HomeMy WebLinkAboutSite Utility StudyBayview Market MAJOR USE SPECIAL PERMIT SITE UTILITY STUDY PREPARED FOR Perkins & Will, Architects by: KIMLEY-HORN AND ASSOCIATES, INC. 8603 S. Dixie Highway, Suite 411 MIAMI, FL 33143 AUGUST 2004 • • • Bayview Market Site Utility Study Introduction The Bayview Market project is a proposed 4 story mixed-use/residential multi -family building with a 5 story garage structure to be located on a total of approximately 7.05 +]- acres of land located on the northwest corner of NE l7th Street and NE 2'1 Avenue, in the City of Miami, Miami -Dade County, Florida (see site location map -Fig 1). The proposed mixed use development includes a tower with residential units, office space and retail space. It will consist of a total 24 residential apartments unit, 612,479 sf of retail units and approximately 2,360 parking spaces enclosed within the 5-story parking garage. Table 1, below depicts the details of the proposed project. Table 1: Project Summary Unit Retail 4 Levels Street Retail 17 598,154 14,325 Residential 24 37,376 Total 649,855 Parking 2,363 (10 Levels) 1.002,262 I. Drainage Relative to the above -referenced project, the following information should be used during the storiin water management design and site grading. Bayview Market Site Utility Study Page 2 • • • Flood Criteria: The federal, state and local flood criteria were evaluated and the project elevations will be designed to meet flood criteria according to Miami -Dade County and city of Miami Beach standards. The subject project is located in PANEL 183 of COMMUNITY -PANEL NUMBER 12025C0183 3 of the Flood Insurance Rate Map {FIRM). According to the National Flood Insurance Program, the project is in Zone AE (with a flood base elevation 9.0 ft National Geodetic Vertical Datum (NGVD). This will be used for the proposed Finish Floor Elevations. 2. Miami -Dade County Flood Criteria elevation as per Amended Plat of Flood Criteria Map, plat book 120, page 13 is estimated to be 5.0 ft. NGVD. This will be used for the proposed site grading minimum grate/rim elevations. 3. The average October ground water level elevation is estimated to be 2.50 ft. NGVD. This elevation will be used to compute drainage well capacity and roadway base clearance. (Source: Dade County Department of Environmental Resource Management & Miami - Dade County Public Works Manual, Volume II - Design Standard Detail WC 2-2). Wetlands: Specify the acreage of wetlands or other surface waters, if any, that are proposed to be disturbed, filled, excavated, or otherwise impacted by the proposed activity: None, the site is not encumbered by wetland areas. Therefore mitigation for impacts to wetlands and other surface waters will not he required. Existing Drainage Presently, the site is undeveloped {sodded). There are several existing drainage inlets visible within the property boundaries. These inlets most likely connect to an onsite drainage system consisting of either drainage wells and/or French drain. Bayview Market Site Utility Study Page 3 • • • Figured.: Site Location Map 4 NW 25TH ST INW 24TH ST NW 23RD ST NW 22ND TE NW 22ND ST a NW 215('E NW i9TH ST z 1 II ray 24TH ST 3 z NH' 4 4` Z NW211- ST_ 23RD St > N5 19Ik ST if mNW18kTE 1 NW t,rH I 1 > NW ;6TH TE� tNW 15TTH ST. NW 1:,TJ:/ / II I v NW 14TH 5T1. Bayview .Market Site Utility Study NW 217 N1 24T? 9 ST I NW 2350 Sf NW 22ND LA NW 22ND TE n �� N1 22ND 22ND ST z h1W KW 23RD ST > Q U Q NN 2iST j5T zNW2DTHITE NW 20TH1 ST _ >` a z1 t fl 'z h, 1 r.._ NW 17TH ST NW1 jf NW NW z NW i INW 1 15THTT� 15IH ST NW 11514 STI r - :w114Ti NE 22ND S ? NE 21ST S: NE 21771 7. 1_, NE 2OTH ST ._.i ------- NE 39TH T{ — ---- NE 1911-1 ST NE 19TH STST 5� �(0j > In: <1 I f 41 zj i• • LfJ 4! 