1
dra
Portico
MUSP Traffic Impact Study
TABLE OF CONTENTS
Page
List of Exhibits ii
EXECUTIVE SUMMARY 1
1.0 INTRODUCTION 2
1.1 Study Area 2
1.2 Study Objective 2
2.0 EXISTING TRAFFIC CONDITIONS 4
2.1 Data Collection 4
2.1.1 Roadway Characteristics 4
2.1.2 Traffic Counts 5
2.1.3 Intersection Data 5
2.2 Corridor Capacity Analysis 8
2.3 Intersection Capacity Analysis 10
3.0 PLANNED AND PROGRAMMED ROADWAY IMPROVEMENTS 12
4.0 FUTURE TRAFFIC CONDITIONS 13
4.1 Background Traffic 13
4.2 Committed Developments 13
4.3 Project Traffic 13
4.3.1 Project Trip Generation 13
4.3.2 Project Trip Assignment 16
4.4 Future Corridor Capacity Analysis 20
4.5 Future Intersection Capacity Analysis 20
4.6 Site Access 24
5.0 CONCLUSIONS 25
Appendix A:
Appendix B:
Appendix C:
Appendix D:
Appendix E:
Appendix F:
Approved Transportation Methodology & Site Plan
Traffic Counts & Signal Timing
FDOT's Quality/LOS Handbook — Generalized Tables
Downtown Miami DRI Increment II Transit Ridership
Intersection Capacity Analysis Worksheets
Committed Development Information
Traffic Control Measures Plan
Page i
Portico
MUSP Traffic Impact Study
LIST OF EXHIBITS
Exhibit Page
1 Location Map 3
2 2004 PM Peak Hour Traffic Volumes 6
3 Existing Lane Configurations 7
4 Existing Corridor and Transit Conditions 9
5 Person -trip Volume and Capacity — Existing Conditions Matrix 11
6 2004 Intersection Capacity Analysis Results 10
7 Future Lane Configuration 14
8 Future PM Peak Hour Traffic Volumes without Project 15
9 PM Peak Hour Project Trip Generation 17
10 Cardinal Distribution 18
11 PM Peak Hour Project Vehicular Trips Assignment 19
12 Person -trip Volume and Capacity — Future Conditions Matrix 21
13 Project PM Peak Hour Vehicular Volumes 22
14 Future with project PM Peak Hour Vehicular Volumes 23
15 Future Intersection Capacity Analysis 20
Page ii
Portico
MUSP Traffic Impact Study
EXECUTIVE SUMMARY
The Portico project is a proposed mixed -use development located on NE 4 Avenue between NE
18 Street and NE 19 Street in Miami, Florida. The project consists of 324 condominium units
and 1,000 SF of retail space. Primary access to the site is proposed on NE 4 Avenue via a two-
way driveway. A secondary service driveway will also be accessed from NE 4 Avenue. Build
out of the project is anticipated by the year 2008.
Existing and future traffic conditions for the project area corridors were established using the
person -trip based corridor capacity method. This method, consistent with the City's
Comprehensive Plan, promotes improved transportation efficiency through increased private
vehicle occupancies and makes mass transit a full partner in the urban transportation system.
Analysis results show that the project area corridors are projected to operate within the
established corridor threshold.
The intersection capacity analysis was performed at the intersections under study using vehicular
volumes and the Highway Capacity Software (HCS), based on the procedures of the 2000
Highway Capacity Manual. Results of the future intersection analysis show that all intersections
operate within the standard adopted by the city.
Page 1
Portico
MUSP Traffic Impact Study
1.0 INTRODUCTION
The Portico project is a proposed mixed -use development located on NE 4 Avenue between NE
18 Street and NE 19 Street in Miami, Florida (see Exhibit 1). The project consists of 324
condominium units and 1,000 SF of retail space. Primary access to the site is proposed on NE 4
Avenue via a two-way driveway. A secondary service driveway will also be accessed from NE 4
Avenue. Build out of the project is anticipated by the year 2008.
1.1 Study Area
Consistent with the approved methodology for this project (See Appendix A) the traffic study
was performed for PM peak conditions. For traffic analysis purposes, the study area has been
defined as NE 29 Street to the north, 1-395 to the south, Miami Avenue to the lAest, and Biscayne
Bay to the east. Corridor capacity analysis was performed for Biscayne Boulevard, and NE 15
Street (Venetian Causeway). Intersection capacity analysis was performed for the following
intersections:
NE 17 Terrace / Biscayne Boulevard NE 18 Street / Biscayne Boulevard
NE 19 Street / NE 4 Avenue NE 18 Street / NE 4 Avenue
1.2 Study Objective
The objective of this traffic study is to assess possible PM peak hour impacts on the project area
corridors using the person -trip corridor capacity method. This method is designed to meet the
challenges posed by Florida's growth management laws: to promote compact urban
development, discourage suburban sprawl and improve urban mobility. The method is consistent
with the City's Comprehensive Plan and promotes improved transportation efficiency through
increased private vehicle occupancies, thus making mass transit a full partner in the urban
transportation system.
Page 2
PROJECT
SITE
BICENTENNIAL
PARK
DOUGL
HERAT
PROJECT,
PORTICO
MUSP TRAFFIC IMPACT STUDY
TFLEe
LOCATION MAP
EXHIBIT No.
1
Page 3
Portico
MUSP Traffic Impact Study
2.0 EXISTING TRAFFIC CONDITIONS
2.1 Data Collection
Data collection for this study included roadway characteristics, intersection data, intersection
volumes, and signal timing. The data collection effort is described in detail in the following
sections.
2.1.1 Roadway Characteristics
Biscayne Boulevard
Biscayne Boulevard (US-1) is a major arterial that provides north/south access throughout the
City of Miami from downtown (the CBD) north to the Broward County line. Between NE 14
Street and NE 29 Street, Biscayne Boulevard is a two-way, 4-lane divided roadway. Exclusive
left turn lanes are provided at major intersections. The posted speed limit is 30 mph.
NE 18 Street
NE 18 Street between NE 2 Avenue and Biscayne Boulevard is a two-way, 2-lane divided
roadway. There are no posted speed limit signs within the study area.
NE 17 Terrace
NE 17 Terrace between NE 2 Avenue and Biscayne Boulevard is a two-way, 2-lane undivided
roadway. There is on -street parking on both sides of the roadway. There are no posted speed
limit signs within the study area.
NE 15 Street
NE 15 Street between Bayshore Drive and Biscayne Boulevard is a two-way, 2-lane divided
roadway. Between Biscayne Boulevard and North Miami Avenue, NE 15 Street is a two-way, 2-
lane undivided roadway. There is on -street parking on the south side of the roadway along the
Metromover line. There are no posted speed limit signs within the study area.
Page 4
Portico
MUSP Traffic Impact Study
2.1.2 Traffic Counts
Consistent with the methodology submitted to and approved by the City, peak period vehicle
turning movement counts and 24-hour directional counts were collected at the intersections and
segments under study. Seasonal adjustment factors were obtained from the Florida Department
of Transportation (FDOT). Traffic counts are included in Appendix B. Exhibit 2 shows the
adjusted 2004 PM peak season, peak hour traffic volumes at the study intersections.
2.1.3 Intersection Data
A field survey was conducted to determine the lane configurations for the roadways and
intersections under study. Existing signal timing data was obtained from Miami -Dade County
for the analyzed intersection. Signal information is included in Appendix B. This information
provided the signal phasing and timing used in the intersection capacity analysis. Exhibit 3
shows the existing lane configurations for the intersections and roadways studied.
Page J
d
Pa
PROJECT:
PORTICO
MUSP TRAFFIC IMPACT STUDY
TITLE:
EXISTING PM PEAK
TRAFFIC VOLUMES
EXHIBIT No.
2
Page 6
PROJECT:
PORTICO
MUSP TRAFFIC IMPACT STUDY
TITLE:
EXISTING LANE
CONFIGURATION
EXHIBIT No.
Page 7
Portico
MUSP Traffic Impact Study
2.2 Corridor Capacity Analysis
Existing traffic conditions for the project area corridors have been established using the person -
trip based corridor capacity method. The methodology for this analysis is outlined in the Miami
Comprehensive Neighborhood Plan. The existing traffic conditions analysis identifies the
person -trip volumes and person -trip capacities of the corridors, establishes existing person -trip
usage and identifies whether or not person -trip deficiencies exist. An adopted standard of LOS E
applies to the transportation corridors as measured by the person -trip method.
The existing conditions analysis establishes the multi -modal corridor conditions within the
project area. The person -trip capacities and volumes for the study corridors have been developed
consistent with the approved methodology for this project as described below:
Person -Trip Volumes
Link volumes collected were adjusted to peak season traffic conditions using seasonal
adjustment factors provided by FDOT. Peak hour maximum service volumes were obtained
from FDOT's 2002 Quality/Level of Service Handbook. Transit (bus and fixed rail) ridership
and capacity were obtained from Increment II of the Downtown Miami Area -wide DRI. An
analysis of existing vehicle roadway and transit conditions is shown in Exhibit 4, supporting
information included in Appendix C.
Person -Trip Capacity
Vehicle occupancy for the person -trip capacity calculations is based upon a comprehensive study
performed for the City of Miami. The vehicle occupancy factor of 1.6 persons per vehicle is
approved for use as the practical capacity of a private passenger vehicle to determine the person -
trip capacity of the vehicular traffic system.
Bus and fixed rail capacity for each corridor was determined based on the number of transit
vehicles per hour and the person -trip capacity of each transit vehicle. This information was
obtained directly from Increment II of the Downtown Miami Area -wide DRI.
Page 8
65
y
Exhibit 4
Existing Corridor and Transit Conditions
Corridor
From To
Roadway Conditions (vehicles)
Transit Conditions (persons)
Du
Existing
Lanes
Count
Source/
Penod
Raw PM
Peak Hour
Volume
Peak
Season
Factor
PM
Peak Hour
Volume
Dv Max
Service
Volume [1]
Total
Bus
Ridership
[2]
Bus
Capacity
[2]
Total
Metrcrail
Ridership
[2]
Metrorail
Capacity
[2]
Total
Metromover
Ridership
[2]
Metromover
Capacity
[2]
Total
Transst
Ridership
121
Transit
Capacity
[2]
BISCAYNE BOULEVARD
NE 20 STREET NE 19 STREET
NB
2LD
DPA - PM
1414
1 02
1442
1660
523
1472
0
0
0
0
523
1472
SB
2LD
DPA - PM
951
1.02
970
1660
416
2252
0
0
0
0
416
2252
NE 19 STREET NE 15 STREET
NB
2LD
DPA - PM
1249
1.02
1274
1660
442
1469
0
0
44
960
486
2429
SB
2LD
CPA - PM
999
1.02
1019
1660
383
2249
0
0
53
960
436
3209
NE 15 STREET NE 14 STREET
NB
2LD
DPA - PM
1498
1.02
1627
1660
678
1028
0
0
44
960
722
1988
SB i
21.0
CPA - PM
1068
1.02
1069
1660
485
1808
0
0
53
960
538
2768
NE 1b STREET) VENETIAN CSWY
N BAYSHORE DR BISCAYNE BLVD
EB
1LD
DPA - PM
551
1.02
562
850
74
546
0
0
0
0
74
546
WB
1LD
DPA - PM
309
1.02
315
850
37
270
0
0
0
0
37
270
BISCAYNE BLVD N. MiAMI AVENUE
EB
1LU
DPA - PM
171
1.02
174
810
0
0
0
0
0
0
0
0
WB
1LU
DPA - PM
162
102
165
810
0
0
0
0
0
0
0
0
notes:
[1] Peak Hour Directional Maximum Service Volumes are obtained from FDCOTs Quality/Level or Service Handbook
[2] Transit and roadway information obtained from the Downtown Miami DRI Increment II
Portico
MUSP Traffic Impact Study
Available Person -Trip Capacity
The available person -trip capacity for each corridor is shown in Exhibit 5 based on the
following: Person -trip capacity — Person -trip volume = Available Person -trip capacity. A
general level of service designation is provided for each study corridor based on the calculated
available person -trip capacity. A person -trip level of service look -up table was developed based
on the ratios derived from the FDOT's 2002 Quality/Level of Service Handbook (see Appendix
C). Based upon the person -trip evaluation for existing traffic conditions, no study corridor
operates below the acceptable "person -trip" level of service standards.
2.3 Intersection Capacity Analysis
The intersection capacity analysis was performed using vehicular volumes and the Highway
Capacity Software (HCS), based on the procedures of the 2000 Highway Capacity Manual.
Exhibit 6 shows the resulting LOS for existing conditions at the intersections under study,
analysis worksheets are included in Appendix D. For the unsignalized intersections, the software
tends to overestimate delay measurements for the side streets (minor approach). The actual
delays (observed in the field) are acceptable and similar to other comparable intersections in the
area. However, if the delays ever reach such a point shown by the software, motorists tend to use
an alternate route, balancing demand throughout an area.
Exhibit 6
Existing Intersection Capacity Analysis
Weekday PM Peak Hour Conditions
Intersection
S/U
Existing LOS
NE 17 Terrace / Biscayne Boulevard
S
C
NE 18 Street / Biscayne Boulevard
U
B/F 1
NE 19 Street / NE 4 Avenue
U
A
NE 18 Street / NE 4 Avenue
U
B
U= unsignalized S= signalized
Note: 1 Major/Minor street LOS, field observations suggest acceptable delays on the minor street.
Source: DPA
Page 10
CORRIDOR
FROM TO
BISCAYNE BOULEVARD
NE 20 STREET NE 19 STREET
NE 19 STREET NE 15 STREET
NE 15 STREET NE 14 STREET
NE 15 STREET 1 VENETIAN CSWY
N. BAYSHORE DR BISCAYNE BLVD
BISCAYNE BLVD N. MIAMI AVENUE
NB
SB
NB
SB
NB
SB
EB
WB
EB
WB
(a)
Roadway
Vehicular
Capacity
[t]
1660
1660
1660
1660
1660
1660
850
850
B10
810
Exhibit 5
Person -Trip Volume and Capacity
Existing Conditions Matrix
Roadway Mode
[2]
2656
2656
2656
2656
2656
2656
1360
1360
1296
1296
(c)
Roadway
Vehicular
Volume
l3]
1442
970
1274
1019
1527
1089
562
315
174
165
(d)
Pers-Trip
Volume
@PPV=1.4
(c) ' 1.4
[4 ]
2019
1357
1784
1427
2138
1525
787
441
244
231
(e)
Excess
Pers-Trip
Capacity
b-d
637
1299
872
1229
518
1131
573
919
1052
1065
Transit Mode
(f)
Total
Pers-Trip
Capacity
15]
1472
2252
2429
3209
1988
2768
546
270
0
0
(9)
Total
Pers-Tnp
Volume
[s]
523
416
486
436
722
538
74
37
0
0
Notes:
[1] The Roadway Vehicular Capacity is obtained from Exhibit 4.
[2] Person -Trip capacity is derived by applying a 1.6 vehicle occupancy to the vehicular capacity.
[3]) The Roadway Vehicular Volume is obtained from Exhibit 4.
[4] Person -Trip Volume is derived by applying a 1.4 vehicle occupancy to the vehicular capacity,
[5] The Total Transit Person-Tnp Capacity is obtained by adding bus. metrorail and metromover capacities (see Exhibit 4).
[6] The Total Transit Person -Trip Volume is obtained by adding bus and metrornover volumes (see Exhibit 4).
[7] The Person Tnp LOS is provided consistent with the FDOT's Quality/Level of Service Handbook (see Appendix C).
(h)
Pers-Trip
Excess
Capacity
(f)-(g)
949
1836
1943
2773
1266
2230
472
233
0
0
Segment Total
(i)
Segment
Pers-Trip
Capacity
b+
4128
4908
5085
5865
4644
5424
1906
1630
1296
1296
(l)
Segment
Pers-Trip
Volume
d+
2542
1773
2270
1863
2860
2063
861
478
244
231
(k)
Pers-Tnp
Excess
Capacity
(i -(1)
1586
3135
2815
4002
1784
3361
1045
1152
1052
1065
(I)
Segment
Person Trip
v/c LOS
fl)/(i)
0.62
0.36
0.45
0.32
0.62
0.38
0.45
0.29
0.19
0.18
Portico
MUSP Traffic Impact Study
3.0 PLANNED AND PROGRAMMED ROADWAY
IMPROVEMENTS
The 2005 Miami -Dade County Transportation Improvement Program (TIP) and the 2025 Metro -
Dade Transportation Plan Long Range Element, were reviewed to identify any programmed or
planned projects within the limits of the study area established. These documents show no
officially programmed or planned capacity improvement projects within the study area prior to
completion of the proposed project.
Page 12
Portico
MUSP Traffic Impact Study
4.0 FUTURE TRAFFIC CONDITIONS
4.1 Background Traffic
Consistent with other traffic studies performed in the area, a conservative two (2) percent growth
factor was applied to existing traffic volumes. This growth rate is intended to account for future
growth due to additional developments that have not been identified at this time but occur within
the study period.
4.2 Committed Developments
A list of projects was obtained from city staff, City of Miami Planning and Zoning Department
Report on Private Development From 1996 to Present (Updated through November 2004).
These projects are approved and are either under construction or about to break ground. Other
projects are approved by City Commission but with no building permits, or in the application
stage. The projects in the vicinity of Portico are shown in Exhibit 7. These projects size and trip
generation are included in Appendix E. Traffic generated by these developments was distributed
using the Cardinal Distribution from the appropriate TAZ. For estimating trip distribution from
committed projects, consideration was given to conditions such as the roadway network,
roadway available to travel in the desired direction and attractiveness of traveling on a specific
roadway. This information and a matrix showing segment volumes from the committed
developments are also included in Appendix E. Future traffic volumes were projected for the
build -out year 2008. Exhibit 8 shows the projected turning movement volumes without the
project.
4.3 Project Traffic
4.3.1 Project Trip Generation
Project trip generation is based on the calculation of person -trips consistent with the City of
Miami Comprehensive Plan. Person -trips generated by the project were established using the
Page 13
Nq
PROJECT:
NM
II IIIIIi
I II II I
1
NE
PORTICO
MUSP TRAFFIC IMPACT STUDY
II I
Immomissilonom
I❑ ❑lO
111
❑ ❑
(6)
NE 18 S T
fNE
7 TER
NE T 7 S T
TITLE:
WE!
MARGAR
PACE
PARK
LEGEND
1 - PERFORMING ARTS CENTER
2-ONYX
3-ONYX2
4 - BAY PARC PLAZA
5-QUANTUM
6 - ROSABELLA LOFTS
7 - STAR LOFTS
8 - THE 1800 CLUB
GEN
HERALD P L
COMMITTED DEVELOPMENT MAP
EXHIBIT No.
Page 14
NE 20 ST
NE 19 ST
NE 18 ST
NE 17 TER
NE 17 ST
BISCAYNE BLVD
wA09
L
4
3
30�
N W N
165
3
39
154
33
150
60
121 ir
rm0
N00<h
14
114�
43�
PROJECT:
PORTICO
MUSP TRAFFIC IMPACT STUDY
TITLE.
FUTURE WITHOUT PROJECT
PM PEAK
TRAFFIC VOLUMES
EXHIBIT No.
8
Page 15
Portico
MUSP Traffic Impact Study
following procedures consistent with Increment 11 of the Downtown DRI and the approved
methodology:
• The gross vehicular trip generation for each land use was determined using the Institute of
Transportation Engineers (TIE) Trip Generation 7th Edition rates or formulas.
• Gross vehicular trips were reduced by 16% based upon the use of the Il'E trip rates (City of
Miami's 1.4 vs. I l'E's 1.2 pers/veh).
• Gross vehicular trips were reduced by 11.7% to reflect transit usage based on projected
modal splits from Increment II of the Downtown DRI.
• Gross vehicular trips were also reduced by 10% for pedestrian/bicycle based on estimates
from Increment 11 of the Downtown DRI.
• The net external vehicle trips were converted to person -trips using 1.4 persons per vehicle
pursuant to City standards.
