HomeMy WebLinkAboutIII.2 - Traffic Impact Analysis• • January 5, 2005 Ms. Lilia I. Medina, AICP Assistant Transportation Coordinator City of Miami, Office of the City Manager/Transportation 444 SW 2nd Avenue (10th Floor) Miami, Florida 33130 Re: Miami Rivertown Sufficiency Letter — W.O. # 90 Dear Ms. Medina: Via Fax and US Mail Subsequent to our December 3rd, 2004 review comments for the subject project, we have received a revised traffic impact report along with a formal response to our comments from David Plummer and Associates (DPA) on December 281h, 2004. A copy of the response letter is attached herewith. We have reviewed the revised study. All four of the original review comments have been adequately addressed. At this time, we conclude that the revised traffic impact report along with the revisions meet the traffic requirements and the report is found to be sufficient. Should you have any questions, please call Quazi Masood or me at 954.739.1881. Since U o : tion Southern Raj Shanmu Se or Traffic Engineer cc: Mr. Kevin Watford, Planner I, City of Miami Ms. Rita Carbonell, David Plummer & Associates (Fax: 305.444.4986) Attachment: URS Corporation Lakeshore Complex 5100 NW 33rd Avenue, Suite 15D Fort Lauderdale, FL 33309.8375 Tel: 954.739.1881 Fax: 954.739.1789 03/23/2005 11:22 3054444986 DAVID PLLJMMERANDASSO PAGE 02 • • • DAVID PLUMMER & ASSOCIATES TRANSPORTATION • CM. • STRUCTURAL • ENVIRONMENTAL March 22, 2005 Ms. Vicky Garcia -Toledo Bilzin, Sumberg, Baena Price & Axelrod, LLP 200 South Biscayne Boulevard, Suite 2500 Miami, Florida 33131-2338 RE: Miami Rivertown- #04234 1750 PONCE DE LEON BOULEVARD CORAL GABLES. FLORIDA 33134 305 447-0900 FAX: 305 444498d Email: d4oitdplummeroom Dear Ms. Garcia -Toledo: The Miami Rivertown project is a proposed mixed -use development located south of North River Drive between NW 15 Avenue and NW 14 Avenue in Miami, Florida. As part of this project, a traffic study was done and approved by the city for 1,002 residential units, 47,558 SF of retail, 97,819 SF of office and 1,771 parking spaces. However, the development program has changed slightly, some uses decreased while others increased. The new development program consists of 985 residential units, 51,045 SF of retail space, 94,521 SF of office space and 1,866 parking spaces. These proposed changes to the development program are negligible. Therefore, the results from the previous traffic study remain valid. The project trip generation for the previous and the revised development program was reviewed. Trip generation conclusions for both programs are included in Attachment A. The difference in gross vehicular trips for the two development programs is summarized in Exhibit 1. Exhibit 1 Difference in Gross Vehicular Trips PM Peak Hour In 'Out Total Previous Program e 329 368 4 697 Current Program 328 369 697 Difference -1 1 0. % Difference <-1% <1% 0% Should you have any questions, please call me at 305-447-0900. Sincerely, anion Alvarez, PFE Senior V.P. — General Manager cc: Pamela Austin, Aris Garcia, file Attachments trip gen letter.dac CORAL GABLES • PORT MYERS • FORT LAUDERDALE 4—Fa 03/23/2005 11:22 3054444986 DAVID PLUMMERANDASSO PAGE 03 • • Attachment A • • • Exhibit 8 PM Peek Hour Trip Generation Analysis USES UNITS • ITE Land Use Coda PM PEAK HOUR TRIPS IN OUT TOTAL % Tripe % Trips Trips High -Rise Condominiums 1,002 DU 232 62% 240 38% 140 380 Specialty Retail 47,558 SO. FT. 814 44% 57 56% 72 129 General Office 97,819 SO. FT. 710 17% 32 83% 156 188 GROSS VEHICLE TRIPS 47% 329 53% 366 697 Vehicle Occupancy AdJusbnent 0 16.00% of Gross External Trips (1) 47% 53 53% 59 112 Trans/Trip Reduction 0 15.00% of Gross External Trips (2) 47% 49 53% 55 105 Pedestrian / Bicycle Trip Reduction G 10.00% of Gross External Trips (3) 47% 33 53% 37 70 NET EXTERNAL VEHICLE TRIPS , 47% 194 53% 217 411 Net External Person Trips in Vehides 0 1.40 Persons/ Vehicle 47% 272 53% 304 • 578 Net Extemal Person Trips using Transit 0 1.40 Persons/Vehicle 47% 69 53% 77 146 Net External Person Trips {vehicles and transit modes) 47% 341 53% 381 722 Net External Person trips walking i using bicycle 1.40 Personal Vehicle 47% 46 53% 52 98 Notae (1) A 16% reduclion 10 adiust for the difference between ITE auto occupancy and local data (frAami's 1.4 vi. ITE's 1.2 perslveh) (2) Transit trip reduction based on close prcodrnity to Civic Center and Same Clara Metroraf Stallone and other available transit (3) Pedestrian and bicycle trip reductions based on engineering Judgement. 500Z/EZJ£0 986017171750E OSSCQNC63WW01d QIACQ • • Exhibit 8 (March 22, 2005) PM Peak Hour Trip Generation Analysis USES UNITS RE Land Use Code PM PEAK HOUR TRIPS IN OUT TOTAL % Trips % Trips 'Dips High -Rise Condomidums 986 DU 232 62% 236 38% 138 374 Specialty Relali 51,045 SO. FT. 814 44% 61 56% 78 139 General Office 94,521 SQ. FT. 710 17% 31 83% 153 184 GROSS VEHICLE TRIPS 47% ., 328 53% 369 697 Vehicle Occupancy Adjustment • 16.00% of Gross External Tdps (1) 47% 52 59% 59 112 Transit Trip Reduction • 15.00% of Gross Exlemai Traps (2) 47% • 49 53% 55 105 pedestrian / Bicycle Tdp Reduction • 10.00% of Gross External Trips () 47% 33 539E 37 70 NET EXTERNAL VEHICLE TRIPS 47% .8. 194 53% 218 411 Net External Person Trips in Vehicles • . 1.40 Persons/ Vehicle 47% 271 53% 305 576 Net External Person Trips using Trenslt • 1.40 Persons/ Vehicle 47% 69 53% 77 146 Net External Person Trips (vehicles and transit modes) 47% w 340 53% 382 722 s Net External Person idps waking / using bicycle 1.40 Persons/ Vehicle 47% 46 , 53% 52 99 NOM (1) A 18%i reduction to adjust forihe difference between tTE auto occupancy and local data (Miami's 1,4 vs. ITE's 1.2 pers/veh) (2) Transit trip reduction based on close proximity to Civic Center and Santa Mara Metroral Stations and other avaiable transit (3) Pedestrian and bicycle trip reductions based on engineering Judgement. 900Z/EVE0 9B60000g0E OSSVQNdd314W01d QIAvc Miami Rivertown Major Use Special Permit Traffic impact Study Prepre bye .x ,, David Plummer :& Associates, Inc. October:20,04 IPA Project 'r„ • • Miami Rivertown MUSP Traffic Impact Study TABLE OF CONTENTS Pare List of Exhibits ii EXECUTIVE SUMMARY 1 1.0 INTRODUCTION 2 1.1 Study Area 2 1.2 Study Objective 4 2.0 EXISTING TRAFFIC CONDITIONS 5 2.1 Data Collection 5 2.1.1 Roadway Characteristics 5 2.1.2 Traffic Counts 5 2.1.3 Intersection Data 6 2.2 Corridor Capacity Analysis 9 2.3 Intersection Capacity Analysis 11 3.0 PLANNED AND PROGRAMMED ROADWAY IMPROVEMENTS 13 4.0 FUTURE TRAFFIC CONDITIONS 14 4.1 Background Traffic 14 4.2 Committed Developments 14 4.3 Project Traffic 16 4.3.1 Project Trip Generation 16 4.3.2 Project Trip Assignment 18 4.4 Future Corridor Capacity Analysis 20 4.5 Future Intersection Capacity Analysis 20 4.6 Site Access 24 5.0 CONCLUSIONS 25 Appendix A: Appendix B: Appendix C: Appendix D: Appendix E: Appendix F: Approved Transportation Methodology & Site Plan Traffic Counts & Signal Timing FDOT' s Quality/LOS Handbook — Generalized Tables Metrobus Transit Ridership Intersection Capacity Analysis Worksheets Committed Development Information Traffic Control Measures Plan Page i • Miami Rivertown MUSP Traffic Impact Study LIST OF EXHIBITS Exhibit Page 1 Location Map 3 2 2004 PM Peak Hour Traffic Volumes 7 3 Existing Lane Configurations 8 4 Existing Corridor and Transit Conditions 10 5 Person -trip Volume and Capacity — Existing Conditions Matrix 12 6 2004 Intersection Capacity Analysis Results 11 7 Future PM Peak Hour Traffic Volumes without Project 15 8 PM Peak Hour Project Trip Generation 17 9 Cardinal Distribution 18 10 PM Peak Hour Project Vehicular Trips Assignment 19 11 Person -trip Volume and Capacity — Future Conditions Matrix 21 12 Project PM Peak Hour Vehicular Volumes 22 13 Future with project PM Peak Hour Vehicular Volumes 23 14 Future Intersection Capacity Analysis 20 Page ii Miami River -town MUSP Traffic Impact Study EXECUTIVE SUMMARY The Miami Rivertown project is a proposed mixed -use development located south of North River Drive between NW 15 Avenue and NW 14 Avenue in Miami, Florida. The project consists of approximately 1,002 residential units, 47,558 SF of retail space, and 97,819 SF of office space. Primary access to the site is proposed on NW 15 Avenue via a two-way driveway. A second driveway to the site is located to the west of NW 15 Avenue on North River Drive. Build out of the project is anticipated by the year 2008. The subject site is located outside the boundaries of the Downtown Miami Area -wide DRI. Existing and future traffic conditions for the project area corridors were established using the person -trip based corridor capacity method. This method, consistent with the City's Comprehensive Plan, promotes improved transportation efficiency through increased private vehicle occupancies and makes mass transit a full partner in the urban transportation system. Analysis results show that the project area corridors are projected to operate within the established corridor threshold. The intersection capacity analysis was performed at the intersections under study using vehicular volumes and the Highway Capacity Software (HCS), based on the procedures of the 2000 Highway Capacity Manual. Results of the future intersection analysis show that all intersections operate within the standard adopted by the City. Page I Miami Rivertown MUSP Traffic Impact Study • 1.0 INTRODUCTION The Miami Rivertown project is a proposed mixed -use development located south of North River Drive between NW 15 Avenue and NW 14 Avenue in Miami, Florida (see Exhibit 1). The project consists of approximately 1,002 residential units, 47,558 SF of retail space, and 97,819 SF of office space. Primary access to the site is proposed on NW 15 Avenue via a two-way driveway. A second driveway to the site is located to the west of NW 15 Avenue on North River Drive. A copy of the site plan is included in Appendix A. Build out of the project is anticipated by the year 2008. The subject site is located outside the boundaries of the Downtown Miami Area -wide DRI. 1.1 Study Area Consistent with the approved methodology for this project (see Appendix A) the traffic study was performed for PM peak conditions. For traffic analysis purposes, the study area has been defined as NW 20 Street to the north, Miami River to the south, NW 17 Avenue to the west, and NW 12 Avenue to the east. Corridor capacity analysis was performed for NW 12 Avenue and NW 17 Avenue. Intersection capacity analysis was performed for the following intersections: • North River Drive / NW 14 Avenue • NW 14 Street / NW 14 Avenue • North River Drive / NW .17 Avenue Page 2 W ti 0 PROJ ECT SITE NW 7 ST N.T.S. W JACKSON MEMORIAL HOSPITAL NW 14 ST PROJECT. MIAMI RIVERTOWN MUSP TRAFFIC IMPACT STUDY TITLE. LOCATION MAP Page 3 Miami Rivertown MUSP Traffic Impact Study 1.2 Study Objective The objective of this traffic study is to assess possible PM peak hour impacts on the project area corridors using the person -trip corridor capacity method. This method is designed to meet the challenges posed by Florida's growth management laws: to promote compact urban development, discourage suburban sprawl and improve urban mobility. The method is consistent with the City's Comprehensive Plan and promotes improved transportation efficiency through increased private vehicle occupancies, thus making mass transit a full partner in the urban transportation system. Page 4 Miami Rivertown MUSP Traffic Impact Study • • 2.0 EXISTING TRAFFIC CONDITIONS 2.1 Data Collection Data collection for this study included roadway characteristics, intersection data, intersection volumes, and signal timing. The data collection effort is described in detail in the following sections. 