1i3rH 5 — _ U ' NE l7TH TL -rf.'I TE MI ENE 2¢1H ST 23 3 TE 2 NE 23RD NE 22ND U7 p5 NE 22ND NE. 21 ST ST 0 NE 20TH ST Page 4 • • • Proposed Drainage System The drainage system for the proposed development will consist of drainage wells and exfiltration trench, if possible, to facilitate on -site disposal of storm water runoff. The 5- year design storm event will be used to design the stood! water management system, in accordance with Section D-4, "Water Control", of Part 2 of the Miami -Dade County Public Works Manual. Based on preliminary calculations, it is anticipated that six (6) 24" drainage wells will provide sufficient capacity to dispose of the design 5-year 24-hour storm water runoff generated by the proposed development. Preliminary drainage computations for the project areas are provided in Attachment "A" Preliminary Drainage Well Calculations, which includes the basis for design. The final drainage design for the project should be in conformance with the requirements of the Miami -Dade County DERM Water Control Section, Florida Department of Environmental Protection, and other local, State and federal regulatory agencies having jurisdiction over the project. Also, there is a City of Miami existing 48" drainage concrete pipe running east west through the property 30' public utility easement (P.B. 144-98). This pipe will be relocated to the proposed 25' utility easement located on the North side of the property. (Refer to schematic site plan for more details). II. Water Distribution System The water mains owned and operated by the Miami -Dade Water and Sewer Department (MDWASD) in the vicinity of the project are shown in the Table 3. Bayview Market Site Utility Study Page 5 • • • Table 3: Existing Water Mains Locati()n Between Water. Main(s) NE 2nd Avenue NE 17`'' St. and NE 18`h St. 20" D.I. 6" D.I. NE 17h St. NE. 1st Ave. and NE Miami Pl. NE 2nd Ave. and NE 1" Ave. NE 2nd Ave. and NE 1st Ave. 4" D.I. 6" D.I. 12" D.I. NE Miami Pl. NE 17th St. and NE 17th Ter. 4" D.I. NE l7th Ter. NE 1st Ave. and Miami Pl 2"D.I. In accordance with MDWASD criteria, the owner will most likely be required to construct a new 12-inch ductile iron (DI) water main to serve this project. The new main will be constructed along the west side of the property on NE Miami P1. The proposed 12" water main will likely be connected to the proposed 12" along NE 17th St looped around the site within the proposed 25' easement then interconnected to the existing 20" water main at NE 2nd Ave. A final determination of the points of connection and requirements will not be provided by MDWASD until the Water and Sewer Agreement is requested by the owner. Water service meters will be installed by NIDWASD forces at owner's expense. See Attachment "B" for a copy of the MDWASD water atlas sheet for the project area. III. Sanitary Sewer Collection System Table 4 depicts the sanitary sewer mains owned and operated by Miami -Dade Water and Sewer Department (MDWASD), within the vicinity of the project. Bayview Market Site Utility Study Page 6 • • • Table 4: Existing Sanitary Sewer Mains NE 2nd Ave. From NE 17`" St. along the east property line on NE 2nd Ave. 8" Gravity Main NE l s` Ct. Along NE l s` Ct. through NE 17th St and into the property 6" Gravity Main 8" Gravity Main NE ist Ave. Along NE 1st Ave through NE 17th St and into the property 8" Gravity Main NE Miami Pl. NE 17th St. and NE 17th Ter. 8" Gravity Main NE 17th Ter. Along NE 17th Ter. 8" Gravity Main A copy of the MDWASD Sewer Atlas sheet has been attached. The proposed on -site sanitary sewer system for the property can probably be connected to either or both of the