DAVID PLUMMER & ASSOCIATES, INC.
TRANSPORTATION • CIVIL • STRUCTURAL • ENVIRONMENTAL
Letter of Transmittal
Attention: Ms. Vicky Garcia -Toledo
To: Bilzin Sumberg Baena Price & Axelrod From: Rita Carbonell
200 S Biscayne Boulevard, Suite 2500 Date: October 7, 2004
Miami, FL 33131 DPA Project #: 04188
cc: file
Via: X Mail Courier Hand Deliver Federal Express
We are sending you:
X Attached
The following items:
Under Separate Cover Via:
Shop Drawings Prints Plans Samples
Specifications X Copy of Letter Change Order Other: —
Copies Date No.
1
10/04/04
Description
Approval letter from URS for Biscayne Park MUSP Traffic Impact Study
These are transmitted as checked below:
For Approval
X For Your Use
As Requested
For Review & Comment
Approved As Submitted
Approved As Noted
Returned For Corrections
Other:
Resubmit copies for approval
Submit —copies for distribution
Return corrected prints
Remarks: Enclosed please find a copy of the approval letter from URS in regards to the Biscayne Park MUSP Traffic Impact
Study. Please do not hesitate to call us if you have any questions or comments.
1750 PONCE DE LEON BOULEVARD
CORAL GABLES, FLORIDA 33134
TELEPHONE: 305 447-0900, FAX: 305 444-4986
E-MAIL: dpaC @dpfurnmer.com
SIGNED
EXCEEDING
CLIENT
EXPECTATIONS
lo October 4, 2004
•
Ms. Lilia I. Medina, AICP
Assistant Transportation Coordinator
City of Miami, Office of the City ManagerfTransportation
444 SW 2"d Avenue (10th Floor)
Miami, Florida 33130
Re: Biscayne Park
Sufficient Letter — W.O. # 78
Dear Ms. Medina:
Via Fax and US Mail
Subsequent to our September 13th 2004 review comments for the subject project, we
have received a revised traffic impact report prepared by David Plummer & Associates,
Inc. (DPA) with a formal response dated September 28th 2004. Copy of the response
letter is attached herewith.
We have reviewed the revised study and conclude that all issues raised in the original
review comments have been adequately addressed and the traffic impact report is
found to be sufficient. Please note the report does not provide any information
regarding delivery vehicle maneuverability within the project site. However, as this
project progresses through the review process, the applicant must submit an acceptable
site circulation plan for approval by the City staff.
Should you have any questions, please call me or Quazi Masood at 954.739.1881.
Sin
U
Y,
rpo
outhern
Ra Shanm .am, '.E.
Se for Traffic ngineer
cc:
Mr. Kevin Walford, Planner ! City of Miami (Via Fax and US Mail)
Ms. Rita Carbonell, David Plummer & Associates, Inc. (Via Fax)
Attachment:
URS Corporation
Lakeshore Complex
5100 NW 33rd Avenue, Suite 150
Fort Lauderdale, FL 33309-6375
Tel: 954.739.1881
Fax: 954.739.1789
DAVID PLUMMER & ASSOCIATES
TRANSPORTATION • CIVIL • STRUCTURAL • ENVIRONMENTAL
September 28, 2004
Mr. Quazi Masood
URS Corporation
Lakeshore Complex
5100 NW 33Ta Avenue, Suite 150
Fort Lauderdale, Fl 33309
954-739-1881
954-739-1789 (fax)
Re: Biscayne Park- #04188
Dear Mr. Masood,
Enclosed is a copy of the revised Biscayne Park Major Use Special Permit Traffic Impact Study, along with
responses to the comments.
Response:
Comment 1: The eastern study boundary was extended from Biscayne Boulevard (consistent with the
is revised methodology) to Biscayne Bay.
Comment 2: It is expected that the minor street approach will have significantly higher delay than the major
approach. Therefore the major approach LOS for the unsignalized intersections is reported in Exhibit 6. The
major approach for the unsignalized intersections operate within the LOS standard adopted by the city.
Comment 3: With the extension of the eastern study boundary to Biscayne Bay, the following projects were
included as committed developments: Biscayne Bay Tower (Blue); Biscayne Village; Sky Residences; Bay
25 (Star); Platinum Condominium; Edgewater Tower (Rosabella); Biscayne Bay Lofts (Onyx); Uptown
Lofts; and New Wave.
Comment 4: These additional committed developments were grouped together by their corresponding TAZ
and distributed to the study intersections and segments. Appendix E of the MUSP traffic impact study
includes the trip generation and land uses codes for each TAZ respectively.
Should you have any questions, please call me at 305-447-0900.
Sincerely,
Ca4b3),Q0
Rita Carbonell
inkProject Engineer
cc: file, Lilia Medina, Carlos Melo
comments_let_092804.doc
dpo
Prepared by
David Plummer & Associates, Inc.
July 2004
DPA Project #04188
1
10.
Biscayne Park
MUSP Traffic Impact Study
List of Exhibits
EXECUTIVE SUMMARY
1.0 INTRODUCTION 2
1.1 Study Area 2
1.2 Study Objective 4
2.0 EXISTING TRAFFIC CONDITIONS 5
2.1 Data Collection 5
2.1.1 Roadway Characteristics 5
2.1.2 Traffic Counts 6
2.1.3 Intersection Data 6
22 Corridor Capacity Analysis 9
2.3 Intersection Capacity Analysis 11
3.0 PLANNED AND PROGRAMMED ROADWAY IMPROVEMENTS 13
4.0 FUTURE TRAFFIC CONDITIONS 14
4.1 Background Traffic 14
4.2 Committed Developments 14
4.3 Project Traffic 14
4.3.1 Project Trip Generation 14
4.3.2 Project Trip Assignment 17
4.4 Future Corridor Capacity Analysis 21
4.5 Future Intersection Capacity Analysis 21
4.6 Site Access 25
TABLE OF CONTENTS
Page
ii
5.0 CONCLUSIONS
Appendix A:
Appendix B:
Appendix C:
Appendix D:
Appendix E:
Appendix F:
Approved Transportation Methodology & Site Plan
Traffic Counts & Signal Timing
FDOT's Quality/LOS Handbook --- Generalized Tables
Downtown Miami DRI Increment II Transit Ridership
Intersection Capacity Analysis Worksheets
Committed Development Information
Traffic Control Measures Plan
1
26
Page i
Biscayne Park
MUS'P Traffic Impact Study
LIST OF EXHIBITS
Exhibit Page
1 Location Map 3
2 2004 PM Peak Hour Traffic Volumes 7
3 Existing Lane Configurations 8
4 Existing Corridor and Transit Conditions 10
5 Person -trip Volume and Capacity — Existing Conditions Matrix 12
6 2004 Intersection Capacity Analysis Results 11
7 Future Lane Configuration 15
8 Future PM Peak Hour Traffic Volumes without Project 16
9 PM Peak Hour Project Trip Generation 18
10 Cardinal Distribution 19
11 PM Peak Hour Project Vehicular Trips Assignment 20
12 Person -trip Volume and Capacity — Future Conditions Matrix 22
13 Project PM Peak Hour Vehicular Volumes 23
14 Future with project PM Peak Hour Vehicular Volumes 24
15 Future Intersection Capacity Analysis 21
Page ii
Biscayne Park
.41U ASP Traffic Impact ,Study
EXECUTIVE SUMMARY
The Biscayne Park project is a proposed mixed -use development located on the west side of
Biscayne Boulevard between NE 24 Street and NE 25 Street in Miami, Florida. The project
consists of approximately 214 rental apartments, 8,700 SF of retail space, and 13,000 SF of
office space. Primary access to the site is proposed on NE 25 Street via a two-way driveway. A
second driveway to the site is located on NE 24 Street. Build out of the project is anticipated by
the year 2007. The subject site is located just outside the boundaries of the Downtown Miami
Area -wide DRI.