2.1.1 Roadway Characteristics NW 12 Avenue NW 12 Avenue (SR 933) is a major arterial that provides north/south access throughout the City of Miami from the northern limits of the city to Coral Way (SW 22 Street). Within the project limits, NW 12 Avenue is a two-way, four -lane divided roadway. Exclusive left turn lanes are provided at major intersections. On -street parking is prohibited. The posted speed limit is 35 mph. NW 17 Avenue NW 17 Avenue is a local roadway that provides north/south access within the study area. It is a two-way, two-lane undivided roadway. On -street parking is prohibited and there are no posted speed limit signs within the study area. 2.1.2 Traffic Counts Consistent with the methodology submitted to and approved by the City, peak period vehicle turning movement counts and 24-hour directional counts were collected at the intersections and segments under study. Seasonal adjustment factors were obtained from the Florida Department of Transportation (FDOT). Traffic counts are included in Appendix B. Exhibit 2 shows the adjusted 2004 PM peak season, peak hour period traffic volumes at the study intersections. Page 5 Miami Rivertown MUSP Traffic Impact Study 2.1.3 Intersection Data A field survey was conducted to determine the lane configurations for the roadways and intersections under study. Existing signal timing data was obtained from Miami -Dade County for the analyzed intersection. Signal information is included in Appendix B. This information provided the signal phasing and timing used in the intersection capacity analysis. Exhibit 3 shows the existing lane configurations for the intersections and roadways studied. Page 6 t 19 -.-117 18 4 120 - 215 —► \ 214—,4,-"" 9 r co 447 - — 40 f• -43 NW 14 AVE L NW 15 AVE it/� L NW 17 AVE PROJECT4 MIAMI RIVERTOWN MUSP TRAFFIC IMPACT STUDY TITLE; EXISTING PM PEAK TRAFFIC VOLUMES EXHIBIT No. Page 7 2 • dPa PROJECT. MIAMI RIVERTOWN MUSP TRAFFIC IMPACT STUDY TITLE. EXISTING LANE CONFIGURATION Page 8 3 Miami Rivertown MUSP Traffic Impact Study • • 2.2 Corridor Capacity Analysis Existing traffic conditions for the project area corridors have been established using the person - trip based corridor capacity method. The methodology for this analysis is outlined in the Miami Comprehensive Neighborhood Plan. The existing traffic conditions analysis identifies the person -trip volumes and person -trip capacities of the corridors, establishes existing person -trip usage and identifies whether or not person -trip deficiencies exist. An adopted standard of LOS E applies to the transportation corridors as measured by the person -trip method. The existing conditions analysis establishes the multi -modal corridor conditions within the project area. The person -trip capacities and volumes for the study corridors have been developed consistent with the approved methodology for this project as described below: Person -Trip Volumes Link volumes collected were adjusted to peak season traffic conditions using seasonal adjustment factors provided by FDOT. Peak hour maximum service volumes were obtained from FDOT's 2002 Quality/Level of Service Handbook Transit (metrobus) ridership and capacity data was obtained from Miami Dade County. Fixed rail (metrorail) ridership and capacity was obtained from Increment II of the Downtown Miami Area -wide DRI. An analysis of existing vehicle roadway and transit conditions is shown in Exhibit 4, supporting information included in Appendix C. Person -Trip Capacity Vehicle occupancy for the person -trip capacity calculations is based upon a comprehensive study performed for the City of Miami. The vehicle occupancy factor of 1.6 persons per vehicle is approved for use as the practical capacity of a private passenger vehicle to determine the person - trip capacity of the vehicular traffic system. The bus capacity for each corridor was determined based on the number of transit vehicles per hour and the person -trip capacity of each transit vehicle. Page 9 • Exhibit 4 Existing Corridor and Transit Conditions Corridor From To Roadway Conditions (vehicles) Transit Conditions (persons) " Dir Existing Lanes Count Sourced Period . Raw PM • Peak Hour Volume Peak Season Factor PM Peak Hour Volume Dir Max Service " Volume [1) Total Bus Ridership [2] Bus Capacity 12] Total Motorail Ridership [3] Motorail Capacity [4] Total Metromover Ridership Metromover Capacity Total Transit Ridership Transit Capacity NW 12 AVENUE N RIVER DRIVE NW 20 STREET NW 17 AVENUE N RIVER DRIVE NW 20 STREET NB SB NB SB 2LD 2LD 1LU 1LU DPA - PM DPA - PM DPA - PM DPA - PM 1147 768 572 522 1.01 1.01 1.01 1.01 1158 776 578 527 1660 1660 810 810 40 37 0 0 472 472 0 0 684 . 1384 0 0 2925 2925 0 0 0 0 0 0 0 0 0 0 724 1421 0 0 3397 3397 0 0 Notes: [1] Peak Hour Directional Maximum Service Volumes are obtained from FDOTs Quality/Level of Service Handbook. [2] Transit and roadway information obtained from Miami -Dade County (see Appendix C). [3] Peak person trip assign to each Ilnk reflects only 50% of the total ridership consistent with Downtown Miami DRI Increment II methodology. [4) Peak person trip assigned to each Iink reflects only 50% of the total capacity consistent with Downtown Miami DRI Increment II methodology. Miami Rivertown MUSP Traffic Impact Study • Available Person -Trip Capacity The available person -trip capacity for each corridor is shown in Exhibit 5 based on the following: Person -trip capacity — Person -trip volume = Available Person -trip capacity. A general level of service designation is provided for each study corridor based on the calculated available person -trip capacity. A person -trip level of service look -up table was developed based on the ratios derived from the FDOT's 2002 Quality/Level of Service Handbook (see Appendix C). Based upon the person -trip evaluation for existing traffic conditions, no study corridor operates below the acceptable "person -trip" level of service standards. 2.3 Intersection Capacity Analysis The intersection capacity analysis was performed using vehicular volumes and the Highway Capacity Software (HCS), based on the procedures of the 2000 Highway Capacity Manual. Exhibit 6 shows the resulting LOS for existing conditions at the intersections under study, analysis worksheets are included in Appendix D. All three intersections operate within the standard adopted by the city. Exhibit 6 2004 Intersection Capacity Analysis Weekday PM Peak Hour Conditions Intersection SIU Existing LOS North River Drive / NW 14 Avenue S B NW 14 Street / NW 14 Avenue S D North River Drive / NW 17 Avenue S C Notes : U= unsignalized S= signalized Source: DPA Page 11 Exhibit 5 Person -Trip Volume and Capacity Existing Conditions Matrix Corridor From To Roadway Mode Transit Mode Segment Total Dir (a) Roadway Vehicular Capacity (b) Pers-Trlp Capacity @PPV=1.6 (a) * 1.6 (c) Roadway Vehicular Volume (d) Pers-Trlp Volume 0 PPV=1.4 (c)' 1.4 (e) Excess Pers-Trip Capacity (b) - (d) (t) Total Pers-Trip Capacity (9) Total Pers-Trip Volume (h) Pens -Trip Excess Capacity M7(g) (i) Segment Pers-Trip Capacity (b)+(t) (i) Segment Pen: -Trip Volume (d)+(g) (k) Peps -Trip Excess Capacity (i)-(1) U) Segment Person Trip v/c (j)/(i) LOS NW 12 AVENUE N RIVER DRIVE NW 20 STREET NW 17 AVENUE N RIVER DRIVE NW 20 STREET NB SB NB SB [1] 1660 1660 810 810 (2] 2656 2656 1296 1296 131 1158 776 578 527 [4] 1622 1086 809 738 1034 1570 487 558 [5] 3397 3397 0 0 [6] 724 1421 0 0 2673 1976 0 0 6053 6053 1296 1296 2346 2507 809 738 3707 3546 487 558 0.39 0.41 0.62 0.57 In C D D C Notes: [1 ] The Roadway Vehicular Capacity is obtained from Exhibit 4. [2] Person -Trip capacity is derived by applying a 1.6 vehicle occupancy to the vehicular capacity. [3]) The Roadway Vehicular Volume is obtained from Exhibit 4. [4] Person -Trip Volume is derived by applying a 1.4 vehicle occupancy to the vehicular capacity. [5] The Total Transit Person -Trip Capacity is obtained by adding bus, metrorall and metromover capacities (see Exhibit 4). [6] The Total Transit Person -Trip Volume is obtained by adding bus and metromover volumes (see Exhibit 4). [7] The Person Trip LOS is provided consistent with the FDOTs Quality/Level of Service Handbook (see Appendix C). Miami Rivertown MUSP Traffic Impact Study • 3.0 PLANNWD AND PROGRAMMED ROADWAY IMPROVEMENTS The 2004 Miami -Dade County Transportation Improvement Program (TIP) and the 2025 Metro - Dade. Transportation Plan Long Range Element, were reviewed to identify any programmed or planned projects within the limits of the study area established. These documents show no officially programmed or planned capacity improvement projects within the study area prior to completion of the proposed project. Page 13 Miami Rivertown MUSP Traffic Impact Study • 4.1 Background Traffic • • 4.0 FUTURE TRAFFIC CONDITIONS Consistent with other traffic studies performed in the area, a conservative 0.5 percent growth factor was applied to existing traffic volumes. This growth rate is intended to account for future growth due to additional developments that have not been identified at this time but occur within the study period. 4.2 Committed Developments A list of projects was obtained from city staff, City of Miami Planning and Zoning Department Report on Private Development From 1996 to Present (Updated through October 2004). These projects are approved and are either under construction or about to break ground. Other projects are approved by City Commission but with no building permits, or in the application stage. The only project in the vicinity of Miami Rivertown is New Miami City View Apartments. The project size and trip generation is included in Appendix E. Traffic generated by this development was distributed using the Cardinal Distribution from the appropriate TAZ. For estimating trip distribution for the committed project, consideration was given to conditions such as the roadway network, roadway available to travel in the desired direction and attractiveness of traveling on a specific roadway. This information and a matrix showing volumes from the committed development is also included in Appendix E. Future traffic volumes were projected for the build -out year 2008. Exhibit 7 shows the projected turning movement volumes without the project. Page 14 NW14AVE In r Nr K— 4 H co 57-J 466 —► . 