existing public gravity mains. A letter of availability and further coordination with MDWASD is recommended to verify the proposed sanitary sewer service connection points and requirements for this project. MDWASD may require upgrades to the sanitary sewer system, but this can not be detei mined without a request for a water and sewer agreement. The flows frorn the existing MDWASD sanitary sewage mains on NE 17th St. and NE 2' Ave. are received by MDWASD Regional Pump Station #2, As of March 31, 2004, this Bayview Market Site Utility Study Page 7 • • pump station is operating under capacity as established by the USEPA, and is not under any type of moratorium (see Attachment "C" Pump Station Monthly Information). At this time, it is not anticipated that any improvements to the regional pumping and/or transmission systems will be required to connect the proposed project. However, a final determination regarding the status of the existing transmission system and the need for possible improvements will not be made until construction plans are submitted to the Miami -Dade County DERM Wastewater Section and a Sanitary Sewage System Capacity Certification Letter is issued. The flows created by this project have been determined and are shown in Table 5. Table 5: Water & Sewer Flow Generation Typeof Occupancy Apartment 24 units 200 gpd per unit Total Average Daily Flow (gpd) 4.800 Retail 612,479 sf 5 gpd per 100sf 30,624 Total Anticipated Flow 35,424 IV. Solid Waste Generation Solid waste generated by this project will be collected in standard on -site containers for refuse and recyclables. Regular pick-up service will be provided either by private hauling companies and/or by the City of Miami Solid Waste Department, who will transport the waste to Miami -Dade County's or private disposal and recycling facilities. The volumes of solid waste projected to be generated by the project are shown in Table 6. Bayview Market Site Utility Study Page 8 • • • Table 6: Solid Waste Generation Type of Occupancy; Apartment 24 units 5lbs/unit/day Total Solid Waste Generated (Tons/Day).,: 0.060 Retail 612,479 sf 6lbs/1000 sf/day 1.838 Total Anticipated Solid Waste Generated 1.898 V. Roadway Improvements A traffic study perfoiuued for this project is recommending that the existing three -lane cross section (one way traffic) will be improved to a full four -lane section (two way traffic) consisting of two 22 ft wide asphalt roadways and curb and gutter. Together with the road construction, two sidewalks (6 ft) will be constructed along each right-of-way line. The proposed construction will remove the existing 44ft ± asphalt roadway presently located along the centerline of NE 17th Street (Between N Miami Ave and NE 2nd St); NE 17 Terr (Between NE Miami PI and N Miami Ave); NE 17 Terr (Between NE 2nd Ave and Biscayne Blvd [SR-5/US-1]); NE 2nd Ave (Between NE 17th St and NE 18th St); and NE 18th Street (Between NE 2nd Ave and Biscayne Blvd [SR- 5/US-11). The proposed corridor right-of-way is 70 ft wide. Along with the proposed roadway reconstruction a new and/or modifications to existing Traffic Signals will be required at the following intersections: • NE 17th ST and N Miami Ave; • NE 17th St and NE 1 Ave; • NE 2'd Ave and NE 17 St • NE 2d Ave and NE 17 Terrace; and • NE 17`h Terrace and Biscayne Blvd. Based on preliminary meetings with City staff, the existing roadway drainage system with in the scope of this project will require minimum improvements. The existing system will be modified to accommodate the new roadway cross-section. The proposed system will consist of drainage inlets and baffles, if possible, to facilitate disposal of stone water runoff. The 5-year