BID TABULATION & Results Summary
Bid No. 04-05-048 - Opening Date: 4/13/05 10:00 a.m.
1
Job Order Contract Horizontal A
Maximum Award (Initial Term) $ 10,000,000 or 24 months,
whichever occurs first
Maximum Payable (all terms)
$ 25,000,000
Order of Finish
Bidder/Contractor
2HA
GEC Associates
3Hs... ..
4HA
F&L Construction
6HA
HA Contracting
r..
HeWitt< r Cc slruc ;>
12HA
CW Construction
l
Adjustment Factor 1 Adjustment Factor 2
Normal Working Other Than Normal
Hours Working Hours
70 % weight
1.0615
1i07
1.0544
1.0900
7.1 1
1.1722
13HA MCM Construction
14HA Weeldey Paving
15HA Globe Tech Construction
16HA Williams Paving
17HA Merto Equipment Services
D/B = Davis Bacon wages required
1.6443
1.8850
2.3664
15% Weight
1.0715
1 B884~
1.1944
1.1800
Option Terms $ 5,000,000
Minimum Bond $ 5,000,000
Adjustment Factor 3 Adjustment Factor 4
Normal Working
Hours DIB
10% Weight
1.1015
t t26
1.0894
1.1800
Other Than Normal
Working Hours DM
5% Weight
1.2000
12015
or 12 months,
whichever occurs first
4.1364,
1.2944
1.2800
0
'. .. f5a_
r ,
9 986 14 SG . 1
.-
1 7777
1.6666
1.9850
2.6662
2.6000 3.0000
2.7500 3.0000
1.2722
1.3222
1.6470 1.6682
1.8950 1.9995
2.3664 2.6622
Combined Award
Criteria Figure
Formula = (1 x .70) + (2 x
.15) + (3 X .10) +( 4 X .05)
2.6D00 3.0000
2.7500 3.0000
AWARD
4 0670. HQR O kTAL
1.0741 Vertical A
10859 .. HORIZONTAL
1.0909 Vertical A
1,. Q91 X HORIZONTAL
1.1220
Vertical A
ORIZONTAL
11 i ORJZONTAL
1[_1Y28 HOR ONTAL
1.1971
1.6491
1.9068
2.4261
2.6800
2.8000
ORIZONTAIL
Award is recommended to Metro Express, Tran Construction, Carivon Construction, General Asphalt, FHP Techtonics, Hewett Kier
C_nat ..- S .,w oeete , EngLneering, and Acosta Tractor: at tll' q, respective Adjustment Factors given above in an amount not to exceed
$10,000,000 per contractor and for a maximum initial o onths, whichever occurs first; with up to 3 additional options of
$5,0000,000 per contractor per period for up to 12 first
7
r71-1;
T-
•
Recommended by:
Approved bar.
f 1
CITY OF MIAMI
_e Cif. of Miami 1
BID TABULATION & Results Summary
Bid No. 04-05-048 - Opening Date: 4/13/05 10:00 a.m.
I ( I
Job Order Contract Vertical A
Maximum Award (Initial Term)
$ 10,000,000 or 24 months,
whichever occurs first
Maximum Payable (all terms)
$ 25,000,
Order of Finish
Bidder/Contractor
Option Terms $ 5,000,000 or 12 months,
whichever occurs first
Minimum Bond $ 5,000,000
Combined Award
Adjustment Factor 1 Adjustment Factor 2 Adjustment Factor 3 Adjustment Factor 4 Criteria Figure
Normal Working Other Than Normal Normal Working Other Than Normal
Hours Working Hours Hours DIB Wonting Hours D/B Fcrmula
la (3z f 1 x t)4 + (2 x
70 % weight 15% Weight
`1'�
3VA
Carivon Construction
4VA
6VA
7VA
8VA
Tran Constuction
4 G>:
FHP Tech
Metro Express
MCM Construction
10% Weight 5% Weight
I1�v' 2
AWARD
7 0425 fi ical A
1.a751:
1.0868 1.0885
1.0901 1.1001
:4:119i10
1.1210
1.1200
1.6992
1.1300 1.1300
1.1401 1.1501
1.1350 1.1600
1.4000 1.1400
1.8097
1.7152
1.1850
1.5000
1.6267
1.0935 Horizontal
1.0996
1.1303
1.1830
1.7237
Horizontal
VeT1lcaa[A`:
Horizontal
DIB = Davis Bacon wages required
Award is recommended to GEC Construction, F&L Construction, and to HA Construction at the above Adjustment Factors in an amount not to
exceed $10,000,000 per contractor and for a maxim initial term of up to 24 months, whichever occurs first; with up o 3 additional options of
$5,0000,000 per contractor per period for up to 1 ��`� the each term, whichever occurs first.