42—I 28 219 —► 62 —t NW 15 AVE NW17AVE i PROJECT. MIAMI RIVERTOWN MUSP TRAFFIC IMPACT STUDY TITLE. FUTURE WITHOUT PROJECT PM PEAK TRAFFIC VOLUMES EXHIBIT No. 7 Page 15 Miami Rivertown MUSP Traffic Impact Study • 4.3 Project Traffic 4.3.1 Project Trip Generation Project trip generation will be based on the calculation of person -trips consistent with the City of Miami Comprehensive Plan. Person -trips generated by the project were established using Increment II of the Downtown DRI as a guideline together with the approved methodology: • The gross vehicular trip generation for each land use was determined using the Institute of Transportation Engineers (ITE) Trip Generation rates or formulas. • Gross vehicular trips were reduced by 16% based upon the use of the ITE trip rates (City of Miami's 1.4 vs. ITE's 1.2 pers/veh). • Gross vehicular trips were reduced by 15% to reflect transit usage based on close proximity to Civic Center and Santa Clara Metrorail Stations and other available transit. • Gross vehicular trips were also reduced by 10% for pedestrian/bicycle. • The net external vehicle trips were converted to person -trips using 1.4 persons per vehicle pursuant to City standards. • The vehicular trips assigned to transit were converted back to person -trips using 1.4 persons per vehicle pursuant to City standards. • The net external person -trips were obtained by adding together the project net external person -trips for the vehicle and transit modes. A trip generation summary for the project is provided in Exhibit 8. Page 16 • Exhibit 8 PM Peak Hour Trip Generation Analysis USES UNITS PM PEAK HOUR TRIPS ITE Land Use Code IN OUT TOTAL % Trips % Trips Trips High -Rise Condominiums 1,002 DU 232 62% 240 38% 140 380 Specialty Retail 47,558 SQ. FT. 814 44% 57 56% 72 129 General Office 97,819 SQ. FT. 710 17% 32 83% 156 188 GROSS VEHICLE TRIPS 47% 329 53% 368 697 Vehicle Occupancy Adjustment 0 16.00% of Gross External Trips (1) 47% 53 53% 59 112 Transit Trip Reduction 0 15.00% of Gross External Trips (2) 47% 49 53% 55 105 Pedestrian / Bicycle Trip Reduction 0 10.00% of Gross External Trips (3) 47% 33 53% 37 70 NET EXTERNAL VEHICLE TRIPS 47% 194 53% 217 411 Net External Person Trips in Vehicles 0 1.40 Persons/ Vehicle 47% 272 53% 304 576 Net External Person Trips using Transit 0 1.40 Persons/ Vehicle 47% 69 53% 77 146 Net External Person Trips (vehicles and transit modes) 47% 341 53% 381 722 Net External Person trips walking / using bicycle 1.40 Persons/ Vehicle 47% 46 53% 52 98 Notes (1) A 16% reduction to adjust for the difference between ITE auto occupancy and local data (Miami's 1.4 vs. ITE's 1.2 pers/veh) (2) Transit trip reduction based on close proximity to Civic Center and Santa Clara Metrorail Stations and other available transit. (3) Pedestrian and bicycle trip reductions based on engineering judgement. Miami Rivertown MUSP Traffic Impact Study • • 4.3.2 Proiect Trip Assignment Project traffic was distributed and assigned to the study area using the Cardinal Distribution for TAZ 477, shown in Exhibit 9. The Cardinal Distribution gives a generalized distribution of trips from a TAZ to other parts of Miami -Dade County. For estimating the trip distribution for the project location, consideration was given to conditions such as the roadway network accessed by the project, roadways available to travel in the desired direction, and attractiveness of traveling on a specific roadway. Exhibit 10 shows the project vehicular trip assignment to the impacted roadway segments and intersections. Exhibit 9 Cardinal Distribution of Trips TAZ 477 Cardinal Direction Distribution TAZ 477 NNW 19.44% ENW 7.05% ESE 10.82% SSE 3.92% SSW 13.34% WSW 17.74% WNW 17.09% NNW 14.60% Total 100.00% Page 18 NW12AVE %0 L --0— /\, CO N H co to 15% -->.- e NW 14 AVE NW 15 AVE NW 17 AVE co 4 59 -�— 55% PROJECT: MIAMI RIVERTOWN MUSP TRAFFIC IMPACT STUDY TITLE PROJECT TRIP ASSIGNMENT Page 19 10 Miami Rivertown MUSP Traffic Impact Study 4.4 Future Corridor Capacity Analysis The existing person -trip volumes were combined with the committed development and background growth person -trips to obtain the total year 2008 person -trip volume without project. The net external project person -trips were then added to get the future person -trip volumes with project. These volumes were compared to the future person -trips capacities to determined future level of service. The future person -trip volume and capacity matrix is shown in Exhibit 11. All corridors analyzed are projected to operate within the established LOS E threshold. 4.5 Future Intersection Capacity Analysis Background growth and committed development trips were combined with the adjusted 2004 existing traffic to get the total year 2008 vehicular traffic without project on the study intersections. The project trips were then added to obtain the future with traffic volumes. Exhibit 12 shows the project PM peak hour vehicular volumes and Exhibit 13 shows the total (with project) PM peak hour vehicular volumes at the intersections under study. Results of the future intersection analysis show that all intersections will operate within the LOS E standard adopted by the city. Exhibit 14 shows the resulting LOS at the intersections under study. Intersection capacity analysis worksheets are provided in Appendix D. Exhibit 14 Future Intersection Capacity Analysis Weekday PM Peak Hour Conditions Intersection S/U Future Without Project Future With Project North River Drive / NW 14 Avenue S B B NW 14 Street / NW 14 Avenue S D D North River Drive / NW 17 Avenue S C C Notes : U= unsignalized S= signalized Source: DPA Page 20 b r. a y Exhibit 11 Person -Trip Volume and Capacity Future Conditions Matrix Corridor From To Without Project With Project Dlr (a) Existing Pers-Trip Volumes (b) Future Bkg. Pers-Trip 0.5% 4 (c) Committed Development Pers-Trip (d) Future Pers-Trip Volumes (b)+(c) (e) Future Pers-Trip Capacity (f) Future w/out Proj Pers-Trip (9) Project Pers-Trip Volume (h) Total Pers-Tdp Volumes (d)+(g) a) Future Pers-Trip Capacity a) Future with Proj Pers-Trip v/c (d)/(e) LOS v/c (h)/(I) LOS [1l 121 [3] [4] [5] [3) [4] NW 12 AVENUE N RIVER DRIVE NW 20 STREET NB 2346 2393 -3 2396 6053 0.40 D 38 2434 6053 0.40 D SB 2507 2557 6 2563 6053 0.42 D 34 2597 6053 0.43 D NW 17 AVENUE N RIVER DRIVE NW 20 STREET NB 809 825 5 830 1296 0.64 D 57 887 •1296 0.68 D SB 738 753 8 761 1296 0.59 C 51 812 1296 0.63 D Notes: [1 ] The Existing Person Trip Volume Is obtained from Exhibit 5, column W. [2] Year 2006 Background Person Trip Volume Is derived by applying a 2% growth factor to the existing person -trip volume. [3] The Total Future Peak Hour Person Trip Capacity Is obtained by adding all modes of transportation (Exhibit 5, column (i)) [4] The Person Trip LOS is provided consistent with the FDOT's Quality/Level of Service Handbook (see Appendix C). [5] Project Person Trip Volumes are derived from Trip Generation Analysis (Net External Person Trips (Vehicles + Transit)). •. 0) 29� NW 14 AVE (22) "ro--(11) �— (22) �(1636 15 AVE a �r EON NW 17 AVE m N cr 1 PROJECT, MIAMI RIVERTOWN MUSP TRAFFIC IMPACT STUDY TITLE, PM PEAK PROJECT TRAFFIC VOLUMES EXHIBIT No. 12 Page 22 • 2 122 —1 219 218 23 —� r NW 14 AVE AN\dg,% 482 F—140 co en 28 -4 219 62� a ry 4)ry / 11 22 '`— 163NW 15 AVE NW 17 AVE co N 86 -J 466 —0— 42 —� PROJECT, MIAMI RIVERTOWN MUSP TRAFFIC IMPACT STUDY T(TLEi FUTURE WITH PROJECT PM PEAK TRAFFIC VOLUMES EXHIBIT No. 13 Page 23 Miami Rivertown MUSP Traffic Impact Study • 4.6 Site Access Primary access to the site is proposed on NW 15 Avenue via a two-way driveway. A second driveway to the site is located to the west of NW 15 Avenue on North River Drive. The two driveways are accessible via a proposed connector street running through the center building. Build out of the project is anticipated by the year 2008. No conflicts will occur with proposed driveways. The project trips were assigned to the driveways and analyzed. HCS analyses for the project driveways show adequate operations. The analysis worksheets are included in Appendix D. Page 24 Miami Rivertown MUSP Traffic Impact Study • 5.0 CONCLUSIONS An assessment of the PM peak hour traffic associated with the development of Miami Rivertown was performed in accordance with the approved methodology submitted to the city. Analysis of future (2008) traffic conditions with the project during the PM peak hour shows that the City of Miami's adopted Level of Service standards will not be exceeded. Adequate capacity during the PM peak hour is available to accommodate the proposed project trips within the study area at the intersections and on the transportation corridor segments analyzed. A traffic control measures plan has been developed for this project. The plan is included in Appendix F. musp 110904.doc Page 25 • • • Appendix A Approved Transportation Methodology Site Plan • • • DAVID PLUMMER & ASSOCIATES, INC. TRANSPORTATION • CIVIL • STRUCTURAL • ENVIRONMENTAL To: Affiliation: From: RE: cc: Facsimile Transmission Mr. Raj Shanmugam, PE URS Corporation Juan Espinosa, PE Miami Rivertown - #04234 1 Fax #: Phone #: Date: Pages: Lilia Medina, Ed Woodbury, Steven Stattner; file (954) 739-1789 (954) 739-1881 October 5, 2004 3 page(s), including cover REVISED — OCTOBER 6, 2004 Integrated Property Services is pursuing approvals for a mixed use project located on North River Drive west of NW 14 Avenue in Miami, Florida. The project consists of approximately 585 residential dwelling units, 63 townhomes, 97,000 SF of office space, 47,000 SF of retail space and 1,620 parking spaces. Access to the site is proposed on North River Drive, please see attached site plan. The study area is NW 20 Street to the north, NW 17 Avenue to the west, NW 12 Avenue to the east and the Miami River to the south. The subject site is located outside the limits of the Downtown Miami Area -wide DRL This will serve as our methodology for the subject MUSP traffic impact study. • Turning movement traffic counts are to be collected during the PM (4:00-6:00) peak period at four major intersections in the immediate project vicinity. 1. North River Drive / NW 14 Avenue (signalized) 2. NW 14 Street / NW 14 Avenue (signalized) 3. North River Drive / NW 17 Avenue (signalized) In addition to these intersections, we will analyze the project driveways. • Segment traffic volumes will be collected as 24-hour machine counts at the following locations: 1. NW 12 Avenue between North River Drive and NW 20 Street 2. NW 17 Avenue between North River Drive and NW 20 Street • Available Florida Department of Transportation (FDOT) counts will be consulted where appropriate. • Raw traffic counts will be adjusted to peak season (for the peak hour period). • The signal timing and phasing at the study signalized intersections will be obtained from Miami -Dade County. • Existing and future traffic conditions for the project area corridors (South Miami Avenue and Coral Way) will be established using the person -trip method. The methodology for this method is outlined in the Miami 1750 PONCE DE LEON BOULEVARD CORAL GABLES, FLORIDA 33134 TELEPHONE: 305 447-0900, FAX: 305 444-4986 E-MAIL: dpa@dplummer.com • • Comprehensive Neighborhood Plan. Rubber tire and fixed rail transit capacity of the study corridors will be established based on available information from Increment II of the Downtown DRI. • Corridor capacity will be estimated using generalized vehicular capacities (converted to person -trips) from the Downtown DRI, FDOT LOS Manual, or other acceptable equivalent. • Project Traffic — project trip generation will be based on the calculation of person -trips consistent with the city of Miami Comprehensive Plan. Person -trips generated by the project will be established using the following procedure: • Determine the gross vehicular trip generation for each land use using the Institute of Transportation Engineers (ITE) Trip Generation rates or formulas. • Reduce gross vehicular trips by a vehicle occupancy adjustment based upon the use of the ITE trip rates (City of Miami's 1.4 vs. ITE's 1.2 pers/veh). • Reduce gross vehicular tries by a transit reduction based on projected modal splits from MDT transit data. • Reduce gross vehicular trips by a pedestrian/bicycle reduction based on estimates from Miami -Dade County data, engineering judgment or other acceptable equivalent. • Establish the net external vehicle trips. • Convert the net external vehicle trips to