Loading...
HomeMy WebLinkAboutExhibit 4C'T`''iviDE STORM SEWP7 CLEANING PROJECT - NORTH ZONE B-50711 PROPOSAL COMMISSION OF MIAMI, FLORIDA DATED: G r BIDDER S NAME: .i5✓/V2 ��J' r�':'Y'r'i C�' + id •rpm PRIMARY OFFICE STREET ADDRESS: ,5Y3/ red' 68/4. /-4°.61,-06,/,,, Gentlernerr The undersigned, as Bidder (herein used in the masculine singular, irrespective. of actual gender and number) hereby declares that the only personsinterested' in this Proposal are named herein, that no other person has any interest. in this Proposal, or in the Contract to which this Proposal pertains, that this Proposal is made without connection or arrangement with any other person and that this Proposal is in every respect fair, in good faith, and with,but collusion or fraud. The Bidder further declares that he has complied in every respect with all of the Instructions to Bidders, that he "has read all addenda issued prior to the opening of Bids, and that he has satisfied himself fully relative to all matters arid conditions with respect to the work to which the Proposal pertains. The Bidder proposes and agrees; if this Proposal is accepted, to execute all appropriate Contract Documents for the purpose of establishing a formal contractual relationship between him and the City of 'Miami, Florida, for the furnishing of ail materials, equipment and the performance of all work to which this Proposal pertains The Bidder certifies that this Bid is based upon all items as shown on' the Plans and/or listed in these Specifications, and that he has made no changes in these Contract Documents. APPROV EThe Bidder further declares that he has carefully inspectehe By Date/Zi/6r proposed work. PROPOSAL Page 2a B-50711 CITYWIDE STORM SEWER CLEANING PROJECT NORTH ZONE STARTING CONSTRUCTION TIMES: The Bidder agrees to start work immediately after notice from the Engineer to begin 'work, The work may be started on any working day within this ten (10) consecutive calendar day period, The Bidder shall complete the contract in accordance , with the Plans and Specifications therefore, within the number of calendar clays specified on Proposal Page 2 and no additional completion time shall be added for any optional items awarded. All w rk shall be in full and complete accordance with all terms and conditions set forth in and covered by the contract documents. Should the contractor fail to complete the work on or before the date specified, it is agreed that for each calendar day thatany portion of the work shall remain uncompleted, after the timespecified in the. proposal., with any extension of time which may be allowed by the City for the completion of the work provided for in the contract documents, the sum per day given in Division 1 - General 'Conditions, Section 6-9, shall be deducted from the moneys due the contractor not as a penalty but as liquidated damages and added expense for inspection, The names of the Subcontractors and their current. County -Municipal Occupational License numbers for the typeof work shall be listed below. No change in Subcontractors will be allowed without written approval of the Engineer. Subcontractors shall hold the license at the time of executing and during' the performance of this contract. PROPOSAL Page 2b B--50711. CITYWIDE STORM SEWER CLEANING PROJECT — NORTH ZONE If no Subcontractors are to be used, insert the word "Self" in the spaces under "Name of Subcontractor". NAME O.F TYPE OF WORK SUBCONTRACTORS Waste Disposal 2. Storm/Drainage Sy_sterrt 3. Testing Services SUBCONTRACTOR'S COUNTY -MUNICIPAL OCCUPATIONAL . .LICENSE NUMBER AAP', a. 4. ti 5. Other (Bidder .Fill In) NOTE CONTRACTOR'S SUPERINTENDENT ON 24-HOUR CALL. In the event that the Engineer must contact the Contractor to perform, emergency repair work to correct hazardous or unsafe conditions or problems relating to public health or welfare as a result of or .associated with the project construction the Contractor shall provide the name and 24-hour telephone number of.the job superintendent to be contacted in the space provided below. [Ora �Gr Name -(Job Superintendent) 750_6-' — Telephone Nurrmber. The Contractor shall also provide a toll -free telephone number for his business office for use during normal business hours of 8:00 a,m. - 57.90Eivr,D.riviOnda4 THROUGH Friday." ir Date CITYWIDE STORM SEWER CLEANING PROJECT THE BIDDER STATES THAT• THIS PROPOSAL: IS BASED UPON : THEE CONTRACT DOCUMENTS AND THAT HE ACKNOWLEDGES. THE :RECOtPT OF THE FOLLOWING ADDENDUM (ADDENDA)': ADDENDUM No NOTE:: The Bidder agrees to perform aII . the ..work. , as, ciescribed in t Specifications and as shown on the Plans for the lump sum praxes, as noted on the following sheets. BASE BID THE TOTAL OF ITEMS 1 through 15 based on a Three hundred sixty-five (365) calendar days completion time, the surd of TOTAL BID: twice the BASE BID based on a two .