HomeMy WebLinkAboutTAB O - Site Utility StudyApril 2005 Portico 1837 NE 4th Avenue MAJOR USE SPECIAL PERMIT SITE UTILITY STUDY PREPARED FOR Cameo Apartments Ltd. KHA Project No.: 044814000 Prepared by: KIMLEY-HORN AND ASSOCIATES, INC. 1691 MICHIGAN AVE. SUITE 400 MIAMI BEACH, FL 33139 Site Utility Study Introduction Portico is a proposed residential development to be located at 1837 NE 4th Avenue, in the City of Miami, Miami -Dade County, Florida (see Attachment "A" Site Location Map). The project is located on a bow -shaped lot bounded by NE 4th Avenue to the north and west, and a public alley to the east. The proposed project will consist of a 42-story building that includes 324 residential units and 1,225 sf of gym space with a parking garage structure including 425 parking spaces. Presently, several multi -story residential buildings exist throughout the site, all of which are to be demolished as part of this project. See Table 1, below for further details of the proposed project. Table 1: Project Summary Residential 324 385,308 Gym 1,225 Parking 425 spaces Total 386,533 Portico Site Utility Study Page 1 I. Drainage Relative to the above -referenced project, the following infoiniation should be used during the storm water management design and site grading. Flood Criteria: The proposed project site grade elevations will be designed to meet flood criteria according to Federal State, Miami -Dade County and City of Miami standards as follows: 1. The subject project is located in PANEL 183 of COMMUNITY -PANEL NUMBER 12025C0183 J of the Flood Insurance Rate Map (FIRM). According to the National Flood Insurance Program, the project is in Zone AE, for which a base flood elevation has been determined. The west side of the site lies within Zone AE elevation 10.0 ft NGVD, and the eastern portion of the site lies within elevation 11.0 ft NGVD. 2. Miami -Dade County Flood Criteria elevation as per Amended Plat of Flood Criteria Map, plat book 120, page 13 is estimated to be 5.0 ft. NGVD. This will be used to deteiluine proposed site grading minimum grade elevations. 3. The average October ground water level elevation is estimated to be 2.0 ft. NGVD. This elevation will be used to compute drainage well capacity and roadway base clearance. (Source: Dade County Department of Environmental Resource Management & Miami - Dade County Public Works Manual, Volume II - Design Standard Detail WC 2-2). Existing Drainage Based on site observations, there is an existing drainage system which currently serves the existing buildings and associated parking lots. Said drainage system will be removed and a new stoiiiiwater management system will be constructed to retain the runoff generated by the proposed improvements, as required by code (see below). Proposed Drainage System The drainage system for the proposed development will consist of drainage wells and exfiltration trench, if possible, to facilitate on -site disposal of stoiiii water runoff. The 5- year design storm event will be used to design the storm water management system, in Portico Site Utility Study Page 2 accordance with Section D-4, "Water Control", of Part 2 of the Miami -Dade County Public Works Manual. Based on preliminary calculations, it is anticipated that three (3) 24" drainage wells will provide sufficient capacity to dispose