Loading...
HomeMy WebLinkAboutExhibit 21Iitg .a f 4ffliami STEPHANIE N. GRINDELL, P.E. Director October 12, 2004 Neo Epoch 1, Ltd. 3375 SW Third Avenue Miami, FL 33145 Dear Ladies and Gentlemen: JOE ARRIOLA City Manager RIVERFRONT-EAST NEW TENTATIVE PLAT #1659 Located along the West side of South Miami Avenue, South of 3 Street The City of Miami Plat and Street Committee, at its meeting of October 7, 2004, approved the above tentative plat subject to the following revisions being made to the tentative plat, additional Information being provided and/or variances being granted. Please be advised that the processing of your tentative plat cannot proceed until these conditions have been satisfied. 1. In the location sketch: a. Provide lot and block numbers, subdivision names and plat book and page numbers for underlying and adjacent subdivisions. b. Provide zoning designations and zoning district lines. c. Label the area to be platted as RIVERFRONT-EAST. d. Provide a sectional/fractional legal description. 2. In the title block Include the name of the city, City of Miami. 3. Reference SD•6, Central Commercial -Residential, as according to "Zoning Ordinance 11000, as amended, Article 4, Section 401, Schedule of District Regulations". 4. Provide plat book and page for the flood criteria information. 5. Elevations must be on City of Miami Datum. Also provide the benchmark information. 6. Provide a tree survey, including height, diameter, spread, common and botanical names, if applicable. 7. Label any unplatted area as NOT SUBDIVIDED, if applicable. 8. Existing easements not released prior to the final plat must be shown on the plat. 9. Provide ties (distances and bearings) to the centerline and the monument lines of South Miami Avenue and SW 3 Street. 10. Provide a copy of each Instrument referenced in the special exceptions of the opinion of title. 11. Be more specific in the development statement. C:1MyDirectory\RESOLUTS\R1VERFRONT-E4WPA MENT OF PUBLIC WORKS 444 S.W. 2nd Avenue / Miamf, Florida 33130 / f305) 416-1200 / Fax:(305) 416.2153 Neo Epoch 1, Ltd. RIVERFRONT-EAST NEW TENTATIVE PLAT #1659 October 12, 2004 Page two 12. All encroachments across proposed tract lines must be removed prior to the final plat. 13. Tentative plat application must be made with Miami -Dade County after receiving approval from the City of Miami Plat and Street Committee. 14. Backup documentation will be required for all who execute the final plat. A resolution for authority to execute documents and a Certificate of Good Standing from the Secretary of State is required, if applicable. 15, An opinion of title in the City of Miami opinion of title form must be provided at the time of final plat submittal. 16. Before final plat submittal to the City, a copy of each the. final plat and the opinion of title must be submitted to Miami -Dade County for review and then retrieved and submitted to the City. In addition to the, above requirements, you should be aware of the following: 1. State and local laws require the installation of various physical Improvements in the public rights -of -way when property is platted. These subdivision improvements include paving, drainage, landscaping, sidewalks, etc. In some cases this could represent a substantial investment on your part. 2. The alteration, relocation or installation of utilities such as storm and sanitary sewers, electric, telephone, water, etc. caused by this plat will be at the property owner's expense. Also, utility easements may be required on the property being platted. 3. A building permit will not be issued on the property being platted until the final plat is recorded. Also, the Certificate of Occupancy for any building construction will be issued only after all the required subdivision improvements have been completed. 4. Approval for fire flow requirements must be obtained from the Fire -Rescue Department prior to the Issuance of a building permit. 5. Additional Items must be provided to the City of Miami Department of Public Works before the final plat is submitted to the City Commission for approval. You will be notified in writing as to what these items are after the amount of the bond has been determined for the necessary subdivision improvements. 6. Tentative plat approval Is only valid for one (1D year from the date of the Plat and Street Committee meeting at which time it was approved. C:IMyDirectory\RESOLUTSIRI V ERFRONT-EAST. doc Neo Epoch 1, Ltd. RIVERFRONT-EAST NEW TENTATIVE PLAT #1659 October 12, 2004 Page three If you have any questions concerning these requirements, please refer to the attached sheet for the appropriate person to contact. Sincerely, Rands Mitchell, PE Signing for 8lephanfie Orindell, PE phanie N. Grindell, P. E. Chairman, Plat and Street Committee SNG/UH/rjf Enclosure: Contact Sheet c: Ludovici & Orange 329 Palermo Avenue, 2nd Floor Coral Gables, FL 33134 Plat and Street Committee Members bC: Surveys Civil Engineering Central C:IMyDi rectory\RESOLUTSIRI V ERFRONT-EAST.doc