HomeMy WebLinkAboutSite Utility Study• • • EDC Corp. Environmental Development Consultants Corporation 2455 SW 27th Avenue, Suite 300 Miami, Florida 305.858.8100 PH • 305.855.4760 FAX 700 BISCAYNE/PARAMOUNT PARK PROPOSED CONDOMINIUM TOWER SITE UTILITY STUDY FEBRUARY 2005 Civil and Environmental Engineering • Permitting and Management • • EDC Corp. Environmental Development Consultants Corporation 2455 SW 27th Avenue, Suite 300 Miami, Florida TABLE OF CONTENTS 305.858.8100 PH • 305.858.4760 FAX Page 1. General 3 2. Storm Drainage System 4 3. Water Distribution System 5 4. Sewer Collection System 6 5. Solid Waste Generation 7 EXHIBITS: "A" Location Map 10 "B" Storm Drainage Calculations 12 "C" MD-WASAD Water Atlas 15 MD -Sewer Atlas 16 Proposed Water Use Calculations 17 DERM Pump Station Report 18 "D" Solid Waste Generation Calculations 20 Civic and Environmental Engineering • Permitting and Management • • EDC Corp, Environmental Development Consultants Corporation 2455 SW 27th Avenue, Suite 300 Miami, Florida 305.858.8100 PH • 305.858,4760 FAX 700 BISCAYNE/PARAMOUNT PARK SITE UTILITY STUDY 1. General A. Project Location and Size The proposed project consists of a Residential Condominium Tower to be constructed at an approximately 1.76 acre site located at 700 Biscayne Boulevard, Miami I FI. (See Exhibit A). The project is bounded to the north by NE 8th Street, to the south by NE 7th Street, and to the east by Biscayne Boulevard, all being in Section 31, Township 53 South, Range 42 East, Miami - Dade County, Florida. The site is vacant, in its present condition. B. Proposed project build out: The proposed project build -out is mixed use and consists of 467 residential condominium units, 120 guest hotel/condo suites, 7,297 square feet of restaurant services, and 12,947 square feet of retail/office space. Civil and Environmental Engineering • Permitting and Management • EDC Corp. Environmental Development Consultants Corporation 2455 SW 27`6 Avenue, Suite 300 Miami, Florida 2. Storm Drainage System 305.858.8100 PH • 305.858.4760 FAX A. Existing Storm Drainage System: Roadway storm drainage systems presently exist along the streets surrounding the proposed project. FDOT owns right of way and drainage systems along Biscayne Boulevard. The side Streets and associated drainage systems are owned and maintained by the City of Miami. The site, in its existing or proposed conditions, does not or will not contribute any significant amount of storm water run-off into the Public Roadway System. No significant improvements to the existing Roadway Drainage System are expected as a result of this project other than some possible inlet modifications associated with the street of sidewalk improvements, B. Proposed On -Site Storm Drainage System: The proposed storm drainage system to serve this project will be designed to fully contain on -site the storm water run-off and to meet the Miami. Dade County Department of Environmental Resources Management, (DERM) Environmental Resources Permit (ERF) requirements and the Florida Department of Transportation (FDOT). This will be accomplished by means of deep drainage wells. No offsite run-off will be generated from the site. The total contributing site area and 30% of the building wall area exposed to the rain will be included in the Disposal Well System design calculations. An impervious coefficient of 0.95 will be used for the purpose of this study. Based on local knowledge experienced well drilling company for other projects in the vicinity, an approximate well discharge rate 800 gpm per foot of head can