HomeMy WebLinkAboutSite Utility Study• May 2005 1650 Biscayne Boulevard MAJOR USE SPECIAL PERMIT SITE UTILITY STUDY • PREPARED FOR Cardinal Symphony, LLC. KHA Project No.: 042567000 Prepared by: KIMLEY-HORNAND ASSOCIATES, INC. 1691 MICHIGAN AVE. SUITE 400 MIAMI BEACH, FL 33139 • • • • Site Utility Study Introduction The 1650 Biscayne Boulevard project is a proposed mixed -use development to be located between NE 17`h Street and NE 16th Street from NE 2 'a Avenue to Biscayne Blvd., in the City of Miami, Miami -Dade County, Florida (see Attachment "A" Site Location Map). The site currently consist of one 1-story building; two asphalt parking lots with a portion of undeveloped land, all of which are to be demolished as part of this project. The 1650 Biscayne Boulevard project consists of two high rise residential towers and a 9 story parking structure. The tallest of the two towers will be a 60 story building; while the second tower will stand 40 stories tall. It will include approximately 824 residential units, 49,020 S.F. of office space, 53,720 S.F. of retail and approximately 1,118 parking spaces. See Table 1, below for further details of the proposed project. Table 1: Project Summary Residential 824 1,034,165 Office 49,020 Retail 12,380 Restaurant 13,620 Health Club 27,720 Parking 1,118 spaces Total 1,136,945 1650 Biscayne Boulevard Site Utility Study Page 1 • • I. Drainage Relative to the above -referenced project, the following information should be used during the storm water management design and site grading. Flood Criteria: The proposed project site grade elevations will be designed to meet flood criteria according to Federal State, Miami -Dade County and City of Miami standards as follows: t The subject project is located in PANEL 183 of COMMUNITY -PANEL NUMBER 12025C0183 3 of the Flood Insurance Rate Map (FIRM). According to the National Flood Insurance Program, the west side of the project is in Zone X, for which a base flood elevation has not been determined and the eastern portion of the site lies within Zone AE elevation 9.0 ft NGVD. 2. Miami -Dade County Flood Criteria elevation as per Amended Plat of Flood Criteria Map, plat book 120, page 13 is estimated to be 5.0 ft. NGVD. This will be used to determine proposed site grading minimum grade elevations. 3. The average October ground water level elevation is estimated to be 2.0 ft. NGVD. This elevation will be used to compute drainage well capacity and roadway base clearance. (Source: Dade County Department of Environmental Resource Management & Miami - Dade County Public Works Manual, Volume H - Design Standard Detail WC 2-2). Existing Drainage Presently, the site is partially developed. Based on site observations and available information, there is an existing drainage system which currently serves the existing building and asphalt parking lot. The existing drainage system will be demolished and a new stoiniwater management system will be constructed to retain the runoff generated by the proposed improvements, as required by code (see below). Proposed Drainage System The drainage system for the proposed development will consist of drainage wells and exfiltration trench, if possible, to facilitate on -site disposal of storm water runoff. The 5- year design stoa,tt event will be used to design the storm water management system, in 1650 Biscayne Boulevard Site Utility Study Page 2 • • accordance with Section D-4, "Water Control", of Part 2 of the Miami -Dade