design storm event will be used to design the storm water management system, in accordance with Section D-4, "Water Control", of Part 2 of the Miami -Dade County Public Works Manual. Bayview Market Site Utility Study Page 9 Attachment A Preliminary Drainage Well Calculations • • • • • Bayview Market City of Miami, Florida DRAINAGE CALCULATIONS: "DRAINAGE WELLS" (MASS DIAGRAM - DEEM CRITERIA) 1. Site Data: A. Average October Water Table Elevation = B. County Flood Criteria Elevation = C. F.I.R.M_ Base Flood Elevation = D. Average Road Crown Elevation = E. Average Existing Onsite Grade Elevation = F. Proposed lowest inlet grate elevation = 2. Total Contributing Drainage Area (A) : 2.26 City of Miami Datum (Mean High Water Elev.) 5.26 City of Miami Datum (County Flood Criteria Map, see Appendix A) 9.26 City of Miami Datum (Map No. 12025C0180J, see Apx. A) I065 NGVD 10.40 NGVD 9.00'' NGVD A. Impervious Areas: a) Asphalt and concrete pavement = b) Roof areas + 1/3 NE building corner = Total Impervious Area (A) = 8.715 Acres 0.673 Acres 7.378 Acres 8.051 Acres (92%) B. Pervious areas: a) Green Areas = 0.664 Acres (8%) 3. Weighted Runoff Coefficient (C): Runoff Coefficient Impervious (C1) = Runoff Coefficient Pervious (C2) _ C=[(A1 x CI) + (A2 x C2)] / A; C= C x A = Total Contributing Area; C x A = 0.90 030 0.854 7.45 Acres 4. Time required to generate one inch of runoff (per DERM Water Control Section D-4) Rainfall Intensity (I) = 3085 / [(48.6 x I;°.lt) + t (0.5895 + F-2f3)] Frequency (F) = years - Frequency Curve Q = CIA, V = Qt; V(J in) = Qt(l no, to ia.) = Time to generate 1 inch of runoff V(l in.) '" CIAt(l in) V' x A = CIAt(t in) ; Solving for to in.)+ to no = 1" / (IC) Time to Generate one inch of run-off t(in) Time to reach the inlet (tc.) Total Time required to generate 1 in of runoff: = 11.76 Min. 10.00 Min. = 21.76 Min. DrainCaics, xls BASIN • • • 5. Cumulative Runoff (Inflow Mass Diagram) Time CxA (acres) 1 (inches) Q (CFS) Accumulated Storm Runoff (CF) (Min.) (Sec_) 8 480 7.445 6.405 47.68 22,889 10 600 7.445 6.166 45.91 27,546 15 900 7.445 5.641 42.00 37,799 21.76 1306 7.445 5.058 37.66 49,178 30 1800 7.445 4.493 33.45 60,214 40 2400 7.445 3.956 29.46 70,694 50 3000 7.445 3.534 26.31 78,938 60 3600 7.445 3.193 23.78 85,592 90 5400 7.445 2.477 18.44 99,582 120 7200 7.445 2.023 15.06 108,444 180 10800 7.445 1.480 11.02 119,038 6. Drainage Well Design Discharge Rate: Based on well discharge rate of: `925 GPM/ft. Head Well No. Lowest Inlet Rim Elev. Mean Tide High Elev. Headloss due to Higher SG of Salt Water (ft.) Head Acting on Well (ft.) Well Discharge Rate (CFS) Well Structure Dimensions We Well Structure Storage Volume (CF) Width (re.) Length (ft.) DW-1 9.00 2.26 1.50 5.24 10.80 6.00 14.00 440.16 DW-2 9.00 2.26 1.50 5.24 10.80 6.00. 14.00 440.16 DW-3 9.00 2.26 1.50 5.24 10.80 6.00 14.00 440.16 DW-4 9.00 2.26 1.50 5.24 10.80 6.00 14.00 440.16 DW--5 9.00 2.26 1.50 5.24 10.80 6.00 14.00 440.16 DW-6 9.00 2.26 1.50 5.24 10.80 6.00 14.00 440.16 Well Discharge Rate (CFS) 64.80 Total Storage (CF) 2640.96 7. Detention Time: The drainage well structure must be designed to detain runoff for a minimum of 90 seconds prior to discharge. Qd = Design Runoff Rate (CFS) = Vd = Detention Volume (CF) = Qd x 90 sec. = Val = Detention Volume Per Well (CF) = W = Width of Well Structure (ft.) = L = Length of Well Structure (ft.) = 37.66 CFS 3389.43 CF 564.91 CF 6.0 ft. 14.0 ft. Ha,, is the minimum depth required from the top of well casing to the floor of the well box to achieve 90 second detention time: Hdx,,(ft.)