• The vehicular trips assigned to transit were converted back to person -trips using 1.4 persons
per vehicle pursuant to City standards.
• The net external person -trips were obtained by adding together the project net external
person -trips for the vehicle and transit modes.
A trip generation summary for the project is provided in Exhibit 9.
4.3.2 Proiect Trip Assignment
Project traffic was distributed and assigned to the study area using the Cardinal Distribution for
TAZ 507, shown in Exhibit 10. The Cardinal Distribution gives a generalized distribution of
trips from a TAZ to other parts of Miami -Dade County.
For estimating the trip distribution for the project location, consideration was given to conditions
such as the roadway network accessed by the project, roadways available to travel in the desired
direction, and attractiveness of traveling on a specific roadway. Exhibit 11 shows the project
vehicular trip assignment to the impacted roadway segments and intersections.
Page 16
Exhibit 9
PM Peak Hour Trip Generation Analysis
USES
UNITS
ITE Land Use Code
PM PEAK HOUR TRIPS
IN
I OUT
TOTAL
°
Trips
%
Trips
Trips_
High -Rise Condominiums
324 DU
232
61 %
78
39%
48
126
Specialty Retail
1,000 SC. ET
814
44%
1
56%
2
3
Existing Apartments
20 DU
220
17%
-19
83%
-10
-29
GROSS VEHICLE TRIPS
I 60%
60
1 40%
40
1 100
Vehicle Occupancy Adjustment @ 16.00% of Gross External Trips
(1)
60%
10
40%
6
16
Transit Trip Reduction @ 11.70% of Gross External Trips
(2)
60%
7
40%
5
12
Pedestrian / Bicycle Trip Reduction V 10.00% of Gross External Trips
(3)
60%
6
40%
4
10
NET EXTERNAL VEHICLE TRIPS
60%
37
40%
25
62
I
I
I
Net External Person Trips in Vehicles @ 1.40 Persons/ Vehicle
60%
52
40%
35
87
Net External Person Trips using Transit ig 1.40 Persons/ Vehicle
60%
10
40%
7
16
Net External Person Trips (vehicles and transit modes)
60%
62
40% '
41
104
1
Net External Person trips walling / using bicycle 1.40 Persons/ Vehicle
I
60%
8
[ 40%
6 I
14
Notes
(1) A 16% reduction to adjust for the difference between ITE auto occupancy and local data (Miami's 1.4 vs. ITE's 1.2 pers/veh)
(2) Transit trip reduction based on projected modal splits used in the Downtown Miami DRI Increment II
(3) Pedestrian and bicycle trip reductions based on Downtown characteristics used in the Downtown Miami DRt Increment II
Portico
MUSP Traffic Impact Study
Exhibit 10
Cardinal Distribution of Trips
TAZ 507
Cardinal Direction
Distribution
TAZ 507
NNE
10.56%
ENE
5.32%
ESE
4.41%
SSE
3.38%
SSW
18.74%
WSW
20.68%
WNW
19.90%
NNW
17.01 %
Total
10 0 %
Page 18
0
0
FT —
II
II
BICENTENNIAL
PARK
N.T.S.
PROJECT
SITE
PROJECT:
PORTICO
MUSP TRAFFIC IMPACT STUDY
TITLE:
PROJECT TRIP ASSIGNMENT
EXHIBIT No.
Page 19
Portico
MUSP Traffic Impact Study
4.4 Future Corridor Capacity Analysis
The existing person -trip volumes were combined with the committed development and
background growth person -trips to obtain the total year 2008 person -trip volume without project.
The net external project person -trips were then added to get the future person -trip volumes with
project. These volumes were compared to the future person -trips capacities to determined future
level of service. The future person -trip volume and capacity matrix is shown in Exhibit 12. All
corridors analyzed are projected to operate within the established LOS E threshold.
4.5 Future Intersection Capacity Analysis
Background growth and committed development trips were combined with the adjusted 2004
existing traffic to get the total year 2008 vehicular traffic without project on the study
intersections. The project trips were then added to obtain the future with traffic volumes.
Exhibit 13 shows the project PM peak hour vehicular volumes and Exhibit 14 shows the total
(with project) PM peak hour vehicular traffic volumes at the intersections under study.
Results of the future intersection analysis are tabulated in Exhibit 15 which shows the resulting
LOS at the intersections under study. Intersection capacity analysis worksheets are provided in
Appendix D.
Exhibit 15
Future Intersection Capacity Analysis
Weekday PM Peak Hour Conditions
Intersection
S/U
LOS
Future
Without
Project
LOS
Future with
Project
NE 17 Terrace / Biscayne Boulevard
S
C
C
NE 18 Street / Biscayne Boulevard
U
C/F1
C/F1
NE 19 Street / NE 4 Avenue
U
B
B
NE 18 Street / NE 4 Avenue
U
C
C
Source: DPA
U= unsignalized S= signalized
Note: (1) Major/Minor Street LOS, validation observations suggest exaggerated delays on the minor street.
Page 20
0
Exhibit 12
Person -Trip Volume and Capacity
Future Conditions Matrix
Without Project
With Project
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(1)
(k)
Existing
Future
Committed
Future
Projected
Future
Future wlout Proj
Project
Total
Future
Future with Proj
Corridor
Dir
Pers-Trip
Bkg.
Development
Pers-Trip
Transit
Pers-Trip
Pers-Trip
Pers-Trip
Pers-Trip
Pers-Trip
Pers-Trip
Volumes
Pers-Trip
Pers-Trip
Volumes
Capacity
Capacity
v/c
LOS
Volume
Volumes
Capacity
vie
LOS
2.0 I
From To
4
(b)+(c)
(d)/(f)
(d)+(h)
(VW
I11
121
[3]
141
[5]
[61
[4]
[51
BISCAYNE BOULEVARD
NE 20 STREET NE 19 STREET
NB
2542
2752
161
2913
78
4206
0.69
D
14
2927
4206
0.70
D
SB
1773
1919
241
2160
1530
6438
0.34
C
18
2178
6438
0.34
C
NE 19 STREET NE 15 STREET
NB
2270
2457
408
2865
81
5166
0.55
D
32
2897
5166
0.56
D
SB
1863
2016
276
2292
1533
7398
0.31
C
28
2320
7398
0.31
C
NE 15 STREET NE 14 STREET
NB
2860
3096
456
3552
154
4798
0.74
D
32
3584
4798
0.75
D
58
2063
2233
324
2557
1606
7030
0.36
C
28
2585
7030
0.37
C
NE 15 STREET 1 VENETIAN CSWY
N, BAYSHORE DR BISCAYNE BLVD
EB
861
932
76
1008
53
1959
0.51
C
4
1012
1959
0.52
C
WB
478
517
71
588
81
1711
0.34
C
5
593
1711
0.35
C
BISCAYNE BLVD N, MIAMI AVENUE
EB
244
264
32
296
0
1296
0.23
C
2
298
1296
0.23
C
WB
231
250
28
278
0
1296
0.21
C
2
280
1296
0,22
C
Notes:
[1] The Existing Person Trip Volume is obtained from Exhibit 5, column (j)
[2] Year 2008 Background Person Trip Volume is derived by applying a 2% growth factor to the existing person -trip volume
[3] Projected Transit Capacity was obtained from the Downtown Miami DRI Increment ll
[4] The Total Future Peak Hour Person Trip Capacity is obtained by adding all modes of transportation (Exhibit 5, column (i)) and the projected transit capacity (Exhibit 12, column e)
[5] The Person Trip LOS is provided consistent with the FDOT's Quality/Level of Service Handbook (see Appendix C)
[6] Project Person Trip Volumes are derived from Trip Generation Analysis
PROJECT,
PORTICO
MUSP TRAFFIC IMPACT STUDY
TITLE:
PM PEAK HOUR
PROJECT TRIPS
EXHIBIT No.
Page 22
dPa
PROJ ECT2
PORTICO
MUSP TRAFFIC IMPACT STUDY
TITLE:
FUTURE WITH PROJECT
PM PEAK
TRAFFIC VOLUMES
EXHIBIT No.
14
Page 23
Portico
MUSP Traffic Impact Study
4.6 Site Access
Primary access to the site is proposed on NE 4 Avenue via a two-way driveway. A secondary
service driveway will also be accessed from NE 4 Avenue. No conflicts will occur with existing
driveways. The project trips were assigned to the driveways and analyzed. Unsignalized HCS
analysis results show adequate operations. The analysis worksheets are included in Appendix D.
Page 24
Portico
MUSP Traffic Impact Study
5.0 CONCLUSIONS
An assessment of the PM peak hour traffic associated with the development of Portico was
performed in accordance with the approved methodology submitted to the city. Analysis of
future (2008) traffic conditions with the project during the PM peak hour shows that the City of
Miami's adopted Level of Service standards will not be exceeded. Adequate capacity during the
PM peak hour is available to accommodate the proposed project trips within the study area at the
intersections and on the transportation corridors segments analyzed. A traffic control measures
plan has been developed for this project. The plan is included in Appendix F.
musp march 2005.doc
Page 25
Appendix A
Approved Transportation
Methodology
&
Site Plan
DAVID PLUMMER & ASSOCIATES, INC.
TRANSPORTATION • CIVIL • STRUCTURAL • ENVIRONMENTAL
To:
Affiliation:
From:
RE:
cc:
Facsimile Transmission
Mr. Quazi Masood
URS Corporation
Sonia Shreffler-Bogart, PE
Portico MUSP - #04214
file
Fax #:
Phone #:
Date:
Pages:
(954) 739-1789
(954) 739-1881
December 14, 2004
3 page(s), including cover
Per our conversation, I have modified this methodology; all changes are in bold.
Cameo Apartments, Limited is pursuing City of Miami approvals for a residential project located on NE 4th
Avenue between NE 18 Street and NE 19 Street in Miami, Florida. There is an existing 20 unit apartment
building on the site. The proposed project consists of 324 condominium units, and 1,000 SF of retail space.
Primary access to the site is proposed on NE 4th Avenue via a two-way driveway. A secondary service driveway
will be accessed from either NE 4 Avenue or the Alley along the eastern border of the site (the service access has
not been finalized, in order to expedite the data collection, only the final selected access will be analyzed). The
study area has been defined as NE 29 Street to the north, I-395 to the south, North Miami Avenue to the
west and Biscayne Bay to the east.
This will serve as our methodology for the subject MUSP traffic impact study.
• Turning movement traffic counts are to be collected during the PM (4:00-6:00) peak period at four
intersections in the immediate project vicinity.
1. NE 17 Terrace / Biscayne Boulevard (signalized)
2. NE 18 Street / Biscayne Boulevard
3. NE 18 Street / NE 4 Avenue
4. NE 19 Street / NE 4 Avenue
In addition to these intersections, we will analyze the project driveways.
• Segment traffic volumes will be collected as 24-hour machine counts at the following locations:
1. Biscayne Boulevard between NE 14 Street and NE 20 Street
2. NE 15 Street between North Bayshore Drive and North Miami Avenue
• Available Florida Department of Transportation (FDOT) counts will be consulted where appropriate.
• Raw traffic counts will be adjusted to peak season (for the peak hour period).
1750 PONCE DE LEON BOULEVARD
CORAL GABLES, FLORIDA 33134
TELEPHONE: 305 447-0900, FAX: 305 444-4986
E-MAIL: dpa@dplummer.com
• The signal timing and phasing at the study signalized intersections will be obtained from Miami -Dade
County.
• Existing and future traffic conditions for the project area corridors (Biscayne Boulevard, and NE 15 Street)
will be established using the person -trip method. The methodology for this method is outlined in the Miami
Comprehensive Neighborhood Plan. Rubber tire and fixed rail transit capacity of the study corridors will be
established based on available information from Increment II of the Downtown DRI.
• Corridor capacity will be estimated using generalized vehicular capacities (converted to person -trips) from the
Downtown DRI, FDOT LOS Manual, or other acceptable equivalent.
• Project Traffic — project trip generation will be based on the calculation of person -trips consistent with the
city of Miami Comprehensive Plan. Person -trips generated by the project will be established using the
following procedure consistent with Increment II of the Downtown DRI:
1. Determine the gross vehicular trip generation for each land use using the Institute of
Transportation Engineers (ITE) Trip Generation rates or formulas.
2. Reduce gross vehicular trips by a vehicle occupancy adjustment based upon the use of the ITE
trip rates (City of Miami's 1.4 vs. ITE's 1.2 pers/veh).
3. Reduce gross vehicular trips by a transit reduction based on projected modal splits from
Increment II of the Downtown DRI.
4. Reduce gross vehicular trips by a pedestrian/bicycle reduction based on estimates from Increment
II of the Downtown DRI.
5. Establish the net external vehicle trips.
6. Convert the net external vehicle trips to person -trips using 1.4 persons per vehicle pursuant to
City standards.
7. Convert the vehicular trips assigned to transit back to person -trips using 1.4 persons per vehicle
pursuant to City standards.
8. Add together the project net external person -trips for the vehicle and transit modes.
• Background Traffic. A growth factor consistent with historical annual growth in the area will be applied to the
existing traffic volumes.
• Committed Developments. Will be based on list of relevant projects provided by the city. Only projects that
are approved and are either under construction or about to break ground will be included (see
Attachment A). Committed development trips will also be converted to person -trips based on the
methodology described above.
• Highway Capacity Software (HCS) based on the 2000 Highway Capacity Manual (HCM) will be used for
existing and future intersection capacity analysis. Project and committed development net external vehicle
trips (adjusted for transit, pedestrian and occupancy as described above) will be used for the intersection
capacity analysis. Intersection capacity analyses will be performed at the four study intersections and the
proposed project driveways.
• Trip Assignment. Net new external project traffic will be assigned to the adjacent street network using the
appropriate cardinal distribution from the Metro -Dade Long Range Transportation Plan Update, published by
the Metropolitan Planning Organization. Normal traffic patterns will also be considered when assigning
project trips.
• A Traffic Control Measures Plan for the project will also be included.
If you have any questions you can contact me at (305) 447-0900.
traffic meth fax 3.doc
1750 PONCE DE LEON BOULEVARD
CORAL GABLES, FLORIDA 33134
TELEPHONE: 305 447-0900, FAX: 305 444-4986
E-MAIL: dpa@dplummer.com
ict
itNEMO
mi01
fir=
mambo
rah
atm
hiLl
AMEN
NI •
If P ■
II I
ii n
111111.1
1111,
L-
�t
■�
r
0,J
EbJ
111II
Ilfl li
Lr
IMPS —
us �r
amb
Ammo
LJ
ODRSEY
PARK
!IS=
tip
NE
a■1r■r!E
111S11r111
Jl
es
El]
1u111 i
Sig
"C
Ting
11
1
11�
1111
MI
1
isli101•1.1
1
UM&
■ 10 I
-LrEl
niD
ri
1=1-
ILJ
J
■
'1r
it II
N E 1 S S
m
N 1E !
T R
N E I 7
ga
lame
NE
3
a
1
7
MA RGARE
PACE
PARK
LEGEND
1 - PERFORMING ARTS CENTER
2-ONYX
3.ONYX 2
4 _ BAY PARC PLAZA
5-QUANTUM
6 - ROSABELLA LOFTS
7 - STAR LOFTS
8 - THE 1800 CLUB
G E N
HERALD PL
dpa
PADIECT;
PORTICO
MUSP TRAFFIC IMPACT STUDY
TITLE:
COMMITTED DEVELOPMENT MAP
ATTACHM ENT
A
r
Location Sketch
;xi WEER
• 9VNWEr 3kKR AJWAEE
• sNLr AVER AWN: £
• OS WOE
▪ oMxEYo inc ELECTING sox
▪ IMRR W IEN
• repRele AJVNkYE
LA4NASE HET
• MIER LAM
1•
AVE MNNOIN
0 COW suit
CONCIK7F LAVA AUNT
• tw.av LRAM PDX
• uF. rssr
RAE
@,S _ soT1Ck OT siNLCTALME
t _ Got OE ANY. JR]kare tx
• C =Rut OF WMf OF Aar
2
Symbols Legend
dffi IS an !leant the fmar. mama, s..n r rAr
ahem hrom ord awl rkk dnn pad a.q k ean.vb
ON b.R N yy yye�aa 1 fLAP!!�R CEM1?' rat Ws Array
na.b lA Wr.m F.d..hd Made* a Al forth Jr Om
• Ha, ed Surma. a.i Maw. k Chao..r CT?e7-1
sx
William 0. High
Pahaarew LRed &ONTO ,LA .an
AA. d nra.
Legal Description
L.d 2 s a ad a d J VANI swami, bin. Oet a r.ardat Ja AAA Ubeh 5 a0
PP 4 N 0.4 AVb Rasama 4..4 CANN% nmd..
JCR Aar (l5 PLO
Scale: 1 " = 20'
are arce
Macs AR 1
we NQ
Surveyor's Notes
f) T r. Land 4 060 ewkrle. a ELL 4*0 x'net anrWt
Wm ENO-
}J 14. eb. rdtr W +Jap0. R
2) 5k sna.d ppy; Er awl b da# r. MIRA,
Al NI wW ! Ai wawar•N Ma. tlY a�.mhw and
P RLL Tree Information
7a0-7S r176T 3°N
d•
Sheet
1 Of 1
Appendix B
Traffic Counts
&
Signal Timings
Raw Traffic Counts
Traffic Survey Specialists, Inc. 624 Gardenia Terrace
Delray Beach, Florida 33444 Phone (561) 272-3255
Volume Report with 24 Hour Totals
Page 1
********************************************************************************
Data File
Station
Identification
Start date
Stop date
City/Town
Location
Interval
Start time .
Stop time .