person -trips using 1.4 persons per vehicle pursuant to City standards. • Convert the vehicular trips assigned to transit back to person -trips using 1.4 persons per vehicle pursuant to City standards. • Add together the project net external person -trips for the vehicle and transit modes. • Background Traffic. A growth factor consistent with historical annual growth in the area will be applied to the existing traffic volumes. • Committed Developments. Will be based on list of relevant projects provided by the city that fall within the established study area. Committed development trips will also be converted to person -trips based on the methodology described above. • Highway Capacity Software (HCS) based on the 2000 Highway Capacity Manual (HCM) will be used for existing and future intersection capacity analysis. Project and committed development net external vehicle trips (adjusted for transit, pedestrian and occupancy as described above) will be used for the intersection capacity analysis. Intersection capacity analyses will be performed at the four study intersections and the proposed project driveways. • Trip Assignment. Net new external project traffic will be assigned to the adjacent street network using the appropriate cardinal distribution from the Metro -Dade Long Range Transportation Plan Update, published by the Metropolitan Planning Organization. Normal traffic patterns will also be considered when assigning project trips. If you have any questions you can contact me at (305) 447-0900. traffic_mett_fax_rev.doc 0. ---- 1750 PONCE DE LEON BOULEVARD CORAL GABLES, FLORIDA 33134 TELEPHONE: 305 447-0900, FAX 305 444-4986 E-MAIL: dpa@dplummer.com dPa „y-/ 10'-0” Setback ti�iEiGicrteii2i■.e�z■rLimmEilra*aaweneek A■*illh Ground Floor / Site Plan ANTUNOVICH ASSOCIATES Architects Planners 224 West Huron Street 312,266.1126 Chicago. Illinois 60610 Fax 312.266.7123 urf - :rklag 40,f p ' 444%1,., frig , PHAS PHASE III 0 15 30 60 September 20, 2004 WOLFBERG °RTY SERVICES Architects 1500 San Remo Avenu Coral Gables, Florida ' 305.666.5474 Fax 305.669.9875 McCAFFERY INTERESTS Developers 737 N. Michigan Ave. 312.944.3777 Chicago, Illinois 60611 Fax 312.944.7107 A2.01 Appendix B Traffic Counts Signal Timings Raw Traffic Counts • • Traffic Survey Specialists, Inc. 624 Gardenia Terrace Delray Beach, Florida 33444 Phone (561) 272-3255 Volume Report with 24 Hour Totals Page 1 k***************************************************************************** Data File : D1014002.PRN Station : 000000101301 Identification : 000110252076 Interval : 15 minutes Start date : Oct 14, 04 Start time : 00:00 Stop date : Oct 14, 04 Stop time : 24:00 City/Town : Miami, FL County : Dade Location : NW 12th Avenue Btwn NW 17th & 18th Sts ******************************************************************************* Oct 14 Northbound Volume for bane 1 End Time 00 01 02 03 04 05 06 07 08 09 10 11 ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- 15. 59 25 17 19 14 38 86 151 185 158 230 213• 30 29 27 21 17 17 50 100 177 187 184 178 192 45 30 22 22 10 23 71 137 231 207 173 197 209 00 34 15 8 17 30 75 180 234 168 143 176 234 ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- Hr Total 152 89 68 63 84 234 503 793 747 658 781 848 End Time 12 13 14 15 16 17 18 19 20 21 22 23 15 192 201 237 254 306 326 190 175 134 93 75 86 30 203 177 259 263 306 283 215 162 103 76 64 79 45 256 235 243 323 346 243 193 162 80 67 69 87 00 197 198 214 343 266 217 165 169 95 71 71 122 ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- Hr Total 848 811 953 1183 1224 1069 763 668 412 307 279 374 41" Hour Total : 13911 �.•. peak hour begins : 11:00 AM peak volume : 848 Peak hour factor : 0.91 PM peak hour begins : 15:45 PM peak volume : 1301 Peak hour factor : 0.94 k****************************************************************************** Oct 14 Southbound Volume for Lane 2 Ind Time 00 01 02 03 04 05 06 07 08 09 10 11 ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- G=: 15 56 14 14 19 14 25 90 158 273 261 206 188 30 27 11 8 6 11 27 101 220 260 247 197 193 45 24 13 13 8 11 41 157 270 302 259 219 206 00 22 9 19 11 18 67 181 267 296 229 186 202 ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- 1r Total 129 47 54 44 54 160 529 915 1131 996 808 789 end Time 12 13 14 15 16 17 18 19 20 21 22 23 15 199 191 177 205 223 191 208 194 126 77 66 54 30 219 190 186 228 192 212 204 156 83 50 67 45 45 233 184 215 217 185 175 189 126 92 53 60 63 00 223 229 226 210 192 166 174 113 79 57 69 61 Jr Total 874 794 804 860 792 744 775 589 380 237 262 223 24 Hour Total : 12990 1M peak hour begins : 08:00 AM peak volume : 1131 Peak hour factor : 0.94 PM peak hour begins : 15:15 PM peak volume : 878 Peak hour factor : 0.96 _****************************************************************************** • Traffic Survey Specialists, Inc. 624 Gardeni Delray Beach, Florida 33444 Phone (561) 2 •Volume Report with 24 Hour Totals ******************************************************* Data File : D1014002.PRN Station : 000000101301 Identification : 000110252076 Interval ,,Start date : Oct 14, 04. Start time :. ..Stop date : Oct 14, 04 Stop time . ::City/Town : Miami, FL. County . -Location : NW 12th.Averiue Btwn NW 17th & 18th Sts ********************************************************* Oct 14 Total Volume for All Lanes a Terrace 72-3255 Page 2 *********************** 15 minutes 00:00 24:00 Dade ********************** End Time 00 01 15 115 39 30 56 38 45 5.4 35 00 56 24 Hr Total 281 02 31 29 35 27 136 122 03 38 .28 63 176 309 23 28 77 201 397 18 34 112 294 501 28 48 142 361 501 107 138 394 1032 1708 04 05 06 07 08 09 458 . 419 447 431 509 432 464 372 1878 1654 10 436 375 416 362 1589 11 401 385 415 436 1637 End Time 12 13 15 391 .392 30 422 367 45 489 419 00 420 427 Hr Total 1722 1605 14 414 445 458 440 1,757 '15 459 491 540 553 2043 16 529 498 531 458 2016 17 517 495 418 383 1813 18 398 419 382 339 1538 19 369 318 288 282 1257 20 21 260 170 186 126 172 120 174 128 792 544 22 141 131 129 140 541 23 140 124 150 183 597 Hour Total : 26901 1-wi peak hour begins : 07:45 AM peak volume 1915 Peak hour factor : 0.94 PM peak hour begins : 15:30 PM peak volume : 2120 Peak hour factor : 0.96 ******************************************************************************* • Traffic Survey Specialists, Inc. 624 Gardenia Terrace Delray, Beach, Florida 33444 Phone (561) 272-3255 Volume Report with 24 Hour Totals Page 1 el - !1,********************************************************************-****************•********* ca File D1014001.?RN . ' Station : 000000101302 Identification : 000110252093 Interval : 15 minutes Start date : Oct 14, 04 Start time : 00:00 _Stop date : Oct 14, 04 Stop time : 24:00 ,City/Town : Miami, FL County . : Dade Location : NW 17th Avenue South of NW 16th Street _****************************************************************************,�** - Oct 14 Northbound Volume for Lane 1 End Time 00 01 02 03 04 05 06 07 08 09 10 11 15 45 11 4 12 2 2 47 29 124 119 158 125:. 30 18 2 7 5 4 10 87 160 105 127 135 153 45 18 9 6 4 6 23 102 123 142 128 118 159 00 7 5 4 3 3 31 85 150 117 42 115 123 Hr Total 88 27 21 24 15 66 321 462 488 416 526 560 End Time 12 13 14 15 16 17 18 19 20 21 22 23 15 87 139 117 99 93 138 102 60 67 64 50 46 30 154 150 133 175 172 197 84 46 76. 61 52 57 45 158 168 160 139 134 140 87 95 52 75 38 135 00 158 124 122 188 152 117 93 79 43. 43 35 241 Hr Total 557 581 532 601 551 592 366 280 238 243 175 479 ?A Hour Total : 8209 peak hour begins : 11:00 AM peak volume : 560 Peak hour factor : 0.88 1-,•t peak hour begins : 16:45 PM peak volume : 627 Peak hour factor : 0.80 ***************************************************.***.************************* Oct 14 Southbound Volume for Lane 2 ''End Time 00 01 02 03 04 05 06 07 08 09 10 11 15 26 . 11 9 5 7 12 53 92 109 127 130 114 30 24 5 9 7 6 8 68 108 126 104 127 143 45 9 2 13 2 6 25 97 99 123 133 108 152 00 7 11 6 8 14 36 75 116 127 113 111 146 Hr Total 66 29 37 22 33 81 293 415 485 477 476 555 End Time 12 13 14 15 16 17 18 19 20 21 22 23 15 93 138 138 83 108 57 143 149 104 56 63 38 30 92 136 83 190 128 183 155 142 81 57 •42 41 45 141 143 184 146 141 168 163 97 87 67 39 24 00 135 140 129 ..135 93 166 157 118 62 62 39 26 Hr Total 461 557 534 554 470 574 618 506 334 .242 183 129 24 Hour Total : 8131 AM peak hour begins : 11:00 AM peak volume : 555 Peak hour factor : 0.91 ?M-peak hour begins : 17:15 PM peak volume : 660 Peak hour factor : 0.90 ******************************************************************************* Traffic Survey Specialists, Inc. 624 Gardenia Terrace Delray Beach, Florida 33444 Phone (561) 272-3255 Volume Report with 24 Hour Totals Page 2 0 k***************************************************************************** Data File D1014001.PRN Station : 000000101302. Identification : 000110252093 Interval : 15 minutes ...Start date : Oct 14, 04 Start time : 00:00 ``Stop date : Oct 14, 04 Stop time : 24:00 _ ';City/Town : Miami, FL County : Dade --:Location : NW 17th Avenue South of NW 16th Street ******************************************************************************* Oct 14 Total Volume for All Lanes End Time .00 . 01 02 03 04 .05 06 07. 08 09 10 11 15 .71 22 13 17 9 14 100 - 121 233 '246 288 239 30 •.42 7 16 12 10 18 155 ' 268 231 231 262 296 45 27 11 19 6. 12 .48 199 222 -265 261 226 311 00 .14 16 10 11 17 67 160 ' 266 244 1.55 226 269 Hr Total 154 56 58 46 48 147 614 877 973 893 1002 1115 End Time 12 13 14 15 16 17 18 19 20 21 22 23 15 .180 277 255 182 201 195 245 209 171 120 113 84 30 246 286 216 365 300 380 239 188 '157 118 94 98 45 299 311 344 285. 275 308 250 192 139 142 77 159 00 293 264 251 323 245 283 250 197 105 105 74 267 fir Total 1018 1138 1066 1155 1021 1166 984 786 572 485 358 608 IDHour Total : 16340 . IL - peak hour begins : 11:00 AM peak volume •: 1115 Peak hour factor : 0.90 PM peak hour begins : 17:15 PM peak volume : 1216 Peak hour factor : 0.80 k******************************************************************************' NORTH RIVER DRIVE & IN 14TH AVENUE MIAMI, FLORIDA COUNTED BY: JOEL SANTANA eTANALIZED TRAFFIC SURVEY SPECIALISTS, INC. 624 GARDERIA TERRACE DELRAY BEACH, FLORIDA 33444 1561) 272-3255 FAX 1561) 272-4381 ALL VEHICLES i PEDS Site Code : 00040206 Start Date: 10/14/04 File I.D. : NRIV14AV Page : 1 NW 14TH AVENUE From North Peds -Right Thru Left ==Date 10/14/04 16:00 1 20 64 1 16:15 2 19 61 10 16:30 2 19 36 2 16.45 0 12 52 2 Er Total 5 70 213 15 17:00 0 38 86 6 f=-17:15 0 4 54 9 17:30 2 6 43 9 1.7:45 0 3 3(1 15 Kr Total 2 51 213 39 • NW 12TH STREET From East Peds Right Thru Left NW 14TH AVENUE/N.R.Dr. From South Peds Right Thru Left NORTH RIVER DRIVE From West Peds Right Thru Left Vehicle Total 0 4 34 6 0 9 40 4 4 9 41 4 15 11 44 0 19 33 159 14 7 23 37 4 2 7 49 0 3 6 27 2 4 6 26 3 16 42 139 9 ' 6 1 15 100 3 5 27 61 24 2 25 72 34 4 21 ZL 67 12 94 304 12 4 42 75' 8 3 15 68 8 12 13 60 5 8 18 53 33 27 88 256 0 107 8 0 0 71 21 2 2 46 12 0 2 63 14 0 4 287 55 2 0 79 13 0 2 64 19 1 2 73 21 0 3 5I 24 2 7 274 77 3 360 330 268 300 1258. 