Loading...
HomeMy WebLinkAboutTAB P - Economic Impact Study\Advisory ECONOMIC IMPACT ANALYSIS Portico - Prepared by - Lambert Advisory, LC - Prepared for - Portico May 4, 2005 Economic Impact Analysis — Portico Economic Impact Analysis Portico Lambert Advisory has completed an economic impact analysis for the development of Portico, a luxury condominium project located at the intersection of Biscayne Boulevard, 18th Street, and N.E. 4th Avenue in the City of Miami. The analysis estimates the tangible direct and indirect economic impacts that will be derived from the construction and operation of the development. This report identifies and quantifies the benefits created by the Portico development, and can supplement the major use special permit application to be submitted to the City of Miami. The Portico property is situated in the SD-6 zoning district of downtown Miami, and is adequately accessible to major thoroughfares, including 1-395 and I-95. The residential development will have a positive impact on the surrounding community in terms of taxes, jobs, and general investment generated, and will also enhance the area's commercial/retail demand. This development will help maintain economic stability within the area and attract on -going investment during the next several years. We have completed this analysis on the basis of development and performance information (i.e., price, absorption, timing, costs) that has been provided by representatives of Portico. We have not independently verified this information or data. A profile of the project follows. Portico Economic Impact Analysis Building Features & Profile General Features Site Size (Net) Building Height Number of Residential Units Number of Parking Spaces Detailed Building Profile Gross Building Area (w/parking) Maximum Development Area (FAR) Residential FAR Gross Parking Area 0.65 acres 42 stories 324 units 425 spaces 696,974 sq.ft. 385,308 sq.ft. 385,308 sq.ft. 182,750 sq.ft. Note: Estimates are based upon data provided by Portico and Arquitectonica, and/or calculations made by Lambert Advisory, and may be subject to change. Source: Portico, Lambert Advisory, 2005. Development of Portico is expected to commence in 2006. The duration of construction is anticipated to be 18-24 months, with occupancy planned for 2008. 2 Lconoinic Impact Analysts — Portico Based upon the information provided, construction and subsequent operations of Portico will generate considerable benefits to the immediate area, the City of Miami, and the metro -Miami community. There are four key areas in which the project will provide positive economic impacts: 1. Short-term construction employment and expenditure 2. Long-term residential expenditure 3. Long-term building employment and operating expenditure 4. Indirect flow -through benefits For both short-term and long-term impacts, which are detailed in the following analysis, the economic benefit to the area is the result of projected increases in revenue from primary sources, including employment, wages, and taxes. Accordingly, the impact from these key sources comes from two distinct measures: • Direct Expenditures — disbursements for site acquisition and development (hard and soft costs) • Indirect Expenditures — net additional expenditures that flow into the local economy as a result of the new development Estimates of the tangible impacts from direct and indirect expenditures are captured by this analysis. However, potential intangible impacts — such as the project's ability to serve as a catalyst for future development in the immediate area — are not included, as they are nearly impossible to quantify. Economic impacts from the four key sources are detailed in the following sections. 1. Short -Term Construction Employment and Expenditure The impact from short-term construction employment and expenditure is directly associated with the project's development; the table below shows a summary of estimated development costs, as provided by Portico. Portico Economic Impact Analysis Development Costs Item Cost Hard Costs $58,675,000 Soft Costs $16,506,000 Total $75,181,000 Source: Portico, 2005. The majority of development -related expenditures will be made in Miami -Dade County, and the City of Miami will capture a significant share of these expenditures. 