County
Biscayne Boulevard Btwn NE 19 & 20 St
*******************************************************************************
Dec 14
D1214004.PRN
000000121302
000110252090
Dec 14, 04
Dec 14, 04
Miami, FL
Northbound Volume for Lane 1
15 minutes
00:00
24:00
Dade
End Time 00
15 110 49
30 96 61
45 77 30
00 54 37
Hr Total 337 177 110
01 02 03
26 13
36 27
30 25
18 25
04 05
24 31
12 32
15 40
17 46
90 68
06 07
50 124
79 137
81 160
105 156
149 315 577
08 09
171 256
185 227
233 222
221 225
810 930
10
189
229
252
262
932
11
278
254
260
263
1055
End Time 12
15
30
45
00
298
345
263
336
13 14
246
295
325
323
Hr Total 1242 1189
300
278
301
289
1168
306
350
373
365
1394
15 16 17 18
336 381 324
356 386 326
343 351 289
299 376 276
1334 1494 1215
19 20 21 22 23
252 207 164
247 192 156
230 169 148
200 162 138
929 730 606 525
148
145
121
111
149
142
110
89
490
24 Hour Total : 17866
AM peak hour begins : 11:30 AM peak volume : 1166 Peak hour factor : 0.84
PM peak hour begins : 17:00 PM peak volume : 1494 Peak hour factor : 0.97
*******************************************************************************
Dec 14
Southbound Volume for Lane 2
End Time 00 01
15
30
45
00
48
43
36
32
Hr Total 159
45
30
35
15
02
18
22
15
18
125 73
9
19
19
23
03 04
15
17
16
30
70 78
05
34
46
65
68
213
06 07 08 09 10 11
92 217 357 324
153 271 361 343
196 305 337 307
199 370 343 330
640 1163 1398 1304
315 238
297 231
247 234
271 232
1130 935
End Time 12
15 242 254
30 289 257
45 296 299
00 246 242
Hr Total 1073 1052
13 14
221
224
216
252
15
214
223
258
223
913 918
16 17 18 19
225 276 245 172
234 251 222 156
236 243 200 154
230 206 175 166
925 976 842 648
137
141
134
113
525
20 21
135
125
101
126
487
22 23
106 85
112 68
97 81
85 67
400 301
24 Hour Total : 16348
AM peak hour begins : 07:45 AM peak volume : 1425 Peak hour factor : 0.96
PM peak hour begins : 12:15 PM peak volume : 1085 Peak hour factor : 0.92
*******************************************************************************
Traffic Survey Specialists, Inca 624 Gardenia Terrace
Delray Beach, Florida 33444 Phone (561) 272-255
Volume Report with 24 Hour Totals Page 2
********************************************************************************
Data File : D1214004.PRN
Station : 000000121302
Identification : 000110252090 Interval : 15 minutes
Start date : Dec 14, 04 Start time : 00:00
Stop date : Dec 14, 04 Stop time : 24:00
City/Town : Miami, FL County : Dade
Location : Biscayne Boulevard Btwn NE 19 & 20 St
*******************************************************************************
Dec 14 Total Volume for All Lanes
End Time 00 01 02 03 04 05 06 07 08 09 10 11
15 158 94 44 22 39 65 142 341 528 580 504 516
30 139 91 58 46 29 78 232 408 546 570 526 485
45 113 65 45 44 31 105 277 465 570 529 499 494
00 86 52 36 48 47 114 304 526 564 555 533 495
Hr Total 496 302 183 160 146 362 955 1740 2208 2234 2062 1990
End Time 12 13 14 15 16 17 18 19 20 21 22 23
---- ---- ---- ---- ---- ---- ---- ---- ----
15 540 500 521 520 561 657 569 424 344 299 254 234
30 634 552 502 573 590 637 548 403 333 281 257 210
45 559 624 517 631 579 594 489 384 303 249 218 191
00 582 565 541 588 529 582 451 366 275 264 196 156
Hr Total 2315 2241 2081 2312 2259 2470 2057 1577 1255 1093 925 791
24 Hour Total : 34214
AM peak hour begins : 08:30 AM peak volume : 2284 Peak hour factor : 0.98
PM peak hour begins : 17:00 PM peak volume : 2470 Peak hour factor : 0.94
*******************************************************************************
Traffic Survey Specialists, Inc. 624 Gardenia Terrace
Delray Beach, Florida 33444 Phone (561) 272-3255
Volume Report with 24 Hour Totals Page 1
***************
Data File
Station
Identification
Start date
Stop date
City/Town
Location
Dec 14
*****************************************************************
: D1214002.PRN
: 000000121303
: 000059070049
: Dec 14, 04
: Dec 14, 04
Miami, FL
Interval
Start time
Stop time
County
Biscayne Boulevard North of NE 17 Terr
Northbound Volume for Lane 1
: 15 minutes
: 00:00
: 24:00
: Dade
End Time 00
15
30
45
00
101
91
63
45
01 02
44
47
24
31
18
33
27
15
Hr Total 300 146 93
03 04 05 06 09
14 15 25 47 124
25 11 25 76 135
22 12 38 85 145
25 15 43 100 150
86 53 131 308 554 716 784
07 08
144
160
216
196
223
181
197
183
10
177
207
221
233
838
11
233
230
247
239
949
End Time 12 13 14 15 16
15 265 212 248 273 312
30 309 271 235 276 308
45 228 275 245 327 311
00 293 270 251 322 252
Hr Total 1095 1028 979 1198 1183
17
339
326
320
330
1315
18
266
299
259
237
1061
19 20
220
215
204
159
176
168
149
131
798 624
21
147
142
132
123
544
22 23
123
119
110
105
126
119
86
79
457 410
24 Hour Total : 15650
AM peak hour begins : 11:30 AM peak volume : 1060 Peak hour factor : 0.86
PM peak hour begins : 17:00 PM peak volume : 1315 Peak hour factor : 0.97
*******************************************************************************
Dec 14 Southbound Volume for Lane 2
End Time 00 01 02
15 51 49
30 46 31
45 43 39
00 39 19
Hr Total 179 138
19
25
17
19
80
03
10
23
17
23
73
04 05 06 07 08 09
15 30 84 221 370 325
18 45 147 251 371 337
19 58 204 292 370 343
29 79 206 373 367 339
81 212 641 1137 1478 1344
10 11
353 253
322 250
260 249
309 236
1244 988
End Time 12 13
15 258 248
30 297 261
45 322 325
00 250 254
Hr Total 1127 1088
14 15 16 17
245 219 206 310
227 250 202 285
218 270 280 259
256 255 230 226
946 994 918 1080
18
262
260
201
183
906
19 20
179 144
184 161
173 143
168 112
704 560
21
123
124
108
134
489
111
112
93
101
417
22 23
97
72
79
60
308
24 Hour Total : 17132
AM peak hour begins : 07:45 AM peak volume : 1484 Peak hour factor : 0.99
PM peak hour begins : 12:00 PM peak volume : 1127 Peak hour factor : 0.88
*******************************************************************************
Traffic Survey Specialists, Inc. 624 Gardenia Terrace
Delray Beach, Florida 33444 Phone (561) 272-3255
Volume Report with 24 Hour Totals Page 2
********************************************************************************
Data File
Station
Identification
Start date
Stop date
City/Town
Location
D1214002.PRN
000000121303
000059070049
Dec 14, 04
Dec 14, 04
Miami, FL
Interval
Start time
Stop time
County
Biscayne Boulevard North of NE 17 Terr
: 15 minutes
: 00:00
: 24:00
: Dade
*******************************************************************************
Dec 14
Total Volume for All Lanes
End Time 00
01 02
15 152 93
30 137 78
45 106 63
00 84 50
Hr Total 479 284
37
58
44
34
03
24
48
39
48
173 159
04 05
30 55
29 70
31 96
44 122
134 343
131
223
289
306
949
06 07
345
386
437
523
1691
08
514
531
586
563
2194 2128 2082 1937
09 10 11
548 530 486
518 529 480
540 481 496
522 542 475
End Time
12 13
15
30
45
00
523
606
550
543
460
532
600
524
Hr Total 2222 2116
14
493
462
463
507
1925
15
492
526
597
577
2192
16
518
510
591
482
17 18 19 20 21 22 23
649
611
579
556
2101 2395
528 399
559 399
460 377
420 327
1967 1502
320 270 234 223
329 266 231 191
292 240 203 165
243 257 206 139
1184 1033 874 718
24 Hour Total : 32782
AM peak hour begins : 08:15 AM peak volume : 2228
PM peak hour begins : 17:00 PM peak volume : 2395
*******************************************************************************
Peak hour factor : 0.95
Peak hour factor : 0.92
Traffic Survey Specialists, Inc. 624 Gardenia Terrace
Delray Beach, Florida 33444 Phone (561) 272-3255
Volume Report with 24 Hour Totals Page 1
********************************************************************************
Data File
Station
Identification
Start date
Stop date
City/Town
Location
D1214005.PRN
000000121301
000058410086 Interval
Dec 14, 04 Start time .
Dec 14, 04 Stop time
Miami, FL County
Biscayne Boulevard Btwn NE 14 & 15 St
*******************************************************************************
Dec 14
Northbound Volume for Lane 1
15 minutes
00:00
24:00
Dade
End Time 00
15
30
45
00
90
87
73
39
Hr Total 289
01 02 03
47 15 13
39 26 19
22 21 11
21 14 17
129 76 60
04
8
9
12
20
05 06
25 78
23 100
41 117
51 160
07
180
201
235
281
08 09 10 11
227 288 230 287
222 222 248 272
278 267 283 277
237 237 305 301
49 140 455 897 964 1014 1066 1137
End Time 12 13 14 15
15 363 269 288 306
30 328 345 291 352
45 254 307 281 395
00 355 289 328 390
Hr Total 1300 1210 1188 1443
16
391
373
319
336
1419
17 18 19 20 21 22 23
391 358 252 202 183 158 143
385 375 262 204 164 128 136
385 321 229 164 158 134 88
415 316 214 178 142 118 90
1576 1370 957 748 647 538 457
24 Hour Total : 19129
AM peak hour begins : 11:30 AM peak volume : 1269 Peak hour factor : 0.87
PM peak hour begins : 17:00 PM peak volume : 1576 Peak hour factor : 0.95
*******************************************************************************
Dec 14 Southbound Volume for Lane 2
End Time 00 01 02 03 04 05 06 07
---- ---- ---- ---- ----
15 62 46 16 14 9 34 72 203
30 67 29 29 17 19 39 145 245
45 35 28 16 10 10 45 182 301
00 40 23 21 23 25 63 212 341
Hr Total 204 126 82 64 63 181 611 1090 1407 1322 1269 1147
08 09 10 11
347 318 315 284
342 318 346 261
388 309 282 294
330 377 326 308
---- ---- ---- ----
End Time 12 13
15 311 295
30 308 299
45 239 292
00 299 271
Hr Total 1157 1157
14
291
274
267
259
1091
15
250
281
276
313
1120
16
272
263
266
224
1025
17
296 280 173 147 118 139 96
268 302 175 129 112 126 100
261 259 142 135 100 107 85
286 238 145 109 127 80 73
---- ---- ---- ----
1111 1079 635 520 457 452 354
18 19 20 21 22 23
24 Hour Total : 17724
AM peak hour begins : 07:45 AM peak volume : 1418 Peak hour factor : 0.91
PM peak hour begins : 12:45 PM peak volume : 1185 Peak hour factor : 0.99
*******************************************************************************
Traffic Survey Specialists, Inc. 624 Gardenia Terrace
Delray Beach, Florida 33444 Phone (561) 272-3255
Volume Report with 24 Hour Totals Page 2
********************************************************************************
Data File : D1214005.PRN
Station : 000000121301
Identification : 000058410086 Interval : 15 minutes
Start date : Dec 14, 04 Start time 00:00
Stop date : Dec 14, 04 Stop time : 24:00
City/Town : Miami, FL County : Dade
Location Biscayne Boulevard Btwn NE 14 & 15 St
*******************************************************************************
Dec 14 Total Volume for All Lanes
End Time 00 01 02 03 04 05 06 07 08 09 10 11
---- ---- ---- ---- ---- ---- ---- ---- ---- ----
15 152 93 31 27 17 59 150 383 574 606 545 571
30 154 68 55 36 28 62 245 446 564 540 594 533
45 108 50 37 21 22 86 299 536 666 576 565 571
00 79 44 35 40 45 114 372 622 567 614 631 609
Hr Total 493 255 158 124 112 321 1066 1987 2371 2336 2335 2284
End Time 12 13 14 15 16 17 18 19 20 21 22 23
---- ---- ---- ---- ---- ---- ---- ---- ---- ----
15 674 564 579 556 663 687 638 425 349 301 297 239
30 636 644 565 633 636 653 677 437 333 276 254 236
45 493 599 548 671 585 646 580 371 299 258 241 173
00 654 560 587 703 560 701 554 359 287 269 198 163
---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----
Hr Total 2457 2367 2279 2563 2444 2687 2449 1592 1268 1104 990 811
24 Hour Total : 36853
AM peak hour begins : 11:30 AM peak volume : 2490 Peak hour factor : 0.92
PM peak hour begins : 17:00 PM peak volume : 2687 Peak hour factor : 0.96
*******************************************************************************
Traffic Survey Specialists, Inc. 624 Gardenia Terrace
Delray Beach, Florida 33444 Phone (561) 272-3255
Volume Report with 24 Hour Totals Page 1
********************************************************************************
Data File
Station
Identification
Start date
Stop date
City/Town
Location
Interval
Start time
Stop time
County
: NE 15th Street Btwn Bayshore & Biscayne
*******************************************************************************
Dec 14
: D1214003.PRN
: 000000121304
: 009601150098
: Dec 14, 04
: Dec 14, 04
: Miami, FL
Eastbound Volume for Lane 1
15 minutes
00:00
24:00
Dade
End Time 00
15
30
45
00
20
24
26
16
Hr Total 86
01 02 03
5 2
3 8
7 4
3 5
17
16
7
6
46 18
19
04 05 06 07 08
4 8 32 77
0 8 29 75
7 15 55 108
12 16 66 146
23 47 182 406
09
106 118
112 117
102 92
91 92
411 419
10 11
89 100
89 73
78 98
99 102
355 373
End Time 12
15
30
45
00
120
119
132
126
Hr Total 497
13 14
112 104
119 101
111 96
110 132
452 433 493
15
118
118
130
127
16 17 18 19 20 21 22 23
111 134 153 97 75 53 47 48
128 153 122 114 70 63 48 39
125 152 131 82 62 48 47 39
138 161 115 88 59 61 45 30
502 600 521 381 266 225 187 156
24 Hour Total : 7098
AM peak hour begins : 07:30 AM peak volume : 472 Peak hour factor : 0.81
PM peak hour begins : 17:15 PM peak volume : 619 Peak hour factor : 0.96
*******************************************************************************
Dec 14
Westbound Volume for Lane 2
End Time 00
15
30
45
00
28
20
13
14
Hr Total 75
01 02
6
8
8
13
53 35
14
14
12
13
03
3
7
3
8
04
0
6
3
11
21 20
05
6
6
6
16
34
06 07 08 09 10 11
17 41 85 79 83 89
19 44 109 86 89 73
22 65 116 69 61 66
33 81 114 94 71 78
91 231 424 328 304 306
End Time 12
15
30
45
00
79
73
74
84
Hr Total 310
13 14
74
86
71
71
302
91
76
78
68
313
15
71
107
76
74
328
16 17
58 84
80 83
88 88
64 72
290 327
18 19 20
98
71
71
57
297
21 22 23
52 54 42 45 38
55 46 46 46 32
63 45 29 27 33
50 50 42 31 21
220 195 159 149 124
24 Hour Total : 4936
AM peak hour begins : 08:00 AM peak volume 424 Peak hour factor : 0.91
PM peak hour begins : 17:15 PM peak volume : 341 Peak hour factor : 0.87
*******************************************************************************
Traffic Survey Specialists, Inc. 624 Gardenia Terrace
Delray Beach, Florida 33444 Phone (561) 272-3255
Volume Report with 24 Hour Totals Page 2
Data File : D1214003.PRN
Station : 000000121304
Identification : 009601150098 Interval : 15 minutes
Start date : Dec 14, 04 Start time : 00:00
Stop date : Dec 14, 04 Stop time : 24:00
City/Town : Miami, FL County : Dade
Location : NE 15th Street Btwn Bayshore & Biscayne
*******************************************************************************
Dec 14 Total Volume for All Lanes
End Time 00 01 02 03 04 05 06 07 08 09 10 11
15 48 31 11 5 4 14 49 118 191 197 172 189
30 44 30 11 15 6 14 48 119 221 203 178 146
45 39 19 15 7 10 21 77 173 218 161 139 164
00 30 19 16 13 23 32 99 227 205 186 170 180
Hr Total 161 99 53 40 43 81 273 637 835 747 659 679
End Time 12 13 14 15 16 17 18 19 20 21 22 23
15 199 186 195 189 169 218 251 149 129 95 92 86
30 192 205 177 225 208 236 193 169 116 109 94 71
45 206 182 174 206 213 240 202 145 107 77 74 72
00 210 181 200 201 202 233 172 138 109 103 76 51
Hr Total 807 754 746 821 792 927 818 601 461 384 336 280
24 Hour Total : 12034
AM peak hour begins : 07:45 AM peak volume : 857 Peak hour factor : 0.94
PM peak hour begins : 17:15 PM peak volume : 960 Peak hour factor 0.96
*******************************************************************************
Traffic Survey Specialists, Inc. 624 Gardenia Terrace
Delray Beach, Florida 33444 Phone (561) 272-3255
Volume Report with 24 Hour Totals Page 1
********************************************************************************
Data File : D1214001.PRN
Station : 000000121305
Identification : 000058410067 Interval
Start date : Dec 14, 04 Start time
Stop date : Dec 14, 04 Stop time
City/Town : Miami, FL County
Location : NE 15th Street East of NE 1st Avenue
*******************************************************************************
Dec 14 Eastbound Volume for Lane 1
15 minutes
00:00
24:00
Dade
End Time
00 01 02 03 04 05 06 07 08 09
15 5 2 1
30 2 2 1
45 1 0 0
00 7 1 2
Hr Total
---- ---- ---- ---- ----
10 11
1 0 5 6 11 32 28 24
0 2 5 4 13 28 31 36
2 3 6 5 16 33 31 38
2 1 7 17 26 28 18 35
---- ---- ---- ---- ----
15 5 4 5 6 23 32 66 121 108 133
32
21
44
58
155
End Time 12
13
15 45 35 32
30 29 26 32
45 30 30 35
00 30 33 36
Hr Total 134 124 135
14 15 16 17
50 60 46
30 37 36
46 42 50
45 40 31
171 179 163
18 19 20 21 22 23
35
21
14
15
13
18
14
8
11
6
6
7
6
7
12
7
3
6
4
6
5
4
5
3
85 53 30 32 19 17
24 Hour Total : 1815
AM peak hour begins : 11:30 AM peak volume : 176 Peak hour factor : 0.76
PM peak hour begins : 15:30 PM peak volume : 188 Peak hour factor : 0.78
*******************************************************************************
Dec 14 Westbound Volume for Lane 2
End Time
00 01 02
15 3 2 2 1
30 2 3 1 4
45 3 2 0 2
00 6 2 4 2
Hr Total 14 9 7 9
03 04
1
2
3
4
05
2
4
6
4
06 07
5
2
6
18
10 16 31
13
14
15
36
78
08
28
36
19
23
106
09
26
24
25
16
91
10
22
28
24
30
104
11
25
22
29
33
109
End Time 12 13 14 15 16 17 18 19 20 21 22 23
15 35 41
30 30 22
45 23 33