be expected. Storm water from roofs, internal driveways, walkways and parking areas will be conveyed by means of a collection system to sediment tanks sized to meet the detention volume requirements prior to discharging into the Well System, Additional Water Quality pre-treatment and Pollution Retardant Baffles at the catch basins will be provided at areas subject to vehicle traffic. C. Required number of Wells: The proposed wells will be designed to maintain the site dry during the 5 year-1 day storm, to keep flooding below the perimeter grades during the 25 year-3 day storm and to keep flooding below the minimum flood elevation during the 100 year- 3 day storm. Based on the attached calculations, a total of 4 storm drainage wells are required to provide full on -site retention for this project depending on the actual yields obtained during the well drilling operations. Civil and Environmental Engineering • Permitting and Management • • EDC Corp. Environmental Development Consultants Corporation 2455 SW 27'h Avenue, Suite 300 305.858.8100 PH • 305.858.4760 FAX Miami, Florida For Well Disposal System calculations refer to attached Exhibit "B". 3. Water Distribution System A. Existing Water System Facilities: Miami -Dade Water & Sewer Department (MD-WASD) owns and operates the following domestic water facilities in the vicinity of this project: • An existing 12-inch water main on NE 8th Street that runs along the entire north side of the property. An existing 8-inch water main on NE 7th Street that runs along the entire southt side of the property. • An existing 24- inch watermain on Biscayne Boulevard. B. Required Water System Improvements: It appears the existing Watermain System is adequate and additional offsite system improvements will not be necessary for the construction of this project. WASAD will determine the exact points of connection. The proposed project should connect to the 12 inch watermain on NE 8th Street to obtain Domestic Water, Fire Protection and Landscape Irrigation service. C. Anticipated Water Use: The water use requirements for this project are calculated based on the build -out information previously described. An additional flow demand of 136,897 GPD for the residential and office components is expected from this project. For determination of anticipated flows see Exhibit "C". Civil and Environmental Engineering • Permitting and Management • • • EDC Corp. Environmental Development Consultants Corporation 2455 SW 27th Avenue, Suite 300 Miami, Florida 305.858.8100 PH • 305.858.4760 FAX 4. Sewer Collection System A. Existing Sanitary Sewer System Facilities: Miami -Dade Water & Sewer Department (MD-WASD) owns and operates the following sanitary sewer facilities in the vicinity of this project: • An existing 27-inch gravity sewer line along Biscayne Boulevard that runs along the entire front of this property. This line collects all the sanitary flows from the general area and directs them to Miami -Dade Water and Sewer Department Pump Station # 02 located in Bicentennial Park. • An existing 24-inch gravity sewer line along NE 8th Street that runs along the north side of this property. This line collects all the sanitary flows from the general area and directs them to Miami -Dade Water and Sewer Department Pump Station # 02. B. Required Sanitary Sewer System Improvements: MD-WASD Gravity Sewer System requirements: It appears that the existing Sanitary Sewer Collection System is adequate and additional offsite system improvements will not be necessary for the construction of this project. The proposed project