407 293 272 246 1218 *TOTAL* 7 121 426 54 1 35 75 298 23 I 100 39 182 560 1 11 561 132 5 I 2476 3 Tl I�a1 (1O\Ic-�,crz�- NORTH RIVER DRIVE & NV 14TH AVENUE MIIAMI, FLORIDA COUNTED BY: JOBL SANTANA lip"VALIZBD TRAFFIC SURVEY SPECIALISTS, INC. 624 GARDENIA TERRACE DELRAY BEACH, FLORIDA 33444 (5611 272-3255 FAX (561) 272-4381 ALL VEHICLES & PEDS Site Code : 00040206 Start Date: 10/14/04 File I.D. : NRIV14AV Page : 2 NA 14TH AVENUE From North Peds Right Thru Left Date 10/14/04 NV 12TH STREET From Bast Peds Right Thru Left NE 14TE AVENUE/N.R.Dr. From South Peds Right Thru Left NORTH RIVER DRIVE From Nest Peds Right Thru Left Vehicle Total 121 121 -'NORTH RIVER DRIVE • 560 298 979 121 5 5 • 132 NW 14TH AVENUE 426 60 54 5 182 75 426 54 262 1 863 ALL VEHICLES & PEDS 621 ,677 132 698 561 11 561 11 J Intersection Total 2,476 23 426 561 1,010 1,791 560 560 35 35 7 75 5 396 298 781 • 182 NW 14TH AVENUE/N.R Dr. 182 298 23 23 225 NW 12TH STREET 54 132 39 39 100 39 100 NORTH RIVER DRIVE & IN 14TH AVENUE NIANI, FLORIDA COUNTED BY: JOEL SANTANA IIIIIIRTGNALIZED TRAFFIC SURVEY SPECIALISTS, INC. 624 GARDENIA TERRACE DELRAY BEACH, FLORIDA 33444 (561) 272-3255 FAX (561) 272-4381 ALL VEHICLES & PEDS Site Code : 00040206 Start Date: 10/14/04 File I.D. : NRIV14AV Page : 3 Ni 14T1 AVENUE From North Peds Right Thru Left Date 10/14/04 =-:Peak Hour Analysis By Entire Peak start 16:15 Volume - 88 235 20 Percent - 268 691 6I Pk total 343 Highest 17:00 'Volume - 38 86 6 Hi total 130 _.PRY .66 .NORTH RIVER DRIVE 279 162 529 88 2 2 1 60 NE 12TH STREET From East Peds Right Thru Left NV 14TH AVENUE/N.R.Dr. From South Peds Right Thru Left NORTH RIVER DRIVE From Nest Peds Right Thru Left Vehicle Total Intersection for 16:15 226 17:00 64 .88 88 88 the Period: 16:00 to 18:00 on 10/14/04 16:15 52 162 12 - 15 121 279 231 721 58 4% 298 67% 415 17:00 23 37 4 - 4 42 75 121 .86 NW 14TH AVENUE 235 235 343 20 20 50 60 321 259 f 259 4 1 518 2 121 52 175 ALL VEHICLES & PEDS Intersection Total 1,305 12 235 259 506 921 279 279 32 16:15 - 259 60 2 - 818 19% 11 321 16:15 - 71 21 2 94 .85 26 26 52 52 226 162 415 121 NW 14TH AVENUE/N.R Dr. 121 162 12 12 95 NW 12TH STREET 20 60 15 15 15 73 73 J • .1'4 #1 'Caw.; F- '- - Gcob.ec 14-120o4- cirixim l : Luis fAlowthlo • ze<1 • Np 14TH STREET f IN 14T1 AVENUE f NN 13TH TERRACE, KIAMI, FLORIDA •COUNTED BY: F. SANCHEZ f L. PAL0NING . SIGNALIZED Traffic Survey Specialists, Inc. 624 Gardenia Terrace Delray Beach, Florida 33444 (561) 272-3255 Fax (561) 272-4381 ALL VEHICLES Study Name: 14ST14AV Site Code : 00040206 Start Date: 10/14/04 Page : 1 Start lime NN 14TH AVENUE From North Right Left IlruTo 13T Right NN 14TH STREET From East Thru LeftTo 13T Thru Right NN 14TH AVENUE From South Left o 13T Left Thru Right NN 13TH TERRACE Fron outhvest LefFrThru Right Right.Right o 14STo 14ATo 14STo 14A IN 1 From o 13S '1" Intv1 Total 10/14/04 16:00 29 . 60 57 6 19 85 30 29 0 1 17 6 1 6 14 1 3 364 16:15 32 60 44 10 11 95 44 54 1 4 33 3 0 23 22 8 3 447 16:30 . 34. 36 81 2 4 128 17 61 2 3 33 4 0 25 29 2 9 470 16:45 35 48 57 1 7 127 10 56 2 7 42 IL 0 14 21 2 12 451 Hour 130 204 239 19 41 435 101 200 5 15 125 23 1 68 86 .13 27 1732 17:00 38 82 29 9 18 66 48 57 2 11 52 5 0 17 41 8 11 494 17:15 27 54 64 2 5 100 18 34 0 2 20 2 0 16 24 2 7 377 17:30 28 46 57 4 12 85 29 34 1 1 16 6 1 11 20 3 14 368 17:45 14 39 34 5 8 103 24 38 1 3 18 2. 0 11 11 1 10 342 lour 107 221 184 20 43 354 119 163, 4 17 106 15 1 55 116 14 42 1581 Total 237 425 423 39 84 789 220 363 9 32 231 38 2 123 202 27 69 3313 R Apr. 21.0 37.8 37.6 3.4 5.7 54.1 15.1 24.9 2.9 10.3 74.5 12.2 0.5 34.7 57.0 7.6 100.0 - R Int. 7.1 12.8 12.7 1.1 2.5 23.8 6.6 10.9 0.2 0.9 6.9 1.1 - 3.7 6.0 0.8 2.0 - -111c.Oct I l ice--ter-4 • -TO< Movc clots ¥ rccr vv.11 ina-cr�S�c+icr� , • NI 14TH STREET E NW 14TH AVENUE & NW 13TH TERRACE, MIAKI, FLORIDA •COUNTED BY: F. SANCHEZ & L. PALOMINO IGNALIZED r • • Start Time Peak H Time Vol. Pct. Total High Vol. Total PHF NW 14TH AVENUE From North Right Left ThruTo 13T Rtgj►t ur Analysis By Entire I 16:15 139 226 211 22 23.2 37.7 35.2 3.6 598 17:00 38 82 29. 9 158 0.946 RN 14TH STREET From East Thru LeftTo 13T Thru Right tersection for the Peri 16:15 40 416 119 228 4.9 51.8 14.8 28.3 803 16:30 4 128 17 61 210 0.956 Traffic Survey Specialists, Inc. 624 Gardenia Terrace Delray Beach, Florida 33444 (561) 272-3255 Fax (561) 272-4381 ALL VEHICLES NV 14TH AVENUE From South Left o 13T Left Thru Right d: 16:00 on 10/14/04 to 16:15 7 25 160 22 3.2 11.6 74.7 10.2 214 17:00 2 11 52 5 70 0.764 Study Name: 14ST14AV Site Code : 00040206 Start Date: 10/14/04 Page :2 NN 13TH TERRACE IN 1 From Southwest From Left Thru Right Right Right o 14ST4 itATo 14STD 14A o 13S 17:45 on 10/14/04 16:15 16:1 0 79 113 20 35 0.0 37.2 53.3 9.4 100.0 212 35 17:00 16:4 0 17 41 8 12 66 12 0.803 0.729 NW 14TH STREET 166 201 35 7 669 ' 5, 881 79 P rr, 113 20A NW 13TH TERRA Nip! 14TH AUENUE- 22 211226139 467 L1 1065 10/14/04 83:NOPM 1862 500 4,4 T f 7 160 2t80625 t 14TAUENUE 1077 228 F-- 119 �--416 47 40 — 274 NW 14TH STREET Intvl .Total NW 14TR STREET E NW 14TH AVENUE E RN 13TR TERRACE, NIAMI, FLORIDA COUNTED BY: F. SANCHEZ E L. PALOMINO IGNALIZED Traffic Survey Specialists, Inc. 624 Gardenia Terrace Delray Beach, Florida 33444 (561) 272-3255 Fax (561.) 272-4381 PEDESTRIANS Study Name: 14ST141V Site Code : 00040206 Start Date: 10/14/04 Page :1 Start Time NA 14TR AVENUE From North Left Thru Right Peds. NN 14TR STREET From Bast Left T.ru Riggt Peels_ HA 14TR AVENUE From South Left Thru Rfaht Pelt NW 13 From Peds NI 14TR STREET From Nest . Left Thru Peels_ Intv1. Total 10/14/04 16:00 0 0 0 0 0 0 0 1 0 0 0 2 0 0 0 0 3 16:15 0 0 0 4 0 0 0 0 0 0 0 0 2 0 0 2 8 16:30 0 0 0 1 0 0 0 0 0 0 0 1 0 0 0 2 4 16:45 0 0 0 3 0 0 0 1 0 0 0 Q 4. 0 0 1, 9 Hour 0 0 0 B 0 0 0 2 0 0 0 3 6 0. 0 5 24 17:00 0 0 0 B 0 0 0 0 0 0 0 4 1 0 0 4 11 17:15 0 0 0 2 0 0 0 1 0 0 0 2 0 0 0 4 9 • 17:30 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2 17:45 0 0 0 2 0 0 0 1 0 0 0 2- 1. 0 0 0 6 Hour 0 0 0 14 0 0 0 2 0 0 0 8 2 0 0 8 34 Total 0 0 0 22 0 0 0 4 0 0 0 11 8 0 0 13 58 t Apr. - - - 100.0 - - - 100.0 - - - 100.0 100.0 - - 100.0 - % Int. - - - 37.9 - - - 6.8 - - - 18.9 13.7 - - 22.4 - • L • • fl4 Deft" 1FLoao . oct-o lDe( 13 2.0041 ciftwmbi �s `t (kLo ;i0 11 Si -9 NORTE RIVER DRIVE & NW 17TH AVENUE INCLUDING VI TO SB OVERPASS MIAMI, FLORIDA SIGNALIZED �((MINTED BY: VASQUBZ, VELEZ &•VAN VLIET TRAFFIC SURVEY 624 GARD DELRAY BEACH, (561) 272-3255 SPECIALISTS, INC. ENIA TERRACE FLORIDA 33444 FAX (561) 272-4381 ALL VEHICLES & PBDS Site Code : 00040206 Start Date: 10/14/04 File I.D. : NRIV17AV Page : 1 NN 17T1 AVENUE From North Right Thru Left - Date 10/14/04 16:00 16:15 16:30 16:45 Er Total 17:00 L.17.15 17:30 17:45 _Hr Total 20 7 10 6 43 16 7 11 3 37 53 131 143 50 377 74 152 141 141 508 18 14 9 14 55 6 11 17 22 56 NORTH RIVER DRIVE From East Left Right Thru Left OvrPas NN 17TH AVENUE From South NORTH RIVER DRIVE From West Right Thru Left Right Thru Left Total 20 11 14 11 56 13 13 4 12 42 52 47 45 63 207 50 78 55 48 231 1 1 1 1 4 1 0 1 1 3 110 257 282 205 854 181 256 160 175 772 20 71 60 43 194 81 50 71 96 298 45 164 129 95 433 116 154 109 87 466 24 35 49 25 133 18 50 34 37 139 17 63 59 40 179 51 66 69 42 228 50 7 37 2 27 6 38 6 152 21 46 23 35 25 129 2 5 6 2 15 437 840 834 597 2708 655 865 713 691 2924 *TOTAL* 80 885 111 1 98 438 7 1626 1 492 899 272 1 407 281 36 1 5632 qs.rce He ricjk - -t V\ • 11 .ci : \ • NORTH RIVER DRIVE & NW 17TH AVENUE .' INCLUDING NB TO SB OVERPASS NIANI, FLORIDA SIGNALIZED rn1INTBD BY: VASQUEZ, VELEZ & VAN VLIET TRAFFIC SURVEY SPECIALISTS, INC. 624 GARDENIA TERRACE DELRAY BEACH, FLORIDA 33444 (561) 272-3255 FAX (561) 272-4361 ALL VEHICLES & PEDS Site Code : 00040206 Start Date: 10/14/04 File I.D. : NRIV17AV Page :2 NW 17TH AVENUE From North Right Thru Left - Date 10/14/04 NORTH RIVER DRIVE From Bast Left Right Thru Left OvrPas NW 17TH AVENUE From South Right Thru Left NORTH RIVER DRIVE From Nest Right Thru Left Total 11 80 80 -'NORTH RIVER DRIVE 272 438 790 80 36 36 281 NW 17TH AVENUE 885 885 1,076 111 111 281 724 407 407 1 0 • 2,109 36 899 98 1,033 ALL VEHICLES & PEDS ,514 3,05 Intersection Total 5,632 1,633 885 407 2,925 4,588 I-- • 272 272 NW 17TH AVENUE 31 31 98 98 2,169 438 1,663 • 899 899 438 • 1,633 1,633 884 111 281 492 NORTH RIVER DRIVE 492 492 0 0 NORTH RIVER DRIVE & NW 17TH AVENUE . INCLUDING NB TO SB OVERPASS NIAMI, FLORIDA SIGNALIZED •tTTNTED BY: VASQUEZ, VELEZ & VAN VLIET TRAFFIC SURVEY SPECIALISTS, INC. 624 GARDENIA TERRACE DELRAY BEACH, FLORIDA 33444 (561) 272-3255 FAX (561) 272-4381 ALL VERICLES & PEDS Site Code : 00040206 Start Date: 10/14/04 File I.D. : NRIV17AV Page : 3 NW 17TH AVENUE From North NORTH RIVER DRIVE From East NW 17TH AVENUE From South NORTH RIVER DRIVE From Nest Left Right Thru Left Right Thru Left OvrPas Right Thru Left Right Thru Left Date 10/14/04 --`Peak Hour Analysis By Entire Intersection for the Period: 16:00 to 18:00 on 10/14/04 Peak start 16:30 16:30 16:30 Volume 39 419 40 51 236 3 924 234 Percent 81 84% 8% 41 19% 0% 76% 27% Pk total 498 1214 870 Highest 17:15 17:15 17:15 Volume 7 152 11 13 78 0 256 50 154 50 Hi total 170 347 254 ---PHF .73 .87 .86 • NORTH RIVER DRIVE 142 236 417 39 t. -< . 19 19 134 134 216 216 • 39 39 494 142 57% 16% NW 17TH AVENUE 419 419 498 40 40 86 369 1 0 1,062 16:30 216 134 19 594 36% — 51 369 17:00 51 46 2 99 .93 19 494 51 564 ALL VEHICLES & PEDS 1,62 Intersection Total 2,951 927 419 216 1,562 2,432 r-- • 142 142 NW 17TH AVENUE Total 15 15 51 51 1,214 236 870 494 494 236 927 927 408 40 134 234 NORTH RIVER DRIVE 234 234 0 0 NORTE RIVER DRIVE & NI 17TH AVENUE " INCLUDING NB TO SB OVERPASS MIAMI, FLORIDA SIGNALIZED •"'UNTED BY: VASQUEZ, VELEZ E VAN VLIET TRAFFIC SURVEY SPECIALISTS, INC. 624 GARDENIA TERRACE DELRAY BEACH, FLORIDA 33444 (561) 272-3255 FAX (561) 272-4381 ALL VEHICLES E PEDS Site Code : 0 Start Date: 1 File I.D. : N Page : 1 NY 17TH AVENUE From North Peds Right Thru Left Date 10/14/04 16:00 16:15 16:30 16:45 Er Total 17:00 --17:15 17:30 17:45 Er Total 1 20 1 7 0 10 0 6 2 43 3 4 1 1 9 16 7 11 3 37 53 131 143 50 377 74 152 141 141 508 18 14 9 14 55 NORTH RIVER DRIVE From East Left Peds Right Thru Left OvrPas NN 17TH AVENUE From South Peds Right Thru Left NORTH RIVER DRIVE From Nest Peds Right Thru Left V 6 11 17 22 56 1 20 0 11 1 14 3 11 5 56 5 13 6 13 6 4 9 12 26 42 52 47 45 63 207 50 78 55 48 231 1 110 1 257 1 282 1 205 4 854 1 _ 0 1 1 3 181 256 160 175 772 20 71 60 43 194 81 50 71 96 298 45 164 129 95 433 116 154 109 87 466 24 35 49 133 18 50 34 37 139 0 17 50 7 0 63 37 2 0 59 27 6 0 40 38 6 0 179 152 21 0 51 46 2 0 66 23 5 0 69 35 6 0 42 25 2 0 228 129 15 *TOTAL* 11 80 885 111 I 31 98 438 7 1626 I 0 492 899 272 I 0 407 281 36 W1•aWlt F °rick 0cfo ber i4. 20o4. - A raw rk b , tq, eA-Lottirio 5 ..1na-(i Zec) • Adjusted Traffic Counts • DAVID PLUMMER i ASSOCIATES. NC. 24-HOUR COUNTS Project Name: Miami Rivertown MUSP Location: NW 12 Avenue between NW 17 Street and 18 Street Observer: Traffic Survey Specialists, Inc. BEGIN TIME NORTHBOUND 1st 1/4 2nd 1/4 3rd 1/4 4th 1/4 TOTAL 12:00 AM 59 29 30 34 152 01:00 AM 25 27 22 15 89 02:00 AM 17 21 22 8 68 03:00 AM 19 17 10 17 63 04:00 AM . 14 17 23 30 84 05:00 AM 38 ' 50 71 ' 75 234 08:00 AM 86 100 137 180 503 07:00 AM 151 177 231 234 793 08:00 AM 185 187 207 168 747 09:00 AM 158 184 173 143 658 10:00 AM 230 178 197 176 781 11:00 AM 213 192 209 234 848. 