00 29 32
Hr Total 117 128
28
29
40
25
122
25 45 41 21
45 52 29 15
40 76 24 14
49 39 18 11
159 212 112 61
6
4
12
9
7 6 8
9 4 4
9 15 6
6 8 4
8
7
3
2
31 31 33 22 20
24 Hour Total : 1632
AM peak hour begins : 11:30 AM peak volume : 127 Peak hour factor : 0.91
PM peak hour begins : 15:45 PM peak volume : 222 Peak hour factor : 0.73
*******************************************************************************
Traffic Survey Specialists, Inc. 624 Gardenia Terrace
Delray Beach, Florida 33444 Phone (561) 272-3255
Volume Report with 24 Hour Totals Page 2
********************************************************************************
Data File : D1214001.PRN
Station : 000000121305
Identification : 000058410067 Interval : 15 minutes
Start date : Dec 14, 04 Start time : 00:00
Stop date : Dec 14, 04 Stop time : 24:00
City/Town : Miami, FL County : Dade
Location : NE 15th Street East of NE 1st Avenue
*******************************************************************************
Dec 14 Total Volume for All Lanes
End Time 00 01 02 03 04 05 06 07 08 09 10 11
15 8 4 3 2 1 7 11 24 60 54 46 57
30 4 5 2 4 4 9 6 27 64 55 64 43
45 4 2 0 4 6 12 11 31 52 56 62 73
00 13 3 6 4 5 11 35 62 51 34 65 91
Hr Total 29 14 11 14 16 39 63 144 227 199 237 264
End Time 12 13 14 15 16 17 18 19 20 21 22 23
15 80 76 60 75 105 87 56 19 18 12 11 13
30 59 48 61 75 89 65 36 22 15 11 10 11
45 53 63 75 86 118 74 28 26 15 27 10 8
00 59 65 61 94 79 49 26 17 13 15 10 5
Hr Total 251 252 257 330 391 275 146 84 61 65 41 37
24 Hour Total : 3447
AM peak hour begins : 11:30 AM peak volume : 303 Peak hour factor : 0.83
PM peak hour begins : 15:45 PM peak volume : 406 Peak hour factor 0.86
*******************************************************************************
NE 17TH TERRACE & BISCAYNE BOULEVARD
MIAMI, FLORIDA
COUNTED BY: FRANK SANCHEZ
SIGNALIZED
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4381
ALL VEHICLES
Site Code : 00040269
Start Date: 12/15/04
File I.D. : 17TEBISC
Page : 1
BISCAYNE BOULEVARD
From North
Right Thru Left
Date 12/15/04
16:00 10 197 31
16:15 6 207 38
16:30 7 179 36
16:45 6 198 60
Hr Total 29 781 165
17:00 7 230 50
17:15 9 204 48
17:30 2 168 51
17:45 2 211 57
Hr Total 20 813 206
NE 17TH TERRACE
From East
Right Thru Left
BISCAYNE BOULEVARD
From South
Right Thru Left
NE 17TH TERRACE
From West
Right Thru Left
Total
36
42
34
23
135
38
27
43
36
144
3
4
3
9
19
12
4
8
6
30
7
6
7
7
27
7
8
7
15
37
11
16
20
12
59
11
21
15
21
68
316
305
330
296
1247
301
297
342
310
1250
10
4
3
3
20
10
3
5
2
20
7
2
6
7
22
6
4
4
2
16
1
0
3
0
4
1
2
0
0
3
4
2
1
2
9
0
0
1
3
633
632
629
623
2517
675
627
645
663
2610
*TOTAL* 49 1594 371
279
49 64
127 2497 40
38 7 12 1 5127
NE 17TH TERRACE & BISCAYNE BOULEVARD
MIAMI, FLORIDA
COUNTED BY: FRANK SANCHEZ
SIGNALIZED
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4381
ALL VEHICLES
Site Code : 00040269
Start Date: 12/15/04
File I.D. : 17TEBISC
Page : 2
BISCAYNE BOULEVARD
From North
Right Thru Left
Date 12/15/04
NE 17TH TERRACE
40
49 138
49
NE 17TH TERRACE
From East
Right Thru Left
BISCAYNE BOULEVARD
From South
Right Thru Left
NE 17TH TERRACE
From West
Right Thru Left
Total
12
12
7
BISCAYNE BOULEVARD
1,594
1,594
2,014
95
7 57
38
38
0
1
371
371
4,802
12
2,497
279
2,788
• ALL VEHICLES
Intersection Total
5,127
64
1,594
38
1,696
4,360
40
40
89
39
2,664
BISCAYNE BOULEVARD
2,497
2,497
0
0
279
279
49
49
64
64
505
371
7
127
NE 17TH TERRACE
NE 17TH TERRACE & BISCAYNE BOULEVARD
MIAMI, FLORIDA
COUNTED BY: FRANK SANCHEZ
SIGNALIZED
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4381
ALL VEHICLES
Site Code : 00040269
Start Date: 12/15/04
File I.D. : 17TEBISC
Page : 3
BISCAYNE BOULEVARD
From North
Right Thru Left
Date 12/15/04
Peak Hour Analysis By Entire
Peak start 17:00
Volume 20 813 206
Percent 2% 78% 20%
Pk total 1039
Highest 17:00
Volume 7 230 50
Hi total 287
PHF .91
NE 17TH TERRACE
20
30
20
70
NE 17TH TERRACE
From East
Right Thru
Left
BISCAYNE BOULEVARD
From South
Right Thru Left
NE 17TH TERRACE
From West
Right Thru Left
Total
ntersection for
17:00
144 30
68% 14%
211
17:30
43 8
58
.91
3
3
3
20
20
the Period: 16:00 to 18:00
17:00
37 68 1250 20
18% 50 93% 1%
1338
17:30
7 15 342 5
362
.92
n 12/15/04
17:00
16 3 3
730 14% 14%
22
17:00
6 1 2
9
.61
BISCAYNE BOULEVARD
813
813
1,039
2
3 22
16
16
0
206
206
2,436
3
1,250
144
1,397
ALL VEHICLES
Intersection Total
2,610
37
813
16
866
2,204
20
20
48
211
1,338
BISCAYNE BOULEVARD
1,250
1,250
0
0
144
144
30
30
37
37
277
206
3
68
NE 17TH TERRACE
NE 18TH STREET & BISCAYNE BOULEVARD
MIAMI, FLORIDA
COUNTED BY: MIKE MALONE
NOT SIGNALIZED, E/W STOP
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4381
ALL VEHICLES
Site Code : 00040269
Start Date: 12/15/04
File I.D. : 18STBISM
Page : 1
BISCAYNE BOULEVARD
From North
Right Thru Left
Date 12/15/04
16:00 2 218 9
16:15 3 239 7
16:30 3 219 19
16:45 3 253 15
Hr Total 11 929 50
17:00 1 281 19
17:15 3 260 20
17:30 1 216 18
17:45 0 258 17
Hr Total 5 1015 74
NE 18TH STREET
From East
Right Thru Left
BISCAYNE BOULEVARD
From South
Right Thru Left
NE 18TH STREET
From West
Right Thru Left
Total
26
22
26
25
99
32
27
21
26
106
1
1
1
1
4
0
0
1
0
1
1
3
3
2
9
2
2
1
3
8
4 351 3
3 350 5
3 358 4
2 313 3
12 1372 15
2 343 6
2 339 3
3 363 4
2 334 3
9 1379 16
9
5
2
12
28
10
7
4
5
26
0
0
0
1
1
3
0
0
1
4
1
1
1
3
1
1
2
1
5
624
639
639
631
2533
700
664
634
650
2648
*TOTAL* 16 1944 124
205 5 17 1 21 2751
31 1 54
5 8
5181
NE 18TH STREET & BISCAYNE BOULEVARD
MIAMI, FLORIDA
COUNTED BY: MIKE MALONE
NOT SIGNALIZED, E/W STOP
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4381
ALL VEHICLES
Site Code : 00040269
Start Date: 12/15/04
File I.D. : 18STBISM
Page : 2
BISCAYNE BOULEVARD
From North
Right Thru Left
Date 12/15/04
NE 18TH STREET
From East
Right Thru Left
BISCAYNE BOULEVARD
From South
Right Thru Left
NE 18TH STREET
From West
Right Thru Left
Total
0
NE 18TH STREET
31
5
16
52
0
8
8
1
16
16
BISCAYNE BOULEVARD
• 1,944
1,944
— 2,084
19
5 67
54
54
1
0
0
124
124
5,048
8
2,751
205
2,964
ALL VEHICLES
Intersection Total
5,181
17
1,944
54
2,015
4,818
31
31
37
227
2,803
BISCAYNE BOULEVARD
2,751
2,751
21
21
0
0
205
205
5
5
17
17
150
NE 18TH STREET
0
0
124
5
21
NE 18TH STREET & BISCAYNE BOULEVARD
MIAMI, FLORIDA
COUNTED BY: MIKE MALONE
NOT SIGNALIZED, E/W STOP
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4381
ALL VEHICLES
Site Code : 00040269
Start Date: 12/15/04
File I.D. : 18STBISM
Page : 3
BISCAYNE BOULEVARD
From North
Right Thru Left
Date 12/15/04
NE 18TH STREET
From East
Right Thru Left
BISCAYNE BOULEVARD
From South
Right Thru Left
NB 18TH STREET
From West
Right Thru Left
Total
Peak Hour Analysis By Entire
Peak start 17:00
Volume 5 1015 74
Percent 0% 93% 7%
Pk total 1094
Highest 17:00
Volume 1 281 19
Hi total 301
PHF .91
ntersection for the
17:00
106 1 8
92% 1% 7%
115
17:00
32 0 2
34
.85
NE 18TH STREET
16
1
5
22
5
5
4
4
26
26
0
5
5
Period: 16:00 to 18:00 on 12/15/04
17:00
9 1379 16
1% 98% 10
1404
17:30
3 363 4
370
.95
BISCAYNE BOULEVARD
• 1,015
1,015
1,094
7
35
74
74
2,584
17:00
26 4 5
74% 11% 14%
35
17:00
10 3 1
14
.62
5
1,379
106
1,490
• ALL VEHICLES
Intersection Total
2,648
8
1,015
26
1,049
2,453
16
16
115
202
1,404
• 1,379
BISCAYNE BOULEVARD
1,379
9
9
0
0
106
106
1
8
8
87
NE 18TH STREET
0
0
74
4
9
NE 19TH STREET & NE 4TH AVENUE
MIAMI, FLORIDA
COUNTED BY: ISIDRO GONZALEZ
NOT SIGNALIZED
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4381
WEST INTERSECTION
Site Code : 00040269
Start Date: 12/15/04
File I.E. : 19ST4AVE
Page : 1
NE 19TH STREET
From East
Thru Left
Date 12/15/04
NE 4TH AVENUE
From South
Right Left
NE 19TH STREET
From West
Right Thru
Total
16:00 9 0
16:15 12 0
16:30 10 1
16:45 6 0
Hr Total 37 1
17:00 9 0
17:15 11 0
17:30 10 0
17:45 8 0
Hr Total 38 0
1 31 6 13
0 26 8 7
0 33 5 9
0 37 3 10
1 127 22 39
2 49 5 7
0 35 8 5
0 32 10 7
0 38 3 9
2 154 26 28
60
53
58
56
227
72
59
59
58
248
*TOTAL* 75 1
3 281 I 48 67
475
NE 19TH STREET & NE 4TH AVENUE
MIAMI, FLORIDA
COUNTED BY: ISIDRO GONZALEZ
NOT SIGNALIZED
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4381
WEST INTERSECTION
Site Code : 00040269
Start Date: 12/15/04
File I.D. : 19ST4AVE
Page : 2
NE 19TH STREET
From East
Thru Left
Date 12/15/04
NE 4TH AVENUE
From South
Right Left
NE 19TH STREET
From West
Right Thru
Total
NE 19TH STREET
281
75 356
0
0
67
71
67 115
48
48
0
l
• WEST INTERSECTION
Intersection Total
475
1
0
48
49
333
281
281
NE 4TH AVENUE
14
7
284
0
0
0
0
75
75
1
1
70
NE 19TH STREET
0
67
3
NE 19TH STREET & NE 4TH AVENUE
MIAMI, FLORIDA
COUNTED BY: ISIDRO GONZALEZ
NOT SIGNALIZED
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4381
WEST INTERSECTION
Site Code : 00040269
Start Date: 12/15/04
File I.D. : 19ST4AVE
Page : 3
NE 19TH STREET
From Bast
Thru Left
Date 12/15/04
NE 4TH AVENUE
From South
Right Left
NE 19TH STREET
From West
Right Thru
Total
Peak Hour Analysis By
Peak start 17:00
Volume 38 0
Percent 100% 0%
Pk total 38
Highest 17:15
Volume 11 0
Hi total 11
PHF .86
Entire Intersection for the
NE 19TH STREET
17:00
2 154
1% 99%
156
17:00
2 49
51
.76
154
38 192
0
28
Period: 16:00 to 18:00 on 12/15/04
17:00
26 28
48% 52%
54
17:30
10 7
17
.79
46
28 54
26
0
26
0
WEST INTERSECTION
Intersection Total
248
0
0
26
26
182
154
154
NE 4TH AVENUE
6
38
156
0
2
2
0
0
0
38
38
0
0
30
NE 19TH STREET
0
0
0
28
2
NE 18TH STREET & NE 4TH AVENUE, WESTSIDE
MIAMI, FLORIDA
COUNTED BY: LUIS PALOMINO
NOT SIGNALIZED
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4381
ALL VEHICLES
Site Code : 00040269
Start Date: 12/15/04
File I.D. : 18ST_4AV
Page : 1
NB 4TH AVENUE
From North
Right Thru Left
Date 12/15/04
16:00
16:15
16:30
16:45
Hr Total
17:00
17:15
17:30
17:45
Hr Total
1
0
2
0
3
0
1
0
1
2
8
10
4
3
25
5
6
9
4
24
1
0
0
0
1
0
0
0
0
0
NE 18TH STREET
From East
Right Thru Left
NE 4TH AVENUE
From South
Right Thru Left
NB 18TH STREET
From West
Right Thru Left
Total
0
0
0
0
0
0
0
1
0
1
6
3
9
4
22
3
7
3
5
18
0
0
1
0
1
0
0
0
3
3
0
0
0
1
1
1
0
0
0
1
28
23
34
36
121
51
33
29
36
149
22
19
22
21
84
31
20
21
20
92
6
4
15
8
33
13
13
8
11
45
6
5
7
9
27
11
6
12
10
39
1
1
0
0
2
0
1
1
0
2
79
65
94
82
320
115
87
84
90
376
*TOTAL* 5 49 1
1
40 4
2 270 176 1 78 66 4
696
NE 18TH STREET & NE 4TH AVENUE, WESTSIDE
MIAMI, FLORIDA
COUNTED BY: LUIS PALOMINO
NOT SIGNALIZED
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4381
ALL VEHICLES
Site Code : 00040269
Start Date: 12/15/04
File I.D. : 18ST_4AV
Page : 2
NE 4TH AVENUE
From North
Right Thru Left
Date 12/15/04
NE 18TH STREET
176
40 221
5
NE 18TH STREET
From East
Right Thru Left
NE 4TH AVENUE
From South
Right Thru Left
NE 18TH STREET
From West
Right Thru Left
Total
4
4
66
5
5
NE 4TH AVENUE
49
49
— 55
69
66 148
78
78
1
J
1
1
330
4
270
1
275
ALL VEHICLES
Intersection Total
696
4
49
78
131
579
176
176
NE 4TH AVENUE
11
45
448
270
270
0
0
1
1
40
40
4
4
69
NE 18TH STREET
0
0
1
66
2
NB 18TH STREET & NB 4TH AVENUE, WESTSIDE
MIAMI, FLORIDA
COUNTED BY: LUIS PALOMINO
NOT SIGNALIZED
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DBLRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4381
ALL VEHICLES
Site Code : 00040269
Start Date: 12/15/04
File I.D. : 18ST_4AV
Page : 3
NB 4TH AVENUE
From North
Right Thru Left
Date 12/15/04
Peak Hour Analysis By Entire
Peak start 16:30
Volume 3 18 0
Percent 14% 86% 0%
Pk total 21
Highest 17:15
Volume 1 6 0
Hi total 7
PHF .75
NE 18TH STREET
From East
Right Thru Left
NE 4TH AVENUE
From South
Right Thru Left
NE 18TH STREET
From West
Right Thru Left
Total
ntersection for the
16:30
0 23 1
0% 96% 4%
24
16:30
0 9 1
10
.60
0
0
NE 18TH STREET
94
23 120
3
33
3
3
Period: 16:00 to 18:00 on 12/15/04
16:30
2 154 94
1% 62% 38%
250
17:00
1 51 31
83
.75
NE 4TH AVENUE
18
18
21
03
33 83
49
1
49
1
1
0
0
176
16:30
49 33 1
59% 40% 1%
83
17:00
13 11 0
24
.86
1
154
0
155
ALL VEHICLES
Intersection Total
378
1
18
49
68
318
94
94
NE 4TH AVENUE
5
24
250
154
154
2
2
0
0
0
0
23
23
1
1
35
NE 18TH STREET
0
0
0
33
2
Adjusted Traffic Counts
Florida Department of Trail sportation
Transportation Statistics Office
2003 Peak Season Factor Category Report
MIAMI-DADE NORTH MOCF = 0.99
Category: 8700
Week Dates SF
PSCF
1 01/01/2003 - 01/04/2003 1.01 1.02
2 01/05/2003 - 01/11/2003 1.01 1.02
3 01/12/2003 - 01/18/2003 1.02 1.03
4 01 / 19/2003 - 01/2.5 /2003 1.01 1.02
5 01/26/2003 - 02/01/2003 1.00 1.01
6 02/02/2003 - 02/08/2003 0.99 1.00
* 7 02/09/2003 - 02/15/2003 0.98 0.99
* 8 02/16/2003 - 02/2212003 0.99 1.00
* 9 02/23/2003 - 03/01/2003 0.99 1.00
* 10 03/02/2003 - 03/08/2003 0.99 1.00
* 11 03/09/2003 - 03/15/2003 1.00 1.01
* 12 03/16/2003 - 03/22/2003 0.99 1.00
* 13 03/23/2003 - 03/29/2003 0.99 1.00
* 14 03/30/2003 - 04/05/2003 0.99 1.00
* 15 04/06/2003 - 04/ 12/2003 0.99 1.00
* 16 04/13/2003 - 04/19/2003 0.99 1.00
* 17 04/20/2003 - 04/26/2003 0.99 1.00
* 18 04/27/2003 - 05/03/2003 0.99 1.00
* 19 05/04/2003 - 05/10/2003 0.99 1.00
20 05/11/2003 - 05/17/2003 0.99 1.00
21 05/18/2003 - 05/24/2003 0.99 1.00
22 05/25/2003 - 05/31/2003 0.99 1.00
23 06/01/2003 - 06/07/2003 0.99 1.00
24 06/08/2003 - 06/14/2003 1.00 1.01
25 06/15/2003 - 06/21/2003 1.00 1.01
26 06/22/2003 - 06/28/2003 1.00 1.01
27 06/29/2003 - 07/05/2003 1.00 1.01
28 07/06/2003 - 07/12/2003 1.01 1.02
29 07/13/2003 - 07/19/2003 1.01 1.02
30 07/20/2003 - 07/26/2003 1.01 1.02
31 07/27/2003 - 08/02/2003 1.02 1.03
32 08/03/2003 - 08/09/2003 1.02 1.03
33 08/10/2003 - 08/16/2003 1.02 1.03
34 08/17/2003 - 08/23/2003 1.02 1.03
35 08/24/2003 - 08/30/2003 1.02 I.03
36 08/31/2003 - 09/06/2003 1.02 1.03
37 09/07/2003 - 09/13/2003 1.01 1.02
38 09/14/2003 - 09/20/2003 1.01 1.02
39 09/21/2003 - 09/27/2003 1.01 1.02
40 09/28/2003 - 10/04/2003 1.01 1,02
41 10/05/2003 - 10/11/2003 1.01 1.02
42 10/12/2003 - 10/18/2003 1.00 1.01
43 10/19/2003 - 10/25/2003 1.00 1.01
44 10/26/2003 - 11/01/2003 1.01 1.02
45 11/02/2003 - 11/08/2003 1.01 1.02
46 11/09/2003 - 11/15/2003 1.01 1.02
47 11/16/2003 - 11/22/2003 1.01 1.02
48 11/23/2003 - 11/29/2003 1.01 1.02
49 11/30/2003 - 12/06/2003 1.01 1.02
50 12/07/2003 - 12/13/2003 1.01 1.02
51 12/14/2003 - 12/20/2003 1.01 1.02
52 12/21/2003 - 12/27/2003 1.01 1.02
53 12/28/2003 - 12/3112003 1.02 1.03
Note: "*" indicates peak season week Page 1
DAVID PLUMMER & ASSOCIATES, INC.
24-HOUR COUNTS
Project Name: Portico
Location: Biscayne Boulevard Between NE 19 Street and NE 20 Street
Observer:
Traffic Survey Specialists, Inc.
BEGIN
TIME
NORTHBOUND
1st 1/4
2nd 1/4
3rd 1/4
4th 1/4
TOTAL
12:00 AM
110
96
77
54
337
01:00 AM
49
61
30
37
177
02:00 AM
26
36
30
18
110
03:00 AM
13
27
25
25
90
04:00 AM
24
12
15
17
68
05:00 AM
31
32
40
46
149
06:00 AM
50
79
81
105
315
07:00AM
124
137
160
156
577
08:00 AM
171
185
233
221
810
09:00 AM
256
227
222
225
930
10:00 AM
189
229
252
262
932
11:OOAM
278
254
260
263
1,055
12:00 PM
298
345
263
336
1,242
01:00 PM
246
295
325
323
1,189
02:00 PM
300
278
301
289
1,168
03:00 PM
306
350
373
365
1,394
04:00 PM
336
356
343
299
1,334
05:00 PM
381
386
351
376
1,494
06:00 PM
324
326
289
276
1,215
07:00 PM
252
247
230
200
929
08:00PM
207
192
169
162
730
09:OOPM
164
156
148
138
606
10:OOPM
148
145
121
111
525
11:00 PM
149
142
110
89
490
I24-HOUR TOTALII
17,866
AM Peak Hour:
PM Peak Hour:
NORTHBOUND
Project No.:
Count Date:
BEGIN
TIME
SOUTHBOUND
1st 1/4
2nd 1/4
3rd 1/4
4th 1/4
TOTAL
12:00 AM
48
43
36
32
159
01:00 AM
45
30
35
15
125
02:00 AM
18
22
15
18
73
03:00 AM
9
19
19
23
70
04:00 AM
15
17
16
30
78
05:00 AM
34
46
65
68
213
06:00 AM
92
153
196
199
640
07:00 AM
217
271
305
370
1,163
08:00 AM
357
361
337
343
1,398
09:00 AM
324
343
307
330
1,304
10:00 AM
315
297
247
271
1,130
11:00 AM
238
231
234
232
935
12:00 PM
242
289
296
246
1,073
01:00 PM
254
257
299
242
1,052
02:00 PM
221
224
216
252
913
03:00 PM
214
223
258
223
918
04:00 PM
225
234
236
230
925
05:00 PM
276
251
243
206
976
06:00 PM
245
222
200
175
842
07:00PM
172
156
154
166
648
08:00 PM
137
141
134
113
525
09:OOPM
135
125
101
126
487
10:00 PM
106
112
97
85
400
11:00 PM
85
68
81
67
301
II24-HOUR
TOTALII
16,348
DAILY TRAFFIC COUNT SUMMARY
Time: 11:45 AM Volume: 1,169
Time: 05:00 PM Volume: 1,494
AM Peak Hour:
PM Peak Hour:
AM Peak Hour:
PM Peak Hour:
NORTHBOUND AND SOUTHBOUND
Time:
K-factor:
D-factor:
Time:
K-factor:
D-factor:
08:30 AM
6.7%
59.0% SB
05:00 PM
7.2
60.5 % NB
04214
12/14/04
TWO-WAY
TOTAL
496
302
183
160
146
362
955
1,740
2,208
2,234
2,062
1,990
2,315
2,241
2,081
2,312
2,259
2,470
2,057
1,577
1,255
1,093
925
791
34,214
Time: 07:45 AM Volume: 1,425
Time: 12:15 PM Volume: 1,085
Volume: 2,284
PHF: 0.98
Volume: 2,470
PHF: 0.94
biscayne_btw_19 street_20 street.xls
DAVID PLUMMER & ASSOCIATES, INC.