Existing and future traffic conditions for the project area corridors were established using the
person -trip based corridor capacity method. This method, consistent with the City's
Comprehensive Plan, promotes improved transportation efficiency through increased private
vehicle occupancies and makes mass transit a full partner in the urban transportation system.
Analysis results show that the project area corridors are projected to operate within the
established corridor threshold.
The intersection capacity analysis was performed at the intersections under study using vehicular
volumes and the Highway Capacity Software (HCS), based on the procedures of the 2000
Highway Capacity Manual. Results of the future intersection analysis show that all intersections
operate within the standard adopted by the city.
Page 1
Biscayne Park
fvMUSP Traffic Impact Study
1.0 INTRODUCTION
The Biscayne Park project is a proposed mixed -use development located on the west side of
Biscayne Boulevard between NE 24 Street and NE 25 Street in Miami, Florida (see Exhibit 1).
The project consists of approximately 214 rental apartments, 8,700 SF of retail space, and 13,000
SF of office space. Primary access to the site is proposed on NE 25 Street via a two-way
driveway. A second driveway to the site is located on NE 24 Street. A copy of the site plan is
included in Appendix A. Build out of the project is anticipated by the year 2007. The subject
site is located just outside the boundaries of the Downtown Miami Area -wide DRI.
1.1 Study Area
Consistent with the approved methodology for this project (see Appendix A) the traffic study
was performed for PM peak conditions. For traffic analysis purposes, the study area has been
defined as NE 36 Street to the north, NE 20 Street to the south, North Miami Avenue to the west,
and Biscayne Boulevard to the east. Corridor capacity analysis was perfoi...ed for Biscayne
Boulevard and NE 20 Street. Intersection capacity analysis was performed for the following
intersections:
• NE 24 Street / Biscayne Boulevard
• NE 25 Street / Biscayne Boulevard
• NE 26 Street / Biscayne Boulevard
• NE 24 Street / NE 2 Avenue
• NE 24 Street / NE 2 Court
• NE 25 Street / NE 2 Avenue
Page 2
•
0
0
0
0
1
r
r
1
11
1
1
i
1
1
1
1
1
1
1
1
0
1
I10
.
dPa
PFDJECT:
BISCAYNE PARK
MUSP TRAFFIC IMPACT STUDY
LOCATION MAP
EXHIBIT No.
Page 3
1 /
&seayne Park
MUSP Traffc Impact Study
1
1
1
1
1
1
1
1
411
1
1
1.2 Study Objective
The objective of this traffic study is to assess possible PM peak hour impacts on the project area
corridors using the person -trip corridor capacity method. This method is designed to meet the
challenges posed by Florida's growth management laws: to promote compact urban
development, discourage suburban sprawl and improve urban mobility. The method is consistent
with the City's Comprehensive Plan and promotes improved transportation efficiency through
increased private vehicle occupancies, thus making mass transit a full partner in the urban
transportation system.
Page 4
Biscayne Park
MUSA Traffic Impact Srudy
1.
2.1 Data Collection
1
Data collection for this study included roadway characteristics, intersection data, intersection
volumes, and signal timing. The data collection effort is described in detail in the following
sections.
!
! 2.1.1 Roadway Characteristics
!
111
Exclusive left turn lanes are provided at major intersections. On -street parking is prohibited. The
posted speed limit is 30 mph.
NE 20 Street
NE 20 Street between North Miami Avenue and Biscayne Boulevard is a two-way, two-Iane
10 undivided roadway. On -street parking is prohibited. There are no posted speed limit signs
within the study area.
NE 24 Street
NE 24 Street is a local roadway that provides east/west access within the study area. It is a two-
way, two-lane undivided roadway. On -street parking is prohibited and there are no posted speed
limit signs within the study area.
• NE 25 Street
NE 25 Street is a local roadway that provides east/west access within the study area. It is a two-
way, two-lane undivided roadway. On -street parking is not permitted and there are no posted
speed limit signs within the study area.
Page 5
2.0 EXISTING TRAFFIC CONDITIONS
Biscayne Boulevard
Biscayne Boulevard (US-1) is a major arterial that provides north/south access throughout the
City of Miami from downtown (the CBD) north to the Broward County line. Between NE 20
Street and NE 36 Street, Biscayne Boulevard is a two-way, four -lane divided roadway.
Bie'cayne Park
MUSP Traffic Impact Study
NE 2 Avenue
NE 2 Avenue is a minor arterial that provides north/south access within the study area. NE 2
Avenue is a two-way, four -lane undivided roadway within the project limits. On -street parking
is prohibited. There are no posted speed limit signs within the study area.
1
1 NE 2 Court
1 NE 2 Court is a two-way, two-lane undivided roadway within the project limits. There are no
posted speed limit signs within the study area.
r
1
1 2.1.2 Traffic Counts
1
I Consistent with the methodology submitted to and approved by the City, peak period vehicle
1 turning movement counts and 24-hour directional counts were collected at the intersections and
segments under study. Seasonal adjustment factors were obtained from the Florida Department
I of Transportation (FDOT). Traffic counts are included in Appendix B. Exhibit 2 shows the
adjusted 2004 PM peak season, peak hour period traffic volumes at the study intersections.
1
1
I
I
A field survey was conducted to deteiiiiine the lane configurations for the roadways and
intersections under study. Existing signal timing data was obtained from Miami -Dade County
for the analyzed intersection. Signal information is included in Appendix B. This infolination
provided the signal phasing and timing used in the intersection capacity analysis. Exhibit 3
shows the existing lane configurations for the intersections and roadways studied.
I
10
111
1
NIP
1
2.1.3 Intersection Data
1
1
Page 6
•
1
1
1
•
r
1
1
1
1
1
1
16.L.
I
I
I
I
I
I
I
I
I
I
I
_......,- 5
-- 20
NE 26 ST
NE 25 TERR
NE 25 ST
m
22
20-
15
19
§ 46
L -26
11
NE 24 ST
NE 23 ST
3
9
T 1
12- nea
0 m
12�
PROJECT
SITE
13
12
V
[*1
2
27
10
cNi
2
8
6
17
36
-- 0
4
i
dPe
PROJEC Tv
BISCAYNE PARK
MUSP TRAFFIC IMPACT STUDY
TSTLE:
BISCAYNE BLVD
EXISTING PM PEAK
TRAFFIC VOLUMES
N.T.S.
EXHIBIT No.
2
Page 7
NE 26 ST
NE 25 TERR
NE 25 ST
NE 24 ST
PROJECT
SITE
NE 23 ST
0
z
W
z
BISCAYNE BLVD
N.T.S.
dP
PACIJECT:
BISCAYNE PARK
MUSP TRAFFIC IMPACT STUDY
TILE
EXISTING LANE
CONFIGURATION
EXHIBIT No.