3 Economic Impact Analysis -- Portico Labor will account for approximately 60 percent ($35 million) of hard costs, and materials will account for 40 percent ($23 million). Over an estimated 21-month construction period, at an average annual construction wage of $39,260 1 in Miami -Dade County, with a benefit/overhead multiplier of 1.4, there will be 366 Full Time Equivalent (FTE) jobs created. Additionally, $1.5 million in professional fees are expected to be paid to Miami area firms (e.g., architecture, engineering, legal). Assuming an average profit margin of 15% and overhead of 30%, over $800,000 in professional wages will be paid out by these firms. Impact and other fees payable to the City and County during the construction period will amount to approximately $3 million, which will be available for public expenditures associated with the project including developmental, administrative, permitting, schools, and other costs. A detailed profile of impact fees and other relevant non -impact fees paid to the City and/or Miami -Dade County as a result of the development of Portico is included in the following table. State of Florida ES-202, second quarter 2004 4 Economic Impact Analysis — Portico Portico Economic Impact Analysis Impact and Other Fees Impact Fees: City of Miami Development Impact Fee (Ord. 10426) City of Miami Development Impact Admin. Fee Miami Dade County Roads Miami Dade County Schools Total $361,804 $10, 854 $284,148 $552,001 $1, 208, 807 Other/Non-Impact Fees: City of Miami Bonus Fees $1,194,455 Miami Dade W.A.S.A. Connection Fee $452,952 City of Miami Building Permit Fee $77,899 Energy Installation Fee $56,806 M.U.S.P Application Fee $45,000 Dade County Code Compliance $37,591 Radon Gas Fee $5,681 Fire Plan Review Fee $5,113 Ground Cover Fee $564 Land Use/Zoning, Review for BIdg.Permit $2,000 Certicate of Occupancy $250 Application Fee $35 TOTAL OTHER FEES $1,878,344 TOTAL PROJECT FEES $3,087,151 Source: City of Miami Planning, Building & Zoning; Miami Dade County; Portico; Lambert Advisory. Fees included above may be subject to change. 2. Long -Term (On -Going) Resident Expenditure Based on demographic and rental housing trends in the area, the Portico resident base is expected to consist primarily of younger working professionals. Considering the proposed average sale price of $390,000, it is assumed that the residents will be mostly upper income individuals/households with incomes of at least $150,000. Therefore, with a total of 324 households in the building, total personal income for the building is estimated to be nearly $50 million. Estimating that approximately half of the owners will relocate from outside the City, over $24 million of marginal personal income will flow into Miami. We have estimated the marginal impact of $24 million in household income on retail sales and space demanded, using the Lambert Advisory Retail Trade Model. The following table provides a summary of additional retail expenditure and demand for space as a result of development and sale of the units by mid-2008. 5 Economic! Impact Analysis — Portico Portico Area Expenditure Potential (from New -to -Miami Residents), 2008 Type of Good Est. Marginal Growth Sales/ Expenditure SF SF Demanded General Merchandise Apparel and Accessories Furniture and Home Equipment Electronic and Appliance Stores Sporting Goods, Books and Music Stores Miscellaneous Shoppers Goods Shoppers Goods - Sub -Total $542,748 $522,176 $216,439 $207,011 $197,453 $301,155 $227 $290 $227 $200 $250 $420 2,391 1,801 953 1,035 790 717 $258 7,687 Food Stores $422 6,571 Eating & Drinking Establishments $375 4,575 Health & Personal Care Stores $407 2,190 Liquor $280 212 $1, 986, 982 $2,773,101 $1,715,497 $891,332 $59,493 Convenience Goods - Sub -Total $5,439,423 $401 13,548 Building Materials Total $534,794 $115 4,650 $7,961,200 $308 25,886 Source: Lambert Advisory, 2005. 3. Long -Term (On -Going) Building Employment and Operating Expenditure There are a number of areas where positive public benefits or economic impacts will result from the on -going operation of the residential development. These include: • Additional employment from operation of the condominium community; • Property tax revenue to the City of Miami and Miami -Dade County; and • Purchase of goods and services. We estimate that 11 FTE workers will be needed to operate the building — positions such as building managers, parking garage attendants, maintenance staff, and security personnel will need to be filled. At an average Miami -Dade County wage of $37,284 2 the operation of the building will generate approximately $400,000 in wages each year. Positions at various skill levels will be made available to area residents. Additionally, an estimated $385,000 in goods and services related to building maintenance will be purchased annually within Miami -Dade. This includes cleaning services, maintenance supplies, utilities, etc. 2 State of Florida ES-202, second