Project Name: Portico
Location:
Observer:
24-HOUR COUNTS
Biscayne Boulevard North of NE 17 Terrace
Traffic Survey Specialists, Inc.
BEGIN
TIME
NORTHBOUND
1st 1/4
2nd 1/4
3rd 1/4
4th 1/4
TOTAL
12:00 AM
101
91
63
45
300
01:00 AM
44
47
24
31
146
02:00 AM
18
33
27
15
93
03:00 AM
14
25
22
25
86
04:00 AM
15
11
12
15
53
05:00 AM
25
25
38
43
131
06:00 AM
47
76
85
100
308
07:00AM
124
135
145
150
554
08:00AM
144
160
216
196
716
09:00 AM
223
181
197
183
784
10:OOAM
177
207
221
233
838
11:00 AM
233
230
247
239
949
12:00 PM
265
309
228
293
1,095
01:00 PM
212
271
275
270
1,028
02:00 PM
248
235
245
251
979
03:00 PM
273
276
327
322
1,198
04:00 PM
312
308
311
252
1,183
05:00 PM
339
326
320
330
1,315
06:00 PM
266
299
259
237
1,061
07:00 PM
220
215
204
159
798
08:00PM
176
168
149
131
624
09:OOPM
147
142
132
123
544
10:OOPM
123
119
110
105
457
11:00 PM
126
119
86
79
410
I24-HOUR TOTALII
15,650 I
AM Peak Hour:
PM Peak Hour:
NORTHBOUND
Project No.:
Count Date:
BEGIN
TIME
SOUTHBOUND
1st 1/4
2nd 1/4
3rd 1/4
4th 1/4
TOTAL
12:00 AM
51
46
43
39
179
01:00 AM
49
31
39
19
138
02:00 AM
19
25
17
19
80
03:00 AM
10
23
17
23
73
04:00 AM
15
18
19
29
81
05:00 AM
30
45
58
79
212
06:00 AM
84
147
204
206
641
07:00 AM
221
251
292
373
1,137
08:00 AM
370
371
370
367
1,478
09:00 AM
325
337
343
339
1,344
10:00 AM
353
322
260
309
1,244
11:00 AM
253
250
249
236
988
12:00 PM
258
297
322
250
1,127
01:00 PM
248
261
325
254
1,088
02:00 PM
245
227
218
256
946
03:00 PM
219
250
270
255
994
04:00 PM
206
202
280
230
918
05:00 PM
310
285
259
226
1,080
06:00 PM
262
260
201
183
906
07:00PM
179
184
173
168
704
08:00 PM
144
161
143
112
560
09:OOPM
123
124
108
134
489
10:00 PM
111
112
93
101
417
11:00 PM
97
72
79
60
308
II24-HOUR
TOTALII
17,132 I
DAILY TRAFFIC COUNT SUMMARY
Time: 11:30 AM Volume: 1,060
Time: 05:00 PM Volume: 1,315
AM Peak Hour:
PM Peak Hour:
AM Peak Hour:
PM Peak Hour:
NORTHBOUND AND SOUTHBOUND
Time:
K-factor:
D-factor:
Time:
K-factor:
D-factor:
08:15 AM
6.8%
64.3% SB
05:00 PM
7.3%
54.9% NB
04214
12/14/04
TWO-WAY
TOTAL
479
284
173
159
134
343
949
1,691
2,194
2,128
2,082
1,937
2,222
2,116
1,925
2,192
2,101
2,395
1,967
1,502
1,184
1,033
874
718
I 32,782 I
Time: 07:45 AM Volume: 1,484
Time: 12:00 PM Volume: 1,127
Volume: 2,228
PHF: 0.95
Volume: 2,395
PHF: 0.92
biscayne_north_17 terrace.xls
DAVID PLUMMER & ASSOCIATES, INC.
24-HOUR COUNTS
Project Name: Portico
Location: Biscayne Boulevard Between NE 14 Street and NE 15 Street
Observer:
Traffic Survey Specialists, Inc.
BEGIN
TIME
NORTHBOUND
1st 1/4
2nd 1/4
3rd 1/4
4th 1/4
TOTAL
12:00 AM
90
87
73
39
289
01:00 AM
47
39
22
21
129
02:00 AM
15
26
21
14
76
03:00 AM
13
19
11
17
60
04:00 AM
8
9
12
20
49
05:00 AM
25
23
41
51
140
06:00 AM
78
100
117
160
455
07:00 AM
180
201
235
281
897
08:00 AM
227
222
278
237
964
09:00 AM
288
222
267
237
1,014
10:00 AM
230
248
283
305
1,066
11:00 AM
287
272
277
301
1,137
12:00 PM
363
328
254
355
1,300
01:00 PM
269
345
307
289
1,210
02:00 PM
288
291
281
328
1,188
03:00 PM
306
352
395
390
1,443
04:00 PM
391
373
319
336
1,419
05:00 PM
391
385
385
415
1,576
06:00 PM
358
375
321
316
1,370
07:00 PM
252
262
229
214
957
08:00PM
202
204
164
178
748
09:OOPM
183
164
158
142
647
10:00 PM
158
128
134
118
538
11:00 PM
143
136
88
90
457
I24-HOUR TOTAL!'
19,129 I
AM Peak Hour:
PM Peak Hour:
NORTHBOUND
Project No.:
Count Date:
BEGIN
TIME
SOUTHBOUND
1st 1/4
2nd 1/4
3rd 1/4
4th 1/4
TOTAL
12:00 AM
62
67
35
40
204
01:00 AM
46
29
28
23
126
02:00 AM
16
29
16
21
82
03:00 AM
14
17
10
23
64
04:00 AM
9
19
10
25
63
05:00 AM
34
39
45
63
181
06:00 AM
72
145
182
212
611
07:00 AM
203
245
301
341
1,090
08:00 AM
347
342
388
330
1,407
09:00 AM
318
318
309
377
1,322
10:00 AM
315
346
282
326
1,269
11:00 AM
284
261
294
308
1,147
12:00 PM
311
308
239
299
1,157
01:00 PM
295
299
292
271
1,157
02:00 PM
291
274
267
259
1,091
03:00 PM
250
281
276
313
1,120
04:00 PM
272
263
266
224
1,025
05:00 PM
296
268
261
286
1,111
06:00 PM
280
302
259
238
1,079
07:00PM
173
175
142
145
635
08:OOPM
147
129
135
109
520
09:OOPM
118
112
100
127
457
10:00 PM
139
126
107
80
452
11:00 PM
96
100
85
73
354
II24-HOUR
TOTAL II
17,724 I
DAILY TRAFFIC COUNT SUMMARY
Time: 11:30 AM Volume: 1,269
Time: 05:00 PM Volume: 1,576
AM Peak Hour:
PM Peak Hour:
AM Peak Hour:
PM Peak Hour:
NORTHBOUND AND SOUTHBOUND
Time:
K-factor:
D-factor:
Time:
K-factor:
D-factor:
11:30 AM
6.8%
51.0% NB
05:00 PM
7.3
58.7% NB
04214
12/14/04
TWO-WAY
TOTAL
493
255
158
124
112
321
1,066
1,987
2,371
2,336
2,335
2,284
2,457
2,367
2,279
2,563
2,444
2,687
2,449
1,592
1,268
1,104
990
811
I 36,853 I
Time: 07:45 AM Volume: 1,418
Time: 12:45 PM Volume: 1,185
Volume: 2,490
PHF: 0.92
Volume: 2,687
PHF: 0.96
biscayne_btw_1 4 street_15 street.xls
DAVID PLUMMER & ASSOCIATES, INC.
24-HOUR COUNTS
Project Name: Portico
Location: NE 15 Street Between Bayshore and Biscayne
Observer:
Traffic Survey Specialists, Inc.
BEGIN
TIME
EASTBOUND
lst 1/4
2nd 1/4
3rd 1/4
4th 1/4
TOTAL
12:00 AM
20
24
26
16
86
01:00 AM
17
16
7
6
46
02:00 AM
5
3
7
3
18
03:00 AM
2
8
4
5
19
04:00 AM
4
0
7
12
23
05:00 AM
8
8
15
16
47
06:00 AM
32
29
55
66
182
07:00 AM
77
75
108
146
406
08:00 AM
106
112
102
91
411
09:00 AM
118
117
92
92
419
10:00 AM
89
89
78
99
355
11:00 AM
100
73
98
102
373
12:00 PM
120
119
132
126
497
01:00PM
112
119
111
110
452
02:00 PM
104
101
96
132
433
03:00PM
118
118
130
127
493
04:00 PM
111
128
125
138
502
05:00 PM
134
153
152
161
600
06:00PM
153
122
131
115
521
07:00 PM
97
114
82
88
381
08:00 PM
75
70
62
59
266
09:00 PM
53
63
48
61
225
10:00 PM
47
48
47
45
187
11:00 PM
48
39
39
30
156
II24-HOUR
TOTAL II
7,098
AM Peak Hour:
PM Peak Hour:
EASTBOUND
Project No.:
Count Date:
BEGIN
TIME
WESTBOUND
lst 1/4
2nd 1/4
3rd 1/4
4th 1/4
TOTAL
12:00 AM
28
20
13
14
75
01:00 AM
14
14
12
13
53
02:00 AM
6
8
8
13
35
03:00 AM
3
7
3
8
21
04:00 AM
0
6
3
11
20
05:00 AM
6
6
6
16
34
06:00 AM
17
19
22
33
91
07:00 AM
41
44
65
81
231
08:00 AM
85
109
116
114
424
09:00 AM
79
86
69
94
328
10:00 AM
83
89
61
71
304
11:00 AM
89
73
66
78
306
12:00 PM
79
73
74
84
310
01:00 PM
74
86
71
71
302
02:00 PM
91
76
78
68
313
03:00 PM
71
107
76
74
328
04:00 PM
58
80
88
64
290
05:00 PM
84
83
88
72
327
06:00 PM
98
71
71
57
297
07:00 PM
52
55
63
50
220
08:00 PM
54
46
45
50
195
09:00 PM
42
46
29
42
159
10:00 PM
45
46
27
31
149
11:00 PM
38
32
33
21
124
I24-HOUR TOTAL II
4,936
DAILY TRAFFIC COUNT SUMMARY
Time: 11:45 AM Volume: 473
Time: 05:15 PM Volume: 619
AM Peak Hour:
PM Peak Hour:
04214
12/14/04
TWO-WAY
TOTAL
161
99
53
40
43
81
273
637
835
747
659
679
807
754
746
821
792
927
818
601
461
384
336
280
12,034
AM Peak Hour: Time: 08:00 AM Volume: 424
PM Peak Hour: Time: 05:15 PM Volume: 341
EASTBOUND AND WESTBOUND
Time:
K-factor:
D-factor:
Time:
K-factor:
D-factor:
07:45 AM
7.1%
54.4% EB
05:15 PM
8.0
64.5% EB
Volume: 857
PHF: 0.94
Volume: 960
PHF: 0.96
15 street_btw_bayshore_biscayne.xls
DAVID PLUMMER & ASSOCIATES, INC.
Project Name: Portico
Location:
Observer:
24-HOUR COUNTS
NE 15 Street East of NE 1 Avenue
Traffic Survey Specialists, Inc.
BEGIN
TIME
EASTBOUND
1st 1/4
2nd 1/4
3rd 1/4
4th 1/4
TOTAL
12:00 AM
5
2
1
7
15
01:00 AM
2
2
0
1
5
02:00 AM
1
1
0
2
4
03:00 AM
1
0
2
2
5
04:00 AM
0
2
3
1
6
05:00 AM
5
5
6
7
23
06:00 AM
6
4
5
17
32
07:00 AM
11
13
16
26
66
08:00 AM
32
28
33
28
121
09:00 AM
28
31
31
18
108
10:00 AM
24
36
38
35
133
11:00 AM
32
21
44
58
155
12:00 PM
45
29
30
30
134
01:00 PM
35
26
30
33
124
02:00 PM
32
32
35
36
135
03:00 PM
50
30
46
45
171
04:00 PM
60
37
42
40
179
05:00 PM
46
36
50
31
163
06:00 PM
35
21
14
15
85
07:00 PM
13
18
14
8
53
08:00 PM
11
6
6
7
30
09:00 PM
6
7
12
7
32
10:00 PM
3
6
4
6
19
11:00 PM
5
4
5
3
17
I24-HOUR TOTALII
1,815
AM Peak Hour:
PM Peak Hour:
EASTBOUND
Project No.:
Count Date:
BEGIN
TIME
WESTBOUND
1st 1/4
2nd 1/4
3rd 1/4
4th 1/4
TOTAL
12:00 AM
3
2
3
6
14
01:00 AM
2
3
2
2
9
02:00 AM
2
1
0
4
7
03:00 AM
1
4
2
2
9
04:00 AM
1
2
3
4
10
05:00 AM
2
4
6
4
16
06:00 AM
5
2
6
18
31
07:00 AM
13
14
15
36
78
08:00 AM
28
36
19
23
106
09:00 AM
26
24
25
16
91
10:00 AM
22
28
24
30
104
11:00 AM
25
22
29
33
109
12:00 PM
35
30
23
29
117
01:00 PM
41
22
33
32
128
02:00 PM
28
29
40
25
122
03:00 PM
25
45
40
49
159
04:00 PM
45
52
76
39
212
05:00 PM
41
29
24
18
112
06:00 PM
21
15
14
11
61
07:00 PM
6
4
12
9
31
08:00 PM
7
9
9
6
31
09:00 PM
6
4
15
8
33
10:00 PM
8
4
6
4
22
11:00 PM
8
7
3
2
20
II24-HOUR
TOTALII
1,632
DAILY TRAFFIC COUNT SUMMARY
Time: 11:30 AM Volume: 176
Time: 03:30 PM Volume: 188
AM Peak Hour:
PM Peak Hour:
04214
12/14/04
TWO-WAY
TOTAL
29
14
11
14
16
39
63
144
227
199
237
264
251
252
257
330
391
275
146
84
61
65
41
37
3,447
AM Peak Hour: Time: 11:30 AM Volume: 127
PM Peak Hour: Time: 03:45 PM Volume: 222
EASTBOUND AND WESTBOUND
Time:
K-factor:
D-factor:
Time:
K-factor:
D-factor:
11:30 AM
8.8
58.1 % EB
03:45 PM
11.8%
54.7% WB
Volume: 303
PHF: 0.83
Volume: 406
PHF: 0.86
15 street_east_1 avenue.xls
DAVID PLUMMER & ASSOCIATES,
Project
Location:
Observer:
INC.
Name:
TURNING MOVEMENT COUNTS
Portico
Project Number:
Count Date:
Day of Week:
Wednesday
04214
Biscayne Boulevard and NE 17 Terrace
12/15/04
Traffic Survey Specialists, Inc.
Biscayne Boulevard
NE 17 Terrace
TIME
INTERVAL
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
GRAND
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
04:00 PM
04:15 PM
10
316
11
337
31
197
10
238
4
1
7
12
7
3
36
46
633
04:15 PM
04:30 PM
4
305
16
325
38
207
6
251
2
0
2
4
6
4
42
52
632
04:30 PM
04:45 PM
3
330
20
353
36
179
7
222
1
3
6
10
7
3
34
44
629
04:45 PM
05:00 PM
3
296
12
311
60
198
6
264
2
0
7
9
7
9
23
39
623
05:00 PM
05:15 PM
10
301
11
322
50
230
7
287
2
1
6
9
7
12
38
57
675
05:15 PM
05:30 PM
3
297
21
321
48
204
9
261
0
2
4
6
8
4
27
39
627
05:30 PM
05:45 PM
5
342
15
362
51
168
2
221
0
0
4
4
7
8
43
58
645
05:45 PM
06:00 PM
2
310
21
333
57
211
2
270
1
0
2
3
15
6
36
57
663
AVERAGE PM PEAK PERIOD HOUR TURNING MOVEMENT COUNT SUMMARY
ANNUAL AVERAGE DAILY TRAFFIC CONDITIONS
Biscayne Boulevard
NE 17 Terrace
TIME
INTERVAL
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
GRAND
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
04:00 PM
06:00 PM
20
1273
65
1,359
189
813
25
1,027
6
4
19
29
33
25
142
200
2,615
PEAK HOUR FACTOR
0.92
0.88
0.59
0.84
0.97
Note: 2002 FDOT Seasonal Weekly Volume Factor =
1.02
biscayne_17 terr.xls
DAVID PLUMMER & ASSOCIATES,
Project
Location:
Observer:
INC.
Name:
TURNING MOVEMENT COUNTS
Portico
Project Number:
Count Date:
Day of Week:
Wednesday
04214
Biscayne Boulevard and NE 18 Street
12/15/04
Traffic Survey Specialists, Inc.
Biscayne Boulevard
NE 18 Street
TIME
INTERVAL
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
GRAND
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
04:00 PM
04:15 PM
3
351
4
358
9
218
2
229
0
0
9
9
1
1
26
28
624
04:15 PM
04:30 PM
5
350
3
358
7
239
3
249
1
0
5
6
3
1
22
26
639
04:30 PM
04:45 PM
4
358
3
365
19
219
3
241
1
0
2
3
3
1
2
6
615
04:45 PM
05:00 PM
3
313
2
318
15
253
3
271
1
1
12
14
2
1
25
28
631
05:00 PM
05:15 PM
6
343
2
351
19
281
1
301
1
3
10
14
2
0
32
34
700
05:15 PM
05:30 PM
3
339
2
344
20
260
3
283
1
0
7
8
2
0
27
29
664
05:30 PM
05:45 PM
4
363
3
370
18
216
1
235
2
0
4
6
1
1
21
23
634
05:45 PM
06:00 PM
3
334
2
339
17
258
0
275
1
1
5
7
3
0
26
29
650
AVERAGE PM PEAK PERIOD HOUR TURNING MOVEMENT COUNT SUMMARY
ANNUAL AVERAGE DAILY TRAFFIC CONDITIONS
Biscayne Boulevard
NE 18 Street
TIME
INTERVAL
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
GRAND
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
04:00 PM
06:00 PM
16
1403
11
1,430
63
991
8
1,063
4
3
28
34
9
3
92
104
2,630
PEAK HOUR FACTOR
0.95
0.87
0.60
0.75
0.95
Note: 2002 FDOT Seasonal Weekly Volume Factor =
1.02
biscayne_18 street.xls
DAVID PLUMMER & ASSOCIATES,
Project
Location:
Observer:
INC.