Page 8
3}
Biscayne Park
MUSP Traffic Im aasct Study
1
1
1
1
1
1
1
1
1
10
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2.2 Corridor Capacity Analysis
Existing traffic conditions for the project area corridors have been established using the person -
trip based corridor capacity method. The methodology for this analysis is outlined in the Miami
Comprehensive Neighborhood Plan. The existing traffic conditions analysis identifies the
person -trip volumes and person -trip capacities of the corridors, establishes existing person -trip
usage and identifies whether or not person -trip deficiencies exist. An adopted standard of LOS E
applies to the transportation corridors as measured by the person -trip method.
The existing conditions analysis establishes the multi -modal corridor conditions within the
project area. The person -trip capacities and volumes for the study corridors have been developed
consistent with the approved methodology for this project as described below:
Person -Trip Volumes
Link volumes collected were adjusted to peak season traffic conditions using seasonal
adjustment factors provided by FDOT. Peak hour maximum service volumes were obtained
from FDOT's 2002 Quality/Level of Service Handbook. Transit (bus and fixed rail) ridership
and capacity were obtained from Increment II of the Downtown Miami Area -wide DRI. An
analysis of existing vehicle roadway and transit conditions is shown in Exhibit 4, supporting
information included in Appendix C.
Person -Trip Capacity
Vehicle occupancy for the person -trip capacity calculations is based upon a comprehensive study
performed for the City of Miami. The vehicle occupancy factor of 1.6 persons per vehicle is
approved for use as the practical capacity of a private passenger vehicle to determine the person -
trip capacity of the vehicular traffic system.
Bus and fixed rail capacity for each corridor was determined based on the number of transit
vehicles per hour and the person -trip capacity of each transit vehicle. This info! illation was
obtained directly from Increment II of the Downtown Miami Area -wide DRI.
Page 9
w w w w� w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w ww w w w
.13
stl
Exhibit 4
Existing Corridor and Transit Conditions
Corridor
From To
Roadway Conditions (vehicles)
Transit Conditions (persons)
Dir
Existing
Lanes
Count
Source/
Period
Raw PM
Peak Hour
Volume
Peak
Season
Factor
PM
Peak Hour
Volume
Dir Max
Service
Volume [1]
Total
Bus
Ridership
[2]
Bus
Capacity
[2]
Total
Metrorail
Ridership
V]
Metrorail
Capacity
[21
Total
Metromover
Ridership
[21
Metromover
Capacity
121
Total
Transit
Ridership
[21
Transit
Capacity
[21
BISCAYNE BOULEVARD
NE 36 STREET NE 29 STREET
NE 29 STREET NE 20 STREET
NE 20 STREET
NE 2 AVENUE N. MIAMI AVENUE
Notes:
NB
SB
NB
88
EB
NIB
2L0
2LD
2LD
2LD
1LU
ILU
DPA - PM
DPA - PM
DPA - PM
DPA - PM
DPA - PM
DPA - PM
1603
1653
1494
1080
267
248
1.02
1.02
1.02
1.02
1.02
1.02
1635
1584
1524
1102
272
251
1660
1660
1660
1660
850
850
523
416
523
416
27
18
1472
2252
1472
2252
195
195
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
523
416
523
416
27
18
1472
2252
1472
2252
195
195
[1] Peak Hour Directional Maximum Service Volumes are obtained from FDCT's Quality/Level of Service Handbook
[2] Transit and roadway information obtained from the Downtown Miami DRI Increment if
•
•
•
1
1
1
1
1
r
r
•
•
•
•
••
•
•
•
10
Biscayne Park
MUSP Traffic Tn(pact Study
Available Person -Trip Capacity
The available person -trip capacity for each corridor is shown in Exhibit 5 based on the
following: Person -trip capacity — Person -trip volume = Available Person -trip capacity. A
general level of service designation is provided for each study corridor based on the calculated
available person -trip capacity. A person -trip level of service look -up table was developed based
on the ratios derived from the FDOT's 2002 Quality/Level of Service Handbook (see Appendix
C). Based upon the person -trip evaluation for existing traffic conditions, no study corridor
operates below the acceptable "person -trip" level of service standards.
2.3 Intersection Capacity Analysis
The intersection capacity analysis was performed using vehicular volumes and the Highway
Capacity Software (HCS), based on the procedures of the 2000 Highway Capacity Manual.
Exhibit 6 shows the resulting LOS for existing conditions at the intersections under study,
analysis worksheets are included in Appendix D. All six intersections operate within the
standard adopted by the city.
Exhibit 6
2004 Intersection Capacity Analysis
Weekday PM Peak Hour Conditions
Intersection S/U
Existing LOS'
NE 24 Street / Biscayne Boulevard
U
B
NE 25 Street / Biscayne Boulevard
U
B
NE 26 Street / Biscayne Boulevard
S
A
NE 24 Street / NE 2 Court
U
A
NE 24 Street / NE 2 Avenue
U
B
NE 25 Street / NE 2 Avenue
U
B
o...._..... roan
Notes : ' LOS is for the Major Street for unsi
U= unsignalized S= signalized
alized intersections.
Page 11
IF Mr VP Mir w w w ww ww IMP IMP 111, 1114 111, MI Mr IV WWII" W WM. W 1111, NV W W
Exhibit 5
Person -Trip Volume and Capacity
Existing Conditions Matrix
Corridor
From To
Roadway Mode
Transit Mode
Segment Total
Dir
(a)
Roadway
Vehicular
Capacity
(b)
Pers-Trip
Capacity
@PPV=1.6
(a) - 1.6
(c)
Roadway
Vehicular
Volume
(d)
Pers-Trip
Volume
@PPV=1,4
„(c) * 1,4
(e)
Excess
Pers-Trip
Capacity
Jb) - (d)
(f)
Total
Pers-Trip
Capacity
(9)
Total
Pers-Trip
Volume
(h)
Pers-Trip
Excess
Capacity
-(f)-(g
(i)
Segment
Pers-Trip
Capacity
b)+(f1
(J)
Segment
Pers-Trip
Volume
(d)+(g)
(k)
Pers-Trip
Excess
Capacity
li...(j)
(I)
Segment
Person Trip
v/c
(ij(i)
LOS
iti
[2]
13i
(41
151
l6]
Vi
BISCAYNE BOULEVARD
NE 36 STREET NE 29 STREET
NB
1660
2656
1635
2289
367
1472
523
949
4128
2812
1316
0.68
D
SB
1660
2656
1584
2218
438
2252
416
1836
4908
2634
2274
0.54
D
NE 29 STREET NE 20 STREET
NB
1660
2656
1524
2133
523
1472
523
949
4128
2656
1472
0.64
D
SS
1660
2656
1102
1542
1114
2252
416
1836
4908
1958
2950
0,40
D
NE 20 STREET
NE 2 AVENUE N. MIAMI AVENUE
ES
850
1360
272
381
979
195
27
168
1555
408
1147
0.26
C
WB
850
1360
251
351
1009
195
18
177
1555
369
1186
0.24
C
Notes:
[1) The Roadway Vehicular Capacity is obtained from Exhibit 4.
(2) Person -Trip capacity is derived by applying a 1.6 vehicle occupancy to the vehicular capacity.
(31) The Roadway Vehicular Volume is obtained from Exhibit 4.
[4] Person -Trip Volume is derived by applying a 1.4 vehicle occupancy to the vehicular capacity.
[5) The Total Transit Person -Trip Capacity is obtained by adding bus, metrorail and metromover capacities (see Exhibit 4).