County Public Works Manual. Based on preliminary calculations, it is anticipated that eight (8) 24" drainage wells will provide sufficient capacity to dispose of the design 5-year 24-hour storm water runoff generated by the proposed development. Preliminary drainage computations for the project areas are provided in Attachment "B" Preliminary Drainage Well Calculations, which includes the basis for design_ The final drainage design for the project should be in conformance with the requirements of the Miami -Dade County DERM Water Control Section, Florida Department of Environmental Protection, and other local, state and federal regulatory agencies having jurisdiction over the project. II. Water Distribution System The water mains owned and operated by the Miami -Dade Water and Sewer Department (MDWASD) in the vicinity of the project are shown in the Table 3. Table 3: Existing Water Mains (Per MDWASD Water Atlas Sheet) Biscayne Boulevard NE 17th Street and NE 16`h Street 18" NE 2nd Avenue NE 17th Street and NE 16th Street 6" 20" NE 17th Street Biscayne Boulevard and NE 2°d Avenue 6" 12" (South Half of NE 17th Street) NE 16th Street Biscayne Boulevard and NE 2°d Avenue 2" 1650 Biscayne Boulevard Site Utility Study Page 3 Per the MDWASD Water Atlas, an existing 18-inch water main fronts the property along Biscayne Boulevard. There is also a 20-inch and 6-inch water main abutting the property along NE 2nd Avenue, as well as a 2-inch along NE 16th Street. In the north side of the property there is also a 6-inch and a 12-inch in the south half of the block. In accordance with Miami -Dade Water and Sewer Department (MDWASD) criteria, the developer may be required to construct a new 8-inch - 16-inch ductile iron (DI) water main along NE 16th Street or extend the existing 12-inch wateimain along NE 17th St. to NE 2nd Ave. A final determination of the points of connection and requirements will not be provided by MDWASD until a Water and Sewer Agreement is requested by the owner and/or the Hydraulic Analysis done by MDWASD is completed. Water service meters will be installed by MDWASD forces at owner's expense. Service lines for domestic water, fire sprinkler systems and irrigation could be connected from the existing water distribution system. See Attachment "C" for a copy of the MDWASD water atlas sheet for the project area. III. Sanitary Sewer Collection System Table 4 depicts the sanitary sewer mains owned and operated by Miami -Dade Water and Sewer Department (MDWASD), within the vicinity of the project. Table 4: Existing Sanitary Sewer Mains (Per MDWASD Sewer Atlas Sheet) NE 17d' Street and NE 16th Street NE 17th Street and NE I6th Street 10" Gravity Main 8" Gravity Main (North half of Biscayne Blvd.) Biscayne Boulevard and NE 2nd Avenue Biscayne Boulevard and NE 2"d Avenue 8" Gravity Main 8" Gravity Main 1650 Biscayne Boulevard • Site Utility Study Page 4 • • • Similar to the water main, an agreement with M-Dade County Water and Sewer Department (MDWASD) will be required for final determination of the points of connection. Public improvement requirements will not be provided by MDWASD until a Water and Sewer Agreement is requested by the owner. The proposed an -site sanitary sewer system for the property can be connected to the either of the existing mains abutting the property; provided that the line has capacity to handle the existing flows plus the additional flows contributed by the proposed project. A letter of availability