Name:
TURNING MOVEMENT COUNTS
Portico
Project Number:
Count Date:
Day of Week:
Wednesday
04214
NE 4 Avenue and NE 19 Street (West)
12/15/04
Traffic Survey Specialists, Inc.
NE 4 Avenue
NE 19 Street
TIME
INTERVAL
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
GRAND
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
04:00 PM
04:15 PM
31
0
1
32
0
0
0
0
0
13
6
19
0
9
0
9
60
04:15 PM
04:30 PM
26
0
0
26
0
0
0
0
0
7
8
15
0
12
0
12
53
04:30 PM
04:45 PM
33
0
0
33
0
0
0
0
0
9
5
14
1
10
0
11
58
04:45 PM
05:00 PM
37
0
0
37
0
0
0
0
0
10
3
13
0
6
0
6
56
05:00 PM
05:15 PM
49
0
2
51
0
0
0
0
0
7
5
12
0
9
0
9
72
05:15 PM
05:30 PM
35
0
0
35
0
0
0
0
0
5
8
13
0
11
0
11
59
05:30 PM
05:45 PM
32
0
0
32
0
0
0
0
0
7
10
17
0
10
0
10
59
05:45 PM
06:00 PM
38
0
0
38
0
0
0
0
0
9
3
12
0
8
0
8
58
AVERAGE PM PEAK PERIOD HOUR TURNING MOVEMENT COUNT SUMMARY
ANNUAL AVERAGE DAILY TRAFFIC CONDITIONS
NE 4 Avenue
NE 19 Street
TIME
INTERVAL
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
GRAND
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
04:00 PM
06:00 PM
143
0
2
145
0
0
0
0
0
34
24
59
1
38
0
39
242
PEAK HOUR FACTOR
0.70
N/A
0.76
0.79
0.86
Note: 2002 FDOT Seasonal Weekly Volume Factor =
1.02
4 avenue_19 street (west).xls
DAVID PLUMMER & ASSOCIATES,
Project
Location:
Observer:
INC.
Name:
TURNING MOVEMENT COUNTS
Portico
Project Number:
Count Date:
Day of Week:
Wednesday
04214
NE 4 Avenue and NE 18 Street (West)
12/15/04
Traffic Survey Specialists, Inc.
NE 4 Avenue
NE 18 Street
TIME
INTERVAL
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
GRAND
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
04:00 PM
04:15 PM
22
28
0
50
1
8
1
10
1
6
6
13
0
6
0
6
79
04:15 PM
04:30 PM
19
23
0
42
0
10
0
10
1
5
4
10
0
3
0
3
65
04:30 PM
04:45 PM
22
34
0
56
0
4
2
6
0
7
15
22
1
9
0
10
94
04:45 PM
05:00 PM
21
36
1
58
0
3
0
3
0
9
8
17
0
4
0
4
82
05:00 PM
05:15 PM
31
51
1
83
0
5
0
5
0
11
13
24
0
3
0
3
115
05:15 PM
05:30 PM
20
33
0
53
0
6
1
7
1
6
13
20
0
7
0
7
87
05:30 PM
05:45 PM
21
29
0
50
0
9
0
9
1
12
8
21
0
3
1
4
84
05:45 PM
06:00 PM
20
36
0
56
0
4
1
5
0
10
11
21
3
5
0
8
90
AVERAGE PM PEAK PERIOD HOUR TURNING MOVEMENT COUNT SUMMARY
ANNUAL AVERAGE DAILY TRAFFIC CONDITIONS
NE 4 Avenue
NE 18 Street
TIME
INTERVAL
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
GRAND
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
L
T
R
TOTAL
04:00 PM
06:00 PM
90
138
1
228
1
25
3
28
2
34
40
75
2
20
1
23
355
PEAK HOUR FACTOR
0.67
0.69
0.77
0.56
0.82
Note: 2002 FDOT Seasonal Weekly Volume Factor =
1.02
4 avenue_18 street (west).xls
Signal Timings
PATTERN SCHEDULE FOR 4136 US 1 & NE 17 TERR FOR DAY # 4 (SECTION 3)
TIME PT OFF NSW F Y EWW F G Y SL Y R S Y M CYC
MIN: 7 10 12 1 5
0 11 88 41 10 4 6 12 1 4 7 4 1 90EARLY NI
15 21 88 41 10 4 6 12 1 4 7 4 1 90NITE M2
115 23 0 20 10 4 6 12 1 4 5 4 1 6 67LATE NIG
500 19 0 20 10 4 6 12 1 4 5 4 1 6 67DAWN M2
545 1 88 41 10 4 6 12 1 4 7 4 1 90AVG M2 0
615 2 3 40 10 4 6 12 1 4 8 4 1 90PRE AM M
745 12 23 41 10 4 6 12 1 4 7 4 1 90AM PEAK
845 16 8 52 10 4 6 12 1 4 16 4 1 110MID MORN
1200 17 49 53 10 4 6 12 1 4 15 4 1 110NOON M2
1345 10 52 50 10 4 6 12 1 4 18 4 1 110AFT M1 0
1545 9 54 55 10 4 6 12 1 4 18 4 1 115PRE PM P
1630 18 14 55 10 4 6 12 1 4 18 4 1 115PM PEAK
1800 3 1 40 10 4 6 12 1 4 8 4 1 90POST PM
1900 1 88 41 10 4 6 12 1 4 7 4 1 90AVG M2 0
2130 11 88 41 10 4 6 12 1 4 7 4 1 90EARLY NI
ENTER THE DAY #, CONTROLLER # (/ = STOP)
Appendix C
FDOT's Quality/LOS Handbook
Generalized Tables
Downtown Miami DRI Increment II
Transit Ridership
TABLE 4 - 7
GENERALIZED PEAK HOUR DIRECTIONAL VOLUMES FOR FLORIDA'S
URBANIZED AREAS*
UNINTERRUPTED FLOW HIGHWAYS
Lanes Divided
1 Undivided
2 Divided
3 Divided
A
100
1,060
1,600
Level of Service
B C D
340 670 950
1,720 2,500 3,230
2,590 3,740 4,840
E
1,300
3,670
5,500
STATE TWO-WAY ARTERIALS
Class I (>0.00 to 1.99 signalized intersections per mile)
Level of Service
Lanes Divided A B C D
1 Undivided ** 220 720 860
2 Divided 250 1,530 1,810 1,860
3 Divided 380 2,330 2,720 2,790
4 Divided 490 3,030 3,460 3,540
Class II (2.00 to 4.50 signalized intersections per mile)
Level of Service
Lanes Divided A B C D
1 Undivided
2 Divided
3 Divided
4 Divided
**
**
**
**
100
220
340
440
590
1,360
2,110
2,790
810
1,710
2,570
3,330
E
890
***
***
***
E
850
1,800
2,710
3,500
Class III (more than 4.5 signalized intersections per mile and not
within primary city central business district of an
urbanized area over 750,000)
Lanes Divided
1 Undivided
2 Divided
3 Divided
4 Divided
A
**
**
**
**
**
**
**
**
Level of Service
B C D
280 660
650 1,510
1,020 2,330
1,350 3,070
E
810
1,720
2,580
3,330
Class IV (more than 4.5 signalized intersections per mile and within
primary city central business district of an urbanized area
over 750,000)
Lanes Divided
1 Undivided
2 Divided
3 Divided
4 Divided
A
**
**
**
**
Level of Service
B C D
** 270 720
650 1,580
1,000 2,390
1,350 3,130
**
**
**
E
780
1,660
2,490
3,250
FREEWAYS
Interchange spacing > 2 mi. apart
Level of Service
Lanes A B C D
2 1,270 2,110 2,940 3,580
3 1,970 3,260 4,550 5,530
4
5
6
2,660
3,360
4,050
4,410
5,560
6,710
Interchange spacing < 2 mi. apart
Lanes
2
3
4
5
6
A
1,130
1,780
2,340
3,080
3,730
6,150
7,760
9,360
Level of Service
B
1,840
2,890
3,940
4,990
6,040
7,480
9,440
11,390
C D
2,660 3,440
4,180 5,410
5,700 7,380
7,220 9,340
8,740 11,310
E
3,980
6,150
8,320
10,480
12,650
E
3,910
6,150
8,380
10,620
12,850
Lanes Divided
1 Undivided
2 Divided
3 Divided
Lanes Divided
1 Undivided
2 Divided
** **
** **
NON -STATE ROADWAYS
Major City/County Roadways
Level of Service
A B C
** **
** **
** **
480
1,120
1,740
Other Signalized Roadways
(signalized intersection analysis)
Level of Service
D
760
1,620
2,450
A B C D
250 530
580 1,140
E
810
1,720
2,580
E
660
1,320
BICYCLE MODE
(Note: Level of service for the bicycle mode in this table is based on roadway
geometrics at 40 mph posted speed and traffic conditions, not number of
bicyclists using the facility.) (Multiply motorized vehicle volumes shown below
by number of directional roadway lanes to determine maximum service volumes.)
Paved Shoulder/
Bicycle Lane
Coverage
0-49%
50-84%
85-100%
A
** **
130
160 380
Level of Service
B C D
720
>210
170
210
>380
* * *
E
>720
***
***
PEDESTRIAN MODE
(Note: Level of service for the pedestrian mode in this table is based on roadway
geometrics at 40 mph posted speed and traffic conditions, not the number of
pedestrians using the facility.) (Multiply motorized vehicle volumes shown below
by number of directional roadway lanes to determine maximum service volumes.)
Sidewalk Coverage
0-49%
50-84%
85-100%
Sidewalk Coverage
0-84%
85-100%
A
**
**
**
B
**
**
120
Level of Service
C D
** 330
** 520
590 >590
BUS MODE (Scheduled Fixed Route)
(Buses per hour)
Level of Service
A B C
** >5 >4
>6 >4 >3
D
>3
>2
E
810
990
* * *
E
>2
>1
Source: Florida Department of Transportation
Systems Planning Office
605 Suwannee Street, MS 19
Tallahassee, FL 32399-0450
http://www11.myflorida.com/planning/systems/sm/los/default.htm
02/22/02
ARTERIAL/NON-STATE ROADWAY ADJUSTMENTS
DIVIDED/UNDIVIDED
(alter corresponding volumes by the indicated percent)
Lanes Median
1 Divided
1 Undivided
Multi Undivided
Multi Undivided
Left Turns Lanes
Yes
No
Yes
No
Adjustment Factors
+5%
ONE WAY FACILII'MS
Increase corresponding volume 20%
-20%
-5%
-25%
*This table does not constitute a standard and should be used only for general planning applications. The computer models from which this table is derived should be used for more specific planning
applications. The table and deriving computer models should not be used for corridor or intersection design, where more refined techniques exist. Values shown are hourly directional volumes for levels of
service and are for the automobile/truck modes unless specifically stated. Level of service letter grade thresholds are probably not comparable across modes and, therefore, cross modal comparisons should be
made with caution. Furthermore, combining levels of service of different modes into one overall roadway level of service is not recommended. To convert to annual average daily traffic volumes, these.
volumes must be divided by appropriate D and K factors. The table's input value defaults and level of service criteria appear on the following page. Calculations are based on planning applications of the
Highway Capacity Manual, Bicycle LOS Model, Pedestrian LOS Model and Transit Capacity and Quality of Service Manual, respectively for the automobile/truck, bicycle, pedestrian and bus modes.
**Cannot be achieved using table input value defaults.
***Not applicable for that level of service letter grade. For automobile/truck modes, volumes greater than level of service D become F because intersection capacities have been reached. For bicycle
and pedestrian modes, the level of service letter grade (including F) is not achievable, because there is no maximum vehicle volume threshold using table input value defaults.
97
LEVEL OF SERVICE TABLE
CLASSIFICATION
TYPE
FDOT'S 2002 QUALITY / LEVEL OF SERVICE
[1]
PERSON TRIP LEVEL OF SERVICE
A
B
C
D
E
A
B
C
D
E
CLASS 4
ARTERIAL
1LU
0
0
270
720
780
0
0
0.35
0.92
1.00
2LD
0
0
650
1580
1660
0
0
0.39
0.95
1.00
3LD
0
0
1000
2390
2490
0
0
0.40
0.96
1.00
4LD
0
0
1350
3130
3250
0
0
0.42
0.96
1.00
NON -STATE
ROADWAYS
1LU
0
0
480
760
810
0
0
0.59
0.94
1.00
1LD
0
0
500
800
850
0
0
0.59
0.94
1.00
Source: FDOT's 2002 Quality/Level of Service Handbook
NOTES:
[1] THE PERSON TRIP LEVEL OF SERVICE IS DERIVED BY DIVIDING THE FDOT'S 2002 LEVEL OF SERVICE BY THE LOS E
FOR EACH TYPE OF ROADWAY.
Paps 1 415
20.NGw2001
ROADWAY
FROM
BISCAYNE BLVO
Ng 54 STREET
NE 46 STREET
1.19E
NE 36 STREET
NE 29 STREET
NE 20 STREET
NE 19 STREET
NE 15 STREET
NE 14 STREET
NE 13 STREET
1-395
NE 6 STREET
NE 3 STREET
NE 1 STREET
5E 1 STREET
SE 2 STREET
TO
NE 46 STRET
1.19E
NE 36 STREET
NE 29 STREET
NE 20 STREET
NE 19 STREET
NE 15 STREET
NE 14 STREET
NE 13 STREET
1-395
NE 6 STREET
NE 3 STREET
NE 1 STREET
5E 1 STREET
SE 2 STREET
SE 1 STREET
NE 2 AVENUE17RICRELL AVENUE
NE 20 STREET NE 19 STREET
NE 19 STREET NE $4 STREET
edE 14 STREET NE 13 STREET
NE 13. STREET 1-395
I-395 NE351REET
NE 3 STREET NE 1 STREET
NE 1 STREET FLAGLER STREET
FLAGLER STREET SE 1 STREET
SE 1 STREET 5E 2 STREET
SE 2 STREET SE 4 STREET
SE 4 STREET SE 0 STREET
SE 8 STREET SW 13 STREET
SW 13 STREET SW 15 ROAD
SW 15 ROAD RICITENBACKER CSWY
NE 1 AVENUE
NE T7 STREET NE 14 STREET
NE 14 STREET f-395
1.39E . NE STREET
NE STREET FLAGLER STREET
i FLAGLER STREET SE 1 STREET
T i SE 1 STREET SE 2 STREET
5DIJREE KEITH ARO SCHNARS P
FACILITY
TYPE
EXISTING
DIR LANES
N6
50
NB
SB
I46
sB
NB
SB
N6
SB
NB
SS
140
50
NO
50
NO
S6
NB
SB
NB
5B
5S
NB
56
NB
5B
NB
5B
N9
NB
se
NB
SS
4413
S3
50
5B
86
SB
SE
SB
5B
NB
SB
NB
SB
NB
5B
NB
SB
NB
se
NB
Na
NB
NB
NB
4L0
4LD
TABLE21A5
DOWNTOWN MIAMI DR1 UPDATE
EXIStING P1f BBB RIOERBRIP AND PERSON -TRIP CAPACITY ASSIGNMENTS
3
4LD 3
3
ILO 3
410
4L0
3
4LD 3
4LD
8l0
3
ELD 3
3
4L 3
36 3
BLO 3
3
OLD 3
3
8L0 3
40
8LD 95
2L0W 95
4LV 9
4LU
CAI
9
9
3L 9
3L 9
3L 9
3L K
3L
3L 24
4L 24
2L 24
31, 24
440 24
24
4413 4a
40
4LD 40
40
18
18
16
16
16
16
16
16
16
16
15
16
32
32
40
40
16
16
16
18
16
16
16
16
56
16
11
93
95
95
10
10
10
10
10
10
10
T
9
da
48
46
62
62
62
62
62
62
36
36
36
36
36
36
36
36
62
62
40
4a
49
48
40
48
49
40
48
48
16
95
95
32
32
1(
Si
95.
e
93
93
93
93
93
93
62
62
62
62
62
62
62
62
93
93
51
51
51
51
51
51
31
51
51
93
48
T
T
N
95
93
93
93
93
93
93
93
93
95
93
93
93
93
93
93
93
93
93
95
77
T
95
24V 6 9 10
3L 6 9 10 R T
3L 6 9 10 N T
3L 2 6 7 e 9
3L 2 6 7 a 9
34 6 0
T
95
T
95
95
Y
95
95
C
95
D
95
C
95
C
95
95
95
51
B
10
10
BUS ROwJTEB SERVING
ROA0YVAYBEGEMENT1
65
95
65
95
95
5
95
95
95
S
95
95
95
93
K
K
95 T
95 T
96 T
95 T
95 C
95 O
95 C
95
95
C
95
T
C
C
S
95
5
S
5
5
95
C
5
111
56
111
66
111
66
111
66
11
66
111
66
$11
54
11t
45
111
45
111
45
111
45
60
46
8a
30
84
16
99
69
99
fig
99
89
99 32
69 20
99 32
69 20
99 32
69 20
18 32
1a 32
99
42
99
42
75
42
75
240 75
9 TO
132 48
72 20
66 TO
56 18
66 10
66 1a
46 12
2
08
40
24
32
18
27
4B
36 46 51
0
0
0
51
BUS ROUTES AND
R1DER0H1P PER SEGEMENT
52
52
52
52
52
52
52
52
46
52
d6
62
21
13
21
13
21
21
13
21
13
21
13
21
13
21
13
B
77 a3 15 C
108
100
106
500
TOO
100
100
150 0
108
100 0
100
150 0
106
100 16
104
76 18
104 96
76 to 72
100 96
60 16 72
T00 96
fie 10 72
60 96
66 16 63
SO 75
60 18 63
12 00 107 75
60
96
96
96
52 84
84
76 12
76 6 12
92 6 137 80
80 3 24
68 a 144
92 3
0 14
2 24
6 132
fi 16
6 7 6 9 10 N I T
132 16
132 ,0 156 t20
136 4.3 112 532
4 70 48 114 46 76 124
2 33 66 66 46 76 76
66
126
120
128
106
108
187
117
B
290
200
290
200
290
200
290
200
290
200
295
170
273
152
140
152
148
132
1411
152
1411
152
132
TOTAL
BITS
RIDERSHIP
1PERSON91
399
248
339
24a
939
248
523
416
523
416
523
416
442
383
676
405
752
506
748
496
748
498
677
,09
657
394
1.106
Si
187
107
195
119
04
306
308
306
304
192
06
94
365
115
240
119
156
26
130
22
184
4E0
434
570
403
66
BIDS
CAPACITY
PERSONS]
920
920
920
920
920
920
1,472
2.252
1,472
2.252
1,472
2.252'
1,469
2.249
1.021
1.608
1.706
2,486
1,706
2,4E6
1,706
2,486
1,706
2,406
2 436
2.226
3,434
306
780
780
7,3
713
S16
1.070
1,070
1,070
1,330
552
538
566
1.346
566
561
566
306
306
306
306
674
1.226
1.226
2,114
2,114
534
WC
0 368
0270
0 360
0270
0 368
3.270
0.355
0.16E
0 355
D 185
0 355
0.165
0 301
0 170
0 660
0266
0441
0.204
0436
0.200
0.438
0.200
0 397
0137
0.264
0.17J
0.322
0 114E
0240
0 240
0.278
0167
0.162
9.299
0230
0288
0 229
0.348
0 164
0.166
0.27t
0.203
0 424
0.210
0 313
0.035
0 451
0.072
0273
0.362
0 354
0273
0 192
0.127
N lTRANPLAFAPROJECT51200111671fi1TABLE0111 MATRIX WK4
Peg* Sal 5
204N_1v"E01
ROADWAY
FROM
��8S 1Ia AVE Be
TO
NW 20 50REST
II
li
NW 17 STREET
Hw 14 STREET
NW 9 STREET
NW 5 STREET
Nw 17 STREET
NW 14 STREET
NW 9 STREET
NW 5 STREET
5'N 1 STREET
ONE 26 STREET
NE 2 AVENUE N MIAMI AVENUE
N MIAMI AVENUE NO 3AVENUE
III NW 3AVENUE F95
NE 15 STREET/VENETIAN CBWY
BISCAYNE ISLAND BAYSHORE CHINE
BAYSHORE DRIVE BISCAYNE BLVD
BISCAYNE BLVD N MIAMI AVENUE
;NE 14 STREET
BAY5110RE DRIVE BISCAYNE BLVD
BISCAYNE BLVD NE 1 AVENUE
NE 1 AVENUE N 14IAM1 AVENUE
N MIAMI AVENUE Nye 2 AVENUE
NW2AVENUE NW3AYE NUE
74W)AVENUE 1-95
NE 11 STREET
Nw 3AVENUE K95
NE 40 OTREET
NW 3 AVENUE
1 FACILITY'
TYPE
EXISTING
OIR LAMES
NB
55
NB
SB
NB
SB
NB
NB
EB
YVB
EB
WB
EB
WB
ES
WB
EB
W9
EB
WB
EB
W0
EB
W8
EB
WB
EB
w8
EB
WB
EB
WB
we
I-95 E EB
NE 6 STREET/PORT BOULEVARD
E OF PORT BRIDGE 515CAYNE BLVD
BISCAYNE BLVD NE 1 AVENUE
NE 1 AVENUE, N MIAMI AVENUE
N MIAMI AVENUE NW 1 AVENUE
NW 1 AVENUE NW 1 GT
NW 1 CT Nw2AVE NUE
NW 2 AVENUE NW 3 AVENUE
NW 3 AVENUE 1-95
EB
we
W0
WB
WB
WB
WB
WB
8
N
Lr3
0
21.11
2LU
21U
31.
