HomeMy WebLinkAboutSchool Board CommentsMai 12 2005 1 : 1 8PM SITE PLANNING 30595547SO p. 2
•
•
•
'REVISED'
SCHOOL IMPACT REVIEW ANALYSIS
May 13, 2005
FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE
INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT
TRIGGERED SINCE THE APPLICANT 15 NOT REQUESTING ADDITIONAL
RESIDENTIAL DENSITY OVER WHAT IS CURRENTLY ALLOWED UNDER
EXISTING ZONING CLASSIFICATION FOR SUBJECT PROPERTY.
APPLICATION: Platinum on the Bay
REQUEST: Major Use Special Permit (PAB May 18, 2005)
PRESENT
ZONING; R4 with SD-20 Overlay that allows 150 DU/acre
ACRES: Approximately 2.67 net acres
LOCATION: 2955 NE 7 Avenue; 486 and 700 NE 29 Terrace; 555 and
711 NE 29 Street, Miami
NUMBER OF
UNITS:
320 units proposed (2.67 net acres x 150 DU/acre = 401
maximum units allowed)
MSA: 4.7 = 0,22 Multifamily
ESTIMATED STUDENT
POPULATION: 70 students*
ELEMENTARY: 32
MIDDLE: 18
SENIOR: 20
SCHOOLS SERVING AREA OF APPLICATION:
ELEMENTARY: Eneida M. Hartner Elementary - 401 NW 299' Street
MIDDLE: Jose De Diego Middle - 3100 N.W. 5 Street
SENIOR HIGH: Booker T. Washington Senior - 1200 N.W. 6 Street
Schools are located in Region IV.
*Based on Census 2000 information provided by the Miami -Dade County Department of
Planning and Zoning.
May 12 20E15 1:1SPM SITE PLANNING 3055954760 P - 3
•
•
The following population and facility capacity data are as reported by the Office of
Information Technology, as of October 2004:
STUDENT
POPULATON
Eneida M. 8181
Hartner 850*
Elementary
Jose De Diego 1,170/
Middle 1,188*
♦A
FISH DESIGN UTILIZATION
CAPACITY FISH DESIGN
PERMANENT CAPACITY
PERMANTENT
724
1,036
113%/
117%4
113%/
115%4
% UTILIZATION CUMULATIVE
NUMBER OF FISH DESING STUDENTS**
PORTABLE CAPACITY
STUDENT PERMANENT
STATIONS AND
RELOCATABLE
0
0
113%/
117%*
113%/
115%*
Booker T. 57%/ 57%/
Washin ton 1502/,2,624 0 , 0 •
9 1522* 58fo 58%
Senior
increased student population as a result of the proposed development
**
1,249
2,869
4,722
Estimated # of students (cumulative) based on zoning/land use log (2001-
present) and assuming all approved developments are built; also assumes none
of the prior cumulative students are figured in current population
Notes:
1) Figures above reflect the impact of the class size amendment.
2) Pursuant to the Interlace] Agreement, Eneida M. Hartner and Jose De Diego
Middle schools meet the review threshold.
PLANNED RELIEF SCHOOLS IN THE AREA
(Information included in proposed 5-Year Capital Plan, 2005-2009, dated January 2005)
Projects in Planning, Design or Construction
School Status Occupancy Date
N/A
Proposed Relief Schools
School Funding Year
New Middle FY 06-07
State School "GG-1"
(Jose De Diego Middle Relief)
(1,241 student stations)
OPERATING COSTS: According to Financial Affairs, the average cost for K-12 grade
students amounts to $6,549 per student. The total annual operating cost for additional
students residing in this development, if approved, would total $458,430.
May 12 2005 1:18PM SITE PLANNING 3059954760 p.4
•
•
CAPITAL COSTS: Based on the State's May 2005 student station cost factors*, capital
costs for the estimated additional students to be generated by the proposed
development are:
ELEMENTARY
MIDDLE
SENIOR
32 x $ 13,545 = $433,440
18 x $ 15,530 = $279,540
20 x $ 20,551 = $411,020
Total Potential Capital Cost
$1,124,000
'Based on Information provided by the Florida Department of Education, Office of
Educational Facilities Budgeting. Cost per student station does not include land cost.