Loading...
HomeMy WebLinkAboutExhibit B• • • Project Data Property Address: Net Lot Area: Gross Lot Area: Current Zoning: FEMA Zone: Proposed Zoning: Setback Requirements: F.A.R. Allowed: Maximum Density: Maximum Building Height: Maximum Lot Coverage: Green Space: Parking Requirements: {per OIR-4 zoning) Loading Berths: Projected Development: 1500 NW N River Drive Miarrri, Florida 286,262 square feet 1 5.572 acres 421,056 square feet 7 9.667 acres 0. Office Ilse (allows residential under the R-4 Multi -Family High- Density designation) AE-9: Base Flood Elevation: 9-0' Cl,-Commercial (with SO-19 Overlay of 2.80 FAR) West Lot: Front (North River Drive}: Side: Side Street (NW 15th Ave): Waterfront Yard (River Front): East Lot: Front (NW 15th Ave): Side Street (N River Drive): Side: Waterfront Yard (River Front): Above 120 vertical feel from Base Building Line (both lots): Per 0/R-4 zoning: Per OIR-4 zoning: (150 units per net acre) No Height imitations 60 % of gross lot area (per R-4 zoning) 15% of gross bt area (per R-4 zoning) Phase I: RetaB: (1 space/300 st) Office: (1 space/300 sf) Studios 8 One Bedrooms: (1 spece&unit) Two and Three Bedrooms: (2 spaces/unit) Townhomes: (2 spacesluntt) Visitor Parking- (1 space/10 units) Management'Sales: (1 space/3(0 sf) Total: Phase II: Relad: Office: Restaurant: Studios 8 One Bedrooms: Two and Three Bedrooms Townhomes: Visitor Parking: Managernent:Sales: Total: Phase Ill: Retail: Office: Restaurant: Studios 8 One Bedrooms: Two and Three Bedrooms Townhomes: Visitor Parking: Management/Sales: Totat: (1 speceJ300 sf) (1 space/300 st) (1 space/100 sr) (1 spacelunil) (2 spaceslun8) (2 spaceslunit) (1 spacell0 units) (1 spacel300 sf) space7300 sf) (1 space(300 sf) (1 specel100 sf} (1 space/unit) (2 spaces/unit} (2 spaces/unit) (1 spacei10units) (1 space/300 sf) Project Total: Phase 1: One 12'x35' berth tor every one hundred residential units: One 10'x20' berth tar every 30 residential units remainder. Nonresidential: One berth for area up to 50,000 gsf: Phase It: One 12k35' berth for every one hundred residential units: One 101x20' berth tor every 30 residential units remainder. Nonresidential: One berth for area up to 50,000 gsf-. Phase III: One 12'x35' berth for every one hundred residential units: One 10'x20' berth Ion every 30 residential units remainder: Nonresidential: One berth for area up to 50,000 gsf: Phase I: Townhomes: Tower units: Phase 11: Townhomes: Tower units: Phase III: Townhomes: Tower units: Total Residential Units: EXHIBIT Required 1 Allowed: 10.-0" 10'--0- (Abuts R) 7'-0" 25'-A' 7'-6" 10'-0' (Abuts 0) 25`-0" Proposed: 15'.0 10-2" 7'-6` 45'-0' 10'-0' 15'-0" 19-0` 1 additional fool for every fool above 120 feel (45 degrees) 1,72 716,636 st max, permitted area 985 units NIA 252,633 sf 63,156 st 78 144 277 90 52 35 13 689 spaces req'd 47 95 16 249 108 22 32 10 579 spaces req'd 27 52 16 246 102 50 33 10 536 spaces req'd 1,804 spaces req'd 3 large berths 2 small berths 1 large berth 3 large berths 1 small berth 1 targe berth 3 large berths 1 small berth 1 large berth 2.76 (Proposed with 5D-19 Overlay of 2.80) 1,167,373 sf development 985 units 38FF-0" 180,500 sf 63,846 sf 728 spaces provided 598 spaces provided 540 spaces provided 1,866 spaces provided 3 large berths 2 small berths 1 large berth (shared) 3 large berths 1 small berth 1 large berth (shared) 3 large berths 1 small berth t large berth (shared) 26 units 323 units 11 units 303 units 25 units 297 units 965 units