2L
2LU
41U
810
2L0
2LD
2LU
4LU
2L
IL
2L
1L
2LU
21U
21.0
3L
2L
510
3L
2L
2L
2L
2L
2L
3L
2
2
21
21
32
32
32
32
32
32
21
21
A
A
32 38
32
3
M
M
M
2
2
21
2
2
2
7
16
16
M
M
M
M
7
21
µ
La
45
48
51
51
A
A
62
62
C
C
R
K
TABLE 21 J15
DOWNTOWN MIAMI OR/ UPDATE
EXISTING PM Bus RIDERSHIP AND PERSON -TRIP CAPACITY ASSIGNMENTS
BUS ROUTES SERVING
Ii0A0WAY SEGEMENTs
M
41
32
93
128
72
32
2J
18
27
16
27
IB
32
18
18
2
68
128
21
16
21
54
75
75
75
s6
22
58
16
36
32
3
45
T
86
66
75
78
A
24
18
24
16
3
51
5
BIOS
RIDERSHIP
ROUTES
PER
AND
SEGEM ENT
TOTAL
BUS
RIDERSHIP
PERSONS
BUS
CAPACITY
PERSONS)
WC
196
559
0 354
1au
559
0 250
58
174
0 509
18
114
0 156
27
195
0 136
18
195
0092
27
195
0138
10
195
0092
27
195
a138
16
195
0092
24
45
0533
8
45
0400
74
546
0136
37
270
0137
Si
82
93
G
I4
M
8
1
52
13
75
112
68
275
152
945
2 008
0 421
52
21
76
72
96
14
200
132
774
2.739
0 263
112
46
128
286
682
0 419
96
14
128
23$
662
0 349
46
46
130
0 354
14
14
130
❑ 108
46
48
130
0 354
14
14
130 0 106
46
114
445 0.256
14
142
445
0 319
16
114
❑ 140
S4
111
0474
243
169
868
8 213
141
510
0 276
75
315
0 235
132
309
9 427
132
309
0 427
SOURCE KEITH AND SCHNAR S. P A
44.ITRANPLANiPROJECTS<20011167161TABLE5111MRTRI74 WK4
Appendix D
Intersection Capacity Analysis
Worksheets
Existing Conditions
HCS2000: Signalized Intersections Release 4.1e
Analyst: DPA Inter.: BISCAYNE BLVD / NE 17 TERRACE
Agency: Area Type: All other areas
Date: 12/17/04 Jurisd:
Period: EXISTING PM PEAK HOUR Year : 2004
Project ID: PORTICO MUSP - # 04214
E/W St: NE 17 TERRACE N/S St: BISCAYNE BLVD
SIGNALIZED INTERSECTION SUMMARY
I Eastbound I Westbound
I Northbound
I Southbound
IL T RIL T RIL T RIL TR
I I I I
No. Lanes I 0 1 0 I 1 1 0 I 1 2 0 I 1 2 0
LGConfig I LTR I L TR I L TR I L TR
Volume 16 4 19 133 25 142 120 1273 65 1189 813 25
Lane Width I 12.0 112.0 12.0 112.0 12.0 112.0 12.0
RTOR Vol I 0 I 0 I 0 I 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A 1 NB Left A
Thru A 1 Thru A
Right A Right A
Peds Peds
WB Left A SB Left A A
Thru A Thru A
Right A Right A
Peds Peds
NB Right 1 EB Right
SB Right 1 WB Right
Green 19.0 65.0 18.0
Yellow 4.0 4.0 4.0
All Red 0.0 0.0 1.0
Cycle Length: 115.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
LTR 260 1573 0.12 0.17 41.0 D 41.0 D
Westbound
L 227 1374 0.15 0.17 41.4 D
TR 269 1626 0.64 0.17 49.8 D 48.4 D
Northbound
L 278 491 0.08 0.57 11.5 B
TR 1990 3521 0.69 0.57 18.9 B 18.8 B
Southbound
L 455 1770 0.43 0.76 27.8 C
TR 1996 3531 0.43 0.57 14.5 B 17.0 B
Intersection Delay = 20.6 (sec/veh) Intersection LOS = C
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: DPA
Agency/Co.:
Date Performed: 12/17/04
Analysis Time Period: EXISTING PM PEAR HOUR
Intersection: BISCAYNE BLVD / NE 18 STREET
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2004
Project ID: PORTICO MUSP - #04214
East/West Street: NE 18 STREET
North/South Street: BISCAYNE BLVD
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 16 1403 11 63 991 8
Peak -Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 16 1476 11 66 1043 8
Percent Heavy Vehicles 2 -- -- 2 -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 1 2 0 1 2 0
Configuration L T TR L T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 9 3 92 4 3 28
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 9 3 96 4 3 29
Percent Heavy Vehicles 2 2 2 2 2 2
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage / No /
Lanes 0 1 1 0 1 0
Configuration LT R LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L L I LT R I LTR
v (vph) 16 66 12
C(m) (vph) 658 448 18
v/c 0.02 0.15 0.67
95% queue length 0.07 0.51 1.78
Control Delay 10.6 14.4 386.2
LOS B B F
Approach Delay
Approach LOS
59.6
96 36
357 85
0.27 0.42
1.07 1.72
18.8 75.4
C F
75.4
F F
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: DPA
Agency/Co.:
Date Performed: 12/17/04
Analysis Time Period: EXISTING PM PEAR HOUR
Intersection: NE 4 AVE / NE 19 STREET (WEST)
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2004
Project ID: PORTICO MUSP - #04214
East/West Street: NE 19 STREET
North/South Street: NE 4 AVENUE
Intersection Orientation: EW Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 34 24 1 38
Peak -Hour Factor, PHF 0.86 0.86 0.86 0.86
Hourly Flow Rate, HFR 39 27 1 44
Percent Heavy Vehicles -- -- 2 --
Median Type/Storage Undivided /
RT Channelized?
Lanes 1 0 0 1
Configuration TR LT
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 143 2
Peak Hour Factor, PHF 0.86 0.86
Hourly Flow Rate, HFR 166 2
Percent Heavy Vehicles 2 2
Percent Grade (%) 0
Flared Approach: Exists?/Storage No /
Lanes 0 0
Configuration LR
0
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 1 7 8 9 I 10 11 12
Lane Config LT 1 LR I
v (vph) 1 168
C(m) (vph) 1536 901
v/c 0.00 0.19
95% queue length 0.00 0.68
Control Delay 7.3 9.9
LOS A A
Approach Delay 9.9
Approach LOS A
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: DPA
Agency/Co.:
Date Performed: 12/17/04
Analysis Time Period: EXISTING PM PEAK HOUR
Intersection: NE 4 AVE / NE 18 ST (West)
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2004
Project ID: PORTICO MUSP - # 04214
East/West Street: NE 18 STREET
North/South Street: NE 4 AVENUE
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 90 138 1 1 25 3
Peak -Hour Factor, PHF 0.82 0.82 0.82 0.82 0.82 0.82
Hourly Flow Rate, HFR 109 168 1 1 30 3
Percent Heavy Vehicles 2 -- -- 2 -- --
Median Type/Storage Raised curb / 1
RT Channelized?
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 2 20 1 2 34 40
Peak Hour Factor, PHF 0.82 0.82 0.82 0.82 0.82 0.82
Hourly Flow Rate, HFR 2 24 1 2 41 48
Percent Heavy Vehicles 2 2 2 2 2 2
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage No / No /
Lanes 0 2 0 0 2 0
Configuration LT TR LT TR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config LTR LTR I LT TR I LT TR
v (vph) 109 1 14 13 22 68
C(m) (vph) 1579 1409 496 514 501 791
v/c 0.07 0.00 0.03 0.03 0.04 0.09
95% queue length 0.22 0.00 0.09 0.08 0.14 0.28
Control Delay 7.4 7.6 12.5 12.2 12.5 10.0-
LOS A A B B B A
Approach Delay 12.3 10.6
Approach LOS B B
Future without Project
HCS2000: Signalized Intersections Release 4.1e
Analyst: DPA Inter.: BISCAYNE BLVD / NE 17 TERRACE
Agency: Area Type: All other areas
Date: 12/17/04 Jurisd:
Period: FUTURE W/O PROJ PM PEAK HOUR Year : 2004
Project ID: PORTICO MUSP - # 04214
E/W St: NE 17 TERRACE N/S St: BISCAYNE BLVD
SIGNALIZED INTERSECTION SUMMARY
1 Eastbound I Westbound 1 Northbound 1 Southbound
1 L T R I L T R 1 L T R I L T R
1 I 1 I
No. Lanes 1 0 1 0 I 1 1 0 1 1 2 0 I 1 2 0
LGConfig 1 LTR I L TR 1 L TR I L TR
Volume 16 8 21 1150 33 154 122 1509 102 1205 970 27
Lane Width 1 12.0 112.0 12.0 112.0 12.0 112.0 12.0
RTOR Vol 1 0 1 0 1 0 1 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A 1 NB Left A
Thru A 1 Thru A
Right A Right A
Peds Peds
WB Left A SB Left A A
Thru A Thru A
Right A Right A
Peds Peds
NB Right 1 EB Right
SB Right 1 WB Right
Green 19.0 65.0 18.0
Yellow 4.0 4.0 4.0
All Red 0.0 0.0 1.0
Cycle Length: 115.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
LTR 242 1463 0.15 0.17 41.4 D 41.4 D
Westbound
L 228 1381 0.69 0.17 54.0 D
TR 270 1633 0.73 0.17 55.2 E 54.7 D
Northbound
L 208 368 0.11 0.57 11.8 B
TR 1986 3513 0.85 0.57 24.8 C 24.7 C
Southbound
L 404 1770 0.53 0.76 37.9 D
TR 1996 3532 0.53 0.57 15.7 B 19.5 B
Intersection Delay = 26.1 (sec/veh) Intersection LOS = C
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: DPA
Agency/Co.:
Date Performed: 12/17/04
Analysis Time Period: FUTURE W/O PROJ PM PEAH HOUR
Intersection: BISCAYNE BLVD / NE 18 STREET
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2004
Project ID: PORTICO MUSP - #04214
East/West Street: NE 18 STREET
North/South Street: BISCAYNE BLVD
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 17 1543 108 86 1134 9
Peak -Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 17 1624 113 90 1193 9
Percent Heavy Vehicles 2 -- -- 2 -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 1 2 0 1 2 0
Configuration L T TR L T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 39 3 165 4 3 30
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 41 3 173 4 3 31
Percent Heavy Vehicles 2 2 2 2 2 2
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage / No /
Lanes 0 1 1 0 1 0
Configuration LT R LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config L L I LT R I LTR
v (vph) 17 90 44
C(m) (vph) 576 358 8
v/c 0.03 0.25 5.50
95% queue length 0.09 0.98 6.89
Control Delay 11.4 18.4 2930
LOS B C F
Approach Delay
Approach LOS
620.4
173 38
296 34
0.58 1.12
3.45 4.03
32.9 369.6
D F
369.6
F F
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: DPA
Agency/Co.:
Date Performed: 12/17/04
Analysis Time Period: FUTURE W/O PROJ PM PEAH HOUR
Intersection: NE 4 AVE / NE 19 STREET (WEST)
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2004
Project ID: PORTICO MUSP - #04214
East/West Street: NE 19 STREET
North/South Street: NE 4 AVENUE
Intersection Orientation: EW Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 60 121 1 84
Peak -Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 63 127 1 88
Percent Heavy Vehicles -- -- 2 --
Median Type/Storage Undivided /
RT Channelized?
Lanes 1 0 0 1
Configuration TR LT
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 216 2
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 227 2
Percent Heavy Vehicles 2 2
Percent Grade (%) 0
Flared Approach: Exists?/Storage No /
Lanes 0 0
Configuration LR
0
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 1 7 8 9 I 10 11 12
Lane Config LT 1 LR I
v (vph) 1 229
C(m) (vph) 1384 772
v/c 0.00 0.30
95% queue length 0.00 1.24
Control Delay 7.6 11.6
LOS A B
Approach Delay 11.6
Approach LOS B
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst: DPA
Agency/Co.:
Date Performed: 12/17/04
Analysis Time Period: FUTURE W/O PROJ PM PEAK HOUR
Intersection: NE 4 AVE / NE 18 ST (West)
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2004
Project ID: PORTICO MUSP - # 04214
East/West Street: NE 18 STREET
North/South Street: NE 4 AVENUE
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 14 5 6
L T R I L T R
Volume 97 245 1 30 88 27
Peak -Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 102 257 1 31 92 28
Percent Heavy Vehicles 2 -- -- 2 -- --
Median Type/Storage Raised curb / 1
RT Channelized?
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 2 116 1 14 114 43
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 2 122 1 14 120 45
Percent Heavy Vehicles 2 2 2 2 2 2
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage No / No /
Lanes 0 2 0 0 2 0
Configuration LT TR LT TR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 17 8 9 I 10 11 12
Lane Config LTR LTR I LT TR I LT TR
v (vph) 102 31 63 62 74 105
C(m) (vph) 1468 1307 412 418 388 547
v/c 0.07 0.02 0.15 0.15 0.19 0.19
95% queue length 0.22 0.07 0.53 0.52 0.69 0.70
Control Delay 7.6 7.8 15.3 15.1 16.5 13.1
LOS A A C C C B
Approach Delay 15.2 14.5
Approach LOS C B
Future with Project
HCS2000: Signalized Intersections Release 4.1e
Analyst: DPA Inter.: BISCAYNE BLVD / NE 17 TERRACE
Agency: Area Type: All other areas
Date: 2/22/05 Jurisd:
Period: FUTURE WITH PROJ PM PEAK HOUR Year : 2004
Project ID: PORTICO MUSP - # 04214
E/W St: NE 17 TERRACE N/S St: BISCAYNE BLVD
SIGNALIZED INTERSECTION SUMMARY
1 Eastbound 1 Westbound 1 Northbound 1 Southbound
1 L T R I L T R I L T R I L T R
1 1 1
No. Lanes 1 0 1 0 1 1 1 0 1 1 2 0 1 1 2 0
LGConfig 1 LTR L TR L TR L TR
Volume 16 9 21 1152 33 154 122 1526 104 1205 980 27
Lane Width 1 12.0 112.0 12.0 112 0 12.0 112.0 12.0
RTOR Vol 1 0 1 0 1 0 1 0
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left A NB Left A
Thru A Thru A
Right A Right A
Peds Peds
WB Left A 1 SB Left A A
Thru A Thru A
Right A Right A
Peds Peds
NB Right 1 EB Right
SB Right 1 WB Right
Green 19.0 65.0 18.0
Yellow 4.0 4.0 4.0
All Red 0.0 0.0 1.0
Cycle Length: 115 0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
LTR
246 1489 0.15 0.17 41.4 D 41.4 D
Westbound
L 228 1382 0.69 0.17 53.7 D
TR 270 1633 0.71 0.17 54.1 D 53.9 D
Northbound
L 212 375 0.11 0.57 11.8 B
TR 1986 3513 0.85 0.57 24.4 C 24.3 C
Southbound
L 404 1770 0.52 0.76 37.4 D
TR 1996 3532 0.52 0.57 15.6 B 19.3 B
Intersection Delay = 25.7 (sec/veh) Intersection LOS = C
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst:
Agency/Co.:
Date Performed: 2/22/05
Analysis Time Period: FUTURE WITH PROJ PM PEAH HOUR
Intersection: BISCAYNE BLVD / NE 18 STREET
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2004
Project ID: PORTICO MUSP - #04214
East/West Street: NE 18 STREET
North/South Street: BISCAYNE BLVD
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 I 4 5 6
L T R I L T R
Volume 17 1543 126 86 1134 9
Peak -Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 17 1624 132 90 1193 9
Percent Heavy Vehicles 2 -- -- 2 -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 1 2 0 1 2 0
Configuration L T TR L T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11
L T R I L T
12
R
Volume 49 4 165 4 5 30
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 51 4 173 4 5 31
Percent Heavy Vehicles 2 2 2 2 2 2
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage / No /
Lanes 0 1 1 0 1 0
Configuration LT R LTR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 I 7 8 9 I 10 11 12
Lane Config L L I LT R I LTR
v (vph) 17 90 55
C(m) (vph) 576 352 5
v/c 0.03 0.26 11.00
95% queue length 0.09 1.00 8.64
Control Delay 11.4 18.7 5912
LOS B C F
Approach Delay
Approach LOS
173 40
291 25
0.59 1.60
3.55 4.92
34.0 633.1
D F
1452 633.1
F F
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst:
Agency/Co.:
Date Performed: 2/22/05
Analysis Time Period: FUTURE WITH PROJ PM PEAH HOUR
Intersection: NE 4 AVE / NE 19 STREET (WEST)
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2008
Project ID: PORTICO MUSP - #04214
East/West Street: NE 19 STREET
North/South Street: NE 4 AVENUE
Intersection Orientation: EW Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 I 4 5 6
L T R I L T R
Volume 60 135 1 84
Peak -Hour Factor, PHF 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 63 142 1 88
Percent Heavy Vehicles -- -- 2 --
Median Type/Storage Undivided /
RT Channelized?
Lanes 1 0 0 1
Configuration TR LT
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 225 2
Peak Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 236 2
Percent Heavy Vehicles 2 2
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage No / /
Lanes 0 0
Configuration LR
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 I 7 8 9 I 10 11 12
Lane Config LT I LR
v (vph) 1 238
C(m) (vph) 1366 764
v/c 0.00 0.31
95% queue length 0.00 1.33
Control Delay 7.6 11.8
LOS A B
Approach Delay 11.8
Approach LOS B
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst:
Agency/Co.:
Date Performed: 2/22/05
Analysis Time Period: FUTURE WITH PROJ PM PEAK HOUR
Intersection: NE 4 AVE / NE 18 ST (West)
Jurisdiction:
Units: U. S. Customary
Analysis Year: 2008
Project ID: PORTICO MUSP - # 04214
East/West Street: NE 18 STREET
North/South Street: NE 4 AVENUE
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 I 4 5 6
L T R I L T R
Volume 97 245 1 30 88 27
Peak -Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 102 257 1 31 92 28
Percent Heavy Vehicles 2 -- -- 2 -- --
Median Type/Storage Raised curb / 1
RT Channelized?