and further coordination with MDWASD is recommended to verify the proposed sanitary sewer service connection points and requirements for this project. MDWASD may require upgrades to the sanitary sewer system, but this can not be determined without a request for a water and sewer agreement. A copy of the MDWASD Sewer Atlas sheet has been attached (See Attachment C). The flows from the existing MDWASD sanitary sewage mains on Biscayne Boulevard, NE 17`h Street, NE 16`h Street and NE 2nd Avenue are received by MDWASD Regional Pump Station #2, which is located at 925 Biscayne Boulevard. As of May 2005, Pump Station No. 2 is currently operating at an average yearly NAPOT of 2.98 hours/day, and is presently not under any type of moratorium (see attached pump station report). It is not anticipated that any improvements to the regional pumping and/or transmission systems will be required to connect the proposed project. However, a final determination regarding the status of the existing transmission system and the need for possible improvements will not be made until construction plans are submitted to the Miami -Dade County DERM Wastewater Section and a Sanitary Sewage System Capacity Certification Letter is issued. The flows created by this project have been determined and are shown in Table 5. 1650 Biscayne Boulevard Site Utility Study Page 5 • • • Table 5: Water & Sewer Flow Generation f Oecu a icy `ae rate o A era€ge a�� w Apartment 739 units 200 gpd per unit 147,800 Duplex 85 units 250 gpd per unit 21,250 Health Club 27,720 sf 35 gpd per 100 sf 9,702 Office 49,020 sf 10 gpd per 100 sf 4,902 Retail 47,853 sf 5 gpd per 100 sf 2,393 Restaurant 908 seats 50 gpd per seat 45,400 Total Anticipated Flow 231,447 gpd IV. Solid Waste Generation Solid waste generated by this project will be collected in standard on -site containers for refuse and recyclables. Regular pick-up service will be provided either by private hauling companies and/or by the City of Miami Solid Waste Department, who will transport the waste to Miami -Dade County's or private disposal and recycling facilities. The volumes of solid waste projected to be generated by the project are shown in Table 6. 1650 Biscayne Boulevard Site Utility Study Page 6 • • • Apai tunent Table 6: Solid Waste Generation 739 units 5 lbs/unit/day 1.98 Duplex 85 units 3.6 lbs/unit/day 0.15 Health Club 27,720 sf 3.12 lbs/100 sf/ day 0.43 Office 49,020 sf 6 lbs11000 sf/day 0.15 Retail 47,853 sf 6 lbs/1000 sf/day 0.14 Restaurant 100 seats 1 lbs/seat/day 0.45 Total Anticipated Solid Waste Generated 3.30 V. Utility Easement According to the survey by McLaughlin Engineering Company, there is a 10' wide Private Easement within the site. If the proposed improvements are in conflict with said easements and consequently the existing facilities (overhead lines, poles etc.) the easement will have to be removed by plat. In addition, the facilities will have to be relocated to accommodate the improvements which may require another easement. 1650 Biscayne Boulevard Site Utility Study Page 7 • Attachment A Site Location Map 40 • IN L /GIAIL) 1 L... :2ND -H ST Z i 1 C.N. ;fi L� NE 22ND S NE 211 ST ST NE12 NE 22ND S- ST ST Ik NE 20TH TE NE 20,1H NE 19TH TE f z NE rev • i NkT i 5TH ST NE 19TH ST 17TH TE z 1 Li Lij z z i 41:: fS_ -- \ P-1 I I i c' 1 N E 13T H T EE 1 1 I < I z 1 1_SF\; E 1 3 "H SI -�-- CN N E NE 20TH NE 9JH ST PROJEC LOCATIOkI 7T , S. nI jj NE_15TH T NE 14TNI ST 9 1 N E 15T Kimley-Horn and Associates, Inc. 169i Michigan Avenue Suite 400 Miami 8eccn, rlor=.dc 33139 Phone: 305-673-2025 fax: 3C5-673--4882 1650 BISCAYNE BOULEVARD SITE LOCATION MAP BRQWARD cQu 1 to EC!I YOa«ni.N 4C• AGE ND' - - 2- . IESTIMATED) INTERVAL i.O FOOT. is+did.