HomeMy WebLinkAboutFact SheetFACT SHEET
DEPARTMENT OF PUBLIC WORKS
SHEET 1 OF t DATE: 6 / 27 / 2005
JOB NUMBER: B-30256
PROJECT NAME: CITYWIDE OUTFALL CLEANING PROJECT, B-30258
CIP NUMBER: N/A
LOCATION: All Outfalt Infrastructure citywide
OTHER TYPE: PW
PROJECT MANAGER / EXT. No.:
ASSOCIATED DEPARTMENT:
E. Estevez 1217
Public Works
FEDERAL (C.D.B.G.): I I
S.N.P.B. 1 ]
ASSESSABLE: I 1
COMMISSIONER DISTRICT: ALL
EMERGENCY: INO 1
BID REQUEST: FORMAL, .,.',., INFORMAL.!
RESOLUTION No.:
DESCRIPTION: This project includes the cleaning of the outfall storm sewe infrastructure usingmechanical vactor trucks.
The project consists of cleaning and de -silting the outfall storm sewer infrastructure including but not limited
to outfall pipes, and all connected structures such as catch basins, Inlets, manholes, augerhotes, solid cross pipes, french drains,
cover ditch systems, open joint pipe systems, etc. The project is located citywide. The work will be performed using hydraulic cleaning and
vacuum removal equipment and the project requires a minimum of two full crews.
Total Bid In the amount of $399,990 is for a two year period ($199,995 per year) from PW General Account 001000.311003.6340.
Marlin Engineering Work Order of $319,612.80 is for a two year period ($159,806.40 per year) from PW General 001000,311003.6270 to
perform Inspection services. OF NECESSARY, CONT1NUE ON TnE SACRl
SCOPE OF SERVICES:
ADVERTISING
OUTSIDE DESIGN
SURVEY / PLAT
P.W. DESIGN & BID DOCUMENTS
CONSTRUCTION
CONSTRUCTION ADMINISTRATION
OTHER:
PUBLIC WORKS
COST (% OF CONST. COST)
$ (a) $ -- %
$ -- $ --
$ -- $ --
$ -- (E) $ -- %
$ -- $ 399,990.00 ('TOTAL BID)
$ $ -- %
$ -- (E) $ (E)
(a) - actual coat
(E) - ESTIMATE
ESTIMATED CONST. COST $
TOTAL $ 399, 990.00
r
(TOTAL ENG. FEE)
per year
CONTRACTOR'S INFORMATION:
Pipe Cleaning
CLASS: J f!`;P'r, S
NON - MINORITY ':,Y .
TYPE OF WORK: Inlet and
MINORITY [ e H f F i
YEARS OF ESTABLISHMENT: 7 Years LICENSE CGC150707453
NAME: Envirowaste Services Group TELEPHONE: (305) 740-8315
ADDRESS: 5931 SW BB Street
CITY, STATE, ZI Miami, FL 33156
CONTACT PERSC Eduardo Barba, President
SUS -CONTRACTORS:
NAMES: Envira Dyne 1997-00165
COPIES: ASSISTANT DIRECTORS, COST ANALYSIS, FILE, ASSOCIATED DEPT. CIP MANAGER