=Vdi/(WxL)= 6.80 ft. Top of Well Casing Elev. = 2.26 Elevation at Floor of Well Box (NGVD) = Top of Well Casing Elev. - H,;,, _ -4.54 • • • 8. Excess storm water runoff excluding well structure storage: Time Well Discharge Rate (CFS) Accumulated Well Discharge Volume (CF) Accumulated Storm Runoff (CF) Total Overflow Volume (CF) (Min:) : • . (Sec.) 8 480 64.80 31,104 22,889 -8.215 10 600 64.80 38,880 27,546 -11,334 15 900 64.80 58,320 37,799 -20,520 21.76 1,305.84 64.80 84,618 49,178 -35,439 30 1800 64.80 116,639 60,214 -56,425 40 2400 64.80 155,519 70,694 -84,824 50 3000 64.80 194,398 78,938 -115,460 60 3600 64.80 233,278 85,592 -147,686 90 5400 64.80 349,917 99,582 -250,336 120 7200 64.80 466,556 108,444 -358,112 180 10800 64.80 699,834 119,038 -580,796 9. Excess storm water runoff including well structure storage: Time Accumulated Storm Runoff (CF) Storage in Well Structure (CF) Accumulated Well Discharge Volume (CF) Total Overflow Volume (CF) (Min) (Sec.) 8 480 22,889 2,641 31,104 -10,855.97 10 600 27,546 2,641 38,880 -13,975.13 15 900 37,799 2,641 58,320 -23,161.13 21.76 1,305.84 49,178 2,641 84,618 -38,080.22 30 1800 60,214 2,641 116,639 -59,065.90 40 2400 70,694 2,641 155,519 -87,465.25 50 3000 78,938 2,641 194,398 -118,101.39 60 3600 85,592 2,641 233,278 -150,327.28 90 5400 99,582 2,641 349,917 -252,976.53 120 7200 108,444 2,641 466,556 -360,753.11 180 10800 119,038 2,641 699,834 -583,437.15 Safety Factor 1.72% Safety Factor 1.82% 111 Attachment B Existing Utility Records • • 374 a �,i,rr,ilt ItP I6 57 NE17TER • 0. 14 ►8 07 MVO N1Fr.11111001“ irat6; :lllr 4' 7443 1 r DWI NE 17 TER r1zor OW1 0 ev f SO: gr� NE17ST E 16 ST E 15 TERR 546 NE 15 1 wirir as NE 14 TERR 46 6 w ♦Yrrrn • • 222 '300 322 37991 321 3798 2 4. 245 378 327 332 3240 329 390 1 3901 1 335-_�•_; 338 3202 219 rEP OWN 5 'I8 210 3821 \17 522 204 374! z 211 205 518 2 3_8 \4 7 5846 NE 14 TEMR 6, et 5, ) 100 98 99 H1 ? • • • 0' Lvo , oer �f P.A." u wrs1]w3A "1G .0' 1 w 7 • f�/r'Ir'4 CYJ.M) rTOH Y24/11, • • E � }62 WWI 1NAvasle 1sNlSd9 N.7t V0 p -77OHNVW 0 H.71 fC ane.TA0.7 Ca' al 'were mats 370H b.,fanr 77.1.41' 19 0Walec ' }/S ' 0 01 ND/1.3JNNOJ • ON3 i3 7 rim 0 Attachment C Pump Station Monthly Information • 0 Pump Station Monthly Station..30 -0002 Atlas Pg..EI3 MTANI DADE WATER & SEWER DEPARTMENT Adc9r_ .925 BISCAYNE BLVD Sec -Township -Range 31-53-42 enr . ET clock . Y Telzn. Y ##Pumps . 5 p Type.A Stn C1ass.M Speed.R Erspwr.+ Res f iow (gpd) Plans.. 1,679,974 Plats._ 0 Extens_ 0 Proj Napot % Cap 4.22 hrs 42.20 3.05 hrs 30.50 3.05 hrs 30.50 Information _ <Plan Reviex, Mo.ratorium._< Moratorium effective since / / Yearly NAPOT (hrs) 3.05 Stn Gross Capacity(gpd),. 57,600,000 Station Reduction Factor 0.60 Stn Net Cap Certif (gpd) . , 0 Stn Net Capacity(gpd).,., 34,560,000 Indicated Flows(gpd).,... 4,392,000 Date Mo.NAPOT Avg Daily Flows Rgd 4 Comments im 03/29/2004 3.28 13.10 0.00 FYg P5P 02/27/2004 3.25 12.98 0.00 Y 5 01/28/2004 3.00 11.99 0.00 Y S 12/26/2003 3.22 12.89 0.00 Y 5 11/21/2003 3.71 14.83 0.00 Y 5 10/23/2003 3.81 15.25 0.00 Y 5 09/24/2003 3.38 13.53. 0.00 Y 5 Signature..LEALG Sign Date..03/17/2003 13:52:24.01 GOLD/M Station I<m>provement GOLD/S <S>tation Inform. GOLD/U <U>pstream Statioi GOLD/D <D>ownstream Station GOLD/P <P>ump Infoimatiox GOLD/G Codes & Cata<g>ories GOLD/T Sewer Cer<t>ification • • l 'd 'ON VlRti E -H .1dV *20(74042916214495*CA.SALP * This is not an cffjcial doci ent. * M Stat Station Station Current Delta ProjectE R Type Owner Number ET (Hrs) ET (Hrs) ET (Hrs Proposed Number of gallons (gpd): 56610 410(********************w******* Downstream Stations *********** **k***-********** ASRM+ 30 0002 4.22 0.04 4.2 AC 30 CD 1002.02 0.01 1002.0 AC 30 RS 1002.03 0.00 1002.0 IN 30 RS95APR 1001.75 0.00 1001_7 TN 30 RS94MAR 1001.89 0.00 1001.9 • • € d iH'ON d 1 E iOO1 •61 'IdV