HomeMy WebLinkAboutSite Utility Study•
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300
Miami, Florida
305.858.8100 PH • 305.855.4760 FAX
700 BISCAYNE/PARAMOUNT PARK
PROPOSED CONDOMINIUM TOWER
SITE UTILITY STUDY
FEBRUARY 2005
Civil and Environmental Engineering • Permitting and Management
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300
Miami, Florida
TABLE OF CONTENTS
305.858.8100 PH • 305.858.4760 FAX
Page
1. General 3
2. Storm Drainage System 4
3. Water Distribution System 5
4. Sewer Collection System 6
5. Solid Waste Generation 7
EXHIBITS:
"A" Location Map 10
"B" Storm Drainage Calculations 12
"C" MD-WASAD Water Atlas 15
MD -Sewer Atlas
16
Proposed Water Use Calculations 17
DERM Pump Station Report
18
"D" Solid Waste Generation Calculations
20
Civic and Environmental Engineering • Permitting and Management
•
•
EDC Corp, Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300
Miami, Florida
305.858.8100 PH • 305.858,4760 FAX
700 BISCAYNE/PARAMOUNT PARK
SITE UTILITY STUDY
1. General
A. Project Location and Size
The proposed project consists of a Residential Condominium Tower to be constructed at an
approximately 1.76 acre site located at 700 Biscayne Boulevard, Miami I FI. (See Exhibit A).
The project is bounded to the north by NE 8th Street, to the south by NE 7th Street, and to the
east by Biscayne Boulevard, all being in Section 31, Township 53 South, Range 42 East, Miami -
Dade County, Florida.
The site is vacant, in its present condition.
B. Proposed project build out:
The proposed project build -out is mixed use and consists of 467 residential condominium
units, 120 guest hotel/condo suites, 7,297 square feet of restaurant services, and 12,947
square feet of retail/office space.
Civil and Environmental Engineering • Permitting and Management
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27`6 Avenue, Suite 300
Miami, Florida
2. Storm Drainage System
305.858.8100 PH • 305.858.4760 FAX
A. Existing Storm Drainage System:
Roadway storm drainage systems presently exist along the streets surrounding the proposed
project. FDOT owns right of way and drainage systems along Biscayne Boulevard. The side
Streets and associated drainage systems are owned and maintained by the City of Miami. The
site, in its existing or proposed conditions, does not or will not contribute any significant amount
of storm water run-off into the Public Roadway System. No significant improvements to the
existing Roadway Drainage System are expected as a result of this project other than some
possible inlet modifications associated with the street of sidewalk improvements,
B. Proposed On -Site Storm Drainage System:
The proposed storm drainage system to serve this project will be designed to fully contain on -site
the storm water run-off and to meet the Miami. Dade County Department of Environmental
Resources Management, (DERM) Environmental Resources Permit (ERF) requirements and the
Florida Department of Transportation (FDOT). This will be accomplished by means of deep
drainage wells. No offsite run-off will be generated from the site.
The total contributing site area and 30% of the building wall area exposed to the rain will be
included in the Disposal Well System design calculations. An impervious coefficient of 0.95 will
be used for the purpose of this study.
Based on local knowledge experienced well drilling company for other projects in the vicinity, an
approximate well discharge rate 800 gpm per foot of head can be expected.
Storm water from roofs, internal driveways, walkways and parking areas will be conveyed by
means of a collection system to sediment tanks sized to meet the detention volume requirements
prior to discharging into the Well System, Additional Water Quality pre-treatment and Pollution
Retardant Baffles at the catch basins will be provided at areas subject to vehicle traffic.
C. Required number of Wells:
The proposed wells will be designed to maintain the site dry during the 5 year-1 day storm, to
keep flooding below the perimeter grades during the 25 year-3 day storm and to keep flooding
below the minimum flood elevation during the 100 year- 3 day storm.
Based on the attached calculations, a total of 4 storm drainage wells are required to provide full
on -site retention for this project depending on the actual yields obtained during the well drilling
operations.
Civil and Environmental Engineering • Permitting and Management
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27'h Avenue, Suite 300 305.858.8100 PH • 305.858.4760 FAX
Miami, Florida
For Well Disposal System calculations refer to attached Exhibit "B".
3. Water Distribution System
A. Existing Water System Facilities:
Miami -Dade Water & Sewer Department (MD-WASD) owns and operates the following
domestic water facilities in the vicinity of this project:
• An existing 12-inch water main on NE 8th Street that runs along the entire north side of
the property.
An existing 8-inch water main on NE 7th Street that runs along the entire southt side of
the property.
• An existing 24- inch watermain on Biscayne Boulevard.
B. Required Water System Improvements:
It appears the existing Watermain System is adequate and additional offsite system
improvements will not be necessary for the construction of this project. WASAD will
determine the exact points of connection.
The proposed project should connect to the 12 inch watermain on NE 8th Street to obtain
Domestic Water, Fire Protection and Landscape Irrigation service.
C. Anticipated Water Use:
The water use requirements for this project are calculated based on the build -out information
previously described.