should connect to the existing 24-inch gravity main to obtain sanitary sewer service. C. Transmission Capacity Requirements The Wastewater generated by this project will be conveyed to MD-WASD Regional Pump Station No. 02. This station has a yearly NAPOT of 4.32 hours per day respectively according to DERM. (See Exhibit "C). The current ET data as of February 2005 reflects 4.32 hours. With an additional flow of 136,897 gallons per day generated by this project, the station will increase by 0.09 hours to 4.41 hours. Civil and Environmental Engineering • Permitting and Management • • • EEC Corp. Environmental Development Consultants Corporation 2455 SW 27`h Avenue, Suite 300 305.858.8100 PH • 305.858.4760 FAX Miami, Florida The above referenced pump station has sufficient available capacity to support this project. Flows from this Pump Station are transmitted to the MD-WASD Treatment Plant at Virginia Key. 5. Solid Waste Generation A. Solid Waste Generated by this project will be collected in standardized onsite-containers for refuse and recycle. Either hauling companies and/or the City of Miami Solid Waste Department will provide regular pick— up services. The anticipated daily solid waste generation for this project is 21.2 CY per day (See Appendix "D"). Civil and Environmental Engineering • Permitting and Management • • EDC Corp. Environmental Development Consultants Corporation 2455 SW 27th Avenue, Suite 300 Miami, Florida 305.858,8100 PH • 305.858.4760 FAX Civil and Environmental Engineering • Permitting and Management • • EDC Corp. Environmental Development Consultants Corporation 2455 SW 27th Avenue, Suite 300 Miami, Florida EXHIBIT "A" LOCATION MAP 305.858.8100 PH • 305.858.4760 FAX Civil and Environmental Engineering • Permitting and Management • EDC Corp. Environmental Development Consultants Corporation 2455 SW 27th Avenue, Suite 300 Miami, Florida LOCATION MAP 305,858.8100 PH • 305.858.4760 FAX Civil and Environmental Engineering • Permitting and Management • • EDC Corp. Environmental Development Consultants Corporation 2455 SW 27th Avenue, Suite 300 Miami, Florida EXHIBIT "B" Storm Drainage Calculations 305.858.8100 PH - 305.858.4760 FAX Civil and Environmental Engineering • Permitting and Management EDC Corp. Environmental Development Consultants Corporation 2455 SW 27th Avenue, Suite 300 Miami, Florida STORMWATER WELL CALCULATIONS 700 BISCAYNE/PARAMOUNT PARK DATE: February 2005 SITE DATA: SITE AREA BUILDING FOOT PRINT BUILDING HEIGHT BUILDING WALL AREA CONTRIBUTING BUILDING AREA CONTRIBUTING AREA LOWEST ADJACENT GRADE RUN OFF COEFFICIENT WELL DATA: 305.858.8100 PH • 305.858.4760 FAX 1.76 Acres 375 Feet 780 Feet 6.80 Acres 2.24 Acres 4.00 Acres 7.0 Ft. 0.95 WELL DISCHARGE RATE PER .FT OF HEAD 800 GPM NUMBER OF WELLS 4 TOTAL WELL DISCHARGE RATE PER FT OF HEAD 3200 GPM/FT. MEAN HIGH TIDE ELEVATION MHWL 1.5 Ft. GVD WELL DIAMETER 24 Inches SPECIFIC GRAVITY LOSS (SG) 1.0 Feet 12 Civil and Environmental Engineering • Permitting and Management • EDC Corp. Environmental Development Consultants Corporation 2455 SW 27th Avenue, Suite 300 Miami, Florida 305.858.8100 PH • 305.858.4760 FAX EXHIBIT "C" Miami Dade Water Atlas Miami Dade Sewer Atlas Proposed Water Use Calculations DERM Pump Station Monthly information Civil and Environmental Engineering • Permitting and Management • • • EDC Corp. Environmental Development Consultants Corporation 2455 SW 27m Avenue, Suite 300 Miami, Florida IAMI-DACE WATER ATLAS 305.858.8100 PH - 305.858.4760 FAX Civil and Environmental Engineering • Permitting and Management • • • EDC Corp. 2455 SW 27th Avenue, Suite 300 Miami, Florida : . f; 42 7 Environmental Development Consultants Corporation 305.858.8100 PH • 305.858.4760 FAX 3999 1 1 ; - '''-•/ . 