[6] The Total Transit Person -Trip Volume is obtained by adding bus and metromover volumes (see Exhibit 4).
[7] The Person Trip LOS is provided consistent with the FDOT's Quality/Level of Service Handbook (see Appendix C).
Brsca nc Park
MUSP Traffic Impact Study
3.0 PLANNED AND PROGRAMMED ROADWAY
IMPROVEMENTS
The 2004 Miami -Dade County Transportation Improvement Program (TIP) and the 2025 Metro -
Dade Transportation Plan Long Range Element, were reviewed to identify any programmed or
planned projects within the limits of the study area established. These documents show no
officially programmed or planned capacity improvement projects within the study area prior to
completion of the proposed project.
Page 13
Biscayne Park
Nit SP Traffic Impact Study
1 4.0 FUTURE TRAFFIC CONDITIONS
4.1 Background Traffic �
Consistent with other traffic studies perfoiiied in the area, a conservative two (2) percent growth
factor was applied to existing traffic volumes. This growth rate is intended to account for future
growth due to additional developments that have not been identified at this time but occur within
the study period.
4.2 Committed Developments
A list of projects was obtained from city staff, City of Miami Planning and Zoning Department
Report on Private Development From 1996 to Present (Updated through July 11, 2004). These
projects are approved and are either under construction or about to break ground_ Other projects
are approved by City Commission but with no building permits, or in the application stage. The
projects in the vicinity of Biscayne Park are shown in Exhibit 7. The project size and trip
�• generation are included in Appendix E. Traffic generated by these developments was distributed
using the Cardinal Distribution from the appropriate TAZ. For estimating trip distribution from
I/ committed projects, consideration was given to conditions such as the roadway network,
roadway available to travel in the desired direction and attractiveness of traveling on a specific
roadway. This information and a matrix showing volumes from the committed developments are
also included in Appendix E. Future traffic volumes were projected for the build -out year 2007.
Exhibit 8 shows the projected turning movement volumes without the project.
0
4.3 Project Traffic
1
4.3.1 Protect Trip Generation
Project trip generation is based on the calculation of person -trips consistent with the City of
Miami Comprehensive Plan. Person -trips generated by the project were established using the
.410
1
Page 14
1
1
1
1
1
1
1
1
1
1
1
1
1
r
r�
r
1
r
M
r
r
r
r
1
r
r
r
r
C
RAIL
ROAD
YARDS
PROJECT:
BISCAYNE PARK
MUSP TRAFFIC IMPACT STUDY
r1l I fl I
i Ir
LEGEND
�3 S T
A - SHOPS AT MIDTOWN MIAMI
B - 2 MIDTOWN
TITLE:
COMMITTE❑ DEVELOPMENT MAP
EXHIBIT No,
7
Page 15
17
5
22
NE 26 ST
NE 25 TERR
24
2
6
NE 25 ST
22
16 —.-
21
49
�...._...._.- 1
1 27
12
3
10
NE 24 ST
31
a
PROJECT
SITE
�— 28
t 11
2 —4
1
--t
Y 3
38
0
4
13
0
13
NE 23 ST
F-
CC
14
13
6
1
18
VI N CO
CID
BISCAYNE BLVD
N. T. S.
Pa
PROJECT:
BISCAYNE PARK
MUSP TRAFFIC IMPACT STUDY
TITLE:
FUTURE WITHOUT PROJECT
PM PEAK
TRAFFIC VOLUMES
EXHIBIT No.
8
Page 16
Biscayne Park
MUSP Traffic Impact Study
following procedures consistent with the City's Comprehensive Plan and the approved
methodology:
• The gross vehicular trip generation for each land use was deteiisiined using the Institute of
Transportation Engineers (ITE) Trip Generation 7th Edition rates or foimulas.
• Gross vehicular trips were reduced by 16% based upon the use of the ITE trip rates (City of
Miami's 1.4 vs. ITE's 1.2 pers/veh).
• Gross vehicular trips were reduced by 14.9% to reflect transit usage based on projected
modal splits using data from Increment 11 of the Downtown DRI.
• Gross vehicular trips were also reduced by 10% for pedestrian/bicycle based on estimates
from Increment II of the Downtown DRI since project is within such close proximity.
• The net external vehicle trips were converted to person -trips using 1.4 persons per vehicle
pursuant to City standards.
• The vehicular trips assigned to transit were converted back to person -trips using 1.4 persons
per vehicle pursuant to City standards.
410 • The net external person -trips were obtained by adding together the project net external
person -trips for the vehicle and transit modes.
A trip generation summary for the project is provided in Exhibit 9.
4.3.2 Protect Trip Assignment
Project traffic was distributed and assigned to the study area using the Cardinal Distribution for
TAZ 503, shown in Exhibit 10. The Cardinal Distribution gives a generalized distribution of
trips from a TAZ to other parts of Miami -Dade County.
For estimating the trip distribution for the project location, consideration was given to conditions
such as the roadway network accessed by the project, roadways available to travel in the desired
direction, and attractiveness of traveling on a specific roadway. Exhibit 11 shows the project
4111 vehicular trip assignment to the impacted roadway segments and intersections.
Page 17
iiii�iIII iiiiiiIII iMP' iIMF iwMIiIII !#iiiIII iIII lair iis i ii i i i
USES
High -Rise Apartments
Specialty Retail
General Office
GROSS VEHICLE TRIPS
Exhibit 9
PM Peak Hour Trip Generation Analysis
UNITS
214 DU
8,700 SQ. FT.
13,000 SQ. FT.
ITE Land Use Code
222
814
710
Vehicle Occupancy Adjustment @ 16% of Gross External Trips (1)
Transit Trip Reduction @ 14.90% of Gross External Trips (2)
Pedestrian / Bicycle Trip Reduction @ 10.00% of Gross External Trips (3)
NET EXTERNAL VEHICLE TRIPS
Net External Person Trips in Vehicles @
Net External Person Trips using Transit @
Net External Person Trips (vehicles and transit mode
Net External Person trips walking 1 using bicycle
1.40
1.40
Persons/ Vehicle
Persons/ Vehicle
1.40 Persons/ Vehicle
PM PEAK HOUR TRIPS
I
OUT
TOTAL
Trips
%
Trips
Trips
61%
44%
17%
49
19
3
39%
56%
83%
32
24
16
81
43
19
50%
nal
50%
50%
50%
50%
11
11
7
50%
50%
50%
—
12_
11
7
23
21
14
50%
III
50%
85
---MEI
MINI
50%
50%
50%
59
15
74
50%
50%
50%
60
15
75
118
30
148
50%
10
50%
10
20
Notes
(1) A 16% reduction to adjust for the difference between ITE auto occupancy and local data (Miami's 1.4 vs. ITE's 1.2 pers/veh)
(2) Transit trip reduction based on projected modal splits used in the Downtown Miami DRI Increment II
(3) Pedestrian and bicycle trip reductions based on Downtown characteristics used in the Downtown Miami DR! Increment II
•
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1•
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Biscayne Park
MUS'P Traffic Impact SIuy
Exhibit 10
Cardinal Distribution of Trips
TAZ 503
Cardinal Direction
Distribution
TAZ 503
NNE
ENE
ESE
SSE
SSW
WSW
WNW
NNW
13.58%
4.53%
5.30%
9.67%
12.94%
21.33%
15.29%
17.36%
Total 100.00%
Page 19
1
r
r
r
r
r
IK
NE 2& ST
NE 25 TERR
rW-- (5%1 r 30% j I
a
NE 25 ST L
1L
NE 24 ST
r
PROJECT
SITE
�(,0%, J1L
r«5%1-}
,5% I
i
10% �p E
a 1
�-- (low
NE 2 CT
(5%}
F
L 3% je
j
-1 E
NE23ST t
d
I 3% J
'a 3E
e Es
(5%1 I L
4%
•• • • (15%1
BISCAYNE BLVD
-1 I
e,
Q
2
n
NE 22 ST
NE 21 ST
1r
I r 2% (5%)
m A
o
i 1
X m
J 1
NE 20 ST
..--(15%)
15%---15%J
N.T.S.