of the design 5-year 24-hour storm water runoff generated by the proposed development. Preliminary drainage computations for the project areas are provided in Attachment "B" Preliminary Drainage Well Calculations, which includes the basis for design. The final drainage design for the project should be in confoiiiiance with the requirements of the Miami -Dade County DERM Water Control Section, Florida Department of Environmental Protection, and other local, state and federal regulatory agencies having jurisdiction over the project. II. Water Distribution System The water mains owned and operated by the Miami -Dade Water and Sewer Department (MDWASD) in the vicinity of the project are shown in the Table 2. Existing Water Mains (Per MDWASD Water Atlas Sheet) Location Between Water Main(s) NE 4th Ave. NE 19th St. & NE 18`h St. 4" NE 18t1 St. NE 4`i' Ave. & N Bayshore Dr. 6" Alley Abutting East Side of Property NE 18th Street and NE 19th Street 4" Portico Site Utility Study Page 3 Currently, there is a MDWASD approved permit listed under Quantum Bay and Cityview Condominiums (DW 2004-235, R.A. 11/10/04) for a project under construction to extend a new 16" water main along NE 19th Street from North Bayshore to the east of the proposed project. In accordance with Miami -Dade Water and Sewer Department (MDWASD) criteria, the developer may be required to construct a new 8-16 inch ductile iron (DI) water main along the frontage of the property. There is a high probability that MDWASD will require a new 8-16 inch (DI) water main with in the public alley (east side of the property), along NE 18th Street or NE 19th Street. A final determination of the points of connection and requirements will not be provided by MDWASD until a Water and Sewer Agreement is requested by the owner and/or the Hydraulic Analysis done by MDWASD is completed. Service lines for domestic water, fire sprinkler systems and irrigation could be connected from the existing water distribution system. Water service meters would need to be purchased and installed by MDWASD officials at the owner's expense. See Attachment "C" for a copy of the MDWASD water atlas sheet for the project area. III. Sanitary Sewer Collection System Table 3 depicts the sanitary sewer mains owned and operated by Miami -Dade Water and Sewer Department (MDWASD), within the vicinity of the project. Table 3: Existing Sanitary Sewer Mains (Per MDWASD Sewer Atlas Sheet) Location Between Sanitary Sewer Main(s) NE 4th Avenue NE 18t1i Street midway to NE 19th Street 8" Gravity Main NE 18th Street NE 4th Avenue to North Bayshore 12" Gravity Main Alley Abutting East Side of Property NE 18t1i Street and NE 19th Street 6" Gravity Main Portico Site Utility Study Page 4 Similar to the water main, an agreement with M-Dade County Water and Sewer Department (MDWASD) will be required for final deteiuiination of the points of connection. Public improvement requirements will not be provided by MDWASD until a Water and Sewer Agreement is requested by the owner. The proposed on -site sanitary sewer system for the property can be connected to the either of the existing mains abutting the property; provided that the line has capacity to handle the existing flows plus the additional flows contributed by the proposed project. A letter of availability and further