HomeMy WebLinkAboutExhibit 4C'T`''iviDE STORM SEWP7 CLEANING PROJECT - NORTH ZONE
B-50711
PROPOSAL
COMMISSION
OF MIAMI, FLORIDA
DATED: G r
BIDDER S NAME: .i5✓/V2 ��J' r�':'Y'r'i C�' + id •rpm
PRIMARY OFFICE STREET ADDRESS: ,5Y3/ red' 68/4.
/-4°.61,-06,/,,,
Gentlernerr
The undersigned, as Bidder (herein used in the masculine singular, irrespective. of
actual gender and number) hereby declares that the only personsinterested' in
this Proposal are named herein, that no other person has any interest. in this
Proposal, or in the Contract to which this Proposal pertains, that this Proposal is
made without connection or arrangement with any other person and that this
Proposal is in every respect fair, in good faith, and with,but collusion or fraud.
The Bidder further declares that he has complied in every respect with all of the
Instructions to Bidders, that he "has read all addenda issued prior to the opening of
Bids, and that he has satisfied himself fully relative to all matters arid conditions
with respect to the work to which the Proposal pertains.
The Bidder proposes and agrees; if this Proposal is accepted, to execute all
appropriate Contract Documents for the purpose of establishing a formal
contractual relationship between him and the City of 'Miami, Florida, for the
furnishing of ail materials, equipment and the performance of all work to which this
Proposal pertains
The Bidder certifies that this Bid is based upon all items as shown on' the Plans
and/or listed in these Specifications, and that he has made no changes in these
Contract Documents. APPROV EThe Bidder further declares that he has carefully inspectehe
By
Date/Zi/6r
proposed work.
PROPOSAL
Page 2a
B-50711
CITYWIDE STORM SEWER CLEANING PROJECT NORTH ZONE
STARTING CONSTRUCTION TIMES:
The Bidder agrees to start work immediately after notice from the Engineer to
begin 'work, The work may be started on any working day within this ten (10)
consecutive calendar day period, The Bidder shall complete the contract in
accordance , with the Plans and Specifications therefore, within the number of
calendar clays specified on Proposal Page 2 and no additional completion time
shall be added for any optional items awarded. All w rk shall be in full and
complete accordance with all terms and conditions set forth in and covered by the
contract documents.
Should the contractor fail to complete the work on or before the date specified, it is
agreed that for each calendar day thatany portion of the work shall remain
uncompleted, after the timespecified in the. proposal., with any extension of time
which may be allowed by the City for the completion of the work provided for in the
contract documents, the sum per day given in Division 1 - General 'Conditions,
Section 6-9, shall be deducted from the moneys due the contractor not as a
penalty but as liquidated damages and added expense for inspection,
The names of the Subcontractors and their current. County -Municipal
Occupational License numbers for the typeof work shall be listed below. No
change in Subcontractors will be allowed without written approval of the Engineer.
Subcontractors shall hold the license at the time of executing and during' the
performance of this contract.
PROPOSAL
Page 2b
B--50711.
CITYWIDE STORM SEWER CLEANING PROJECT — NORTH ZONE
If no Subcontractors are to be used, insert the word "Self" in the spaces under
"Name of Subcontractor".
NAME O.F
TYPE OF WORK SUBCONTRACTORS
Waste Disposal
2. Storm/Drainage Sy_sterrt
3. Testing Services
SUBCONTRACTOR'S
COUNTY -MUNICIPAL
OCCUPATIONAL
. .LICENSE NUMBER
AAP', a.
4. ti
5.
Other (Bidder .Fill In)
NOTE CONTRACTOR'S SUPERINTENDENT ON 24-HOUR CALL. In the event
that the Engineer must contact the Contractor to perform, emergency repair work
to correct hazardous or unsafe conditions or problems relating to public health or
welfare as a result of or .associated with the project construction the Contractor
shall provide the name and 24-hour telephone number of.the job superintendent
to be contacted in the space provided below.
[Ora �Gr
Name -(Job Superintendent)
750_6-' —
Telephone Nurrmber.
The Contractor shall also provide a toll -free telephone number for his business
office for use during normal business hours of 8:00 a,m. - 57.90Eivr,D.riviOnda4
THROUGH Friday."
ir
Date
CITYWIDE STORM SEWER CLEANING PROJECT
THE BIDDER STATES THAT• THIS PROPOSAL: IS BASED UPON : THEE
CONTRACT DOCUMENTS AND THAT HE ACKNOWLEDGES. THE :RECOtPT
OF THE FOLLOWING ADDENDUM (ADDENDA)':
ADDENDUM No
NOTE:: The Bidder agrees to perform aII . the ..work. , as, ciescribed in t
Specifications and as shown on the Plans for the lump sum praxes, as noted on
the following sheets.
BASE BID THE TOTAL OF ITEMS 1 through 15
based on a Three hundred sixty-five (365)
calendar days completion time,
the surd of
TOTAL BID: twice the BASE BID based on
a two .(2) years period :(730) calendar
days
The term of this contract: is for two (2) years with she option t renew' for two additional..
one year period. The City reserves the rightnot to renew for the two optional one year
periods at its discretion;
The Base Bid price is for a one .year, < three hundred sixty five (365) calendar days
completion. time. The Total Bid price is twice the Base Bid price.
The second year term of the contract will be based on the Base :bid ;prices and
additional compensation will beallowed
The City reservesthe right to reject all bids.