LEGEND
XX - ENTER
(XX) - EXIT
PRJEC T:
BISCAYNE PARK
MUSP TRAFFIC IMPACT STUDY
TITLE:
PROJECT
TRIP ASSIGNMENT
EXHIBtT No.
Page 20
•
I
•
1
1
1
1
1
1
1
1
1
1
1
1
1
Biscayne Park
MUSP Traffic Impact Stu
4.4 Future Corridor Capacity Analysis
The existing person -trip volumes were combined with the committed development and
background growth person -trips to obtain the total year 2007 person -trip volume without project.
The net external project person -trips were then added to get the future person -trip volumes with
project. These volumes were compared to the future person -trips capacities to detelinined future
level of service. The future person -trip volume and capacity matrix is shown in Exhibit 12. All
corridors analyzed are projected to operate within the established LOS E threshold.
4.5 Future Intersection Capacity Analysis
Background growth and committed development trips were combined with the adjusted 2004
existing traffic to get the total year 2007 vehicular traffic without project on the study
intersections. The project trips were then added to obtain the future with traffic volumes.
Exhibit 13 shows the project PM peak hour vehicular volumes and Exhibit 14 shows the total
(with project) PM peak hour vehicular volumes at the intersections under study.
Results of the future intersection analysis show that all intersections will operate within the LOS
E standard adopted by the city. Exhibit 15 shows the resulting LOS at the intersections under
study. Intersection capacity analysis worksheets are provided in Appendix D.
Exhibit 15
Future Intersection Capacity Analysis
Weekday PM Peak Hour Conditions
Intersection
S/U
Future Without Project' ' Future With Project'
NE 24 Street / Biscayne Boulevard
U
C C
NE 25 Street / Biscayne Boulevard
U
C
C
NE 26 Street / Biscayne Boulevard
S
A
A
NE 24 Street / NE 2 Court
U
A
A
NE 24 Street / NE 2 Avenue
U
B
B
NE 25 Street / NE 2 Avenue
U
B
B
Notes : I LOS is for the Major Street for un
Li= unsignalized S= signalized
finalize
ters
tions.
ource:
Page 21
!_�____ 'Mr IOW ___ NIP' Mr MI_MI .P______i
41
t
Z74
7 �
Exhibit 12
Person -Trip Volume and Capacity
Future Conditions Matrix
Without Project
With Project
(a)
(b)
(c)
(d)
(e)
(t)
(g)
(h)
(i)
fl)
(k)
Existing
Future
Committed
Future
Projected
Future
Future w/out Proj
Project
Total
Future
Future with Pro,'
Dir
Pers-Trip
Bkg.
Development
Pers-Trip
Transit
Pers-Trip
Pers-Trip
Pers-Trip
Pers-Trip
Pers-Trip
Pers-Trip
Corridor
Volumes
Pers-Trip
Pers-Trip
Volumes
Capacity
Capacity
v/c
LOS
Volume
Volumes
Capacity
vie
LOS
2.0%
From To
`
3
(b)++cl
(d)+(h)
���/c)
BISCAYNE BOULEVARD
[1]
[2]
13]
[41
.d)/(f)
[5]
[6]
,
[4]
tsl
NE 36 STREET NE 29 STREET
NB
2812
2984
0
2984
78
4206
0.71
D
2
2986
4206
0.71
D
SB
2634
2795
6
2801
1530
6438
0.44
D
3
2804
6438
0.44
D
NE 29 STREET NE 20 STREET
NB
2656
2819
17
2836
78
4206
0.67
D
2
2838
4206
0.67
D
88
1958
2078
14
2092
1530
6438
0.32
C
2
2094
6438
0.33
C
NE 20 STREET
NE 2 AVENUE N. MIAMI AVENUE
ES
408
433
2
435
-9
1546
0.28
C
2
437
1546
0,28
C
WB
369
392
6
398
-9
1546
0.26
C
2
400
1546
0.26
C
Notes:
[1] The Existing Person Trip Volume is obtained from Exhibit 5, column (j)
j2j Year 2006 Background Person Trip Volume is derived by applying a 2% growth factor to the existing person -trip volume
[3] Projected Transit Capacity was obtained from the Downtown Miami DRI increment II (Table 21.D10 column (4) - Table 21.A7 column (15))
[4] The Total Future Peak Hour Person Trip Capacity is obtained by adding ail modes of transportation (Exhibit 5, column (i)) and the projected transit capacity (Exhibit 12, column e)
[5] The Person Trip LOS is provided consistent with the FDOT's Quality/Level of Service Handbook (see Appendix C)
[6] Project Person Trip Volumes are derived from Trip Generation Analysis (Net External Person Trips (Vehicles + Transit))
NE 26 ST
NE 25 TERR
I_rsl
;
r — 113
�I
{
J I
NE 25 ST
e >
I L
NE 24 ST
IL
t-t.,
PROJECT
SITE
iT
.
L$
j'1
(11)
JI
l i
I r
ry a
g ",,,,,,,�
"H
1
v
(2) —}
1
v n
NE 23 5T
m -
I— (2)
1
V
J L
I" 1
m
z
0,
fmF m
1
- s
NE 22 ST
ro
jm
k
NE 21 ST
1 —'�'
-II
ti
--. (5)
J J
NE 20 ST
$-...
8J
1
I
TI
PROJECT:
BISCAYNE PARK
MUSP TRAFFIC IMPACT STUDY
PM PEAK HOUR
PROJECT TRIPS
N. T. S.
LEGEND
XX - ENTER
(XX) - EXIT
EXHIBIT No.
13
.Page 23
•
1
r
1
1
1
1
1
0164.
0
�
rr
NE 26 ST
4-17
5
22
NE 25 TERR
0
NE 25 ST
33
2
8
-.-- - 41
13
0
22
16
21
CO
CO
49
27
NE 24 ST
12
3
10
O CA N
IT
35
ti- 1
f 12
17 —.
11 —i
PROJECT
SITE
rn
j
� m
lI 1
t___ 8
—28
f-11
c)
13
1 —
11
w
T.
cn
r-
N N
m
p
4
NE 23 ST
13 -
0 —►^
13�
cv
w
z
I
cO r
O ' M
8 T
22
N 04 O
BISCAYNE BLVD
N.T.S.
PROJEC T:
BISCAYNE PARK
MUSP TRAFFIC IMPACT STUDY
TITLE:
FUTURE WITH PROJECT
PM PEAK
TRAFFIC VOLUMES
EXHIBIT No.
14
Page 24
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Biscayne Park
IvfLSP Traffic Impact Study
4.6 Site Access
Primary access to the site is proposed on NE 25 Street via a two-way driveway. A second
driveway to the site is located on NE 24 Street. No conflicts will occur with proposed
driveways. The project trips were assigned to the driveways and analyzed. Unsignalized TICS
analysis results show adequate operations. The analysis worksheets are included in Appendix D.