coordination with MDWASD is recommended to verify the proposed sanitary sewer service connection points and requirements for this project. MDWASD may require upgrades to the sanitary sewer system, but this can not be determined without a request for a water and sewer agreement. A copy of the MDWASD Sewer Atlas sheet has been attached (See Attachment C). The flows from the existing MDWASD sanitary sewage mains on NE 19th Street, NE 18th Street and NE 4th Avenue are received by MDWASD Regional Pump Station #2, located at 925 Biscayne Blvd. Pump Station #2 is currently operating at an average yearly NAPOT of 3.03 hrs/day. As of March 2005, this pump station is operating under capacity as established by the USEPA, and is not under any type of moratorium (see Attachment "D" Pump Station Monthly Information). At this time, it is not anticipated that any improvements to the regional pumping and/or transmission systems will be required to connect the proposed project. However, a final deteiuiination regarding the status of the existing transmission system and the need for possible improvements will not be made until construction plans are submitted to the Miami -Dade County DERM Wastewater Section and a Sanitary Sewage System Capacity Certification Letter is issued. The flows created by this project have been determined and are shown in Table 4. Portico Site Utility Study Page 5 Table 4: Water & Sewer Flow Generation Apai lucent 324 units 200 gpd per unit otal Average Daily Flow (gpd 64,800 gpd Gym 1,225 sf 35 gpd per 100 sf 429 cnd Total Anticipated Flow 65,229 gpd IV. Solid Waste Generation Solid waste generated by this project will be collected in standard on -site containers for refuse and recyclables. Regular pick-up service will be provided either by private hauling companies and/or by the City of Miami Solid Waste Department, who will transport the waste to Miami -Dade County's or private disposal and recycling facilities. The volumes of solid waste projected to be generated by the project are shown in Table 5. Table 5: Solid Waste Generation Apartment Phase I Quantit Y 324 units 5 lbs/unit/day Total Solid Waste Generated (Tons/Day) 0.810 Gym 1,225 sf 3.12 lbs/100 sf/day 0.019 Total Anticipated Solid Waste Generated 0.829 Portico Site Utility Study Page 6 Attachment A Site Location Map NE 23RD ST NE 22ND ST NE 21 ST ST NE 20TH TE NE 19TH TE NE 19TH ST 17-IH w H ST 4 L z NE 23Ri TE NE 23RD ST NE 22ND TE NE 22ND ST 0 21ST ST 0/ w 0 0 NE 2 OT H STz 0 NE 19TH ST' I � , z Q U 17TH TE P NE 17TH ST NE 16>-H ST NE 15TH TE NE 14TH 14TH TE ST NE 13TH TE 13TH TE z 18TH ST m P S 0 0 NE 13-H Kimley-Horn and Associates, Inc. 1691 Michigan .Avenue Suite 400 Miami Beach, Florida 33139 Phone: 305-673— 2025 Fax: 305-67.3-4882 S T � 1 E- POR CO _OCA1 C\ MA D rn Kimley-Horn and Associates, Inc. 1691 Michigan Avenue Suite 400 Miami Beach, Florida 33139 Phone: 305-673-2025 Fax: 305-673-4882 PORTICO FLOOD CRITERIA MAP • VGE ND. WI... 0*. 