811:9 f17;9-,'-: 2;.741.-9.I•i•.,,,1ii'-.4,.r.....,,,...-.-_1-.,,,. 2,,1,/,/,:i, 11,I al:r.',,,.t,Sa ---i-1 -,1'4: '1, .t.- . 71I1I,l-1-'""*!:i '1'1'-/4;9.9.' 1----lr-„;.--5:'.,.I 4,71,,",,:1 1 2 \ -,44-4L4 4r7 ; ''7 22/1—' '.-/- 4 IP_4A7'2 11i, "1,. 49 ...,•: ',.:1 ,,,I: i \ -- si m.7 .,.1*. ,---- -,.., . 121 29 _ ::......,....-39 i • .....,,'", t le 11 4,...„,.,--31-5' '''' r'----(;i3lir--31-1:: . S. (g.,.., , 381 6 . ,:A. '----- ' , a , 1.- -._ ..... 37r3 . '''''''''''- --:°-• 'f,1,---------,..,,,, t, ,, . rd),..: I i: r37 00 : :""1---: , 1 • ., ..., 9 I- 9 fi 34as 1 ;9944 1- 1114ErA1 A r • 51s I' 2011r 1 .31111- 9220 11324211 ) :56 82 19, ten AT] ; 311 g mr 909•091111.11 0r8r191 9190090K PPM 1909 91.10,1P STA-1 r 914 AND „...f-1/4,981,IPACT 2 3/rEg78 3 5 51199f 19 '7414PROJECTLOCATION a P4 "3' 7;699 1, 1 mr) MIAMI-DADE SEWER ATLAS Civil and Environmental Engineering • Permitting and Management I • .. • e e • EDC Corp. Environmental Development Consultants Corporation 2455 SW 27 ' Avenue, Suite 300 Miami, Florida PROPOSED WATER USE CALCULATIONS 700 BISCAYNE/PARAMOUNT PARK Febrauary 2005 305.858.8100 PH • 305.858.4760 FAX TYPE OF BUILDING USE No. Units RATE (God) ADF (God) CONDOMINIUM UNITS 467 250 116,750 OFFICE 12,947 SF 5/100 SF 647 RESTAURANT 150 seats 50/seat 7,500 HOTEL 120 100 12,000 NET INCREASE: 136,897 Civil and Environmental Engineering • Permitting and Management e • e EDC Corp. 2455 SW 27th Avenue, Suite 300 Miami, Florida Environmental Development Consultants Corporation 305.858.8100 PH • 305.858.4760 FAX *2004051114052558*CAMPAJO ent. * M Stat Station Station R Type Owner Number Proposed Number of gallons (gpd): 136, ****************************** Downstream OK ASRM+ AC AC IN IN 30 0002 30 CD 30 RS 30 RS95APR 30 RS94MARCH DERM NOPT Run February, 2005 Current Delta Projected ET (Hrs) ET (Hrs) ET (Hrs) 897 Stations**************+r*r********,e****r***,r******r**************** 4.32 1001.61 1001.55 1001.34 1001.44 .09 .02 .01 .01 .01 Civil and Environmental Engineering • Permitting and Management 4.41 1001.64 1001.56 1001.34 1001.45 • • • EDC Corp. Environmental Development Consultants Corporation 2455 SW 27111Avenue, Suite 300 305.858.8100 PH 305.858.4760 FAX Miami, Florida Civil and Environmental Engineering • Permitting and Management • • o EDC Corp. Environmental Development Consultants Corporation 2455 SW 271h Avenue, Suite 300 Miami, Florida 305.858.8100 PH • 305.858.4760 FAX EXHIBIT "D" Solid Waste Generation Calculations Civil and Environmental Engineering • Permitting and Management • • • EDC Corp. Environmental Development Consultants Corporation 2455 SW 27;" Avenue, Suite 300 Miami, Florida 305.858.8100 PH • 305.858.4760 FAX PROPOSED SOLID WASTE CALCULATIONS PROJECT 700 BISCAYNE/PARAMOUNT PARK February 2005 TYPE OF BUILDING USE UNITS/ (SEATS) RATE (Pounds) SOLID WASTE GENERATED (Ib) SOLID WASTE GENERATED (tons) CONDOMINIUM 467 8 3,736 1.86 OFFICE 12,947 .025 324 .16 HOTEL 120 8 960 .48 RESTAURANT 200 5 1,000 .50 NET INCREASE: 6,030 3.01 ANTICIPATED SOLID WASTE VOLUME AT 7 CY PER TON: 21.2 Cubic Yards per Day Civil and Environmental Engineering • Permitting and Management • • • EDC Corp. 2455 SW 27th Avenue, Suite 300 Miami, Florida C:Documents and SedingsiKevinDesktop1700 Biscayne MUSPIMUSP Study 700 Biscayne.cloc Environmental Development Consultants Corporation 305.858.8100 PH • 305.858.4760 FAX Civil and Environmental Engineering • Permitting and Management