5300
Area Code and Facsimile Machine Telephone Number: (305) 854-4001
E -Mail Address: MannyDiaz@ei.miami.fl.us
Proiect Manaeer
Organization Name: City of Miarni
Name: Aldo Bustamante
Address: 444 SW 2"d Avenue, 3'd Floor, Miami, Florida
Zip Code: 33130
Area Code and Telephone Number: (305) 416-1436
Area Code and Facsimile Machine Telephone Number: (305) 416-2156
E -Mail Address: abustamante ei.miami.fl.us
Partners
Organization Name: Miarrii Parking Authority
Contact Person: Yanei Crespo
Address: 190 N.E. 3rd Street, Miami, Florida
Zip Code: 33132
Area Code and Telephone Number: (305) 373-6789 ext. 250
Area Code and Facsimile Machine Telephone Number: (305) 371-9451
E -Mail Address: cres o miami arkin .com
Mailing Address for Warrant (if other than the Recipient address):
County in which project is located: Miami -Dade
Project is Statewide: No
DEP Agreement No. CZ613, Attachment A, Page 1 of 5
DEP 55-236 (04105)
Scope of Work Information
Abstract Description: Briefly but completely describe the problem to be addressed and the project solution to
the problem Please limit to one page.
Watson Island is a spoil island located in Biscayne Bay, Miami. The Island's Master Development Plan and the City
of Miami's comprehensive plan reserve the majority of Watson Island for recreational land uses. Towards this goal,
the City proposes to build a Baywalk on the island to increase public use and implement coastal protection goals.
The Baywalk will include an innovative combination of a functional retaining wall, which will build-up and level the
upland slope, combined with a seating area for visitors along the Baywalk. The City has consulted with permitting
agency staff and expects the permitting process to be completed prior to onset of the grant award in July 2005. As a
result of the consultation, the City was advised to design the project to be constructed landward of wetlands and the
mean high water line in order to avoid environmental impacts and regulatory concerns. Otherwise, if the
construction would impact wetlands, it would require an Environmental Resource Permit and nutigation. Also,
construction waterward of the mean high water line would trigger submerged state lands issues and require a lease
from the Board of Trustees, which would likely be denied.
DEP Agreement No. CZ613, Attachment A, Page 2 of 5
DEP 55-236 (04105)
Protect Objectives and Related Tasks and Deliverables: List project objective(s) and tasks that will
accomplish each objective. Indicate the quarter in which these tasks will occur and will be delivered. Deliverables
or work products must be listed.
Objective 1: Pre -construction Activities
Task 1: Site Clearance
Task 2: Design
Deliverable: Conceptual Design
Task 3: Preliminary Approvals & Comments
Deliverable: Review Comments
Task 4: Design
Task 5: Regulatory Approvals/Permitting
Deliverable: Permitted Construction Drawings
Objective 2: Contractor
Task 1: Bid document preparation, contractor selection
Objective 3: Construction
Task 1: Start of Construction
Deliverable: Stan of Retaining Wall Construction pictures
Task2: Construction
Task 3: Final Inspection/Punch List Items
DEP Agreement No. CZ613, Attachment A, Page 3 of 5
DEP 55.236 (04105)
Proiect Budget Schedule: Type dollar amounts only in applicable categories (round to the nearest dollar; no
cents) and leave other categories blank, if your grant Agreement requires match, it must equal the FCMP funds
requested, or one hundred percent (100%). A budget transfer of funds (within approved budget categories), in an
amount not to exceed 10 percent of the FCMP total budget, is allowed without requesting an official amendment.
Budget CafeRory FCMP Funds MATCH Funds
1. Salaries
2. Fringe Benefits
3. Travel
4. Equipment Purchases
5. Supplies
b, Contractual Services 50.000.00
7. Construction
8, Other Expenses
9. indirect Charges
FCMP Total 50,000.00
Match Total
Total Project Cost; $100000,00
DEP Agreement No. CZ613, Attachment A, Page 4 of 5
DEP 55-236 (04105)
50,000.00
50,000.00
Proiect Budget Narrative: Describe line items for each applicable budget category shown on the budget
schedule. Provide sufficient detail to show cost relationship to project activities. Complete for both FCMP and
match items, if applicable. If in-kind match is being provided by a third party, a letter from that party confirming the
amount and type of that match must be included with this project work plan. Note: Indirect costs are not allowed
as match.
FCMP Funds will be used for Contractual Services
$50,000 concrete retaining wall, construction & materials
Match Funds
The city will provide match in the amount of $50,000.00 also in contractual services for Earthwork & Site
Preparation, Saywalk paving, site drainage, architecture and engineering services.
DEP Agreement Na. CZ613, Attachment A, Page 5 of 5