2 (ESTIMATED} NOTES: 1 CONTOUR INTERVAL_ 1,0 FOOT (Exc•pti indioatticI) 1691 Michigan Ave Suite 400 M omi Beach, Florida 33139 Kimley-Horn and Associates, Inc. Phone: 305-673-2025 Fax: 305-673-4882 PORTICO AVERAGE OCTOBER GROUND WATER LEVEL 1960-75 Kimley-Horn and Associates, Inc. 1691 Michigan Ave Suite 400 Miami Beach, Florida 33139 Phone: 305-673-2025 Fax: 305-673-4882 PORTICO F.I.R.M. FLOOD INSURANCE RATE MAP Attachment B Preliminary Drainage Well Calculations PORTICO City of Miami, Florida DRAINAGE CALCULATIONS DRAINAGE WELLS (MASS DIAGRAM-DERM CRITERIA) 1. Site Data: A. Average October Water Table Elevation = B. County Flood Criteria Elevation = C. F.I.R.M. or FEMA Base Flood Elevation = D. Average Crown Road Elevation = E. Average Existing Onsite Grade Elevation = F. Proposed drainage inlet grate elevation = 2. Total Contributing Drainage Area (A): 2.00 NGVD 5.00 NGVD 11.00 Zone AE 5.24 NGVD 4.55 NGVD 6.00 NGVD A. Impervious Areas: a) Asphalt and concrete pavement = b) Roof areas + 1/3 NE building corner = Total Impervious Area (A 1) = B. Pervious areas: a) Green Areas = 3. Weighted Runoff Coefficient (C): Runoff Coefficient Impervious (C 1) = Runoff Coefficient Pervious (C2) = C = [(Al x C1) + (A2 x C2)] / A; C x A = Total Contributing Area; C= CxA= (County Flood Criteria Map, see Appendix A) (Map No. 12025C0183J, see Appendix A) 0.90 Acres 0.88 Acres (98%) 0.02Acres (2%) 0.90 0.30 0.89 0.80 Acres 4. Time required to generate one inch of runoff (per DERM Water Control Section D-4) Rainfall Intensity (I) = 308.5 / [(48.6 x F-01 t) + t (0.5895 + F-213)] Frequency (F) = 5 years - Frequency Curve Q = CIA, V = Qt; V(1 in.) = Qt(1 in.), t(1 in) = Time to generate 1 inch of runoff V(1 in.) = CIAt(1 in.) 1" x A = CIAt(1 in.) ; Solving for t(1 in tiI n.) = 1 n / (IC) Time to Generate one inch of run-off t(in) Time to reach the inlet (tc.) Total Time required to generate 1 in of runoff: = 11.24 Min. 10.00 Min. = 21.24 Min. DRAINAGE CALCS BASIN 5. Cumulative Runoff (Inflow Mass Diagram) Time CxA (acres) I (inches) " Q. (CFS) Accumulated Storm Runoff (CF) (Min.) , (Sec.)' 8 480 0.798 6.405 5.11 2,455 10 600 0.798 6.166 4.92 2,954 15 900 0.798 5.641 4.50 4,054 21.24 1274 0.798 5.099 4.07 5,189 30 1800 0.798 4.493 3.59 6,458 40 2400 0.798 3.956 3.16 7,582 50 3000 0.798 3.534 2.82 8,466 60 3600 0.798 3.193 2.55 9,180 90 5400 0.798 2.477 1.98 10,680 120 7200 0.798 2.023 1.62 11,631 180 10800 0.798 1.480 1.18 12,767 6. Drainage Well Design Discharge Rate: Based on well discharge rate of: 450 GPM/ft. I -lead We11 No. Lowest Inlet Rim Elev. (NGVD) Oct. Water Table elev. (NGVD) Headloss due to Higher SG of Salt Water (ft.) Head Acting, on Well (ft.) Well Discharge Rate (CFS) Well Structure Dimensions Width (ft,) Length (ft.) Well Structure. Storage Volume (CF) DW-1 6.00 2.00 1.60 2.40 2.41 10A 2.0 288 DW-2 6.00 2.00 1.60 2.40 2.41 10.0 12.0 288 DW-3 6.00 2.00 1.60 2.40 2.41 10.0'i 12,0 288 Well Discharge Rate (CFS) 7. Detention Time: 7.22 Total Storage (CF) The drainage well structure must be designed to detain runoff for a minimum of 90 seconds prior to discharge. Qd = Design Runoff Rate (CFS) = Vd = Detention Volume (CF) = Qd x 90 sec. = Vdl = Detention Volume Per Well (CF) = W = Width of Well Structure (ft.) _ L = Length of Well Structure (ft.) = 4.07 CFS 366.44 CF 122.15 CF 10.0 ft. 12.0 ft. 864.00 Hmin is the minimum depth required from the top of well casing to the floor of the well box to achieve 90 second detention time: Hm;n (ft.) = Vd, / ( W x L) = 1.10 ft. Top of Well Casing Elev. = 4.00 Elevation at Floor of Well Box (NGVD) = Top of Well Casing Elev. - Hm; = 2.90 8. Excess storm water runoff excluding well structure storage: Time Well