} Kimley-Horn and Associates, * 1691 Michigan Ave Suite 400 Miami Beach, Florida 33139 Phone: 305-673-2025 Fax: 305-673-4882 1650 BISCAYNE BOULEVARD AVERAGE OCTOBER GROUND WATER LEVEL 1960-75 Kimtey-Horn and Associates, inc. 1691 Michigan Ave Suite 400 Miami Beach, Horida 33139 Phone: 305-673-2025 Fax: 305-673-4882 1650 BISCAYNE BOULEVARD F.I.R.M. FLOOD INSURANCE RATE MAP • C�11 Klmley-Horn and Associates, Inc. 1691 Michigan Avenue Suite 400 Miami Beach, Florida 33139 Phone: 305--673-2025 Fax: 305-673-4882 1650 BISCAYNE BOULEVARD FLOOD CRITERIA MAP • Attachment B Preliminary Drainage Well Calculations • • 1650 BISCAYNE BOULEVARD City of Miami, Florida RANAGL CALCULATIONS DRAINAGE WELLS S IAG. AM DER1 I CRITER A) 1. Site Data: A. Average October Water Table Elevation = 2 bl1;NGVD Iui IaCPW Star�aatPsrt ectlOt D-4 t Or B_ County Flood Criteria Elevation = .5 00 �: NGVD (Coi C. F.I.R.M. or FEMA Base Flood Elevation = 9 00 .Zone X/D (Ma, D. Average Crown Road Elevation = 5 1' NGVD E. Average Existing Onsite Grade Elevation =,.'NGVD F. Proposed drainage inlet grate elevation = 5 NGVD 2. Total Contributing Drainage Area (A): A. Impervious Areas: a) Asphalt and concrete pavement = 3 Acres b) Roof areas + 1/3 NE building corner = 2 2 Acres 3.23 Acres Total Impervious Area (A l) 3.15 Acres (98%) B. Pervious areas: a) Green Areas = ii.Q$ Acres (2%) • 3. Weighted Runoff Coefficient (C): • Runoff Coefficient Impervious (C1) = Runoff Coefficient Pervious (C2) = C=[(AlxCI)+(A2xC2)]/A; C= C x A= Total Contributing Area; C x A= 0.89 2.86 Acres 4. Time required to generate one inch of runoff (per DERM Water Control Section D-4) Rainfall Intensity (I) = 308.5 / [(48.6 x F-01) + t (0.5895 + F-2/3)] Frequency (F) years - Frequency Curve Q = CIA, V = Qt; V(1 ) = Qto m.}, to ;y_) = Time to generate 1 inch of runoff V€1 in) = CIAt0 in) I" x A = CIAt(1 in) ; Solving for t(1 in.), to in.) = 1" / (IC) Time to Generate one inch of run-off t(in) 11.25 Min. Time to reach the inlet (tc.) 1a3 Min. Total Time required to generate 1 in of runoff: 21.25 Min. DRAINAGE CAICS_165O Sisc. Blvd_Atiachment B BASIN • • • 5. Cumulative Runoff (inflow Mass Diagram) Sec) Accumulated Storm .. Runoff (CP) 8 10 15 21.25 30 40 50 60 90 120 180 480 600 900 1275 1800 2400 3000 3600 5400 7200 10800 2.859 2.859 2.859 2.859 2.859 2.859 2.859 2.859 2.859 2.859 2.859 6.405 6.166 5.641 5.099 4.493 3.956 3.534 3.193 2.477 2.023 1.480 18.31 17.63 16.13 14.58 12.85 11.31 10.10 9.13 7.08 5.78 4.23 8.790 10.578 14,515 18,584 23,123 27,147 30,313 32,868 38,240 41,644 45,712 6. Drainage Well Design Discharge Rate: Based on well discharge rate of: GPM/ft. Head DW-1 5.50 2.00 1.60 1.90 3.39 228 DW-2 5.50 2.00 1.60 1.90 3.39 228 DW-3 5.50 2.00 1.60 1.90 3.39 228 DW-4 5.50 2.00 1.60 1.90 3.39 228 DW-5 5.50 2.00 1.60 1.90 3.39 228 DW-6 5.50 2.00 1.60 1.90 3.39 228 DW-7 5.50 2.00 1.60 1.90 3.39 228 DW-8 5.50 2.00 1.60 1.90 3.39 228 Well Discharge Rate (CFS) 7. Detention Time: 27.09 Total Storage (CF) The drainage well structure must be designed to detain runoff for a minimum of 90 seconds prior to discharge. Qd = Design Runoff Rate (CFS) Vd = Detention Volume (CF) = Qd x 90 sec. _ Vdl = Detention Volume Per Well (CF)_ W = Width of Well Structure (ft) L = Length