Loading...
HomeMy WebLinkAboutSchool Board CommentsMai 12 2005 1 : 1 8PM SITE PLANNING 30595547SO p. 2 • • • 'REVISED' SCHOOL IMPACT REVIEW ANALYSIS May 13, 2005 FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE THE APPLICANT 15 NOT REQUESTING ADDITIONAL RESIDENTIAL DENSITY OVER WHAT IS CURRENTLY ALLOWED UNDER EXISTING ZONING CLASSIFICATION FOR SUBJECT PROPERTY. APPLICATION: Platinum on the Bay REQUEST: Major Use Special Permit (PAB May 18, 2005) PRESENT ZONING; R4 with SD-20 Overlay that allows 150 DU/acre ACRES: Approximately 2.67 net acres LOCATION: 2955 NE 7 Avenue; 486 and 700 NE 29 Terrace; 555 and 711 NE 29 Street, Miami NUMBER OF UNITS: 320 units proposed (2.67 net acres x 150 DU/acre = 401 maximum units allowed) MSA: 4.7 = 0,22 Multifamily ESTIMATED STUDENT POPULATION: 70 students* ELEMENTARY: 32 MIDDLE: 18 SENIOR: 20 SCHOOLS SERVING AREA OF APPLICATION: ELEMENTARY: Eneida M. Hartner Elementary - 401 NW 299' Street MIDDLE: Jose De Diego Middle - 3100 N.W. 5 Street SENIOR HIGH: Booker T. Washington Senior - 1200 N.W. 6 Street Schools are located in Region IV. *Based on Census 2000 information provided by the Miami -Dade County Department of Planning and Zoning. May 12 20E15 1:1SPM SITE PLANNING 3055954760 P - 3 • • The following population and facility capacity data are as reported by the Office of Information Technology, as of October 2004: STUDENT POPULATON Eneida M. 8181 Hartner 850* Elementary Jose De Diego 1,170/ Middle 1,188* ♦A FISH DESIGN UTILIZATION CAPACITY FISH DESIGN PERMANENT CAPACITY PERMANTENT 724 1,036 113%/ 117%4 113%/ 115%4 % UTILIZATION CUMULATIVE NUMBER OF FISH DESING STUDENTS** PORTABLE CAPACITY STUDENT PERMANENT STATIONS AND RELOCATABLE 0 0 113%/ 117%* 113%/ 115%* Booker T. 57%/ 57%/ Washin ton 1502/,2,624 0 , 0 • 9 1522* 58fo 58% Senior increased student population as a result of the proposed development ** 1,249 2,869 4,722 Estimated # of students (cumulative) based on zoning/land use log (2001- present) and assuming all approved developments are built; also assumes none of the prior cumulative students are figured in current population Notes: 1) Figures above reflect the impact of the class size amendment. 2) Pursuant to the Interlace] Agreement, Eneida M. Hartner and Jose De Diego Middle schools meet the review threshold. PLANNED RELIEF SCHOOLS IN THE AREA (Information included in proposed 5-Year Capital Plan, 2005-2009, dated January 2005) Projects in Planning, Design or Construction School Status Occupancy Date N/A Proposed Relief Schools School Funding Year New Middle FY 06-07 State School "GG-1" (Jose De Diego Middle Relief) (1,241 student stations) OPERATING COSTS: According to Financial Affairs, the average cost for K-12 grade students amounts to $6,549 per student. The total annual operating cost for additional students residing in this development, if approved, would total $458,430. May 12 2005 1:18PM SITE PLANNING 3059954760 p.4 • • CAPITAL COSTS: Based on the State's May 2005 student station cost factors*, capital costs for the estimated additional students to be generated by the proposed development are: ELEMENTARY MIDDLE SENIOR 32 x $ 13,545 = $433,440 18 x $ 15,530 = $279,540 20 x $ 20,551 = $411,020 Total Potential Capital Cost $1,124,000 'Based on Information provided by the Florida Department of Education, Office of Educational Facilities Budgeting. Cost per student station does not include land cost.