An additional flow demand of 136,897 GPD for the residential and office components is
expected from this project.
For determination of anticipated flows see Exhibit "C".
Civil and Environmental Engineering • Permitting and Management
•
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300
Miami, Florida
305.858.8100 PH • 305.858.4760 FAX
4. Sewer Collection System
A. Existing Sanitary Sewer System Facilities:
Miami -Dade Water & Sewer Department (MD-WASD) owns and operates the following
sanitary sewer facilities in the vicinity of this project:
• An existing 27-inch gravity sewer line along Biscayne Boulevard that runs along the
entire front of this property. This line collects all the sanitary flows from the general area
and directs them to Miami -Dade Water and Sewer Department Pump Station # 02
located in Bicentennial Park.
• An existing 24-inch gravity sewer line along NE 8th Street that runs along the north side of
this property. This line collects all the sanitary flows from the general area and directs
them to Miami -Dade Water and Sewer Department Pump Station # 02.
B. Required Sanitary Sewer System Improvements:
MD-WASD Gravity Sewer System requirements:
It appears that the existing Sanitary Sewer Collection System is adequate and additional
offsite system improvements will not be necessary for the construction of this project.
The proposed project should connect to the existing 24-inch gravity main to obtain sanitary
sewer service.
C. Transmission Capacity Requirements
The Wastewater generated by this project will be conveyed to MD-WASD Regional Pump
Station No. 02. This station has a yearly NAPOT of 4.32 hours per day respectively according
to DERM. (See Exhibit "C).
The current ET data as of February 2005 reflects 4.32 hours. With an additional flow of
136,897 gallons per day generated by this project, the station will increase by 0.09 hours to
4.41 hours.
Civil and Environmental Engineering • Permitting and Management
•
•
•
EEC Corp. Environmental Development Consultants Corporation
2455 SW 27`h Avenue, Suite 300 305.858.8100 PH • 305.858.4760 FAX
Miami, Florida
The above referenced pump station has sufficient available capacity to support this project.
Flows from this Pump Station are transmitted to the MD-WASD Treatment Plant at Virginia
Key.
5. Solid Waste Generation
A. Solid Waste Generated by this project will be collected in standardized onsite-containers for
refuse and recycle. Either hauling companies and/or the City of Miami Solid Waste
Department will provide regular pick— up services.
The anticipated daily solid waste generation for this project is 21.2 CY per day (See
Appendix "D").
Civil and Environmental Engineering • Permitting and Management
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300
Miami, Florida
305.858,8100 PH • 305.858.4760 FAX
Civil and Environmental Engineering • Permitting and Management
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300
Miami, Florida
EXHIBIT "A"
LOCATION MAP
305.858.8100 PH • 305.858.4760 FAX
Civil and Environmental Engineering • Permitting and Management
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300
Miami, Florida
LOCATION MAP
305,858.8100 PH • 305.858.4760 FAX
Civil and Environmental Engineering • Permitting and Management
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300
Miami, Florida
EXHIBIT "B"
Storm Drainage Calculations
305.858.8100 PH - 305.858.4760 FAX
Civil and Environmental Engineering • Permitting and Management
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300
Miami, Florida
STORMWATER WELL CALCULATIONS
700 BISCAYNE/PARAMOUNT PARK
DATE: February 2005
SITE DATA:
SITE AREA
BUILDING FOOT PRINT
BUILDING HEIGHT
BUILDING WALL AREA
CONTRIBUTING BUILDING AREA
CONTRIBUTING AREA
LOWEST ADJACENT GRADE
RUN OFF COEFFICIENT
WELL DATA:
305.858.8100 PH • 305.858.4760 FAX
1.76 Acres
375 Feet
780 Feet
6.80 Acres
2.24 Acres
4.00 Acres
7.0 Ft.
0.95
WELL DISCHARGE RATE PER .FT OF HEAD 800 GPM
NUMBER OF WELLS 4
TOTAL WELL DISCHARGE RATE PER FT OF HEAD 3200 GPM/FT.
MEAN HIGH TIDE ELEVATION MHWL 1.5 Ft. GVD
WELL DIAMETER 24 Inches
SPECIFIC GRAVITY LOSS (SG) 1.0 Feet
12
Civil and Environmental Engineering • Permitting and Management
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27th Avenue, Suite 300
Miami, Florida
305.858.8100 PH • 305.858.4760 FAX
EXHIBIT "C"
Miami Dade Water Atlas
Miami Dade Sewer Atlas
Proposed Water Use Calculations
DERM Pump Station Monthly information
Civil and Environmental Engineering • Permitting and Management
•
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27m Avenue, Suite 300
Miami, Florida
IAMI-DACE WATER ATLAS
305.858.8100 PH - 305.858.4760 FAX
Civil and Environmental Engineering • Permitting and Management
•
•
•
EDC Corp.