CITYWIDE STORM SEWER CLEANING PROJECT NORTH ZONE
ITEM 1:
For furnishing all labor, materials and. equipment. for the removal of sediment debris
and material inside the storm sewer structures (inlets and manholes), less than 6
foot cut, approximately 6,500 structures citywide, the unit price of
Q .. Dollars and
Cents ($ Q. 4„.) X `.6,5O0
pe.r structure
ITEM s:
For furnishing all tabor, materials and equipment far the removal 'Of'Sediment debris
and material inside the storm sewer structures (inlets and manholes}; 6 to S foot
cut, approximately 6,500 structures citywide, the unit; price of
Dollars and
Cents ($ : j X 6,500 -
per structure
ITEM 3:
For furnishing alllabor, materials and equipment for the removal ot+ Sediment debris
and material inside the storm sewer structures (inlets andmanholes),,: more than
foot cut, approximately 500 structures citywide, the unit price of
Dollars' and
)trG Cents ($ d 01 ) X ' 500
per structure
ITEM 4: For furnishing all ,labor, materials and equipment .for the :removal and 'cleaning dt
Sediment. debris and material inside the storm. sewer; pipe System,,, 2" to 11interior':
diameter, approximately 5,000 linear feet of pipe, .any material; !the unrt.price af
.t.. Dollars and
Se).
Cents ($ j X 5,000 sc:..
ITEM 5
per linear foot of
For furnishing all labor, materials and equipment for the removal and cleaning of.
sediment debris and material inside the storm sewerpipe eystern,; 12":; tQ' 1.7
interior diameter, approximately 5,000 linear feet of : pipe, any material, the 'unit'
price of 0
per linear foot c
pipe
Dollars and
CITYWIDE STORM SEWER CLEANING. PROJECT NORTH ZONE
ITEM 6: For furnishing all labor, materials and equipmentfor the rernovaf ard cleaning 'of
sediment debris and material inside the storm: sewer pipe. system;'
interior diameter, approximately 5,000 linear, feet of pipe, any ,material; the ' unit
price of
per linear
ITEM 7: For furnishing all labor, materials and equipment for the removal and cleaning: of
sediment debris: and material 'inside the; storm sewer pipe; 'system; 31" to,,42
interior. diameter, :,approximately 3,000 linear. feet of pipe, any 'material,' the 'unit .,,.;
price of r� `'
Dollars and
Canta,10 (6 op ) X 3,000 - $ �y.11roc :'' a '
-ITEM 7.''
per linear foot of pipe
ITEM6: Poi' furnishing all labor, materials. ;and: equipment 'tor the removal 'arid ctoanmg of
sediment debris and -material'. inside the storm .sew r pipe : System,;; 437.; to ;54"•
interior diameter, approximately 3,000 linear.,feet of pipe,, . any ;manorial; 'the ~unit:
price of
Dollars and
Cents ($ .` 1 x 3,aoo=
per linear foot of pipe
ITEM $ For
debris and material inside the. storm sewer pipe:system
or -furnishing all labor, materials and equipment for 'the removal find cleaning
$; more then,f.55'
interior diameter. approximately '1,000 .linear feet of pipe, any material,` the unit
price of
7,4310C-, Dollars `and
Cents ($ jj.." y X 1,00Qe
per linear foot of pipe
CITYWIDE STORM SEWER CLEANING PROJECT NORTH ZONE:`'.
ITEM 10: For furnishing all labor, materials and equipment for the removal and cleaning of
sediment debris and material inside the storm sewer Culvert trench pipe •pnd Cover
ditch, at any foot cut, . including ;`slab cover restoration and :.complete surfscs
restoration, if necessary, approximately 5,000 linear feet of culvert trench'pipe and:!'
cover ditch, the uriit price of
..[� Ootlars arid
o
D Cents ($ '� ) X
per linear foot
ITEM 11:
For furnishing all labor, materials and equipment for televising (video- camera).
- storm :sewer pipe system, any size interior diameter, approximately 500 finear,fee
of pipe, any material, if necessary, the unit price of
Dollars. and:
Celts (S $' ) X 500a
per linear foot
ITEM12: For furnishing all., labor, materials -and equipment necessary fora providing i''a':4
hydraulic pump including all hoses, diesel and :appertunances,,.mobi ization; setting
up .crew, etc., for ten (10) hours .of operatioress; et different :locations, .the unit per:i
hour price of
per hour.
ITEM '13: For furnishing all : labor, materials end equipment necessaryfor providing is ,
hydraulic pump including all hoset, diesel and, appertunaryces; mobtitzation, sett
up crew, etc., for ten (10) hours of operatio; lons,' the aril r hr
operations, at different #ocati ' , P'e ,..
• price :o.f
per hour
eif
Dollars and
Cents'
nts(s,Awr``)X10 st
PROPOSAL -:
Page 2f
B - 50711;
CITYWIDE STORM SEINER CLEANING PROJECT - NORTH ZONE;
ITEM 14:. For furnishing all labor, materials and equipment necessary,' for the cleaning gffifty
(50) deep.drainage wells at a. minimum depth of 100 ft.` by compreesed,air ;jetting.
method approved equal, at d' Brent locations citywide, theunit per hour price of.
Dollars and
Cants ($ e5C.°1 X 3o
each
ITEM 15: Provision for Special Items as noted in Division 2, Section Z t o, tte!ump �um of THIRTY THOJ$ANIa Dollars' and,. .
NO
dump Burn