1200PM 192 203 256 197 848 01:00 PM 201 177 235 198 811 02:00 PM 237 259 243 214 953 03:OOPM 254' 263 323 343 1,183 04:00 PM 306 306 346 266 1,224 05:OOPM 326 283 243 217 1,069 08:00 PM 190 215 193 165 763 07:00 PM 175 162 162 169 668 08:00 PM 134 103 80 95 412 09:00 PM 93 76 67 71 307 10:00 PM 75 64 69 71 279 11:00 PM 86 79 87 122 374 24-HOUR TOTAL 13,911 AM Peak Hour. PM Peak Four. NORTHBOUND Project No.: 04234 Count Date: 10/14/2004 BEGIN TIME SOUTHBOUND 1st 1/4 2nd 1/4 3rd 1/4 4th 1/4 TOTAL 12:00 AM 56 27 24 22 129 01:00 AM 14 11 r 13 9 47 02:00 AM 14 8 13 19 54 03:00 AM 19 6 8 11 44 04:00 AM - 14 11 11 18 54 05:00 AM 25 27 41 67 160 06:00 AM 90 101 r 157 181 529 07:00 AM 158 220 270 267 915 08:00 AM 273 260 302 296 1,131 996 09:00 AM 261 247 259 229 10:00 AM 206 197 219 186 808 11:00 AM 188 193 206 202 789 12:00 PM 199 219 233 223 874 01:00 PM 191 190 184 229 794 02:00 PM 177 186 215 226 804 03:03 PM 205 228 217 210 860 04:00 PM 223 192 185 192 792 05:00 PM 191 212 175 166 744 06:OO PM 208 204 189 174 775 07:00 PM 194 156 126 113 589 09:00 PM 126 83 92 79 380 09:00 PM 77 50 53 57 237 10:00 PM 66 67 60 69 262 11:0o PM 54 45 63 61 223 24-HOUR TOTAL 12,990 DAILY TRAFFIC COUNT SUMMARY Time: 11:45 AM Volume: 885 Time: 03:45 PM Volume: 1,301 AM Peak Hour. PM Peak Hour. TWO-WAY TOTAL 281 136 122 107 138 394 1,032 1,708 1,878 1,654 1,589 1,637 1,722 1,605 1,757 2,043 2,016 1,813 1,538 1,257 792 544 541 597 26,901 AM Peak Hour. Time: 08:00 AM Volume: 1,131 PM Peak Hour. Time: 03:15 PM Volume: 878 NORTHBOUND AND SOUTHBOUND Time: 07:45 AM Volume: 1,915 K-factor. 7.1% PHF: 0.94 D-factor. 57.5% SS Tone: 03:30 PM Volume: 2,120 K-factor. 7.9% PHF: 0.96 D-factor. 60.3% NB NW 12 Ave_N River Dr -NW 20 St.xls DAVE) PLUAMER & ASSOCIATES, NC. 24-HOUR COUNTS Project Name: Miami Rivertown MUSP Location: NW 17 Avenue South of NW 16 Street Observer: Traffic Survey Specialists, Inc. BEGIN TIME NORTHBOUND 1st 1/4 2nd 1/4 3rd 1/4 4th 1/4 TOTAL 12:00 AM 45 18 18 7 88 01:oo AM 11 2 9 5 27 02:00 AM 4 7 . 6 4 21 ono AM 12 5 4 3 24 04:00 AM 2 4 6 3 15 05:00AM. 2 10 23 31 66 06:00 AM 47 87 102 85 321 07:00 AM 29 160 123 150 462 08:00 AM 124 105 142 117 488 09:00 AM 119 127 128 42 416 10::00 AM 158 135 118 115 526 11:00 AM 125 153 159 123 560 12:00 PM 87 154 158 158 557 01:03 PM 139 150 168 124 581 02:00 PM 117 133 160 122 532 03:00 PM 99 175 139 188 601 04:00 PM 93 172 134 152 551 05:0o PM 138 197 140 117 592 06:00 PM 102 84 87 93 366 07:00 PM 60 46 95 79 280 08:00 PM 67 76 52 43 238 09:00 PM 84 61 75. 43 243 10:00 PM 50 62 38 35 175 MOD PM 46 57 135 241 479 24-HOUR TOTAL 8,209 AM Peak Hour. PM Peak Hour. NORTHBOUND Project No.: 04234 Count Date: 10/14/2004 BEGIN TIME SOUTHBOUND 1st 1/4 2nd 1/4 3rd 1/4 4th 1/4 TOTAL 12:00 AM 26 24 9 ' 7 66 01:00 AM 11 5 2 11 29 02:00 AM 9 9 13 6 37 03:00 AM 5 7 2 8 22 04:00 AM 7 6 6 14 33 oS:DD AM 12 8 25 36 81 06:00 AM 53 68 97 75 293 07:00 AM 92 108 99 116 415 08:00 AM 109 126 123 127 485 09:00 AM 127 104 133 113 477 10:OO AM 130 127 108 111 476 11:00 AM 114 143 152 146 555 12:00 PM 93 92 141 135 461 01:oo PM 138 136 143 140 557 02:00 PM 138 83 184 129 534 03:00 PM 83 190 146 135 554 04:00 PM 108 128 141 93 470 05:00 PM 57 183 168 166 574 06:00 PM 143 155 163 157 618 07:00 PM 149 142 97 118 506 08:00 PM 104 81 87 62 334 09:00 PM 56 57 67 62 242 10:00 PM 63 42 39 39 183 11:00 PM 38 41 24 26 129 24-HOUR TOTAL 8,131 A DAILY TRAFFIC COUNT SUMMARY Time: 11:00 AM Volume: 560 Time: 04:45 PM Volume: 627 AM Peak Hour. PM Peak Hour. TWO-WAY TOTAL 154 56 58 46 48 147 614 877 973 893 1,002 1,115 1,018 1,138 1,066 1,155 1,021 1,166 984 786 572 485 358 608 16,340 AM Peak Hour. Time: 11:00 AM Volume: 555 PM Peak Hour. Time: 05:15 PM Volume: 660 NORTHBOUND AND SOUTHBOUND Time: 11:00 AM Volume: 1,115 K-factor. 6.8% PHF: 0.90 D-factor. 50.2% NB The: 05:15 PM Volume: 1,216 K-factor: 7.4% PHF: 0.80 D-factor. 54.3% SD NW 17 Ave_N River Dr -NW 20 St.xls DAVID PLUMMER & ASSOCIATES. INC. Project Name: Location: Observer: TURNING MOVEMENT COUNTS Mlami Rivertown MUSP North River Drive/NW 14 Avenue Traffic Survey Specialists, Inc. Project Number: 04234 Count Date: 1on412004 Day of Week: Thursday NW 14 Avenue North River Drive TIME INTERVAL NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND GRAND TOTAL L T R TOTAL L T R TOTAL L T R TOTAL L T R TOTAL 04:00 PM 04:15 PM 100 15 1 116 1 64 20 85 0 8 107 115 6 34 4 44 360 04:15 PM 04:30 PM 61 27 5 93 10 61 19 90 0 21 71 92 4 40 9 53 328 04:30 PM 04:45 PM 72 25 2 99 2 36 19 57 0 12 46 58 4 41 9 54 268 04:45 PM 05:00 PM 71 27 4 102 2 52 12 66 0 14 63 77 0 44 11 55 300 05:00 PM 05:15 PM 75 42 4 121 6 86 38 130 0 13 79 92 4 37 23 64 407 05:15 PM 05:30 PM 68 15 3 86 9 54 4 67 0 19 64 83 .0 49 7 56 292 05:30 PM 05:45 PM 60 13 12 85 9 43 6 58 0 21 73 94 2 27 6 35 272 05:45 PM 06:00 PM 53 18 8 79 15 30 3 48 0 24 58 82 3 26 6 35 244 AVERAGE PM PEAK PERIOD HOUR TURNING MOVEMENT COUNT SUMMARY ANNUAL AVERAGE DAILY TRAFFIC CONDITIONS NW 14 Avenue North River Drive TIME INTERVAL NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND GRAND TOTAL L T R TOTAL L T R TOTAL L T R TOTAL L T R TOTAL 04:00 PM 05:00 PM 283 92 20 394 27 215 61 304 0 67 283 350 12 150 38 200 1,248 PEAK HOUR FACTOR 0.81 0.58 0.75 0.77 0.80 Note: 2003 FDOT Peak Seasonal Weekly Volume Fact' 1.01 N River Dr_NW 14 Ave.xls DAVID PWMMER & ASSOCIATES, INC. Project Name: Location: Observer: TURNING MOVEMENT COUNTS Miami Rivertown MUSP NW 14 Street/NW 14 Avenue Traffic Survey Specialists, Inc. Project Number: 04234 Count Date: 10/14/2004 Day of Week: Thursday NW 14 Avenue NW 14 Street TIME INTERVAL NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND GRAND TOTAL L T R TOTAL L T R TOTAL L T R TOTAL L T R TOTAL 04:00 PM 04:15 PM 1 17 6 24 29 60 63 152 6 14 1 21 19 115 29 163 360 04:15 PM 04:30 PM 5 33 3 41 32 60 54 146 23 22 8 53 11 139 54 204 444 04:30 PM 04:45 PM 4 33 4 41 34 36 83 153 25 29 2 56 4 145 61 210 460 04:45 PM 05:00 PM 9 42 10 61 35 48 58 141 14 21 2 37 7 137 56 200 439 05:00 PM 05:15 PM 13 52 5 70 38 82 38 158 17 41 8 66 18 114 57 189 483 05:15 PM 05:30 PM 2 20 2 24 27 54 66 147 16 24 2 42 5 118 34 157 370 05:30 PM 05:45 PM 2 16 6 24 28 46 61 135 11 20 3 34 12 114 34 160 353 05:45 PM 06:00 PM 4 18 2 24 14 39 39 92 11. 31 1 1 43 8 126 38 172 331 AVERAGE PM PEAK PERIOD HOUR TURNING MOVEMENT COUNT SUMMARY ANNUAL AVERAGE DAILY TRAFFIC CONDITIONS NW 14 Avenue NW 14 Street TIME INTERVAL NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND GRAND TOTAL L T R TOTAL L T R TOTAL L T R TOTAL L T R TOTAL 04:00 PM 06:00 PM 20 117 19 156 120 215 233 568 62 102 14 178 42 509 183 735 1,636 PEAK HOUR FACTOR 0.55 0.89 0.67 0.87 0.95 Note: 2003 FDOT Peak Seasonal Weekly Volume Fact 1.01 NW 14 SLNW 14 Ave.xls DAVID PLUMMER IL ASSOCIATES, INC. Project Name: Location: Observer: TURNING MOVEMENT COUNTS Miami Rlvertown MUSP North River Drive/NW 17 Avenue Traffic Survey Specialists, Inc. Project Number: 04234 Count Date: 10/14/2004 Day of Week: Thursday NW 17 Avenue North River Drive TIME INTERVAL NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND (GRAND TOTAL L T R TOTAL L T R— TOTAL L T A TOTAL L T - R -TOTAL 04:00 PM 04:15 PM 24 45 20 89 18 53 20 91 7 50 17 74 110 52 20 182 436 04:15 PM 04:30 PM 35 164 71 270 14 131 7 152 2 37 63 102 257 47 11 315 839 04:30 PM 04:45 PM 49 129 60 238 9 143 10 162 6 27 59 92 282 45 14 341 833 04:45 PM 05:00 PM 25 95 43 163 14 50 6 70 6 38 40 84 205 63 11 279 596 05:00 PM 05:15 PM 18 116 81 215 6 74 16 96 2 46 51 99 181 ' 50 13 244 654 05:15 PM 05:30 PM 50 154 50 254 11 152 7 170 5 23 66 94 256 78 13 347 865 05:30 PM 05:45 PM 34 109 71 214 17 141 11 169 6 35 69 110 160 55 4 219 I 712 05:45 PM 08:00 PM 37 87 96 220 , 22 141 3 , 166 2 25 42 69 175 46 12 235 690 AVERAGE PM PEAK PERIOD HOUR TURNING MOVEMENT COUNT SUMMARY ANNUAL AVERAGE DAILY TRAFFIC CONDITIONS NW 17 Avenue North River Drive TIME INTERVAL NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND GRAND TOTAL L T R TOTAL L T R TOTAL L T R TOTAL L T R TOTAL 04:00 PM 06:00 PM 137 454 248 840 56 447 40 543 18 142 206 366 821 221 49 1,092 2,841 PEAK HOUR FACTOR 0.77 0.79 0.82 0.78 0.85 Note: 2003 FDOT Peak Seasonal Weekly Volume Fact 1.01 N River Dr_NW 17 Ave.xls Signal Timings • Signal Timings PATTERN SCHEDULE FOR 3680 NW 14 AV & 14 ST FOR DAY # 4 (SECTION 146) TIME PT OFF NSG G Y R EG Y R WW F G Y R SL Y S Y M CYC MIN: 18 7 15 1 5 0 22 0 18 1 4 1 11 4 1 7 6 1 4 1 0 0 600 1 0 20 1 4 1 24 4 1 7 10 1 4 1 0 0 700 5 0 21 1 4 1 46 4 1 7 15 8 4 1 12 4 900 8 0 21 1 4 1 23 4 1 7 15 12 -4- 1 ...8_ ._..4. 1530 12 0 30 1 4 1 22 4 1 7 15 20 4 1 11 4 1800 18 0 20 1 4 1 14 4 1 7 12 1 4 1 6 4 4 7 59 NITE 2/7 4 7 78 PRE AM P 7-129 AM PEAK 7 11fiMID"DAY- 7 125PM PEAK 7 BOEVENING PATTERN SCHEDULE FOR 2295 NW 17 AVE & N RIVER DR FOR DAY # 4 (SECTION 145) TIME PT OFF NSG G Y R BDG Y R NSL Y S Y M CYC MIN: 15 9 5 0 23 0 20 1 4 1 11 4 1 0 0 3 7 42NITE 0/4 600 9 31 37 1 4 1 12 4 1 0 0 3 60NITE 0/1 620 8 3 39 1 4 1 22 4 1 5 3 80EARLY MO 700 6 57 48 1 4 1 22 4 1 6 3 90AM PEAK 900 5 3 39 1 4 1 22 4 1 5 3 80AVERAGE 1530 7 86 52 1 4 1 38 4 1 6 3 110PM PEAK 1800 5 3 39 1 4 1 22 4 1 5 3 80AVERAGE 1830 8 3 39 1 4 1 22 4 1 5 3 BOEARLY MO 2200 9 31 37 1 4 1 12 4 1 0 0 3 60NITE 0/1 PATTERN SCHEDULE FOR 3521 N RIVER DR,14 AV& 12ST FOR DAY # 4 (SECTION 146) TIME PT OFF NSG G Y EWW F G Y NL Y S Y M CYC MIN: 13 23 1 5 0 22 0 15 1 4 7 6 1 4 0 0 3 6 3BNITE 2/7 600 1 0 15 1 4 7 7 1 4 0 0 3 7 39PRE AM P 700 5 0 21 1 4 7 23 2 4 8 3 7 73AM PEAK 900 8 0 21 1 4 7 23 1 4 8 3 7 72MID DAY 1530 12 0 32 1 4 7 23 2 4 8 3 7 84PM PEAK 1800 18 0 21 1 4 7 7 1 4 7 3 7 55EVENING Appendix C FDOT's Quality/LOS Handbook Generalized Tables Metrobus Transit Ridership TABLE 4 - 7 GENERALIZED PEAK HOUR DIRECTIONAL VOLUMES FOR FLORIDA'S URBANIZED AREAS* UNINTERRUPTED FLOW HIGHWAYS Lanes Divided 1 Undivided 2 Divided 3 Divided A 100 1,060 1,600 Level of Service B C D 340 670 950 1,720 2,500 3,230 2,590 3,740 4,840 STATE TWO-WAY ARTERIALS Class I (>0.00 to 1.99 signalized intersections per mile) Level of Service Lanes Divided A B C D 1 Undivided ** 220 720 2 Divided 250 1,530 1,810 3 Divided 380 2,330 2,720 4 Divided 490 3,030 3,460 860 1,860 2,790 3,540 Class II (2.00 to 4.50 signalized intersections per mile) Level of Service Lanes Divided A B C D 1 Undivided 2 Divided 3 Divided 4 Divided •• ** •• 100 220 340 440 590 1,360 2,110 2,790 810 1,710 2,570 3,330 E 1,300 3,670 5,500 E 890 •R• 850 1,800 2,710 3,500 Class III (more than 4.5 signalized intersections per mile and not within primary city central business district of an urbanized area over 750,000) Lanes Divided 1 Undivided 2 Divided 3 Divided 4 Divided A Si ii Level of Service B C •• 280 650 1,020 1,350 D 660 1,510 2,330 3,070 E 810 1,720 2,580 3,330 Class IV (more than 4.5 signalized intersections per mile and within primary city central business district of an urbanized area over 750,000) Lanes Divided 1 Undivided 2 Divided 3 Divided 4 Divided A ss •• Level of Service B C D •• 270 720 650 1,580 1,000 2,390 1,350 3,130 •• •• •• E 780 1,660 2,490 3,250 FREEWAYS Interchange spacing 2 mi. apart Level of Service Lanes A B C D E 2 1,270 2,110 2,940 3,580 3,980 3 1,970 3,260 4,550 5,530 6,150 4 2,660 4,410 6,150 7,480 8,320 5 3,360 5,560 7,760 9,440 10,480 6 4,050 6,710 9,360 11,390 12,650 Interchange spacing < 2 mi. apart Level of Service Lanes A B C D E 2 1,130 1,840 2,660 3,440 3,910 3 1,780 2,890 4,180 5,410 6,150 4 2,340 3,940 5,700 7,380 8,380 5 3,080 4,990 7,220 9,340 10,620 6 3,730 6,040 8,740 11,310 12,850 NON -STATE ROADWAYS Major City/County Roadways Level of Service Lanes Divided A B C D E 1 Undivided 2 Divided 3 Divided Lanes Divided 1 Undivided 2 Divided •• ss •* ** .