EXHIBIT "B"
SCHEDULE OF FUNDING
FPN. NO.
PROJECT DESCRIPTION
Name Miami Riverwalk Extension: Flagler Street Bridge Area
Termini From approximately NW 2nd Street to SW 2nd Street (1-95) on North River Drive
P.E.
TYPE OF WORK by Fiscal Year
2003-2004
2004-2005
2005-2006
Total PE
Right -of -Way 2003-2004 _
2004-2005
2005-2006
Total Righl-of-Way Cost
Construction 2003-2004
2004-2005
2005-2006
2006-2007
Total Contract Costs
Construction Engineering and Inspection
2003-2004
2004-2005
2005-2006
Total Construction Engineering
Total Construction Cost
ESTIMATED TOTAL COST OF THE
PROJECT
525-010-40
CONSTRUCTION
OGC. 11103
Length 1,450 L.F
FUNDING
(1)
TOTAL
PROJECT FUNDS
§0.00
$0,00
$0.00L
$0.00
$0.00
$0.00
0.00
$0.00
$0.00
$0.00
$1,193,579.00
$0.00
$1,193,579.00
$0.00
$0,00
1144,121.00
$144,121.00
51,337,700.00
$1,337,700.00
(2)
AGENCY
FUNDS
$0.00
$0.00
$0,00
$0.00
$0,00
$0.00
30.00
$0.00
$0.00
$0.00
$193,579.00
$0.00
$193,579,00
$0.00
50.00
$144,121,00
$144,121.00
(3)
STATE &
FEDERAL FUNDS
$0.00
0.00
•
50.00
$0.00
$0,00
0.00
$0.00
$0.00
$0.00
$337,700.00
$337,700.00
1011.
$1,000,1.00
$1,000,1�00,i,30
$0.00
$0.00
o.a1
$0.00
$1,0000300.00
•
$1,000,000.00
The Department's fiscal year begins on July 1. For this protect, funds are not projected to be available until after
1st, each fiscal year.
The Department will notify the Agency, In writing, when funds are available.