(2) years period :(730) calendar days The term of this contract: is for two (2) years with she option t renew' for two additional.. one year period. The City reserves the rightnot to renew for the two optional one year periods at its discretion; The Base Bid price is for a one .year, < three hundred sixty five (365) calendar days completion. time. The Total Bid price is twice the Base Bid price. The second year term of the contract will be based on the Base :bid ;prices and additional compensation will beallowed The City reservesthe right to reject all bids. CITYWIDE STORM SEWER CLEANING PROJECT NORTH ZONE ITEM 1: For furnishing all labor, materials and. equipment. for the removal of sediment debris and material inside the storm sewer structures (inlets and manholes), less than 6 foot cut, approximately 6,500 structures citywide, the unit price of Q .. Dollars and Cents ($ Q. 4„.) X `.6,5O0 pe.r structure ITEM s: For furnishing all tabor, materials and equipment far the removal 'Of'Sediment debris and material inside the storm sewer structures (inlets and manholes}; 6 to S foot cut, approximately 6,500 structures citywide, the unit; price of Dollars and Cents ($ : j X 6,500 - per structure ITEM 3: For furnishing alllabor, materials and equipment for the removal ot+ Sediment debris and material inside the storm sewer structures (inlets andmanholes),,: more than foot cut, approximately 500 structures citywide, the unit price of Dollars' and )trG Cents ($ d 01 ) X ' 500 per structure ITEM 4: For furnishing all ,labor, materials and equipment .for the :removal and 'cleaning dt Sediment. debris and material inside the storm. sewer; pipe System,,, 2" to 11interior': diameter, approximately 5,000 linear feet of pipe, .any material; !the unrt.price af .t.. Dollars and Se). Cents ($ j X 5,000 sc:.. ITEM 5 per linear foot of For furnishing all labor, materials and equipment for the removal and cleaning of. sediment debris and material inside the storm sewerpipe eystern,; 12":; tQ' 1.7 interior diameter, approximately 5,000 linear feet of : pipe, any material, the 'unit' price of 0 per linear foot c pipe Dollars and CITYWIDE STORM SEWER CLEANING. PROJECT NORTH ZONE ITEM 6: For furnishing all labor, materials and equipmentfor the rernovaf ard cleaning 'of sediment debris and material inside the storm: sewer pipe. system;' interior diameter, approximately 5,000 linear, feet of pipe, any ,material; the ' unit price of per linear ITEM 7: For furnishing all labor, materials and equipment for the removal and cleaning: of sediment debris: and material 'inside the; storm sewer pipe; 'system; 31" to,,42 interior. diameter, :,approximately 3,000 linear. feet of pipe, any 'material,' the 'unit .,,.; price of r� `' Dollars and Canta,10 (6 op ) X 3,000 - $ �y.11roc :'' a ' -ITEM 7.'' per linear foot of pipe ITEM6: Poi' furnishing all labor, materials. ;and: equipment 'tor the removal 'arid ctoanmg of sediment debris and -material'. inside the storm .sew r pipe : System,;; 437.; to ;54"• interior diameter, approximately 3,000 linear.,feet of pipe,, . any ;manorial; 'the ~unit: price of Dollars and Cents ($ .` 1 x 3,aoo= per linear foot of pipe ITEM $ For debris and material inside the. storm sewer pipe:system or -furnishing all labor, materials and equipment for 'the removal find cleaning $; more then,f.55' interior diameter. approximately '1,000 .linear feet of pipe, any material,` the unit price of 7,4310C-, Dollars `and Cents ($ jj.." y X 1,00Qe per linear foot of pipe CITYWIDE STORM SEWER CLEANING PROJECT NORTH ZONE:`'. ITEM 10: For furnishing all labor, materials and equipment for the removal and cleaning of sediment debris and material inside the storm sewer Culvert trench pipe •pnd Cover ditch, at any foot cut, . including ;`slab cover restoration and :.complete surfscs restoration, if necessary, approximately 5,000 linear feet of culvert trench'pipe and:!' cover ditch, the uriit price of ..[� Ootlars arid o D Cents ($ '� ) X per linear foot ITEM 11: For furnishing all labor, materials and equipment for televising (video- camera). - storm :sewer pipe system, any size interior diameter, approximately 500 finear,fee of pipe, any material, if necessary, the unit price of Dollars. and: Celts (S $' ) X 500a per linear foot ITEM12: For furnishing all., labor, materials -and equipment necessary fora providing i''a':4 hydraulic pump including all hoses, diesel and :appertunances,,.mobi ization; setting up .crew, etc., for ten (10) hours .of operatioress; et different :locations, .the unit per:i hour price of per hour. ITEM '13: For furnishing all : labor, materials end equipment necessaryfor providing is , hydraulic pump including all hoset, diesel and, appertunaryces; mobtitzation, sett up crew, etc., for ten (10) hours of operatio; lons,' the aril r hr operations, at different #ocati ' , P'e ,.. • price :o.f per hour eif Dollars and Cents' nts(s,Awr``)X10 st PROPOSAL -: Page 2f B - 50711; CITYWIDE STORM SEINER CLEANING PROJECT - NORTH ZONE; ITEM 14:. For furnishing all labor, materials and equipment necessary,' for the cleaning gffifty (50) deep.drainage wells at a. minimum depth of 100 ft.` by compreesed,air ;jetting. method approved equal, at d' Brent locations citywide, theunit per hour price of. Dollars and Cants ($ e5C.°1 X 3o each ITEM 15: Provision for Special Items as noted in Division 2, Section Z t o, tte!ump �um of THIRTY THOJ$ANIa Dollars' and,. . NO dump Burn