• *s 480 760 1,120 1,620 1,740 2,450 Other Signalized Roadways (signalized intersection analysis) Level of Service A B C D •• ** 250 530 •� •• 580 1,140 Source: Florida Department of Transportation Systems Planning Office 605 Suwannee Street, MS 19 Tallahassee, FL 32399-0450 • http://mvw11.myflorida.com/planninp,/systems/sm/los/defaulthtm 810 1,720 2,580 E 660 1,320 02/22/02 BICYCLE MODE (Note: Level of service for the bicycle mode in this table is based on roadway geometries at 40 mph posted speed and traffic conditions, not number of bicyclists using the facility.) (Multiply motorized vehicle volumes shown below by number of directional roadway lanes to determine maximum service volumes.) Paved Shoulder/ Bicycle Lane Coverage 0-49% 50-84% 85-100% A 160 Level of Service C 170 130 210 380 >380 B •• D 720 >210 •i• E >720 PEDESTRIAN MODE (Note: Level of service for the pedestrian mode in this table is based on roadway geometries at 40 mph posted speed and traffic conditions, not the number of pedestrians using the facility.) (Multiply motorized vehicle volumes shown below by number of directional roadway lanes to determine maximum service volumes.) Sidewalk Coverage 0-49% 50-84% 85-100% Sidewalk Coverage 0-84% 85-100% A N B i• 120 Level of Service C •i •* 590 D 330 520 >590 BUS MODE (Scheduled Fixed Route) (Buses per bour) Level of Service A B •* >5 >6 >4 C >3 D >3 >2 E 810 990 ••• E >2 >1 Lanes 1 1 Multi Multi ARTERIAL/NON-STATE ROADWAY ADJUSTMENTS DIVIDED/UNDIVIDED (alter corresponding volumes by the indicated percent) Median Divided Undivided Undivided Undivided Left Turns Lanes Yes No Yes No Adjustment Factors +5% -20% -5% -25% ONE WAY FACILITIES Increase corresponding volume 20% ' This table does not constitute a standard and should be used only for general planning applications. The computer models from which this rabic is derived should be used for more specific pluming applicatone The table and deriving computer models should not be used for corridor or intersection design, where more refined techniques exist. Values shown are hourly directional volumes for levels of service and are for the autonrobileMnuek modes unless specifically stated Level of service letter grade thresholds are probably not comparable across modes and, therefore, cross modal comparison should be made with caution. Furthermore, combining levels of service of different modes into one overall roadway level of service is not recommended. To convert to annual average daily traffic volumes, these. volumes must be divided by appropriate D and K factors. The table's input value defaults and level of service criteria appear on the follmving page. Calculations ate based on planning application of the Highway Capacity Manual, Bicycle LOS Model, Pedestrian LOS Model and Transit Capacity end Quality of Service Manual, respectively for the automobile/truck, bicycle, pedestrian and bus modes. * *Cannot be achieved using table input vane defaults. * **Not applicable for tlut level of service letter grade. For automobile/truck modes, volumes greater than level of service D become F because intersection capacities have been reached. For bicycle and pedestrian modes, the level of service boa grade (including Pik not achievable, because there is no maximum vehicle volume threshold using table input value defaults. 97 LEVEL OF SERVICE TABLE CLASSIFICATION TYPE FDOT'S 2002 QUALITY / LEVEL OF SERVICE (Peak Hour Directional Volumes) [1] PERSON TRIP LEVEL OF SERVICE (Threshold volume to capacity ratio) A I B I C I D I E A I B C I D I E CLASS 4 ARTERIAL 1LU 0 0 270 720 780 0 0 0.35 0.92 1.00 2LD 0 0 650 1,580 1,660 0 0 0.39 0.95 1.00 3LD 0 0 1,000 2,390 2,490 0 0 0.40 0.96 1.00 4LD 0 0 1,350 3,130 3,250 0 0 0.42 0.96 1.00 NON -STATE ROADWAYS Major City/County Roadways 1LU 0 0 480 760 j 810F 0 0 0.59 0.94 1.00 2LD 0 0 1120 1620 1720 0 0 0.65 0.94 1.00 3LD 0 0 1740 2450 2580 0 0 0.67 0.95 1.00 • Source: FDOT's 2002 Quality/Level of Service Handbook NOTES: [1] THE PERSON TRIP LEVEL OF SERVICE IS DERIVED BY DIVIDING THE FDOT'S 2002 LEVEL OF SERVICE BY THE LOS E FOR EACH TYPE OF ROADWAY. Page 1 of 1 • http://www.miamidade.gov/transidimages/ride guide/routes/downtown.gif 10/22/2004 • BUS OCCUPANCY INFORMATION ROUTE DIRECTION LOCATION BUS # RUN # DATE TIME PASSENGERS 12 NB NW 16 Street / NW 12 Avenue 2170 1017 7/19/2004 18:45 8 12 NB NW 16 Street / NW 12 Avenue 2022 1127 7/30/2004 17:25 6 12 NB NW 16 Street / NW 12 Avenue 9722 1004 / 1011 7/28/2003 17:06 7 12 SB NW 16 Street / NW 12 Avenue 2170 1017 7/19/2004 17:27 31 12 SB NW 16 Street / NW 12 Avenue 2022 1127 7/30/2004 16:01 19 12 SB NW 16 Street / NW 12 Avenue 9722 1004 / 1011 7/28/2003 15:45 18 22 NB NW 20 Street / NW 17 Avenue 2054 5116 1/28/2004 16:37 7 22 NB NW 20 Street / NW 17 Avenue 2055 5082 / 5116 5/15/2003 22 NB NW 20 Street / NW 17 Avenue 9414 5080 3/13/2002 22 SB NW 12 Avenue / NW 14 Street 2054 5116 1/28/2004 19:24 0 22 SB NW 12 Avenue / NW 14 Street 2055 5082 / 5116 5/15/2003 18:02 2 22 SB NW 12 Avenue / NW 14 Street 9414 5080 3/13/2002 17:57 2 32 NB NW 16 Street / NW 12 Avenue 2025 1033 5/19/2003 13:58 13 32 NB NW 16 Street / NW 12 Avenue 9935 1037 12/3/2002 17:43 17 32 NB NW 16 Street / NW 12 Avenue 9957 1037 12/30/2002 17:33 17 32 SB NW 16 Street / NW 12 Avenue 2025 1033 5/19/2003 16:51 12 32 SB NW 16 Street / NW 12 Avenue 9935 1037 12/3/2002 18:23 8 32 SB NW 16 Street / NW 12 Avenue 9957 1037 12/30/2002 18:19 8 M NB NW 14 Street / NW 12 Avenue 9956 1295 1/20/2004 16:47 11 M NB NW 14 Street / NW 12 Avenue 9940 1240 3/12/2003 16:43 16 M NB NW 14 Street / NW 12 Avenue 9085 1236 5/1/2002 15:06 4 M SB NW 14 Street / NW 12 Avenue 9956 1295 1/20/2004 19:05 0 M SB NW 14 Street / NW 12 Avenue 9940 1240 3/12/2003 19:14 3 M SB NW 14 Street / NW 12 Avenue 9085 1236 5/1/2002 17:32 8 Source: MDTA Rivertown Bus Ridership Information' Bus Route 12 22 32 95 M PM Peak Headways 30 min 30 min 30 min 30 min PM Peak Vehicles 3 4 3 2 Bus Capacity 38 42 38 38 38 Average PM Peak Ridership2 PM Peak Capacity' NB 7 NB 7 NB 16 NB NB 10 SB 23 SB 1 SB 9 SB SB 4 114 168 114 - 76 Notes: 1 - Bus ridership and capacity information was based on information provided by MDTA. 2 - Average PM Peak ridership was calculated from ridership information obtained from drivers log. 3 - Calculated based on number of PM Peak vehicles times bus capacity. • Appendix D Intersection Capacity Analysis Worksheets Existing Conditions • • HCS2000: Signalized Intersections Release 4.1e Analyst: Inter.: NW 14 AVENUE / NORTH RIVER DR Agency: Area Type: All other areas Date: 10/22/04 Jurisd: Period: EXISTING PM PEAK HOUR Year : 2004 roject ID: MIAMI RIVERTOWN MUSP - # 04234 ,/W St: NORTH RIVER DRIVE N/S St: NW 14 AVENUE SIGNALIZED INTERSECTION SUMMARY No. Lanes LGConfig Volume Lane Width RTOR Vol Eastbound Westbound Northbound L T R L T R L T R 0 1 1 T R 67 283 12.0 12.0 28 0 1 0 LTR 12 150 38 12.0 0 1 1 0 L TR 283 92 20 12.0 12.0 0 Southbound L T R 1 1 1 L T R 27 215 61 12.0 12.0 12.0 6 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left A A Thru A Thru A Right A Right A Peds Peds -7. WB Left A SB Left A Thru A Thru A Right A Right A Peds Peds NB Right EB Right SB Right WB Right 0-een 32.0 33.0 8.0 .ellow 4.0 4.0 3.0 All Red 0.0 0.0 0.0 Cycle Length: 84.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound T 710 1863 0.12 0.38 16.9 B 20.0+ C R 615 1615 0.52 0.38 20.8 C Westbound LTR 682 1790 0.37 0.38 19.0 B 19.0 B Northbound L 609 1770 0.58 0.54 19.1 B TR 712 1813 0.20 0.39 16.9 B 18.5 B Southbound L 484 1232 0.07 0.39 16.0 B T 732 1863 0.37 0.39 18.4 B 17.8 B `--= R 634 1615 0.11 0.39 16.2 B Intersection Delay = 18.8 (sec/veh) Intersection LOS = B HCS2000: Signalized Intersections Release 4.1e Analyst: Inter.: NW 14 AVENUE / NW 14 STREET ;, Agency: Area Type: All other areas Date: 10/22/04 Jurisd: Period: EXISTING PM PEAK HOUR Year : 2004 110 roject ID: MIAMI RIVERTOWN MUSP - # 04234 �/W St: NW 14 STREET N/S St: NW 14 AVENUE No. Lanes LGC on f i g Volume Lane Width RTOR Vol SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound L T R L T R L T R 0 2 0 LTR 62 102 14 12.0 0 0 2 1 LT R 42 509 183 12.0 12.0 18 1 1 0 L TR 20 117 19 12.0 12.0 0 Southbound L T R 1 1 1 L T R 120 215 233 12.0 12.0 12.0 23 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left A NB Left A Thru A Thru A Right A Right A Peds Peds WB Left A SB Left A A Thru A Thru A Right A Right A Peds Peds NB Right EB Right SB Right WB Right 4110 een 22.0 42.0 4.0 4.0 31.0 11.0 mellow 4.0 4.0 All Red 1.0 1.0 1.0 0.0 Cycle Length: 125.0 secs :_. Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound LTR 618 3513 0.30 0.18 45.1 D 45.1 D Westbound LT 1211 3604 0.48 0.34 33.1 C 32.7 C R 543 1615 0.32 0.34 31.2 C Northbound L 211 852 0.10 0.25 36.4 D TR 461 1860 0.31 0.25 38.7 D 38.4 D Southbound L 503 1805 0.25 0.38 30.2 C T 471 1900 0.48 0.25 40.9 D 39.2 D ==-R 401 1615 0.55 0.25 42.6 D "-- Intersection Delay = 36.9 (sec/veh) Intersection LOS = D • HCS2000: Signalized Intersections Release 4.1e Analyst: DPA Inter.: NW 17 AVENUE / NORTH RIVER DR Agency: Area Type: All other areas Date: 10/22/04 Jurisd: illiPeriod: EXISTING PM PEAK HOUR Year : 2004 roject ID: MIAMI RIVERTOWN MUSP - # 04234 7111"_,/W St: NORTH RIVER DRIVE N/S St: NW 17 AVENUE No. Lanes LGConfig Volume Lane Width RTOR Vol SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound L T R L T R L T R 0 2 0 LT 18 142 12.0 Southbound L T R 0 1 0 1 2 0 1 1 0 TR L T L TR 221 49 137 454 56 447 40 12.0 12.0 12.0 12.0 12.0 0 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left A NB Left A A Thru A Thru A Right Right Peds Peds WB Left SB Left A A Thru A Thru A Right A Right A Peds Peds NB Right EB Right SB Right WB Right 1111 een 38.0 53.0 6.0 mellow 4.0 4.0 3.0 All Red 1.0 1.0 0.0 Cycle Length: 110.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate ._;.,Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound LT ,--,Westbound TR 1136 3287 0.17 0.35 25.1 C 25.1 C 628 1817 0.51 0.35 29.2 C 29.2 C Northbound L 400 1770 0.40 0.58 28.0 C T 1709 3547 0.31 0.48 17.5 B 19.9 B Southbound L 526 1770 0.13 0.58 14.2 B TR 887 1840 0.65 0.48 23.1 C 22.2 C Intersection Delay = 22.8 (sec/veh) Intersection LOS = C • Future without Project • • HCS2000: Signalized Intersections Release 4.1e Analyst: Inter.: NW 14 AVENUE / NORTH RIVER DR Agency: Area Type: All other areas Date: 10/22/04 Jurisd: Period: FUTURE W/O PROJ PM PEAK Year : 2008 'roject ID: MIAMI RIVERTOWN MUSP - # 04234 s/W St: NORTH RIVER DRIVE N/S St: NW 14 AVENUE SIGNALIZED INTERSECTION SUMMARY No. Lanes LGConfig Volume Lane Width RTOR Vol Eastbound Westbound Northbound L T R L T R L T R 0 1 1 T R 68 290 12.0 12.0 29 0 1 0 LTR 12 154 39 12.0 0 1 1 0 L TR 288 95 21 12.0 12.0 0 Southbound L T R 1 1 1 L T R 28 219 62 12.0 12.0 12.0 6 Duration 0.25 Area Type: All other areas Signal Operations := Phase Combination 1 2 3 4 5 6 7 8 EB Left NB Left A A Thru A Thru A Right A Right A Peds Peds WB Left A SB Left A Thru A Thru A Right A Right A Peds Peds NB Right EB Right SB Right WB Right S :een 32.0 33.0 8.0 mellow 4.0 4.0 3.0 All Red 0.0 0.0 0.0 Cycle Length: 84.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate :,:.Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound T 710 1863 0.12 0.38 16.9 ,B 20.2 C R 615 1615 0.53 0.38 21.0 C . Westbound 'LTR 682 1790 0.38 0.38 19.1 B 19.1 B Northbound L 605 1770 0.60 0.54 19.6 B TR 712 1813 0.20 0.39 17.0 B 18.9 B Southbound L 479 1220 0.07 0.39 16.0 B T 732 1863 0.37 0.39 18.5 B 17.8 B R 634 1615 0.11 0.39 16.3 B Intersection Delay = 19.0 (sec/veh) Intersection LOS = B HCS2000: Signalized Intersections Release 4.1e Analyst: Inter.: NW 14 AVENUE / NW 14 STREET Agency: Area Type: All other areas Date: 10/22/04 Jurisd: Period: FUTURE W/O PROJ PM PEAK Year : 2008 'roject ID: MIAMI RIVERTOWN MUSP - # 04234 St: NW 14 STREET N/S St: NW 14 AVENUE -- No. Lanes LGConfig Volume Lane Width RTOR Vol • SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound L T R L T R L T R 0 2 0 LTR 63 104 14 12.0 0 0 2 1 LT R 43 523 187 12.0 12.0 19 1 1 0 L TR 22 119 20 12.0 12.0 0 Southbound L T R 1 1 1 L T R 122 219 241 12.0 12.0 12.0 24 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left A NB Left A Thru A Thru A Right A Right A Peds Peds WB Left A SB Left A A Thru A Thru A Right A Right A Peds Peds NB Right EB Right SB Right WB Right -een 22.0 42.0 31.0 11.0 .e1low 4.0 4.0 4.0 4.0 All Red 1.0 1.0 1.0 0.0 Cycle Length: 125.