Discharge Rate Accumulated Well Discharge Volume (CF) Accumulated Storm Runoff (CF) Total Overflow' Volume (CF) (Min.) (Sec.) (CFS) 8 480 7.22 3,465 2,455 -1,010 10 600 7.22 4.332 2,954 -1,377 15 900 7.22 6,497 4,054 -2,443 21.24 1,274.44 7.22 9,200 5,189 -4,012 30 1800 7.22 12,995 6,458 -6,537 40 2400 7.22 17,326 7,582 -9,744 50 3000 7.22 21,658 8,466 -13,192 60 3600 7.22 25,989 9,180 -16,810 90 5400 7.22 38,984 10,680 -28,304 120 7200 7.22 51,979 11,631 -40,348 180 10800 7.22 77,968 12,767 -65,201 9. Excess storm water runoff including well structure storage: Time Accumulated Storm Runoff Storage', in Well Structure (CF)� Accumulated Well Discharge Volume (CF) Total Overflow Volume ; 'r (CF) (Min.) (Sec.) (CF) 8 480 2,455 864 3,465 -1,874.45 10 600 2,954 864 4,332 -2,241.32 15 900 4,054 864 6,497 -3,307.38 21.24 1,274.44 5,189 864 9,200 -4,875.50 30 1800 6,458 864 12,995 -7,400.75 40 2400 7,582 864 17,326 -10,608.29 50 3000 8,466 864 21,658 -14,055.73 60 3600 9,180 864 25,989 -17.673.67 90 5400 10,680 864 38,984 -29,167.93 120 7200 11,631 864 51,979 -41,212.09 180 10800 12,767 864 77,968 -66.065.20 Safety Factor Safety Factor 1.77% 2.13 Attachment C Existing Utility Records PROJECT LOCATION 1691 Michigan Avenue con Suite 400 Miomi, Florida 33143 Kimley-Horn and Associates, Inc. Phone: 305-662.6445 Fox: 305--662.6492 PORTICO MDWASD WATER ATLAS SHEET YY w,i3a ERRAI.E -575 1,E LED: t t` t -t elm Y lLLAtiE SAY ANC PROJECT LOCH ► /1e.5 ADD ..�..F. AR: PACE PARK REV1`:;10 -+ 744 —174. czn Kimley-Horn and Associates, Inc. 1691 Michigan Avenue Suite 400 Miami, Florida 33143 Phone: 305-662.6445 Fax: 305-662.6492 PORTICO MDWASD SEWER ATLAS SHEET Attachment D Pump Station Monthly Information Pump Station Monthly Information Station..30 -0002 Atlas Pg..E13 MIAMI DADE WATER & SEWER DEPARTMENT Addr..925 BISCA'XNE BLVD S -Township-Range 31-53-42 G r. ET clock.Y Telm.Y #Pumps. 5 Pump Type.A Stn C1ass.M Speed,R Hrspwr,± Res flow(gpd) Plans.. 1,955,650 Plats.. 0 Extens. 0 Proj Napot 4.39 hrs 3.03 hrs 3.03 hrs % Cap 43.00 30.30 30.30 Date 01/28/2005 12/28/2004 11/23/2004 10/25/2004 09/24/2004 08/25/2004 07/27/2004 GOLD/M GOLD/D GOLD/T <Plan Review> Moratorium..OK Moratorium effective since Yearly NAPOT (hrs) 3.03 Stn Gross Capacity(gpd).. 57,600,000 Station Reduction Factor 0.60 Stn Net Cap Certif(gpd).. 0 Stn Net Capacity(gpd)..,. Indicated Flows(gpd) 34,560,000 4,363,200 Mo.NAPOT Avg Daily Flows Rgd # Fig Pmp 2.77 11.07 0.00 Y 5 2.80 11.21 0.00 Y 5 3.09 12.34 0.00 Y 5 3.28 13.10 0.00 Y 5 3.14 12.56 0.00 Y 5 3.38 13.50 0.00 'Y 5 2.82 11.28 0.00 Y 5 Comments Signature..LEALG Sign Date .03/17/2003 13:52:24.01 Station I<m>provement GOLD/S <S>tation Inform, GOLD/U <U>pstream Station <D>ownstream Station GOLD/P <P>ump Information Sewer Cer<t>ification O l ti 'ON UVVLS :O l SOOZ '9l '��!N *2005031610323039*CA8ALP ent . * M Stat Station Station R Type Owner Number posed Number of gallons (gpd): 64800 * * * * * * * * * * * * * * * '* * * * * * * * * * * * * * * OK 115RM+ 30 AC 30 AC 30 IN 30 IN 30 0002 CD RS RS95APR RS94MAR * This is not an official docum Current ET (Hrs) Downstream Stations 4.39 1001.74 1001.73 1001.49 1001.61 Delta ET (Hrs) Projected ET (Hrs) * * * * * * * * '* * * * * * * * * * * * * * * * * * * * 0.04 0.01 0,01 0.00 0.00 4.43 1001.76 1001.74 1001.50 1001.61 OH? 'ON WV'LS:01 A