Recommended by:
Approved by:
L3,
Oty of Miami
CITY OF MIAMI
Bid Results Summary
Bid No. 04-05-048 - Opening Date: 4/13105 10:00 a.m.
Maximum Award (Initial Term)
4,000,000
Maximum Payable (all terms)
Rank Order
of Bid
Bidder/Contractor
Job Order Contract Vertical B
10,000,000
Adjustment Factor 1
Normal Working Hours
70 % weight
1VB
4V8
7VB
GEC Associates
FM_ Construction
BMA Constructiori
Tran Constuction
1.0395
or 24 months,
whichever occurs first
1.0675
1.0811
1.0634
14701:
1.0911
Adjustment Factor 2
Other Than Normal
Working Hours
15% Weight
8VB
MAC Construction
1.0800
9VB
FHP
1.1700
10VB
Metro Express
1.1200
= Davis Bacon wages required
1.0422
1.1111
11011
1.1600
1.1900
Option Terms
Minimum Bond
Adjustment Factor 3
Normal Working Hours
D/B
1.4000.
10% Weight
1.0522
10801
1.0999
1.1201
1.1511
1.1600
1.2100
1.1400
$ 2,000,000
2,000,000
Adjustment Factor 4
Other Than Normal
Working Hours D/B
5% Weight
1.0622
1.1300
or 12 months,
whichever occurs first
1.0801
1.1744
14111;
1.1611
1.2600
1.2350
1.5000
Combined Award
Criteria Figure
Formula = (1 x .70) + (2 x
.15) + (3 X.10) +( 4X .05)
1.0423
AWARD
Vertical A
1 0833 Vertical A
.141,0441
1.1022
1.1090
1.1803
1.1830
VO***
Horizontal
Vertical B
Horizontal
Horizontal
Award is recommended to Carivon Construction, Unitech Builders, and to BMA Construction at the above Adjustment Factors in an amount
not to exceed $4,000,000 per contractor and for a maxim initial term of up to 24 months, whichever occurs first with up to 3 additional
options of $2,0000,000 per contractor per period for up months each terrn, whichever occurs first
Rerxtrrimended bv:
Approved by:
?fL
City of Miami
Maximum Award (initial Term)
City of Miami
BID TABULATION & Results Summary
Bid No. 04-05-048 - Opening Date: 4113/05 10:00 a.m.
Job Order Contract Vertical C
$ 2,000,000 or 24 months, Option Tennsl $ 1,000,000 or 12 months,
whichever occurs first 1 whichever occurs first
Maximum Payable (all terms)
Rank Order of Bid
Bidder/Contractor
1VC
GEC Associates
2VC
3VC
4VC
5VC
SVC
SVC
AML Construction
Carivon Construction
Unitech Builders
F&L Construction
BMA Construction
Tran Construction
9VC
$ 1,000,000
Minimum Bond
$ 1,000,000
Adjustment Factor 1
Normal Working
Hours
70 % weight
Adjustment Factor 2
Adjustment Factor 3
Adjustment Factor 4
Combined Award
Criteria Figure
1.0395
1.0684
Other Than Normal
Working Hours
15% Weight
1.0422
1.0784
Normal Working
Hours D/B
10% Weight
1.0522
1.1184
Other Than Normal
Working Hours D/B
5% Weight
1.0622
1.1284
Formula = (1 x .70) + (2 x
.15)+(3X.10) +(4X.05)
1.0423
1.0779
Award
Vertical A
Vertical C
MAC Construction
1.0675
1.0811
1.0634
1.0701
1.0885
1.0799
1.1344
1.1300
1.0801
1.0999
1.1300
1.0801
1.1744
1.1111
1.0911
1.0805.
1.1011
1.1605
1.1201
1.1311
10VC
11VC
Metro Express
FH P Tech
D/B = Davis Bacon wages required
1.1400
1.2300
1.4000
1.1511
1.1605
1.1611
1.2605
1.0801
1.0808
1.0833
1.0844
1.1022
1.1096.
Vertical A
Vertical B
Vertical A
Vertical B
Horizontal
Vertical C
1.1600
1.2500
1.2700
1.5000
1.1990
Horizontal
1.3000
1.2405
Horizontal
Award is recommended to AML Construction and to MAC Construction at the above Adjustment Factors in an amount not to exceed
$2,000,000 per contractor and for a maximum initial term u to 24 months, whichever occurs first; with up to 3 additional options of
$1,0000,000 per contractor per period for u • to 12 on P t i whichever rs first
y _4
[-
scornwr:*.i b...
!Approved by: