Loading...
HomeMy WebLinkAboutTAB L - Project DescriptionPORTICO Major Use Special Permit 1837 NE 4th AVENUE Project Description Zoning Ordinance 11000 1. Section 1304.2.1 Application forms; supplementary materials (a) Statements of ownership and control of the proposed development or activity. The Disclosure of Ownership Affidavit is provided in Tab B. (b) Statement describing in detail the character and intended use of the development or activity. Character. Portico is a 43 story luxury residential high-rise building with 324 residential units and 425 parking space. The project is located at 1837 NE 4th Avenue in the Edgewater/Omni area of Downtown Miami. The Property benefits from its proximity to Biscayne Bay, Margaret Pace Park and the new Performing Arts Center. The main entrance to the tower and the lobby faces north and is located along NE 4th Avenue. The lobby area connects to ancillary retail office space, which is located at the NW corner of the property and serves to activate the corner. Continuing south along NE 4th Avenue, a row of townhomes will line the street and provide a liner for the parking garage, which is entirely internalized. Portico will provide a mixture of townhomes, 2-bedroom units, 1-bedroom units, and penthouse lofts to the Omni area. A total of 13 penthouse lofts will be located in the upper floors with some penthouses providing private terraces. The lighted roofline of the tower will contribute and compliment the Omni area skyline. Zoning. The zoning designation for the property is SD-6 Central Commercial Residential District and the property is Page 1 located within the Omni Overlay District, which allows a maximum, residential density of 500 units per acre. The proposed development consists of a parcel with a net lot area of 28,185 square feet. The gross lot area is 53,515 square feet and includes two small parcels of open green area owned by the City of Miami. These areas will provide additional green space that compliment the Portico tower. Service. An alley located behind the tower will provide access to the loading area and all loading operations are designed to occur within the building envelope. Mechanical rooms will have access onto the alley. The parking podium contains 12 levels of parking. All 12 levels of parking will be entirely wrapped with residential liner along NE 4th Avenue. In addition, the parking podium will provide more than the minimum required parking for the entire development. Recreational Facilities. A pool, fountain, and recreational spa will be provided on the 13th floor recreation deck. This floor will also contain a gymnasium and a multi -purpose room. The recreation deck will have views of both Biscayne Bay and downtown Miami. (c) General location map, showing relation of the site or activity for which special permit is sought to major streets, schools, existing utilities, shopping areas, important physical features in and adjoining the project or activity and the like. The following exhibits are included with the Major Use Special Permit Application: Aerial: Aerial Photograph of the surrounding area indicating the project site. (2) Area Context Map/Site Aerial: Map of the project area indicating buildings that surround the site. (d) A site plan containing the title of the project and the names of the project planner and developer, date, and north arrow, and based on an exact survey of the property drawn to a scale of sufficient size to show. Page 2 The project developer is Cameo Apartments, Ltd.; The architect is Arquitectonica; The project's engineers are Kimley-Horn and Associates, Inc. The general information requested is shown under Tab K and Q. (1) Boundaries of the project, any existing streets, buildings, watercourses, easements, and section lines. The boundaries and the location of existing streets and easements are shown on the Boundary Survey located under Tab Q. (2) Exact location of all buildings and structures. (3) The exact location of all existing buildings is shown on the Boundary Survey under Tab Q. Access and traffic flow and how vehicular traffic will be separated from pedestrian and other types of traffic. The specific description of site access and traffic flow is provided in the Traffic Impact Analysis located under Tab N. The project will have access from both NE 4th Avenue and from the existing public alley located behind the building. (4) Off street parking and off street loading areas. The off street parking and off street loading areas are shown on the site plans located under Tab Q. (5) Recreational facilities locations. The facilities are for the use of the residents and are shown under Tab Q. (6) Screens and buffers. All screens and buffers are shown under Tab Q. (7) Refuse collection areas. Page 3 These facilities are shown under Tab Q. (8) Access to utilities and points of utilities hookups. Access and connections to site utilities are discussed in the Site Utility Study, located under Tab O. (e) Tabulations of total gross acreage in the project and the percentages thereof proposed to de devoted to: (f) (g) (1) The various permitted uses. Complete tabulation is shown on the site plan included under Tab Q. (2) Ground coverage by structures. Complete tabulation is shown on the site plan included under Tab Q. Tabulation showing the following: (1) The derivation of numbers of off street parking and off street loading spaces shown in (d) above. Complete tabulation is shown on the site plan included under Tab Q. (2) Total project density in dwelling units per acre. The project's total density is approximately 500 units per acre, for a total of 324 units (where 500 units per acre are permitted under the existing land use designation). If common facilities (such as recreation areas of structures, privates streets, common open space, etc.) are to be provided for the development, statements as to