quarter 2004 6 Economic .Impact Analysis — Portico Finally, the development of Portico will provide significant benefit to the City and County by way of real property and personal property (ad valorem) taxes. The tax amount is based upon the County Tax Collector's (2004) millage rate of 26.23895 (per thousand dollars of value), broken down as follows. Portico Economic Impact Analysis Ad Valorem Tax Breakdown Item Annual Millage Taxi City of Miami Operating 8.7163 $930,732 City of Miami Debt 0.950 $101,442 School Operations 8.09 $863,860 School Debt 0.597 $63,748 Environmental Projects 0.100 $10,678 S. Florida Water Management 0.597 $63,748 FIND 0.0385 $4,111 County Millage 5.935 $633,747 County Debt 0.285 $30,433 Children's Trust 0.444 $47,432 Library 0.486 $51,896 TOTAL 26.23895 $2,801,828 Source: Miami Dade County Property Appraiser, Lambert Advisory, 2005. Real property is typically assessed at between 80 and 90 percent of Fair Market Value. For the purposes of this analysis, we calculate ad valorem taxes for Portico based on a market value of $107 million, or 85 percent of the estimated value of the residential use. Accordingly, the development should generate approximately $2.8 million in real property taxes by 2007/8. This represents an estimated net marginal increase of roughly $2.7 million over the ad valorem tax collection the City would receive if the property were valued at current use. 4. Indirect Flow -Through Benefits There will be a number of long term indirect flow -through benefits beyond construction from the project, particularly from the building operations employment. The 11 FTE jobs created as a result of building operations are assumed to have a 1.2 multiplier impact of 13 additional jobs. This multiplier is derived from the U.S. Department of Commerce's 1999 RIMS II model, and identifies indirect secondary and tertiary impacts created throughout the region due to the "ripple effect" of the primary employment. 7 Economic Impact Analysis — Portico Portico Economic Impact Analysis Summary, Economic Impacts Short Term Construction Employment & Expenditure Full Time Jobs Direct Wages Professional Wages (Miami -Dade County) Impact Fees Toward Public Expenditure Total Impact, Short Term Const. Employment & Expenditure Long -Term (On -Going) Resident Expenditure Marginal Expenditure Growth — Residents (2008) Marginal Impact from On -Going Resident Expenditure Long -Term (On -Going) Building Employment and Operating Expenditure Full Time Jobs Total Direct Wages Created Goods & Service Purchased in Miami -Dade County Ad Valorem Taxes (2008) Total Impact from On -Going Operations of the Building/Retail Impact 366 $25,100,000 $800,000 $3,100,000 $29,100,000 $8,000,000 $8,000,000 11 $400,000 $390,000 $2,800,000 $3,600,000 Indirect Flow Through Benefits Full Time Jobs (Indirect) — Miami Dade County 13 Total Indirect Wages Created $500,000 Total Flow Through Indirect Benefits $500,000 Source: Lambert Advisory, 2005. Based upon the analysis set forth herein, the Portico project will clearly have a positive economic impact on both the City of Miami and Miami -Dade County. Total employment created during the development phase is approximately 366, with on -going annual employment of 24 FTE jobs. Accordingly, there is an estimated $29 million impact from short-term construction employment and expenditures, and a stabilized $11.6 million annual revenue stream from resident expenditures and building operations (including real property taxes). 8 b4/05/26W5 11;02 3054444986 i tiaS March 15, 2005 DAVID PLUMMERANDASSO Ms. LAIa I. Medina, AICP Assistant Transportation Coordinator City of Miami, Office of the City Manager/Transportation 444 SW 2'd Avenue (104' Floor) Miami, Florida 33130 R. Portico (WO 0 97) Sufficiency Letter PAGE 64 MERS-and US.Mai Delilir Me. Medina: Subsequent to our February 3, 2005 review comments for the subject project, we have received a response letter dated March 14th 2005, prepared by David Plummer and Associettes Inc. (DPA). Photocopy of the response letter is attached herewith. At this time, we conclude that the traffic report along with the subsequent submittal meet all the traffic requirements and the report is found to be sufficient. Should you have any questions, please call Quay Masood or me at 954,739.1881. Since u Ion Southern Raj Shan E. Se for Traffic Engineer Attachm.nt DM Mr. Kevin Wilford, Planner I, City of Miami (Fax: 305.416.1443) Ma, Sonia Shr f lar6Aogart, DPA, (Fate 305.444.4986) tnts Corporation (Amine* Con'tplex 5100 NW 33re Avenue, Sult* 160 Fart !eu[lardara, FL 333056316 Teh MM./90.188i Fax: 454.739.17n