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 1 10 11
L T R I L T
12
R
Volume 2 127 1 14 134 43
Peak Hour Factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95
Hourly Flow Rate, HFR 2 133 1 14 141 45
Percent Heavy Vehicles 2 2 2 2 2 2
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage No / No /
Lanes 0 2 0 0 2 0
Configuration LT TR LT TR
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 I 7 8 9 1 10 11 12
Lane Config LTR LTR 1 LT TR 1 LT TR
v (vph) 102 31 68 67 84 115
C(m) (vph) 1468 1307 412 418 388 532
v/c 0.07 0.02 0.17 0.16 0.22 0.22
95% queue length 0.22 0.07 0.59 0.57 0.81 0.81
Control Delay 7.6 7.8 15.5 15.2 16.8 13.6
LOS A A C C C B
Approach Delay 15.4 15.0-
Approach LOS C B
Project Driveway
HCS2000: Unsignalized Intersections Release 4.1d
TWO-WAY STOP CONTROL SUMMARY
Analyst:
Agency/Co.: DPA
Date Performed: 2/22/05
Analysis Time Period: PM PEAK
Intersection: NE 4 AVENUE / DRIVEWAY
Jurisdiction: MIAMI
Units: U. S. Customary
Analysis Year: 2008
Project ID: PORTICO #041214
East/West Street: GARAGE ENTRANCE
North/South Street: NE 4TH AVENUE
Intersection Orientation: EW Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Eastbound Westbound
Movement 1 2 3 I 4 5 6
L T R I L T R
Volume 16 0 9
Peak -Hour Factor, PHF 1.00 1.00 1.00
Hourly Flow Rate, HFR 16 0 9
Percent Heavy Vehicles -- 0 -- --
Median Type/Storage Undivided /
RT Channelized?
Lanes 0 0 0
Configuration LTRLR
Upstream Signal? No No
Minor Street: Approach Northbound Southbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 14 24 13 12
Peak Hour Factor, PHF 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 14 24 13 12
Percent Heavy Vehicles 0 0 0 0
Percent Grade (%) 0 0
Flared Approach: Exists?/Storage No /
Lanes 1 0 0 1
Configuration TR LT
/
Delay, Queue Length, and Level of Service
Approach EB WB Northbound Southbound
Movement 1 4 I 7 8 9 I 10 11 12
Lane Config LTR I TR I LT
v (vph) 16 38 25
C(m) (vph) 1636 986 881
v/c 0.01 0.04 0.03
95% queue length 0.03 0.12 0.09
Control Delay 7.2 8.8 9.2
LOS A A A
Approach Delay 8.8 9.2
Approach LOS A A
Appendix E
Committed Development Information
INTERSECTION
MOVEMENT
PM
PK SEASON
PK PERIOD
FUTURE
W/O
PROJECT
Project
Total
FUTURE
WITH
PROJECT
62
NBL
90
97
0- 0 0 8 0 0 0 O 0 0 O
97
NBT
138
245
245
NBR
1
1
1
SBL
1
30
30
SBT
25
88
88
NE 4 AVE /
SBR
3
27
27
NE 18 STREET
EBL
2
14
14
EBT
34
114
134
EBR
40
43
43
WBL
2
2
2
WBT
20
116
127
WBR
1
1
1
TOTAL
357
778
31
809
NBL
143
216
9
225
NBT
0
0
0
0
NBR
2
2
0
2
SBL
0
0
0
0
SBT
0
0
0
0
NE 4 AVE /
SBR
0
0
0
0
NE 19 STREET
EBL
0
0
0
0
EBT
34
60
0
60
EBR
24
121
13
135
WBL
1
1
0
1
WBT
38
84
0
84
WBR
0
0
0
0
TOTAL
242
484
22
506
NBL
20
22
0
22
NBT
1273
1509
18
1526
NBR
65
102
3
104
SBL
189
205
0
205
SBT
813
970
10
980
BISCAYNE BLVD /
SBR
25
27
0
27
NE 17 TERRACE
EBL
6
6
0
6
EBT
4
8
0
9
EBR
19
21
0
21
WBL
33
150
2
152
WBT
25
33
0
33
WBR
142
154
0
154
TOTAL
242
484
33
506
NBL
16
17
0
17
NBT
1403
1543
0
1543
NBR
11
108
18
126
SBL
63
86
0
86
SBT
991
1134
0
1134
BISCAYNE BLVD /
SBR
8
9
0
9
NE 18 STREET
EBL
4
4
0
4
EBT
3
3
2
5
EBR
28
30
0
30
WBL
9
39
10
49
WBT
3
3
1
4
WBR
92
165
0
165
TOTAL
2631
3142
31
3174
#04214
5/5/2005 10:15 AM
TMC's INTERSECTION APP.xls
Portico
Committed Develoment Person -Trip Assignment
CORRIDOR
Project
FROM TO
Direction
PAC
1800 CLUB
MIRAMAR
CENTRE
BISCAYNE
VILLAGE
QUANTUM
TOTAL
BISCAYNE BOULEVARD
NE 20 STREET INE 19 STREET
NE 19 STREET INE 15 STREET
NE 15 STREET NE 14 STREET
NE 15 STREET / VENETIAN CSWY
N. BAYSHORE DRIBISCAYNE BLVD
BISCAYNE BLVD N. MIAMI AVENUE
1
NB
9
30
68
30
24
161
SB
9
33
104
50
45
241
NB
9
127
95
80
97
408
SB
9
113
41
27
86
276
NB
9
139
110
90
108
456
SB
9
130
56
33
96
324
EB
5
12
25
16
18
76
WB
9
17
20
9
16
71
EB
3
7
9
6
7
32
WB
6
6
7
3
6
28
PAC - PERFORMING ARTS CENTER
PM Peak Hour Trip Generation Analysis
USES
UNITS
ITE Land Use Code
PM PEAK HOUR TRIPS
IN
OUT
TOTAL
%
Trips
%
Trips
Trips
Live Theatre
4900 seats
50%
49
50%
49
98
GROSS VEHICLE TRIPS (1)
I 50%
49
I 50%
49
I 98
Vehicle Occupancy Adjustment @
Transit Trip Reduction @
Pedestrian / Bicycle Trip Reduction @
16% of Gross External Trips
14.90% of Gross External Trips
10.00% of Gross External Trips
(2)
(3)
(4)
50%
50%
50%
8
7
5
50%
50%
50%
8
7
5
16
15
10
NET EXTERNAL VEHICLE TRIPS
50%
29
50%
29
58
I
I
I
Net External Person Trips in Vehicles @
Net External Person Trips using Transit @
1.40 Persons/ Vehicle
1.40 Persons/ Vehicle
50%
50%
41
10
50%
50%
41
10
81
20
Net External Person Trips (vehicles and transit modes)
50%
51
50%
51
138
I
I
I
Net External Person trips walking / using bicycle
1.40 Persons/ Vehicle
I 50%
7
I 50%
7
I 14
Notes
(1) Based on Traffic Impact Study provided by City of Miami
(2) A 16% reduction to adjust for the difference between ITE auto occupancy and local data (Miami's 1.4 vs. ITE's 1.2 pers/veh)
(3) Transit trip reduction based on projected modal splits used in the Downtown Miami DRI Increment II
(4) Pedestrian and bicycle trip reductions based on Downtown characteristics used in the Downtown Miami DRI Increment II
T-gen_PM_Comm Developments.xls PAC
ONYX (Biscayne Bay Lofts)
PM Peak Hour Trip Generation Analysis
USES
UNITS
ITE Land Use Code
PM PEAK HOUR TRIPS
IN
OUT
TOTAL
%
Trips
%
Trips
Trips
High Rise Apt / Condo
118 DU
232
62%
28
38%
17
45
GROSS VEHICLE TRIPS (1)
I 62%
28
I 38%
17
I 45
Vehicle Occupancy Adjustment @
Transit Trip Reduction @
Pedestrian / Bicycle Trip Reduction @
16% of Gross External Trips
11.70% of Gross External Trips
10.00% of Gross External Trips
(2)
(3)
(4)
62%
62%
62%
4
3
3
38%
38%
38%
3
2
2
7
5
5
NET EXTERNAL VEHICLE TRIPS
62%
17
38%
11
28
I
Net External Person Trips in Vehicles @
Net External Person Trips using Transit @
1.40 Persons/ Vehicle
1.40 Persons/ Vehicle
62%
62%
24
5
38%
38%
15
3
39
7
Net External Person Trips (vehicles and transit modes)
62%
29
38%
18
47
I
Net External Person trips walking / using bicycle
1.40 Persons/ Vehicle
I 62%
4
I 38%
2
I 6
Notes
(1) Based on Traffic Impact Study provided by City of Miami
(2) A 16% reduction to adjust for the difference between ITE auto occupancy and local data (Miami's 1.4 vs. ITE's 1.2 pers/veh)
(3) Transit trip reduction based on projected modal splits used in the Downtown Miami DRI Increment II
(4) Pedestrian and bicycle trip reductions based on Downtown characteristics used in the Downtown Miami DRI Increment II
ONYX 2 (Biscayne Bay Lofts)
PM Peak Hour Trip Generation Analysis
USES
UNITS
ITE Land Use Code
PM PEAK HOUR TRIPS
IN
OUT
TOTAL
%
Trips
%
Trips
Trips
High Rise Apt / Condo
117 DU
232
64%
28
36%
16
44
GROSS VEHICLE TRIPS (1)
I 64%
28
I 36%
16
I 44
Vehicle Occupancy Adjustment @
Transit Trip Reduction @
Pedestrian / Bicycle Trip Reduction @
16% of Gross External Trips
11.70% of Gross External Trips
10.00% of Gross External Trips
(2)
(3)
(4)
64%
64%
64%
4
3
3
36%
36%
36%
3
2
2
7
5
4
NET EXTERNAL VEHICLE TRIPS
64%
17
36%
10
27
I
Net External Person Trips in Vehicles @
Net External Person Trips using Transit @
1.40 Persons/ Vehicle
1.40 Persons/ Vehicle
64%
64%
24
5
36%
36%
14
3
38
7
Net External Person Trips (vehicles and transit modes)
64%
29
36%
17
46
I
Net External Person trips walking / using bicycle
1.40 Persons/ Vehicle
I 64%
4
I 36%
2
I 6
Notes
(1) Based on Traffic Impact Study provided by City of Miami
(2) A 16% reduction to adjust for the difference between ITE auto occupancy and local data (Miami's 1.4 vs. ITE's 1.2 pers/veh)
(3) Transit trip reduction based on projected modal splits used in the Downtown Miami DRI Increment II
(4) Pedestrian and bicycle trip reductions based on Downtown characteristics used in the Downtown Miami DRI Increment II
OPERA TOWER (BAY PARK PLAZA / MIRAMAR CENTRE PHASE II & III)
PM Peak Hour Trip Generation Analysis
USES
UNITS
ITE Land Use Code
PM PEAK HOUR TRIPS
IN
OUT
TOTAL
%
Trips
%
Trips
Trips
High Rise Apt
Office
Specialty Retail
635 DU
92,260 SF
18,112 SF
222
710
814
61%
17%
44%
129
23
22
39%
83%
56%
83
114
28
212
137
50
GROSS VEHICLE TRIPS (1)
I 44%
174
I 56%
225
I 399
Vehicle Occupancy Adjustment @ 16% of Gross External Trips
Transit Trip Reduction @ 11.70% of Gross External Trips
Pedestrian / Bicycle Trip Reduction @ 10.00% of Gross External Trips
(2)
(3)
(4)
44%
44%
44%
28
20
17
56%
56%
56%
36
26
22
64
47
40
NET EXTERNAL VEHICLE TRIPS
44%
109
56%
140
249
I
Net External Person Trips in Vehicles @ 1.40 Persons/ Vehicle
Net External Person Trips using Transit @ 1.40 Persons/ Vehicle
44%
44%
152
29
56%
56%
196
37
348
65
Net External Person Trips (vehicles and transit modes)
44%
181
56%
233
413
I
Net External Person trips walking / using bicycle 1.40 Persons/ Vehicle
I 44%
24
I 56%
31
I 56
Notes
(1) Based on Traffic Impact Study provided by City of Miami
(2) A 16% reduction to adjust for the difference between ITE auto occupancy and local data (Miami's 1.4 vs. ITE's 1.2 pers/veh)
(3) Transit trip reduction based on projected modal splits used in the Downtown Miami DRI Increment II
(4) Pedestrian and bicycle trip reductions based on Downtown characteristics used in the Downtown Miami DRI Increment II
QUANTUM (METROPOLIS BAYSHORE)
PM Peak Hour Trip Generation Analysis
USES
UNITS
ITE Land Use Code
PM PEAK HOUR TRIPS
IN
OUT
TOTAL
%
Trips
%
Trips
Trips
High Rise Apt / Condo
Specialty Retail
752 DU
8,470 SF
232
814
62%
43%
177
10
38%
57%
109
13
286
23
GROSS VEHICLE TRIPS (1)
I 61%
187
I 39%
122
I 309
Vehicle Occupancy Adjustment @
Transit Trip Reduction @
Pedestrian / Bicycle Trip Reduction @
16% of Gross External Trips
11.70% of Gross External Trips
10.00% of Gross External Trips
(2)
(3)
(4)
61 %
61 %
61%
30
22
19
39%
39%
39%
20
14
12
49
36
31
NET EXTERNAL VEHICLE TRIPS
61%
117
39%
76
193
I
I
I
Net External Person Trips in Vehicles @
Net External Person Trips using Transit @
1.40 Persons/ Vehicle
1.40 Persons/ Vehicle
61 %
61 %
163
31
39%
39%
106
20
270
51
Net External Person Trips (vehicles and transit modes)
61 %
194
39%
126
320
I
I
I
Net External Person trips walking / using bicycle
1.40 Persons/ Vehicle
I 61 %
26
I 39%
17
I 43
Notes
(1) Based on Traffic Impact Study provided by City of Miami
(2) A 16% reduction to adjust for the difference between ITE auto occupancy and local data (Miami's 1.4 vs. ITE's 1.2 pers/veh)
(3) Transit trip reduction based on projected modal splits used in the Downtown Miami DRI Increment II
(4) Pedestrian and bicycle trip reductions based on Downtown characteristics used in the Downtown Miami DRI Increment II
T-gen_PM_Comm Developments.xls QUANTUM METROPOLIS
Rosabella Lofts (Edgewater Tower)
PM Peak Hour Trip Generation Analysis
USES
UNITS
ITE Land Use Code
PM PEAK HOUR TRIPS
IN
OUT
TOTAL
%
Trips
%
Trips
Trips
High Rise Apt / Condo
258 DU
232
63%
62
37%
36
98
GROSS VEHICLE TRIPS (1)
I 63%
62
I 37%
36
I 98
Vehicle Occupancy Adjustment @
Transit Trip Reduction @
Pedestrian / Bicycle Trip Reduction @
16% of Gross External Trips
11.70% of Gross External Trips
10.00% of Gross External Trips
(2)
(3)
(4)
63%
63%
63%
10
7
6
37%
37%
37%
6
4
4
16
11
10
NET EXTERNAL VEHICLE TRIPS
63%
39
37%
22
61
I
Net External Person Trips in Vehicles @
Net External Person Trips using Transit @
1.40 Persons/ Vehicle
1.40 Persons/ Vehicle
63%
63%
54
10
37%
37%
31
6
85
16
Net External Person Trips (vehicles and transit modes)
63%
64
37%
37
102
I
Net External Person trips walking / using bicycle
1.40 Persons/ Vehicle
I 63%
9
I 37%
5
I 14
Notes
(1) Based on Traffic Impact Study provided by City of Miami
(2) A 16% reduction to adjust for the difference between ITE auto occupancy and local data (Miami's 1.4 vs. ITE's 1.2 pers/veh)
(3) Transit trip reduction based on projected modal splits used in the Downtown Miami DRI Increment II
(4) Pedestrian and bicycle trip reductions based on Downtown characteristics used in the Downtown Miami DRI Increment II
Star Lofts (Bay 25)
PM Peak Hour Trip Generation Analysis
USES
UNITS
ITE Land Use Code
PM PEAK HOUR TRIPS
IN
OUT
TOTAL
%
Trips
%
Trips
Trips
High Rise Apt / Condo
55 DU
232
62%
13
38%
8
21
GROSS VEHICLE TRIPS (1)
I 62%
13
I 38%
8
I 21
Vehicle Occupancy Adjustment @
Transit Trip Reduction @
Pedestrian / Bicycle Trip Reduction @
16% of Gross External Trips
11.70% of Gross External Trips
10.00% of Gross External Trips
(2)
(3)
(4)
62%
62%
62%
2
2
1
38%
38%
38%
1
1
1
3
2
2
NET EXTERNAL VEHICLE TRIPS
62%
8
38%
5
13
I
Net External Person Trips in Vehicles @
Net External Person Trips using Transit @
1.40 Persons/ Vehicle
1.40 Persons/ Vehicle
62%
62%
11
2
38%
38%
7
1
18
3
Net External Person Trips (vehicles and transit modes)
62%
13
38%
8
22
I
Net External Person trips walking / using bicycle
1.40 Persons/ Vehicle
I 62%
2
I 38%
1
I 3
Notes
(1) Based on Traffic Impact Study provided by City of Miami
(2) A 16% reduction to adjust for the difference between ITE auto occupancy and local data (Miami's 1.4 vs. ITE's 1.2 pers/veh)
(3) Transit trip reduction based on projected modal splits used in the Downtown Miami DRI Increment II
(4) Pedestrian and bicycle trip reductions based on Downtown characteristics used in the Downtown Miami DRI Increment II
1800 CLUB
PM Peak Hour Trip Generation Analysis
USES
UNITS
ITE Land Use Code
PM PEAK HOUR TRIPS
IN
OUT
TOTAL
%
Trips
%
Trips
Trips
High Rise Apt / Condo
Office
Retail / Service
450 DU
27,604 SF
4,872 SF
GROSS VEHICLE TRIPS
I 53%
171
I 47%
152
I 323
Vehicle Occupancy Adjustment @ 0% of Gross External Trips
Transit Trip Reduction @ 0.00% of Gross External Trips
Pedestrian / Bicycle Trip Reduction @ 0.00% of Gross External Trips
(1)
(2)
(3)
53%
53%
53%
0
0
0
47%
47%
47%
0
0
0
0
0
0
NET EXTERNAL VEHICLE TRIPS 1
53%
171
47%
152
323
I
I
I
Net External Person Trips in Vehicles @ 1.40 Persons/ Vehicle
Net External Person Trips using Transit @ 1.40 Persons/ Vehicle
53%
53%
239
0
47%
47%
213
0
452
0
Net External Person Trips (vehicles and transit modes)
53%
239
47%
213
452
I
I
I
Net External Person trips walking / using bicycle 1.40 Persons/ Vehicle
I 53%
0
I 47%
0
I 0
Notes
(1) Based on Traffic Impact Study provided by City of Miami
T-gen_PM_Comm Developments.xls 1800 CLUB
Appendix F
Traffic Control Measures Plan
Portico
TRAFFIC CONTROL MEASURES PLAN
The project's design and location will reduce the project vehicular traffic volumes as
follows:
•• The project is a proposed residential development which includes a retail component.
This type of development will result in a portion of the trips being captured within the
development, or internal to the site.
•• The project will also provide residential units with accessibility to mass transit. This
feature will allow residents to use mass transit for their trip to work.
The development will also do the following to further reduce peak hour vehicle trips:
• • Will encourage employers/landlords to participate in ridesharing programs through
South Florida Commuter Services. Available information will be obtained and
distributed to all employers/landlords in the development.
— Miami -Dade County Transportation Agency current local and regional mass transit
route and schedule information will be provided to potential transit users in a
prominent public area of the development. The information provided and maintained
on the premises will be updated, when necessary, at no less than six month intervals.
•• Promote mass transit use by encouraging employers/landlords to purchase transit
passes and make them available to employees and residents at discounted prices or no
ch. rge, or in lieu of subsidized parking.
• • Encourage employers to implement staggered work hours.
Implementation of these items will result in a minimum of ten percent (10%) reduction of
peak hour vehicle trips. The performance of the plan will be monitored by measuring
actual afternoon peak hour volumes at the project driveways and comparing the counts
against total project trips based on the Institute of Transportation Engineers (I'1'E) trip
generation rates.
TRAFFIC CONTROL.DOC
DAVId PLUMMER t ASSOCIATES
TRANSPORTATION•C1VIL•STR ICTURAL•rNVIRONM :NTAI..