of Well Structure (ft.) = 14.58 CFS 1311.91 CF 187.42 CF 10.0 ft. 12.0 ft. 1824.00 Hmi„ is the minimum depth required from the top of well casing to the floor of the well box to achieve 90 second detention time: H,„,F, (ft.) = Vds / (W x L) = 1.60 ft. Top of Well Casing Elev. = 3.50 Elevation at Floor of Well Box (NGVD) = Top of Well Casing Elev. - H,�; = 1.90 • • • 8. Excess storm water runoff excluding well structure storage: (Sec) .' Accumulated; elI.._,:::il (CF). l") `1`otal, O er11ow Volume• 8 10 15 21.25 30 40 50 60 90 120 180 480 600 900 1,274.90 1800 2400 3000 3600 5400 7200 10800 27.09 27.09 27.09 27.09 27.09 27.09 27.09 27.09 27.09 27.09 27.09 13,005 16,257 24,385 34,543 48,770 65,027 81,283 97,540 146,310 195,080 292,620 8,790 10.578 14.515 18,584 23,123 27,147 30,313 32,868 38,240 41,644 45,712 -4,216 -5,679 -9.870 -15,959 -25.647 -37.879 -50.970 -64,672 -108,070 -153,437 -246.908 9. Excess storm water runoff including well structure storage: 8 10 15 21.25 30 40 50 60 90 120 180 480 600 900 1,274.90 1800 2400 3000 3600 5400 7200 10800 8,790 10,578 14,515 18,584 23,123 27,147 30,313 32,868 38,240 41,644 45,712 1,824 1,824 1,824 1,824 1,824 1,824 1,824 1,824 1,824 1,824 1,824 13,005 16,257 24,385 34,543 48,770 65,027 81,283 97,540 146,310 I95,080 292,620 -6,039.82 -7,502.91 -11,693.66 -17,782,83 -27,471.18 -39,703.30 -52.794.38 -66,495.93 -109,893.76 -155,260.53 -248,732.41 Safety Factor 1.86% Safety Factor 2.06 • Attachment C Existing Utility Records • • 43 1 PROJECT Li/CATION Kimley-Horn and Associates, Inc. 169E Michigan Avenue Suite 4.00 MLaml, Florida 3,3143 Phone: 305-662 6445 fox: 305-662.6492 1650 BISCAYNE BOULEVARD MDWASD WATER ATLAS SHEET • Kimley-i-torn and Associates, Inc. 7591 Michiqon Avenue Suite 400 tiumi, For. do 33€43 Phone: 305-662.6445 Fax: 305-662,6492 1650 BISCAYNE BOULEVARD MDWASD SEWER ATLAS SHEET • Attachment D Pump Station Monthly Information • • Pump Station Monthly Information Station..30 -0002 Atlas Pg..E13 MIAMI DADE WATER Sc SEWER DEPARTMENT Addr.,925 BISCAYNE BLVD S Township -Range 31-53-42 G ET clock.Y Telm.Y #Pumps. 5 Pump Type.A. Stn Class Speed.R Hrspwr.± Res flow(gpd) Mans.. 2,061,111 Plats.. 0 Extens. 0 Proj Napot 4.41 hrs 2.98 hrs 2.98 hrs % Cap 44.10 29.80 29.80 Date Mo.NAPOT Avg Daily Flows 03/01/2005 2.92 01/28/2005 2.77 12/28/2004 2.80 11/23/2004 3.09 10/25/2004 3.28 11.67 0.00 11.07 0.00 11.21 0.00 12.34 0.00 13.10 0.00 09/24/2004 3.14 12.56 0.00 08/25/2004 3.38 13.50 0.00 Signature..LEALG Sign Date GOLD/M Station I<m>provement GOLD/S <S>tation Inform. GOLD/D <D>ownstream Station GOLD/T Sewer Cer<t>ification <Plan Review> Moratorium..OK Moratorium effective since / / Yearly NAPOT (hrs) 2.98 Stn Gross Capacity(gpd).- 57,600,000 Station Reduction Factor.....,. 0.60 Stn Net Cap Certif (ypd) .. 0 Stn Net Capacity(gpd).... 34,560,000 Indicated Flows(gpd) 4,291,200 Comments • • Rgd # Fig PET Y 5 Y 5 Y 5 Y 5 Y 5 Y 5 Y 5 ..03/17/2003 13:52:24.01 GOLD/U <U>pstream Station GOLD/P <P>ump Information u98 'ON d8a ;U (C! q .4 AvA *2005O5Q315365229*CABALP * This is not an official locum en.. M Stat Station Station Current Delta Projected We pe Owner Number ET (Hrs) ET (Hrs) ET (Hrs) used Number of gallons (gpd) : 231447 *x* *****x******************** Downstream Stations ****************************k OK A5RM-f- 30 0002 4.41 0.16 4.57 AC 30 CD 1001.71 0.04 1001.75 AC 30 RS 1001.70 0.02 1001,72 IN 30 RS95APR 1001.47 0.02 1001.48 IN 30 RS94MAR 1001. 5S 0.02 1001 , 60 • 098 'ON Nd2, AV"N