HomeMy WebLinkAboutExhibit B•
•
•
Project Data
Property Address:
Net Lot Area:
Gross Lot Area:
Current Zoning:
FEMA Zone:
Proposed Zoning:
Setback Requirements:
F.A.R. Allowed:
Maximum Density:
Maximum Building Height:
Maximum Lot Coverage:
Green Space:
Parking Requirements:
{per OIR-4 zoning)
Loading Berths:
Projected Development:
1500 NW N River Drive
Miarrri, Florida
286,262 square feet 1 5.572 acres
421,056 square feet 7 9.667 acres
0. Office Ilse (allows residential under the R-4
Multi -Family High- Density designation)
AE-9: Base Flood Elevation: 9-0'
Cl,-Commercial (with SO-19 Overlay of 2.80 FAR)
West Lot: Front (North River Drive}:
Side:
Side Street (NW 15th Ave):
Waterfront Yard (River Front):
East Lot: Front (NW 15th Ave):
Side Street (N River Drive):
Side:
Waterfront Yard (River Front):
Above 120 vertical feel from Base Building Line (both lots):
Per 0/R-4 zoning:
Per OIR-4 zoning: (150 units per net acre)
No Height imitations
60 % of gross lot area (per R-4 zoning)
15% of gross bt area (per R-4 zoning)
Phase I:
RetaB: (1 space/300 st)
Office: (1 space/300 sf)
Studios 8 One Bedrooms: (1 spece&unit)
Two and Three Bedrooms: (2 spaces/unit)
Townhomes: (2 spacesluntt)
Visitor Parking- (1 space/10 units)
Management'Sales: (1 space/3(0 sf)
Total:
Phase II:
Relad:
Office:
Restaurant:
Studios 8 One Bedrooms:
Two and Three Bedrooms
Townhomes:
Visitor Parking:
Managernent:Sales:
Total:
Phase Ill:
Retail:
Office:
Restaurant:
Studios 8 One Bedrooms:
Two and Three Bedrooms
Townhomes:
Visitor Parking:
Management/Sales:
Totat:
(1 speceJ300 sf)
(1 space/300 st)
(1 space/100 sr)
(1 spacelunil)
(2 spaceslun8)
(2 spaceslunit)
(1 spacell0 units)
(1 spacel300 sf)
space7300 sf)
(1 space(300 sf)
(1 specel100 sf}
(1 space/unit)
(2 spaces/unit}
(2 spaces/unit)
(1 spacei10units)
(1 space/300 sf)
Project Total:
Phase 1:
One 12'x35' berth tor every one hundred residential units:
One 10'x20' berth tar every 30 residential units remainder.
Nonresidential: One berth for area up to 50,000 gsf:
Phase It:
One 12k35' berth for every one hundred residential units:
One 101x20' berth tor every 30 residential units remainder.
Nonresidential: One berth for area up to 50,000 gsf-.
Phase III:
One 12'x35' berth for every one hundred residential units:
One 10'x20' berth Ion every 30 residential units remainder:
Nonresidential: One berth for area up to 50,000 gsf:
Phase I: Townhomes:
Tower units:
Phase 11: Townhomes:
Tower units:
Phase III: Townhomes:
Tower units:
Total Residential Units:
EXHIBIT
Required 1 Allowed:
10.-0"
10'--0- (Abuts R)
7'-0"
25'-A'
7'-6"
10'-0' (Abuts 0)
25`-0"
Proposed:
15'.0
10-2"
7'-6`
45'-0'
10'-0'
15'-0"
19-0`
1 additional fool for every fool above 120 feel (45 degrees)
1,72
716,636 st max, permitted area
985 units
NIA
252,633 sf
63,156 st
78
144
277
90
52
35
13
689 spaces req'd
47
95
16
249
108
22
32
10
579 spaces req'd
27
52
16
246
102
50
33
10
536 spaces req'd
1,804 spaces req'd
3 large berths
2 small berths
1 large berth
3 large berths
1 small berth
1 targe berth
3 large berths
1 small berth
1 large berth
2.76 (Proposed with 5D-19 Overlay of 2.80)
1,167,373 sf development
985 units
38FF-0"
180,500 sf
63,846 sf
728 spaces provided
598 spaces provided
540 spaces provided
1,866 spaces provided
3 large berths
2 small berths
1 large berth (shared)
3 large berths
1 small berth
1 large berth (shared)
3 large berths
1 small berth
t large berth (shared)
26 units
323 units
11 units
303 units
25 units
297 units
965 units