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate .: Grp Capacity (s) v/c g/C Delay LOS Delay LOS • Eastbound LTR 618 3514 0.31 0.18 45.1 D 45.1 D Westbound • LT 1211 3604 0.49 0.34 33.3 C 32.9 C R 543 1615 0.33 0.34 31.3 C Northbound L 207 835 0.11 0.25 36.6 D TR 461 1859 0.32 0.25 38.8 D 38.5 D Southbound L 501 1805 0.26 0.38 30.4 C T 471 1900 0.49 0.25 41.0 D 39.5 D R 401 1615 0.57 0.25 43.1 D Intersection Delay = 37.0 (sec/veh) Intersection LOS = D HCS2000: Signalized Intersections Release 4.1e Analyst: DPA Inter.: NW 17 AVENUE / NORTH RIVER DR Agency: Area Type: All other areas Date: 10/22/04 Jurisd: Period: FUTURE W/O PROJ PM PEAK HOUR Year : 2008 'roject ID: MIAMI RIVERTOWN MUSP - # 04234 .:/W St: NORTH RIVER DRIVE N/S St: NW 17 AVENUE No. Lanes LGConfig Volume Lane Width RTOR Vol SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound L T R L T R L T R 0 2 0 LT 20 145 12.0 0 1 0 TR 226 50 12.0 0 Southbound L T R 1 2 0 1 1 0 L T L TR 140 482 57 466 42 12.0 12.0 12.0 12.0 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left A NB Left A A Thru A Thru A Right Right Peds Peds WB Left SB Left A A Thru A Thru A Right A Right A Peds Peds NB Right EB Right SB Right WB Right -een 38.0 53.0 6.0 fellow 4.0 4.0 3.0 All Red 1.0 1.0 0.0 Cycle Length: 110.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound LT 1130 3271 0.17 0.35 25.1 C 25.1 C t... Westbound TR 628 1817 0.52 0.35 29.5 C 29.5 C Northbound L 383 1770 0.43 0.58 29.7 C T 1709 3547 0.33 0.48 17.7 B 20.4 C Southbound L 510' 1770 0.13 0.58 14.7 B TR 887 1840 0.67 0.48 23.9 C 23.0 C Intersection Delay = 23.3 (sec/veh) Intersection LOS = C Future with Project • HCS2000: Signalized Intersections Release 4.1e • Analyst: DPA Agency: Date: 10/22/04 Period: FUTURE W/ PROJ PM PEAK `roject ID: MIAMI RIVERTOWN MUSP /W St: NORTH RIVER DRIVE No. Lanes LGConfig Volume Lane Width RTOR Vol Eastbound L T R Inter.: NW 14 AVENUE / NORTH RIVER DR Area Type: All other areas Jurisd: Year : 2008 - # 04234 N/S St: NW 14 AVENUE SIGNALIZED INTERSECTION SUMMARY Westbound Northbound L T R L T R 0 1 1 T R 101 290 12.0 12.0 29 Southbound L T R 0 1 0 1 1 0 1 1 1 LTR L TR L T R 12 183 39 288 95 21 28 219 62 12.0 12.0 12.0 12.0 12.0 12.0 0 0 6 Duration 0.25 Phase Combination EB Left Thru A Right A Peds WB Left A Thru A Right A Peds NB Right SB Right S reen 32.0 ,ellow 4.0 All Red 0.0 Appr/ Lane -s: Grp Lane Group Capacity Area Type: All other areas Signal Operations 1 2 3 4 NB Left Thru Right Peds SB Left Thru Right Peds EB Right WB Right 5 6 7 8 A A A A A A A 33.0 8.0 4.0 3.0 0.0 0.0 Cycle Length: 84.0 secs Intersection Performance Summary Adj Sat Ratios Lane Group Flow Rate (s) v/c g/C Delay LOS Approach Delay LOS Eastbound T R Westbound LTR 710 1863 0.18 0.38 17.4 B 615 1615 0.53 0.38 21.0 C 685 1797 0.43 0.38 19.7 B '• Northbound L 605 TR 712 Southbound L 479 T 732 R 634 1770 0.60 0.54 19.6 B 1813 0.20 0.39 17.0 B 1220 0.07 1863 0.37 1615 0.11 Intersection Delay = 19.1 20.0+ C 19.7 B 18.9 B 0.39 16.0 B 0.39 18.5 B 17.8 B 0.39 16.3 B (sec/veh) Intersection LOS = B HCS2000: Signalized Intersections Release 4.1e • Analyst: DPA Inter.: NW 14 AVENUE / NW 14 STREET Agency: Area Type: All other areas Date: 10/22/04 Jurisd: Period: FUTURE W/ PROJ PM PEAK Year : 2008 `roject ID: MIAMI RIVERTOWN MUSP - # 04234 ,!;/W St: NW 14 STREET N/S St: NW 14 AVENUE No. Lanes LGConfig Volume Lane Width RTOR Vol SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound L T R L T R L T R 0 2 0 LTR 63 126 14 12.0 0 0 2 1 LT R 43 542 187 12.0 12.0 19 1 1 0 L TR 22 119 20 12.0 12.0 0 Southbound L T R 1 1 1 L T R 122 219 241 12.0 12.0 12.0 24 Duration 0.25 Area Type: All other areas Signal. Operations __- Phase Combination 1 2 3 4 5 6 7 8 EB Left A NB Left A Thru A Thru A Right A Right A Peds Peds WB Left A SB Left A A Thru A Thru A Right A Right A Peds Peds NB Right EB Right SB Right WB Right 0r.een 22.0 42.0 31.0 11.0 fellow 4.0 4.0 4.0 4.0 All Red 1.0 1.0 1.0 0.0 Cycle Length: 125.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound LTR 620 3525 0.35 0.18 45.5 D 45.5 D Westbound - LT 1211 3604 0.51 0.34 33.6 C 33.1 C R 543 1615 0.33 0.34 31.3 C Northbound L 207 835 0.11 0.25 36.6 D TR 461 1859 0.32 0.25 38.8 D 38.5 D Southbound L 501 1805 0.26 0.38 30.4 C T 471 1900 0.49 0.25 41.0 D 39.5 D R 401 1615 0.57 0.25 43.1 D Intersection Delay = 37.2 (sec/veh) Intersection LOS = D • HCS2000: Signalized Intersections Release 4.1e • Analyst: DPA Inter.: NW 17 AVENUE / NORTH RIVER DR Agency: Area Type: All other areas Date: 10/22/04 Jurisd: Period: FUTURE W/ PROJ PM PEAK HOUR Year : 2008 'roject ID: MIAMI RIVERTOWN MUSP - # 04234 .4/W St: NORTH RIVER DRIVE N/S St: NW 17 AVENUE SIGNALIZED INTERSECTION SUMMARY No. Lanes LGConfig Volume Lane Width RTOR Vol Eastbound Westbound Northbound L T R • L T R L T R 0 2 0 LT 20 155 12.0 Southbound L T R 0 1 0 1 2 0 1 1 0 TR L T L TR 236 83 140 482 86 466 42 12.0 12.0 12.0 12.0 12.0 0 0 Duration 0.25 Area Type: All other areas Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left A NB Left A A Thru A Thru A Right Right Peds Peds WB Left SB Left A A Thru A Thru A Right A Right A Peds Peds NB Right EB Right SB Right WB Right :een 38.0 53.0 6.0 111/ iellow 4.0 4.0 3.0 All Red 1.0 1.0 0.0 Cycle Length: 110.0 secs Intersection Performance Summary Appr/ Lane Adj Sat Ratios Lane Group Approach Lane Group Flow Rate Grp Capacity (s) v/c g/C Delay LOS Delay LOS Eastbound LT 1106 3202 0.19 0.35 25.3 C 25.3 C „Westbound TR 621 1797 0.61 0.35 31.5 C 31.5 C Northbound L 383 1770 0.43 0.58 29.7 C T 1709 3547 0.33 0.48 17.7 B 20.4 C •Southbound L 510 1770 0.20 0.58 15.5 B TR 887 1840 0.67 0.48 23.9 C 22.7 C Intersection Delay = 23.8 (sec/veh) Intersection LOS = C • Project Driveway • • HCS2000: Unsignalized Intersections Release 4.1d TWO-WAY STOP CONTROL SUMMARY • Analyst: DPA Agency/Co.: late Performed: 10/25/2004 analysis Time Period: FUTURE W/ PROJ PM PEAK HOUR Intersection: NORTH RIVER DRIVE / DRIVEWAY Jurisdiction: Units: U. S. Customary Analysis Year: 2008 Project ID: MIAMI RIVERTOWN MUSP - # 04234 East/West Street: NORTH RIVER DRIVE North/South Street: DRIVEWAY Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Movement 1 2 3 L T R Westbound 4 5 6 L T R Volume 396 29 532 Peak -Hour Factor, PHF 0.95 0.95 0.95 Hourly Flow Rate, HFR 416 30 560 Percent Heavy Vehicles Median Type/Storage Raised curb / 1 RT Channelized? Lanes 2 0 2 Configuration T TR T Upstream Signal? No No 1111 inor Street: Approach Northbound Southbound Movement 7 8 9 I 10 11 12 L T R I L T R Volume 22 Peak Hour Factor, PHF 0.95 Hourly Flow Rate, HFR 23 Percent Heavy Vehicles 2 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement 1 4 17 8 9 I 10 11 12 Lane Config I R v (vph) 23 C(m) (vph) 780 v/c 0.03 95% queue length 0.09 Control Delay 9.8 ---' L O S A '-nproach Delay 9.8 ...;.?Proach LOS A Appendix E Committed Development Information • New Miami City View Apartments PM Peak Hour Trip Generation Analysis USES UNITS ITE Land Use Code PM PEAK HOUR TRIPS IN OUT TOTAL % Trips % Trips Trips Residential Apartments 130 DU 220 65% 58 35% 31 89 GROSS VEHICLE TRIPS 1 65% I 58 1 35% I 31 1 89 Vehicle Occupancy Adjustment @ Transit Trip Reduction @ Pedestrian / Bicycle Trip Reduction @ 16.00% of Gross External Trips 15.00% of Gross External Trips 10.00% of Gross External Trips (1) (2) (3) 65% 65% 65% 9 9 6 35% 35% 35% 5 5 3 14 13 13 NET EXTERNAL VEHICLE TRIPS 65% 34 35% 18 48 I I 0 I Net External Person Trips in Vehicles @ Net Extemal Person Trips using Transit @ 1.40 Persons/ Vehicle 1.40 Persons/ Vehicle 65% 65% 44 12 35% 35% 23 7 67 19 Net Extemal Person Trips (vehicles and transit modes) 65% 56 35% 30 86 I Net External Person trips walking / using bicycle 1.40 Persons/ Vehicle 1 65% 12 135% 7 I 19 Notes (1) A 16% reduction to adjust for the difference between ITE auto occupancy and local data (Miami's 1.4 vs. ITE's 1.2 pers/veh) (2) Transit trip reduction based on close proximity to Civic Center and Santa Clara Metrorail Station and other available transit. (3) Pedestrian and bicycle trip reductions based on engineering judgement. #04234 - NMCVA T-Gen.xls • • • New Miami City View Apartments 2005 Cardinal Distribution Direction TAZ 477 NNE 19.44% ENE 7.05% ESE 10.82% SSE 3.92% SSW 13.34% WSW 17.74% WNW 13.09% NNW 14.60% TOTAL 100.00% 27.69% 26.49% 31.08% 14.74% #04234 - NMCVA TAZ.xls mmmm mmm zzzz m mmm mmmm yir yir yir 0 5' i 4 mmm Mir mmm yir 000 000 000 000 000 000 000 000 000 000 .ebb 000 0 0 0 0 0 0 0 0 0 0 0 0 000 000 000 000 000 000 000 000 000 0 0 000 000 000 000 0 0-. 000 awe w O 0 0 0 �j 0 0 coon y m 0 O m 0 28 mmm yir MMM Mir mmm y i r zzzz mirz 0 a f V • mmmm zzz 0 m m ryi mmmm y mmir zzzzmmmm yirr� m • 1 mmm Mir W NN A mNi000 mOa" 2' WNNm )NNTS"92:1O'O mpm OWN NmJ R g El0 m �x o v 0 0 0 0 0 0 0 0 0 0 0 0 000 2 000 O 0000 0000 0 0 0 0 0 0 0 0 0 0 0 0 NNW AgqAm NAaa 'AA m O NNi.pp N' O NN_N N N gal O I014 00.0 'OI 4Nf fNJO 0-0 4)Ol 4f A2fJ 01 OmmN 0Nm A .... c.40 4mm '2g .0.„N 7 0 z 10 000 00. - 5 0 050 0000 000 - f0 0 0 0 0 0 N 0 0 0 0 - 0 0 0 0 0 0 N 0 w- 33 oz < C ill iiii O nj== ODO eon lop 000 O n o O O O O O O O O O 0. O o n o 0 0 0 000 T a m i 0 0 < T L cag �a€ UM011eAla !W W Appendix F Traffic Control Measures Plan • • Miami Rivertown TRAFFIC CONTROL MEASURES PLAN The project's design and location will reduce the project vehicular traffic volumes as follows: • The project is a proposed residential development which includes some retail and office space. This type of development will result in a portion of the trips being captured within the development, or internal to the site. • The project will also provide residential units with accessibility to mass transit. This feature will allow residents to use mass transit for their trip to work. The development will also do the following to further reduce peak hour vehicle trips: • Will encourage employers/landlords to participate in ridesharing programs through South Florida Commuter Services. Available information will be obtained and distributed to all employers/landlords in the development. • Miami -Dade County Transportation Agency current local and regional mass transit route and schedule information will be provided to potential transit users in a prominent public area of the development. The information provided and maintained on the premises will be updated, when necessary, at no less than six month intervals. • Promote mass transit use by encouraging employers/landlords to purchase transit passes and make them available to employees and residents at discounted prices or no charge, or in lieu of subsidized parking. • Encourage employers to implement staggered work hours. Implementation of these items will result in a minimum of ten percent (10%) reduction of peak hour vehicle trips. The performance of the plan will be monitored by measuring actual afternoon peak hour volumes at the project driveways and comparing the counts against total project trips based on the Institute of Transportation Engineers (ITE) trip. generation rates. TRAFFICCONTROL.DOC •