Page 25
Bison ne park
MUST Traffic Impact Study
•
r4I1
•
1
1
1
1
1
1
ri"
r
1
1
1
•
•
1
1
•
1
1
00
1
5.0 CONCLUSIONS
An assessment of the PM peak hour traffic associated with the development of Biscayne Park
was perfoimed in accordance with the approved methodology submitted to the city. Analysis of
future (2007) traffic conditions with the project during the PM peak hour shows that the City of
Miami's adopted Level of Service standards will not be exceeded. Adequate capacity during the
PM peak hour is available to accommodate the proposed project trips within the study area at the
intersections and on the transportation corridor segments analyzed. A traffic control measures
plan has been developed for this project. The plan is included in Appendix F.
cusp report.doc
Page 26
•
•
•
r
1
•
• Appendix A
•
•
i Approved Transportation
�� Methodology
r Site Plan
•
•
•
DAVID PLUMMER & ASSOCIATES, INC.
TRANSPORTATION • CIVIL • STRUCTURAL • ENVIRONMENTAL
To:
Affiliation:
From:
RE:
cc:
Facsimile Transmission
Ms. Jenn King, PE
URS Corporation
Rita Carbonell
Biscayne Park - #04188
Lilia Medina, Jose Melo, file
Fax #:
Phone #:
Date:
Pages:
(954) 739-1789
(954) 739-1881
July 14, 2004
2 page(s), including cover
Jenn:
This will serve as our methodology for the subject MUSP traffic impact study. For ease of review, the changes
from the methodology dated July 9, 2004 are in bold italics.
25 Plaza Corp is pursuing City of Miami approvals for a residential project located on the west side of Biscayne
Boulevard between NE 24 Street and NE 25 Street in Miami, Florida. The project consists of approximately 214
rental apartments, 8,700 SF of retail space, and 13,000 SF of office space. Primary access to the residential
component of the site is proposed on NE 25 Street via a two-way driveway. A secondary service driveway which
provides access to the office component of the site is located on NE 24 Street. The subject site is located just
outside the limits of the Downtown Miami Area -wide DRI.
• The study limits are NE 36 Street to the North, NE 20 Street to the South, Biscayne Boulevard to the East,
and North Miami Avenue to the west.
• Turning movement traffic counts are to be collected during the PM (4:00-6:00) peak period at four major
intersections in the immediate project vicinity.
1. NE 24 Street / Biscayne Boulevard
2. NE 25 Street / Biscayne Boulevard
3. NE 26 Street / Biscayne Boulevard (Signalized)
4. NE 24 Street / NE 2 Court
5. NE 24 Street / NE 2 Avenue
6. NE 25 Street / NE 2 Avenue
In addition to these intersections, we will analyze the project driveways.
• Segment traffic volumes will be collected as 24-hour machine counts at the following locations:
1. Biscayne Boulevard between NE 36 Street and NE 29 Street
2. Biscayne Boulevard between NE 29 Street and NE 20 Street
3. NE 20 Street between NE 2 Avenue and North Miami Avenue
1750 PONCE DE LEON BOULEVARD
CORAL GABLES, FLORIDA 33134
TELEPHONE: 305 447-0900, FAX: 305 444-4986
E-MAIL: dpa@dplummer.com
d
P
•
•
•
• .
11 ••
1 •
1
•
•
•
r
•
•
•
•
M
M
•
•
' r
1
0
i
0
1
Available Florida Department of Transportation (FDOT) counts will be consulted where appropriate.
Raw traffic counts will be adjusted to peak season (for the peak hour period).
The signal timing and phasing at the study signalized intersections will be obtained from Miami -Dade County.
Existing and future traffic conditions for the project area corridors (Biscayne Boulevard and NE 20 Street) will
be established using the person -trip method. The methodology for this method is outlined in the Miami
Comprehensive Neighborhood Plan. Rubber tire and fixed rail transit capacity of the study corridors will be
established based on available information from Increment 11 of the Downtown DRI.
Corridor capacity will be estimated using generalized vehicular capacities (converted to person -trips) from the
Downtown DRI, FDOT LOS Manual, or other acceptable equivalent.
Project Traffic — project trip generation will be based on the calculation of person -trips consistent with the city
of Miami Comprehensive Plan. Person -trips generated by the project will be established using the following
procedure consistent with Increment II of the Downtown DRI:
1. Determine the gross vehicular trip generation for each land use using the Institute of
Transportation Engineers (ITE) Trip Generation, ph Edition rates or formulas.
2. Reduce gross vehicular trips by a vehicle occupancy adjustment based upon the use of the ITE trip
rates (City of Miami's 1.4 vs. ITE's 1.2 pers/veh).
3. Reduce gross vehicular trips by a transit reduction based on projected modal splits from
Increment If of the Downtown DRI. (Project is just one block north of the Downtown DRI
boundary. Additionally analyzed links are included in the DRI analysis. )
4. Reduce gross vehicular trips by a pedestrian/bicycle reduction based on estimates from Increment
II of the Downtown DRI. (Project is just one block north of the Downtown DRI boundary.
Additionally analyzed links are included in the DRI analysis.)
5. Establish the net external vehicle trips.
6. Convert the net external vehicle trips to person -trips using 1.4 persons per vehicle pursuant to
City standards.
7. Convert the vehicular trips assigned to transit back to person -trips using 1.4 persons per vehicle
pursuant to City standards.
8. Add together the project net external person -trips for the vehicle and transit modes.
Background Traffic. A growth factor consistent with historical annual growth in the area will be applied to the
existing traffic volumes.
Committed Developments. Will be based on list of relevant projects provided by the city on July 11, 2004.
Committed development trips will also be converted to person -trips based on the methodology described
above. In addition, the Buena Vista Regional Activity Center (RAC) will be included as a committed
development if a traffic study is provided by the City of Miami traffic consultant.
Highway Capacity Software (HCS) based on the 2000 Highway Capacity Manual (HCM) will be used for
existing and future intersection capacity analysis. Project and committed development net external vehicle
trips (adjusted for transit, pedestrian and occupancy as described above) will be used for the intersection
capacity analysis. Intersection capacity analyses will be performed at the four study intersections and the
proposed project driveways.
Trip Assignment. Net new external project traffic will be assigned to the adjacent street network using the
appropriate cardinal distribution from the Metro -Dade Long Range Transportation Plan Update, published by
the Metropolitan Planning Organization. Normal traffic patterns will also be considered when assigning
project trips.
If you have any questions you can contact me at (305) 447-0900.