how such common facilities are to be provided and permanently maintained. All common facilities will be maintained and controlled by a condominium association. (h) Storm drainage and sanitary sewerage plans. Page 4 (i) Storm drainage, water distribution, wastewater, and solid waste generation provisions are discussed in the Site Utility Study located under Tab O. Architectural definitions for buildings in the development; exact number of dwelling unit, sizes, and types, together with typical floor plans of each type. Detailed information and breakdown of square footage of all uses are found under Project Description included under Tab Q. Typical floor plans for the residential units, as well as all elevations and sections are also located under Tab Q. (j) Plans for signs, if any. N/A. (k) Landscaping plan, including types, sizes, and locations of vegetation and decorative shrubbery, and showing provisions for irrigation and future maintenance. The proposed landscaping plans are found under Tab Q. Landscaping will be maintained by the homeowner association. (I) Plans for recreation facilities, if any, including location and general description of building for such use. (m) The recreation facilities are shown under Tab Q. Portico will provide all recreational facilities including a pool, spa, and gymnasium on the 13th floor of the building. Such additional data, maps, plans, or statements as may be required for the particular use or activity involved. The details of the spaces and calculations used to compute the Floor Area Ratio (FAR) are shown on the FAR plans under Tab Q. (n) Such additional data as the Applicant may believe is pertinent to the proper consideration of the site and development plan. Page 5 N/A. 2. Section 1702.2.1 General Report (1) Property ownership or ownership and beneficial interest within the boundaries of the area proposed for Major Use Special Permit. Statement of Ownership and beneficial interest within the boundaries of the area proposed for Major Use Special Permit is provided in Tab B. (2) The nature of the unified interest or control. (3) The nature of unified interest or control is indicated in Tab B. Survey of the proposed area showing property lines and ownership. A copy of the survey of the entire property and the lots to be rezoned are included under Tab Q. (4) Map of existing features, including streets, alleys, easements, utilities' lines, existing land use, general topography and physical features. (5) The existing site features and utility lines are shown in the survey of the property located under Tab Q. The site features and the utilities are also described in the Site Utility Study, located under Tab O. Materials to demonstrate the relationship of the elements listed in (4) preceding to surrounding area characteristics. The drawings submitted with this Application are located under Tab Q. (6) Existing zoning and adopted comprehensive plan designations for the area on and around the lands proposed for Major Use Special Permit. The property is currently designated High Density Multi -family Residential. The property is zoned SD-6 Central Commercial residential District. The Zoning Atlas map for the area in which Page 6 the property is located is found in Tab F, and indicates the existing and surrounding zoning. 3. Section 1702.2.2 Major Use Special Permit Concept Plan. (a) Relationships of the concept plan to surrounding, existing and proposed future uses, activities, systems, and facilities (transportation, recreation, view corridors, pedestrian systems, service systems, and similar uses). Section 1 (b) under Tab L contains a written narrative of this project outlining proposed uses, activities and architectural character. The traffic report in Tab N also contains descriptions of the project's relationship to traffic, pedestrian movements, and transportation access. Elevations and sections showing the proposed materials, vertical profile and height, and orientation to street are included in the Drawings submitted with this Application. The Drawings submitted are found under Tab Q. (b) Existing zoning and adopted comprehensive plan principles and designations. The property is currently designated High Density Multi -family Residential. The property is zoned SD-6 Central Commercial residential District. The Zoning Atlas map for the area in which the property is located is found in Tab F, and indicates the existing and surrounding zoning. 4. Section 1702.2.3 Developmental impact Study (a) A traffic analysis shall be submitted for an area within approximately 1/4-mile of the site, or an area including the major intersections to be impacted by the site, whichever is larger. The Traffic Impact estimates are included under Tab N of the Supporting Documents. The transportation engineer's conclusion is that the traffic generated will not degrade the existing level of service. (b) Economic impact data shall be provided, including estimates for construction costs, construction employment and permanent employment and shall demonstrate that the Page 7 proposed development is favorable to the economy, public services, environment and housing supply of the City. The Economic Impact Study is included under Tab P of the Supporting Documents. (c) A housing impact assessment. In recent years there has been a strong demand for urban housing in the City of Miami. It is clear that people are moving from the suburbs back to the inner city and its surrounding areas. This has created a shortage of multi -family housing along with an upward surge of housing prices. Contrastingly, the costs of construction have not kept pace with these increases, which have made it economically affordable to construct new buildings for sale. Portico will provide additional housing with a range of prices to satisfy the demand for new condominiums and town homes in the City of Miami. Page 8