Loading...
HomeMy WebLinkAboutPrevious memo2Attachment "D-2" CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO FROM : The Honorable Cit.Z ommis Jo ola C anager • DATE: SUBJECT REFERENCES. ENCLOSURES: CA.13 NOV 15 tz0D4 FILE Worksheet for Agenda Item Department Requesting Agenda Item: General Services Administration 1. Subject: Amendment to Resolution — Fire Station No. 11 Radio Tower Replacement — Bid No, 02-03-187 2. Purpose of item: It is respectft,lly recommended that the City Commission amend Resolution No. 04- 0216, adopted April 8th, 2004._ authorizing an increase in the contract amount awarded to Sabre Communications Corporation. in an amount not to exceed $8,245, from §98,963 to $107,208, to over the Change Order for the redesign of the tower foundation by the vendor. 3. History of item: On April 8'h, 2004, the Citv_Commission approved Resolution No. 04-0216 accepting the bid of Sabre Communications Corporation for: the removal of an existing guyed tower; purchase and delivery of one new 12511. self-supporting radio tower with ice bridge; construction and antenna installations, in an amount not to exceed $98.963. The tower replacement is needed due to engineering reports that indicate that the current twenty year old guyed tower located at Fire Station No. 11, 5920 W. Rader Street. is not capable of supporting the new 800 MHz upgrade equipment load. As part of the tower construction process (as _stipulated in the vendor's Bid Proposal — Notes), Sabre Communications Corporation completed a subsurface evaluation (a/k/a geotechnical exploration) at the above -referenced site. The purpose of the exploration was to complete a one 50ft. deep Standard Penetration Test (SPT) boring, as close as possible to the proposed tower location. The geotechnical exploration provided general site information and selected soil parameters for later foundation design calculgtions. The subsurface soil evaluation indicated that the original quoted mat and pier foundation design (a mat of concrete/pedestal type), that was based on normal soil conditions (EIA normal 4000 psf soil), would need to be modified. The mat and pier foundation design requires an increase in the foundation surface area to properly support the new tower. The increase would exceed the specified space availability and intrude into setback requirements. In addition, the cost of the mat and pier foundation design would almost double in price. from an estimated $19,474 to $36,700. Sabre Communications Corporation has recommended that a caisson design (drill shafts dug down and filled with concrete) be used which will result in the smallest cost increase and does not require an increase in the foundation surface space. A Change Order has been prepared by the vendor in an amount of $8,245 for the redesign of the tower foundation from a mat and pier to a caisson design. Approval of this resolution authorizes an increase to the contract amount for the tdesipf the tower foundation and allows for the completion of the tower replacement project (800 MHz Radio and Microwave System Upgrade). 4. Does this item correlate with the CIP Plan or Strategic Plan? If so, how? Yes. The radio tower is used for radio communication throughout the City. Miami Police, Fire and local government receives radio transmissions from this tower. It is part of our Public Safety System. Thus, it is part of the Superior Customer Service — Provide Excellent Public Safety category. 5. Does this item have any effect on residents within the City of Miami? If so, how? No. The actual replacement of the tower is being coordinated between the vendor and the City of Miami to ensure minimal interruption to traffic and to area residents. Pending the replacement of the tower which shall allow for the upgraded microwave to be installed, a temporary T-1 line (telephone line) is being used as a two-way communication between Fire Station No. 3 and Fire Station No. 11. Therefore, the site is operational and residents are not being affected. 6. Will this item impact any specific District? If so, which one? Yes. The location of the tower is in the Flagami District. 7. Does this item have any fiscal impact? (please provide dollar amount) No. Approved by: hief tilt /Manager