1750 PONCE OE LEON BOULEVARD
CORAL GABLES, FLORIDA 33134
TELEPHONE: 305 447-0900, FAX: 305 444-4986
E-MAIL: dpa G dpturnmer.com
traffic_rneth_071404.doc
W Mr IP Wig IP MP Mr IV IP W W IP IP IP 1W W W IP waT wwwwwwwwwwwwww 111, W
(A.") SITE /IAN
VW • -re '
NI 25th STREET
N.E. 24th. STREET
•
RFAXN11,41. WADING
TERRACE
11
PROPOSED PPAR'tMENT &IOC. fOR
BISCAYNE PARK
2M7 AND 2707 N.W. 25th AMT. 1.441,41, ft 13141
i
•
•
•
•
•
1
1
1
1
1
1
1
•
• Appendix B
•
i Traffic Counts
•
i Signal Timings
r
r
r
r
IP
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1•
1
r
r
r
r
r
r
r
r
r
r
r
r
r
r
r
Raw Traffic Counts
Traffic Survey Specialists, Inc. 624 Gardenia Terrace
Delray Beach, Florida 33444 Phone (561) 272-3255
Volume Report with 24 Hour Totals Page 1
*****************************************************************************
'Data File : D0713005.PRN
'Station : 000000071201
Identification : 000110252090 Interval : 15 minutes
Start date : Jul 13, 04 Start time : 00:00
'Stop date : Jul 13, 04 Stop time : 24:00
City/Town : Miami, FL County : Dade
'Location : Biscayne Blvd South of NE 32nd Street
*******************************************************************************
'Jul 13
Northbound Volume for Lane 1
0End Time 00 01 02 03 04 05 06 07 08 09 10 11
15 130 55 ----
47 29 16 29 71 122 T189 220 -208 239
' 30 106 65 24 21 22 30 76 138 187 207 236 264
45 76 52 32 26 28 46 85 157 192 193 230 318
' 00 90 38 27 27 26 55 99 176 218 225 197 321
0Hr Total 402 210 130 103 92 160 331 593 786 845 871 1142
1End Time 12 13 14 15 16 17 18 19 20 21 22 23
15 320 326 304 345 392 -330 454 -271 197 -----223 174 143
30 323 300 267 328 395 397 375 250 206 186 168 149
' 45 308 344 296 368 421 407 304 229 188 207 139 114
00 354 318 312 355 430 434 320 222 183 199 157 109
'Hr Total 1305 1288 1179 1396 1638 1568 1453 972 774 -815 638 515
I I
4"Hour Total : 19206
PAM peak hour begins : 11:30 AM peak volume : 1282 Peak hour factor : 0.99
'PM peak hour begins : 17:15 PM peak volume : 1692 Peak hour factor :•0.93
*******************************************************************************
'Jul 13 Southbound Volume for Lane 2
'End Time 00 01 02 03 04 05 06 07 08 09 10 11
r 15 85 58 38 14 27 38 -113 296 -386 462 324 311
' 30 63 47 39 22 26 56 144 286 427 337 307 292
45 77 44 28 17 32 62 208 389 416 384 288 323
00 54 24 29 26 37 101 305 449 457 330 301 298
11HrTotal 279 173 -134 - 79 122 257 -770 1420 1686 1513 1220 1224
'End Time 12 13 14 15 16 17 18 19 20 21 22 23
15 308 308 331 279 309 378 386 240 178 158 174 132
' 30 288 295 299 259 364 408 265 201 201 141 163 126
45 333 326 304 295 396 448 241 216 164 188 130 96
00 388 331 317 333 419 384 256 172 201 153 145 89
'Hr Total 1317 1260 1251 1166 1488 1618 1148 -829 744 640 -612 443
1
24 Hour Total : 21393
'AM peak hour begins : 08:15 AM peak volume : 1762 Peak hour factor : 0.95
PM peak hour begins : 16:45 PM peak volume : 1653 Peak hour factor : 0.92
'*******************************************************************************
Traffic Survey Specialists, Inc. 624 Gardenia Terrace
Delray Beach, Florida 33444 Phone (561) 272-3255
411 Volume Report with 24 Hour Totals Page 2
*****************************************************************************
'Data File : D0713005.PRN
'Station : 000000071201
Identification : 000110252090
PStart date : Jul 13, 04
'S
top date : Jul 13, 04
City/Town : Miami, FL
Interval : 15 minutes
Start time : 00:00
Stop time : 24:00
County : Dade
`Location : Biscayne Blvd South of NE 32nd Street
**********************************************,********************************
"Jul 13 Total Volume for All Lanes
/End Tizrie 00 01 02 03
r 15 215 113 85 43 43 67
" 30 169 112 63 43 48 86
45 153 96 60 43 60 108
r 00 144 62 56 53 63 156
R-
"H.r Total 681 383 264 182 214 417 1101 2013 2472 2358 2091 2366
°End Time 12 13 14 15 16 17 18 19 20 21 22 23
° ^-
15 628 634 635 624 701 708 840 511 375 381 �348 275
r 30 611 595 566 587 759 805 640 451 407 327 331 275
" 45 641 670 600 663 817 855 545 445 352 395 269 210
00 742 649 629 688 849 818 576 394 384 352 302 198
°Hr Total 2622 2548 2430 2562 3126 3186 2601 1801 1518 1455 1250 958
° Hour Total : 40599
PAM peak hour begins : 08:15 AM peak volume : 2579 Peak hour factor : 0.95
'PM peak hour begins : 17:15 PM peak volume : 3318 Peak hour factor : 0.97
*******************************************************************************
r
r
411
•
r
r
04
05
06
07 08 09 10 11
184 418 575 682 532 550
220 424 614 544 543 556
293 546 608 577 518 641
404 625 675 555 498 619
r
r
' Traffic Survey Specialists, Inc. 624 Gardenia Terrace
Delray Beach, Florida 33444 Phone (561) 272-3255
lie
Volume Report with 24 Hour Totals Page 1
ik ************************************************** x**************************
'Data File : D0713006.PRN
'Station : 000000071202
Identification : 000058410082 Interval : 15 minutes
PStart date : Jul 13, 04 Start time : 00:00
stop date : Jul. 13, 04 Stop time : 24:00
wCity/Town : Miami, FL County : Dade
'Location : Biscayne Blvd South of NE 24th Street
*******************************************************************************
',Jul 13 Northbound Volume for Lane 1
1End Time 00 01 02 03 04 05 06 07 08 09 10 11
15 110 52 35 30 -
30 59 109 175 212 208. -222
' 30 103 64 25 20 19 22 61 131 177 207 237 265
45 73 48 30 22 22 45 57 139 196 196 205 289
00 80 39 24 24 22 43 96 153 205 218 204 301
OHr Total 366 203 114 96 - 78 -140 -273 �532 -753
'End Time 12 13 14 15 16
15 285 280 294 312 398 375 367 236 190
r 30 315 288 245 298 339 407 366 235 212
45 301 289 273 345 382 363 297 228 189
00 336 276 301 303 374 349 318 209 178
'Hr Total 1237 1133 1113 1258 1493 1494 1348 908 769
833
854 1077
17 18 19 20 21 22
192
162
188
184
726
182
159
135
139
615
23
141
136
129
101
507
Hour Total : 17920
rAM peak hour begins : 11:30 AM peak volume : 1190 Peak hour factor : 0.94
'PM peak hour begins : 16:30 PM peak volume : 1538 Peak hour factor : 0.94
*******************************************************************************
`Jul 13 Southbound Volume for Lane 2
',End Time 00 01 02
