HomeMy WebLinkAboutArticle II - Project Description•
•
PARK PLACE PHASE II
MAJOR USE SPECIAL PERMIT
PROJECT DESCRIPTION
ARTICLE IL
Project Description
A. Zoning Ordinance No. 11000
1. Section 1304.2.1 Application forms; supplementary
materials
2. Section 1702,2.1 General Report
3, Section 1702.2.2 Major Use Special Permit Concept Plan
4. Section 1702.2.3 Development Impact Study
•
•
•
MAJOR USE SPECIAL PERMIT
Section 1304.1.1 Application forms; supplementary materials
(b) Statement describing in detail the character and intended use
of the development or activity;
Park Place is a mixed use development that consists of two towers,
an apartment tower, currently under construction, of 36-stories, with
372 units, 556 parking spaces, and street level retail. The second
tower is an office building with street level retail, consisting of 32-
stories and 1,032 parking spaces.
The development is located at the site bounded by Brickell Avenue
to the east, Southeast 15th Road to the south, South Miami Avenue
to the west, and a privately owned parcel to the north. The site has
157,177 net s.f., and a gross area of 220,664 s.f. The zoning
designation for the property is SD-5/Brickell Avenue Area Office —
Residential District, which allows an FAR of 4.25 for mixed use
development, or 937,822 s.f. without bonuses. The 20% PUD
bonus adds 187,564 s.f., for a total allowable FAR of 1,125,386 s.f.
With the Phase 1 apartment building containing 531,118 s.f., this
leaves 594,268 s.f allowable for the Phase 2 Office Tower. The
Office Tower contains a total of 519,880 s.f.
The project includes retail at grade level, and an open breezeway
through the Office Building connecting Brickell Avenue to the plaza
in front of the residential tower to the west. The office lobby
commands the southern portion of the site, and the office parking
garage is faced with loft style office space fronting the southern part
of the garage. The top of the office parking garage is a landscaped
deck, which matches the height of the residential recreation deck.
The Residential Tower is 438'-8" tall and the Office Tower is 526'-6"
tall. The parking podium is 138'-6" tall.
(d) A site plan containing the title of the project and the names of
the project planner and developer, date, and north arrow and,
base on an exact survey of the property drawn to a scale of
sufficient size to show:
(3) Access and traffic flow and how vehicular traffic will be
separated from pedestrian and other types of traffic;
o
•
Pedestrian access for the project is provided along Brickell
Avenue, Southeast 15th Road and South Miami Avenue.
Street level retail has multiple access points along Brickell
Avenue, The Office Building is accessed off the breezeway,
which connects Brickell Avenue to the apartment entry.
Vehicular access is provided off Southeast 15th Road. The
service area is entered through an alley off Southeast 14th
street, and exits onto Brickell Avenue, The loading areas for
both buildings are completely screened from view.
(4) Offstreet Parking and offstreet Loading areas;
The offstreet parking is located in a 11 level structure and
contains 1,285 spaces. There are 5 loading bays, each 12'-
0" x 55'-0" for the Office Building.
(d) (5) Recreational facilities locations;
There is approximately 10,980 s.f. of retail at grade along
Brickell Avenue.
The roof of the parking garage will serve as a landscaped
recreation deck for the office tenants.
(e) Tabulations of total gross acreage in the project and the
percentages thereof proposed to be devoted to:
Tabulations:
1. The various permitted uses:
Phase 1 = 531,118 s.f.
Retail (Phase 2) = 10,980 s.f.
Office Area s.f. = 508,900 s.f.
(Phase 2)
2. Ground coverage by structures:
Building = 55,668 s.f. for Phase 2
Ground Coverage by the structures is 25.2% of the
total gross lot area.
(f) Tabulation showing the following:
1. The derivation of numbers of offstreet parking and
offstreet loading spaces shown in (d) above; Total required
parking is 660 and total number of spaces provided is 1,285.
•
•
•
(g)
Derivation of the number of off-street parking is shown within the
Project Summary, located under Tab 6.
(2) Total project density in dwelling units per acre.
As per the SD-5 district the maximum project density is
500 units per acre. The designated site, which for density
purposes consists of 3.6 acres, allows for the
construction of 1.800 units. This project will provide for
Phase 1 372 units.
If common facilities (such as recreation areas of structures,
private streets, common open space, etc.) are to be provided
for the development, statements as to how such common
facilities are to be provided and permanently maintained.
All common facilities provided will be maintained by the Owner.
(h) Storm drainage and sanitary sewerage plans.
(i)
Storm drainage, water distribution, waste water and solid waste
generation provisions are discussed in the Site Utility Study
located under Tab 3 of the Supporting Documents,
Architectural definitions for buildings in the development;
exact number of dwelling units, sizes, and types, together
with typical floor plans of each type.
Detailed information and breakdown of square footage of all uses
are found under Project Criteria within The Project Summary,
included under Tab 6 of the Supporting Documents. Typical floor
plans for residential units are shown on the Typical Residential
Floor Plans. All drawings are located under Tab 6 of the
Supporting Documents.
