HomeMy WebLinkAboutexhibit1A SRFPN NO
EXHIBIT A
Project Description and Responsibilities
525-010-40
CONSTRUCTION
OGC • 11/03
This exhibit forms an integral part of that certain Reimbursement Agreement between the State of Florida, Department of
Transportation and
the City of Miami, Florida with offices at 444 SW 2nd Avenue, Florida 33130
for the Miami Riverwalk Extension: Flagler Street Bridge Area
Dated
PROJECT LOCATION:
The project 0 is 0 is not on the National Highway System.
The project 0 is @ is not on the State Highway System.
PROJECT DESCRIPTION:
See Attachment Page 1.
SPECIAL CONSIDERATION BY AGENCY:
Project engineering/design will be supervised by Agency, but it is a contribution of the Trust for Public Land.
SPECIAL CONSIDERATION BY DEPARTMENT:
Attachment Page 1
Project Description:
The Miami Riverwalk Extension: Flagler Street Bridge Area extends from Lummus
Landing located at the intersection of NW North River Drive and NW 2nd Street to the
entrance of the Miami Riverside Center (MRC) Parking lot located under interstate 95.
The segment continues through the lot to connect to the existing riverwalk in -front of the
MRC building. The Flagler Street Bridge Area is approximately .27 miles and consists of
roadway reconstruction, milling and resurfacing, drainage, curb and gutter, integral
colored concrete sidewalk, landscaping and lighting within existing rights of way. The
project's design and construction will be consistent as much as possible with the
requirements of the Phase 1 Schematic Design to implement the goals and objectives of
the Miami River Greenways Action Plan. The projects section will provide two 10 foot
lanes for vehicular traffic and parking on the side of the Right -of -Way opposite the
Greenway. On one side of the Right -of -Way is a standard sidewalk and on the other side
is an approximate 15 foot wide Greenway. The Greenway will provide continuous shaded
trees and shrubs, circulation with amenities such as seating, trash receptacles, decorative
pedestrian lights, wayfinding signs, embedded mile markers and informational kiosks.
Miami Riverwalk Extension: Flagler Street Bridge Area
State Job Number: FM 4105-781
Project Description
LICENSE EXISTING
AGREEMENT R/W
LANDSCAPE VERGE WITH TREE PITS
(REFER TO LANAPE PLANS FOR
WITC,WAL DETAILS)
TYPE F'
MOO. CURB
AND GUTTER
* IT JS THE INTENT THAT THE BACK OF THE PROPOSED SIDEWALK MATCH
THE !EXISTING SIDEWALK. BUILDING, THRESHOLD, DRIVEWAY ETC)
W
ELEVATKALONG THE RIGHT -OF WAY. VARIATIONS REdIIRPD TD
ACCOMMODATE THE TIE-IN ELEVATION WILL BE MADE WHERE INDICATED.
REFERPLEASE pO THE PLAN &
AT AE AND CROSS SECTION SHEETS
FOR
THE CONTRACTaR SHALL STAKE AND STRING UNE THE PROPOSED BACK OF
SIDEWALK AND DRIVEWAY GRADES AT THE RIGHTOF-WAY LINE IDENTIFIED VI
THE CROSS SECTION SHEETS. THE STRING LINE SHOULD BE REVIEWED BY THE
ENGINEER AND aWJETRACTOR IMMEDIATELY F0ULVING CIEARNIG AND GRUBBING
ACTIVITIES. THE JOINT REVIEW SMRILD BE CONDUCTED SEVEN Elms PRIOR TO
CONSTRICTION ACTIVITIES THAT RESULT IN PHYSICAL IMPROVEMENTS. MST DF
LABOR,
MATERIAL AND SURVEYING SHOULD BE INCLUDED Nl THE ASSOCIATED
UNIT COST FOR CQYCRETE SIDEWALK.
• t AWAREWIRED
! 500. COST FACILITATE
S00 BE INCL DED 11NATIoN SHALL BE ITEM !_;. KIND OF
NOTES:
1. TYPICAL SECTION 15 PRESENTED VIEW1MG NORTH
2. IF IT IS DETERUNMED DURING CONSTRLCTILW THAT THE EXISTING
PAVEMENT SECTION IS OF ADECKIATE ELINDITOY, THE CONTRACTOR
MAY, AS AN ALTERNATE TO COMPLETE PAVEMENT RECONSTRUCTION,
IMPLEMENT MILUAC. AND RESURFACING TO OBTAIN THE GRADES
INDICATED WITHIN THE PLANS. ANY ALTERNATE COSTRUCTEN
MCAT-IONS
XAT NORKSS krusT
PBE PJIMPL) AND TR APPROVED fir THE CITY OF MEAMJ
PuBLOC
SEGMENT BBC
TYPICAL SECTIONS
TYPE B STABILIZATION OR 40
VALLEY GUTTER
EXISTING LICENSE
R/W AGREEMENT
LANDSCAPE VERGE WITH TREE PITS
(REFER TO LANDSCAPE PLANS FAR
TYPE F' NIDO.
ADp1TIDNAL DETAILS)
CURB AND GUTTER
EXISTING LICENSE
R/W AGREEMENT
VAR.
0'-7'
PARKING
STA. 113+11.64 TO STA. 127+05.70
N.W. NORTH RIVER ME
5'
51NK
SOD**
6L02 !MAXI.
TYPE U' CuRB
NATURAL
GHIXUND
N£W r WSTRUCTa
TYPE 5 ASPHALTIC CONCRETE (I.5')
LWEROCA 11BR Cal fry
TYPE •B' STABILIZED SUBGRADE (In
1=4
-14
°
7 —
O F
1CC
CL
M CC I—
o iij LO
®4 z
ee Q
CL CL
U LI C.) ea
::
�i
N.rs.
alma*
e.44.
immtl Oa.
4
ti
CITY OF MIAMI
Transportation Enhancement Program (TEP)
Miami Riverwalk Extension: Flagler Street Bridge Area
Grant Vicinity Map
Miami River Cenl:er
Existing Riverwe i
Miles
0 0.04 0.08 0.12 0.18
Legend
Miami Riverwalk Extension: Flagler Street
""� Bridge Area FDOT FM NO. 4105781