2455 SW 27th Avenue, Suite 300
Miami, Florida
: .
f;
42
7
Environmental Development Consultants Corporation
305.858.8100 PH • 305.858.4760 FAX
3999
1 1 ; - '''-•/ . 811:9
f17;9-,'-: 2;.741.-9.I•i•.,,,1ii'-.4,.r.....,,,...-.-_1-.,,,. 2,,1,/,/,:i, 11,I al:r.',,,.t,Sa ---i-1 -,1'4: '1, .t.- . 71I1I,l-1-'""*!:i '1'1'-/4;9.9.' 1----lr-„;.--5:'.,.I 4,71,,",,:1
1
2
\ -,44-4L4
4r7
;
''7
22/1—' '.-/- 4
IP_4A7'2
11i, "1,. 49 ...,•: ',.:1
,,,I:
i \ -- si m.7 .,.1*.
,---- -,.., . 121 29 _ ::......,....-39
i •
.....,,'", t le 11 4,...„,.,--31-5' '''' r'----(;i3lir--31-1::
. S. (g.,.., , 381 6 . ,:A.
'----- ' , a , 1.-
-._ .....
37r3
. '''''''''''- --:°-• 'f,1,---------,..,,,, t, ,, .
rd),..:
I i: r37 00
: :""1---: , 1 • .,
...,
9 I-
9
fi 34as
1
;9944 1-
1114ErA1 A
r
•
51s I'
2011r 1 .31111-
9220 11324211
) :56
82
19,
ten
AT] ;
311
g
mr
909•091111.11 0r8r191
9190090K PPM
1909 91.10,1P STA-1 r 914 AND
„...f-1/4,981,IPACT 2
3/rEg78 3 5
51199f 19
'7414PROJECTLOCATION
a P4
"3' 7;699
1, 1
mr)
MIAMI-DADE SEWER ATLAS
Civil and Environmental Engineering • Permitting and Management
I
• ..
•
e
e
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27 ' Avenue, Suite 300
Miami, Florida
PROPOSED WATER USE CALCULATIONS
700 BISCAYNE/PARAMOUNT PARK
Febrauary 2005
305.858.8100 PH • 305.858.4760 FAX
TYPE OF BUILDING USE
No. Units
RATE
(God)
ADF
(God)
CONDOMINIUM UNITS
467
250
116,750
OFFICE
12,947 SF
5/100 SF
647
RESTAURANT
150 seats
50/seat
7,500
HOTEL
120
100
12,000
NET INCREASE:
136,897
Civil and Environmental Engineering • Permitting and Management
e
•
e
EDC Corp.
2455 SW 27th Avenue, Suite 300
Miami, Florida
Environmental Development Consultants Corporation
305.858.8100 PH • 305.858.4760 FAX
*2004051114052558*CAMPAJO ent. *
M Stat Station Station
R Type Owner Number
Proposed Number of gallons (gpd): 136,
****************************** Downstream
OK ASRM+
AC
AC
IN
IN
30 0002
30 CD
30 RS
30 RS95APR
30 RS94MARCH
DERM NOPT Run February, 2005
Current Delta Projected
ET (Hrs) ET (Hrs) ET (Hrs)
897
Stations**************+r*r********,e****r***,r******r****************
4.32
1001.61
1001.55
1001.34
1001.44
.09
.02
.01
.01
.01
Civil and Environmental Engineering • Permitting and Management
4.41
1001.64
1001.56
1001.34
1001.45
•
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27111Avenue, Suite 300 305.858.8100 PH 305.858.4760 FAX
Miami, Florida
Civil and Environmental Engineering • Permitting and Management
•
•
o
EDC Corp. Environmental Development Consultants Corporation
2455 SW 271h Avenue, Suite 300
Miami, Florida
305.858.8100 PH • 305.858.4760 FAX
EXHIBIT "D"
Solid Waste Generation Calculations
Civil and Environmental Engineering • Permitting and Management
•
•
•
EDC Corp. Environmental Development Consultants Corporation
2455 SW 27;" Avenue, Suite 300
Miami, Florida
305.858.8100 PH • 305.858.4760 FAX
PROPOSED SOLID WASTE CALCULATIONS PROJECT
700 BISCAYNE/PARAMOUNT PARK
February 2005
TYPE OF BUILDING USE
UNITS/
(SEATS)
RATE
(Pounds)
SOLID
WASTE
GENERATED
(Ib)
SOLID
WASTE
GENERATED
(tons)
CONDOMINIUM
467
8
3,736
1.86
OFFICE
12,947
.025
324
.16
HOTEL
120
8
960
.48
RESTAURANT
200
5
1,000
.50
NET INCREASE:
6,030
3.01
ANTICIPATED SOLID WASTE VOLUME AT 7 CY PER TON: 21.2 Cubic Yards per Day
Civil and Environmental Engineering • Permitting and Management
•
•
•
EDC Corp.
2455 SW 27th Avenue, Suite 300
Miami, Florida
C:Documents and SedingsiKevinDesktop1700 Biscayne MUSPIMUSP Study 700 Biscayne.cloc
Environmental Development Consultants Corporation
305.858.8100 PH • 305.858.4760 FAX
Civil and Environmental Engineering • Permitting and Management