Loading...
HomeMy WebLinkAboutProject Data SheetZONING ANALYSIS MUSP RESOLUTION NO. D1-1233 PHASE 1 RESIDENTIAL TOWER - UNDER CONSTRUCTION NEW PHASE 11 OFFICE TOWER - PROPOSED PHASE 1 & NEW PHASE 11 TOTAL Net Lot Area 157,177 SF 80,781 sF 76,396 sF 157,177 SF Gross Lot Area 220,664 SF 109,678 sF 110,986 SF 220,664 sF Zoning District Designation SD-5 SD-5 SO-5 SD-5 Allowable Office FAR {3.25 x GLA) 717,158 SF 717,158 SF Provided Office FAR (Proposed Total Floor Area i GLA) 2.36 FAR Allowable Mixed -Use FAR {4.25 x GLA) 937,822 SF 937,822 SF PUD Bonus (20% of Allowable Mixed -Use FAR) 187,564 SF 187,564 SF Allowable Mixed -Use FAR with PUD Bonus 1,125,386 SF "..__ 1,125,386 SF Provided Total FAR 531,118 SF 519,880 SF 1,050,998 SF Required Open Space {15% of GLA) 30,099 SF 16,451 SF 16,648 SF 33,099 SF ..__. Provided Open Space .... 38,399 SF 33,769 SF 72,168 SF USES PHASE RESIDENTIAL TOWER UNDER CONSTRUCTION NEW PHASE I! PROPOSED OFFICE TOWER PHASEI& NEW PHASE II TOTAL Retail/Restaurant SF 17,664 SF 10,980 SF 28,644 SF Residential SF 513,454 SF 513,454 SF Office SF 508,900 SF 508,900 SF Provided Total FAR 531,118 SF 519,880 SF 1,050,998 SF SETBACKS MUSP RESOLUTION NO.01-1233 PHASEI RESIDENTIAL TOWER UNDER CONSTRUCTION NEW PHASE II PROPOSED OFFICE TOWER Brickell Ave. - Front (30'-0" required) 30`-0" 15-0" 30'-0" 30'-0" South Miami Ave. - Rear (15'-0" required) 15'-0" 15-0" SE 15th Rd. - Side (15'-0' required) 15'-0" 125-2" 15-0" North interior Side Yard (15'-0" required) 15'-0" 15'-0" 15-0" • • • BUILDING HEIGHT MUSP RESOLUTION NO. 01-1233 PHASEI RESIDENTIAL TOWER UNDER CONSTRUCTION NEW PHASE II PROPOSED OFFICE TOWER Residential Tower (Unlimited) 438'-8" 401-3" Office Tower (Unlimited) 125'-0" (31 % of building height) 418'-6" _-._ _ W Parking (not to exceed 35% of building height) 125'-D" 138'-6" (33% of building height) PARKING REQUIREMENTS MUSP RESOLUTION NO. 01-1233 PHASEI RESIDENTIAL TOWER UNDER CONSTRUCTION NEW PHASE II PROPOSED OFFICE TOWER PHASEI& NEW PHASE II TOTAL REQUIRED PROVIDED REQUIRED PROVIDED REQUIRED PROVIDED Retail (1 per 1,000 SF} 13 7 7 11 11 18 r 18 Restaurant (1per 300 SF) — 79 36 41 36 41 Residential (1 per unit) 1,276 372 497 1,249 372 497 Office (1 per 800 SF) (1 8 636 636 1,249 Accessible (2% min.) 32 —_-- 11 13 25 21 36 Total Parking (Including Accessible) 1,400 423 556 660 1,285 1,083 1,841 LOADING REQUIREMENTS (4)12'-0°x35-0" BERTHS REQUIRED FROM 25,000 SF UP TO 500,000 SF; 12` 0"x55-0" BERTHS FOR OVER 500,00 SF PLUS 1 BERTH FOR EVERY 500,00SF THEREOF (Reductions of 12'-0"x35'-0" Berths to 10' 0"x20'-0" by Class it Permit) MUSP RESOLUTION NO. 01-1233 PHASEI RESIDENTIAL TOWER UNDER CONSTRUCTION NEW PHASE II PROPOSED OFFICE TOWER REQUIRED PROVIDED REQUIRED PROVIDED 6 BERTHS @ 12'-0" x 35-0" AND 4 BERTHS @ 10' 0" x 20'-0" 5 BERTHS @ 12'-0" x 55 0„ 3 BERTHS @ 12'-0" x 35'-0" AND 2 BERTHS @ 10'-0" x 20'-0" 5 BERTHS @ 12'-0" x 55'-0" 5 BERTHS @ 12'-0" x 55'-0"