Loading...
HomeMy WebLinkAboutpre interlocal agreementBEXHIBIT B Roadway Improvements Roadway Improvements. All roads will be designed and constructed in accordance with all applicable jurisdictional agency standards. (i.e. Miami -Dade County, City of Miami or Florida Department of Transportation (FDOT). Roadway construction will include sub -grade base, curbing, sidewalks, signage and striping. Roadway lighting will be constructed along the roads within the District. Roadways outside the Boundary of the District (Off -site) N. Miami Ave. The improvements consist of reconstructing approximately 2,350 ft. of existing, 4-lane urban roadway. The proposed center medians will be located between NE 32 street and NE 34 street. There will be sections of on -road, municipal parallel parking on the East side of the right-of-way Located: between NE 32`h St. and NE 35S` St. with a clearance of approximately 50 ft. from each respective intersection. There will be dedicated left turn lanes where feasible from NE 29`h street to NE 36`h street. NE 36`h St. This is a state road. The improvements consist of reconstructing approximately 2,100 ft. of existing, 4-lane urban roadway. The proposed center medians will be located between where feasible. NE 29`h St. (West of RJR). The improvements consist of reconstructing approximately 875 ft. of existing, 4-lane urban roadway. Where feasible there will be municipal parallel parking on both sides of the road. Roadways inside the Boundary of the District (On -site) Buena Vista Ave. The improvements consist of constructing approximately 1400 ft. of new 2- lane, urban roadway. The road, which runs from NE 32rd St. to NE 36'h St., will have on -road, municipal parallel parking on both its East and West sides. The parallel parking on both sides will run on the entirety of the street, but will provide approximately 50-100 ft. of clearance as Exhibit B-1 needed at the intersections: North side of NE 32"d St., both the north and south sides of NE 34 St. and the South side of NE 36th St., respectively. Midtown Blvd. The improvements consist of constructing approximately 2,450 ft. of new 2- lane, urban roadway from NE 29th St. to NE 36th St. The roadway will have on -road, municipal parallel parking on both its east and west sides excluding approximately 50-100 ft. of clearance as needed on both sides of each of the respective intersections as needed: NE 29th St. (North side only), NE 3151 St., NE 32"d St., NE 34'h St. and NE 36th St. (South side only). East Coast Ave. The improvements consist of constructing approximately 1,800 ft. of 2-lane urban, roadway from NE 30th St. to NE 35th St. The roadway will include on -road, private/loading parallel parking on the West side only. The parallel parking will run along the entire length of the avenue, and will provide approximately 50-100 ft. of clearance as needed on both sides of each respective street as needed: NE 30'h St. (North side only), NE 32"d St., NE 34th St. and NE 35'h St. (South side only). NE 30'h St. The improvements will consist of constructing approximately 350 ft. of urban, 2- lane roadway from NE 151 Pl. to E. Coast Ave. The roadway will include on -road, municipal parallel parking on both its north and south sides, providing approximately 75-100 ft. of clearance as needed at each of the respective intersections: NE 151 PI and E. Coast Ave. NE 3151 St. The improvements will consist of constructing approximately 600 ft. of urban, 2- lane roadway from N. Miami Ave. to NE I" P1. The roadway will include on -road, municipal parallel parking on both its north and south sides, providing approximately 50-100 ft. of clearance as needed at each of the respective intersections: N. Miami Ave. and NE 15' Pl. NE 35'h St. The improvements will consist of constructing approximately 375 ftt of urban, 2- lane roadway from NE 15` P1. to E. Coast Ave. The roadway will include on -road, municipal parallel parking on both its north and south sides, providing approximately 75 ft, of clearance at each of the respective intersections: NE 1 S` PI and E. Coast Ave. NE 32" St. The improvements will consist of constructing approximately 1,050 ft, of urban, 2- lane roadway from N. Miami Ave. to E. Coast Ave. The roadway will include on -road, Exhibit B-2 municipal parallel parking on both its north and south sides, providing approximately 50-100 ft. of clearance as needed at each of the respective intersections: East side of N. Miami Ave., East and West sides of Market St. and NE 1 S` Pl., and West side of E. Coast Ave. NE 34'h St. The improvements will consist of constructing approximately 1,175 ft. of urban, 2- lane roadway from N. Miami Ave. to E. Coast Ave. The roadway will include on -road, municipal parallel parking on both its north and south sides along its length, providing approximately 50-100 ft. of clearance as needed at each of the respective intersections: East side of N. Miami Ave., East and West sides of Market St. and NE 15t P1., and West side of E. Coast Ave. In the center of the right-of-way there will be medians along the length of the roadway, providing approximately 50-75 ft. of clearance as needed at each of the respective intersections: East side of N. Miami Ave., East and West sides of Market St. and NE Is' Pl., and West side of E. Coast Ave. Exhibit B-3