HomeMy WebLinkAboutR-05-0297City of Miami
Legislation
Resolution: R-05-0297
City Hall
3500 Pan American
Drive
Miami, FL 33133
www.miamigov.com
File Number: 05-00376 Final Action Date: 5/12/2005
A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENTS,
AUTHORIZING THE CITY MANAGER TO EXECUTE A GRANT OF EASEMENT AND
A BILL OF SALE, IN SUBSTANTIALLY THE ATTACHED FORMS, TO MIAMI-DADE
WATER AND SEWER DEPARTMENT, WHEREBY THE CITY OF MIAMI
("CITY") WILL GRANTA UTILITY EASEMENT, AS DEPICTED IN "EXHIBIT A"
ATTACHED AND INCORPORATED, ON CITY -OWNED PROPERTY LOCATED AT
APPROXIMATELY 2600 SOUTH BAYSHORE DRIVE, MIAMI, FLORIDA
("PROPERTY"), FOR A PERPETUAL NON-EXCLUSIVE EASEMENT ON THE
PROPERTY, FOR THE CONSTRUCTION, INSTALLATION, OPERATION AND
MAINTENANCE OF WATER AND SEWER FACILITIES, WITH THE RIGHT TO
RECONSTRUCT, IMPROVE, CHANGE, AND REMOVE SUCH FACILITIES OR ANY
OF THEM WITHIN THE EASEMENT.
WHEREAS, Miami -Dade Water and Sewer Department ("WASA") has requested the grant of a
non-exclusive easement on City -owned property located at 2600 South Bayshore Drive, Miami,
Florida; and
WHEREAS, this easement will be used for the construction, installation, operation and
maintenance of water and sewer facilities for the property; and
WHEREAS, the easement shall further contain a reverter provision that if the easement shall be
abandoned or discontinued, the easement shall cease and revert back to the City of Miami ("City");
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI,
FLORIDA:
Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted by
reference and incorporated as if fully set forth in this Section.
Section 2. The City Manager is authorized{1} to execute a Grant of Easement and Bill of Sale, in
substantially the attached forms to WASA, on City -owned property located at approximately 2600
South Bayshore Drive, Miami, Florida, whereby the City will grant a utility easement, as depicted in
"Exhibit A," attached and incorporated, for a perpetual non-exclusive easement on the property, for
the construction, installation, operation and maintenance of water and sewer facilities, with the right to
reconstruct, improve, change, and remove such facilities or any of them within the easement.
Section 3. This Resolution shall become effective immediately upon its adoption and signature of
the Mayor.{2}
City of Miami
Page 1 of 2 File Id: 05-00376 (Version: 11 Printed On: 11/14/2016
File Number: 05-00376 Enactment Number: R-05-0297
Footnotes:
{1} The herein authorization is further subject to compliance with all requirements that may be
imposed by the City Attorney, including but not limited to those prescribed by applicable City
Charter and Code provisions.
{2} If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar
days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall
become effective immediately upon override of the veto by the City Commission.
City of Miami Page 2 of 2 File Id: 05-00376 (Version: 1) Printed On: 11/14/2016