(j) Plans for signs, if any.
The project will obtain signage approval at a later date.
(k) Landscaping plan, including types, sizes and locations of
vegetation and decorative shrubbery, and showing
provisions for irrigation and future maintenance.
The landscape plans showing vegetation are found on the L1.0
and L2.0. All landscape plans are located under Tab 6 of the
Supporting Documents,
•
•
•
(t)
(m)
Plans for recreation facilities, if any, including location and
general description of buildings for such use.
The Levels 13 or 14 will contain 18,600 sq. ft. of:
-heated lap and relaxation/therapy pools
-landscaped rooftop garden.
-wet bar, spa cafe, and cabanas
-Fitness spa: massage, sauna, steam and exercise rooms
Such additional data, maps, plans, or statements as may be
required for the particular use or activity involved.
The details of the spaces and calculations used to compute the
Floor Area Ratio (FAR) are shown on the Sheet A0.07, provided
under Tab 6 of the Supporting Documents.
(n) Such additional data as the applicant may believe is pertinent
to the proper consideration of the site and development plan.
Elevations depicting the architectural character of the building are
shown on the Buildings Elevations, Sheets A3.01 through A3.07.
All elevations are located under Tab 6 of the Supporting
Documents.
2. Section 1702.2.1 General Report.
(1)
Property ownership and beneficial interest within the
boundaries of the area proposed for Major Use Special
Permit.
Statement of Ownership and beneficial interest within the
boundaries of the area proposed for Major Use Special Permit are
provided in Article I.
The nature of the unified interest or control.
The nature of unified interest or control is indicated in Article 1.
Survey of the proposed area showing property lines and
ownership.
A copy of the Surveys are included under Tab 5 of the Supporting
Documents.
•
•
•
(4) Map of existing features, including streets, alleys, easements,
utilities lines, existing land use, general topography, and
physical features.
The existing site features and utility lines are shown on the
Boundary Survey of the property located under Tab 5. The site
features and the utilities are also described in the Site Utility
Study, located under Tab 3 of the Supporting Documents.
(5)
Materials to demonstrate the relationship of the elements
listed in (4) proceeding to surrounding area characteristics.
The drawings submitted with this Application are located under
Tab 6 of the Supporting Documents,
(6) Existing zoning and adopted comprehensive plan
designations for the area on and around the lands proposed
for Major Use Special Permit.
The existing zoning designation for the property is SD-5. The
Comprehensive Plan Future Land Use designation for the
property conforms with the Zoning district. The zoning and the
comprehensive plan designations are consistent with one another.
3. Section 1702.2.2 Major Use Special Permit Concept Plan.
a. Relationships of the concept plan to surrounding existing
and proposed future uses, activities, systems, and facilities
(transportation, recreation, view corridors, pedestrian
systems, service systems and similar uses.
Article 11 contains a written narrative of this project outlining
proposed uses, activities and architectural character. This
narrative also contains descriptions of the projects relationship to
traffic, pedestrian movements, and transportation access.
Building elevations, sections and perspectives showing the
proposed materials, vertical profile and height, and orientation to
streets are included in the drawings submitted with this
Application. The list of drawings submitted is found under Tab 6
of the Supporting Documents.
b. Existing zoning and adopted comprehensive plan principles
and designations.
The project conforms to the SD-5 zoning district designation for
the property. The comprehensive plan future land use
designation conforms to the land use designation currently in
effect for the property.
•
•
4. Section 1702.2.3 Developmental impact Study.
(a) A traffic analysis shall be submitted for an area within
approximately 114 mile of the site, or an area including the
major intersections to be impacted by the site, whichever is
larger.
The Traffic Impact Analysis is included under Tab 2 of the
Supporting Documents.
(b) Economic impact data shall be provided, including estimates
for construction costs, construction employment, and
permanent employment and shall demonstrate that the
proposed development is favorable to the economy, public
services, environment and housing supply of the City.
The Economic Impact Study is included under Tab 4 of the
Supporting Documents.
(c) A housing impact assessment.
Over the last several years prices of urban housing have
increased dramatically; despite the recent slow down in the
economy. Subsequently, a substantial amount of people within
metropolitan areas has begun to return to the city to live. This has
created a shortage of multi -family housing along with an upward
surge of housing prices. Contrarily, the cost of construction has
not kept pace with these increases, which has made it
economically affordable to construct new buildings for sale. This
pattern remains the same in South Florida where there continues
to be an increased demand for housing, particularly in Miami -
Dade County.
(d) A description of proposed energy conservation measures
shall be provided, including only those measures that are
proposed in addition to the minimum requirements in State
Energy Code.
Architecturally, the building envelope will be comprised of
insulated walls and roof. Tinted glass will be used throughout the
building. Electrically, all exterior and landscape lighting will be
controlled by means of time clocks and photocell switches. Energy
saving lamps, ballasts and fixtures are being considered at cores
and public spaces.
(e).
Historic Buildings
•
•
•
There are no historic buildings.
(f). Environmental Zone
The property is located within an Archaeological Conservation
Area.