r 15 84 48 32
i 30 44 42 30
45 56 35 21
r 00 55 29 34
-
0Hr Total 239 154 117
10
19
14
25
68
03 04
26
28
26
35
115
05 06 07 08
34 104 238 369 376
46 129 298 355 333
70 180 328 358 328
92 223 388 402 295
242 636 1252 1484 1332 1038 1093
09
10 11
286 276
248 279
252 267
252 271
'End Time 12 13 14 15 16 17 18 19 20 21 22 23
' --
15 251 281 285 238 244 287 235 W216 177 135 152 107
', 30 267 223 296 234 241 297 223 180 153 136 126 117
45 292 280 260 240 276 302 253 190 161 138 119 94
r 00 311 275 276 246 254 259 232 159 168 130 125 77
-
Total 1121 1059 1117 958 1015 1145 943 745 659 539 522 -395
:Hr
24 Hour Total : 17988
PAN' peak hour begins : 08:15 AM peak volume : 1491 Peak hour factor : 0.93
PM peak hour begins : 12:15 PM peak volume : 1151 Peak hour factor : 0.93
',*******************************************************************************
NI
Traffic Survey Specialists, Inc. 624 Gardenia Terrace
Delray Beach, Florida 33444 Phone (561) 272-3255
Volume Report with 24 Hour Totals Page 2
iii ******************************************************************************
▪ Data File : D0713006.PRN
"Station : 000000071202
• Identification : 000058410082 Interval : 15 minutes
PStart date : Jul 13, 04 Start time : 00:00
' Stop date : Jul 13, 04 Stop time : 24:00
City/Town : Miami, FL County : Dade
' Location : Biscayne Blvd South of NE 24th Street
*******************************************************************************
r Jul 13 Total Volume for All Lanes
r End Time 00 01 02 03 04 05 06 07 08 09 10 11
15 194 100 --67 40 41 --.64 163 347 -544 ^588 494 498
' 30 147 106 55 39 47 68 190 429 532 540 485 544
45 129 83 51 36 48 115 237 467 554 524 457 556
1 00 135 68 58 49 57 135 319 541 607 513 456 572
Hr Total 605 357 ^T
231 164 193 -382 909 1784 2237 2165 1892 2170
'End Time 12 13 14 15 16 17 18 19 20 21 22 23
r -T-
15 536 -561 579 550 -642 662 602 452 -367 327 334 248
r 30 582 511 541 532 580 704 589 415 365 298 285 253
' 45 593 569 533 585 658 665 550 418 350 326 254 223
00 647 551 577 549 628 608 550 368 346 314 264 178
Total 2358 2192 2230 2216 2508 2639 2291 1653 1428 1265 1137 902
Hour Total : 35908
rAM peak hour begins : 08:30 AM peak volume : 2289 Peak hour factor : 0.94
'▪ PM peak hour begins : 16:45 PM peak volume : 2659 Peak hour factor : 0.94
Traffic Survey Specialists, Inc. 624 Gardenia Terrace
Delray Beach, Florida 33444 Phone (561) 272-3255
10 Volume Report with 24 Hour Totals Page 1
Data File : D0713004.PRN
'Station : 000000071203
Identification : 000058410087 Interval : 15 minutes
OStart.date Jul 13, 04 Start time : 00:00
Stop date : Jul 13, 04 Stop time : 24:00
',City/Town : Miami, FL County : Dade
'Location : NE 20th Street East of NE Miami Court
*******************************************************************************
',Jul 13
Westbound Volume for Lane 1
i End Time
r 15
' 30
45
' 00
00 01
7 2
7 2
6 6
6 4
02 03 04 05 06 07 08
1 1
5 2
5 0
7 7
09 10 11
3 8 16 24 57 66 58 57
4 4 12 24 57 50 44 61
2 7 21 44 44 54 48 69
5 7 29 59 53 41 40 52
I Hr Total 26 14 18 10 14 26 78 151 211 211 190 239
:End Time 12 13 14 15 16 17 18 19 20 21 22 23
15 64 47 61 50 63 77 47 40 19 15 20 13
1 30 56 53 49 64 53 39 52 25 24 14 25 11
45 67 60 52 51 68 65 38 29 33 18 15 14
00 46 48 66 50 71 55 38 34 21 15 8 12
'Hr Total 233 208 228 215 -255 r236 -175 128 ---- -T_- ---- ----
97 62 68 50
111#
Hour Total : 3143
peak hour begins : 11:15 AM peak volume : 246 Peak hour factor : 0.89
IIPM peak hour begins : 16:15 PM peak volume : 269 Peak hour factor : 0.87
*******************************************************************************
'Jul 13 Eastbound Volume for Lane 2
'End Time 00 01 02 03 04 05 06 07 08 09 10 11
r 15 7 6 4 3 3 3 18 48 53 57 63 74
30 6 3 7 4 5 7 36 38 51 52 61 70
45 10 8 7 3 5 16 27 56 50 78 45 67
' 00 7 8 3 3 10 16 38 65 50 58 59 62
0Hr Total 30 25 21 13 23 42 119 207 204 245 228 273
'End Time 12 13 14 15 16 17 18 19 20 21 22 23
15 61 61 69 56 63 -72 _-53 39 48 27 21 17
' 30 65 61 54 65 66 65 53 19 34 23 17 15
45 57 57 64 48 58 69 55 28 22 19 21 10
P 00 52 76 49 81 80 60 47 36 29 19 18 12
IIIHr Total 235 255 236 250 267 266 -208 ---- ---- ---- _^-- ----
1124 Hour Total : 3621
'AM peak hour begins : 11:00 AM peak volume : 273
PM peak hour begins : 16:45 PM peak volume : 286
122 133 88 77 54
1
1
1
Peak hour factor : 0.92
Peak hour factor : 0.89
Traffic Survey Specialists, Inc. 624 Gardenia Terrace
Delray Beach, Florida 33444 Phone (561) 272-3255
Volume Report with 24 Hour Totals Page 2
ili ***********:r***,*************************************************************
▪ Data File : D0713004.PRN
"Station : 000000071203
Identification : 000058410087
Start date : Jul 13, 04
▪ Stop date : Jul 13, 04
▪ City/Town : Miami, FL
Interval : 15 minutes
Start time : 00:00
Stop time : 24:00
County : Dade
"Location : NE 20th Street East of NE Miami Court
*******************************************************************************
Total Volume for All Lanes
"Jul 13
"End Time 00 01 02 03 04 05 06 07 08 09 10 11
" 15 14 ---8 -__5 -_-4 ---6 11 - 34 --72 110 123 -121 131
" 30 13 5 12 6 9 11 48 62 108 102 105 131
45 16 14 12 3 7 23 48 100 94 132 93 136
" 00 13 12 10 --10 15 23 67 124 -103 99 --99 114
^-----------
/Hr Total 56 39 39 23 37 68 197 358 415 456 418 512
'End Time 12 13 14 15 16 17 18 19 20 21 22 23
15 125 108 130 106 126 149 100 79 67 42 41 30
" 30 121 114 103 129 119 104 105 44 58 37 42 26
00 1
45 124 117 116 99 126 134 93 57 55 37 36 24
98 124 115 131 151 115 85 70 50 34 26 24
- 468 463 464 465 -522 -502 -383 250 230 150 145 104
IIIHr Total
Hour Total : 6764
1 peak hour begins : 11:00 AM peak volume : 512 Peak hour factor : 0 94
PM peak hour begins : 16:15 PM peak volume : 545 Peak hour factor : 0 90
v*******************************************************************************
1
10
` NE 24TR STREET & BISCAYNE BOULEVARD
MIAMI, FLORIDA
P COUNTED BY: LUIS PALOMINO
ALIZED
BISCAYNE BOULEVARD
From North
•
Peds Right Thru
Date 07/13/04
1
0
1
•
i
r
•
•
f
1
1
16:00
16:15
16:30
16:45
Er Total
17:00
17:15
17:30
17:45
Er Total
Left
0 4 235 6
0 4 245 7
0 2 264 9
0 2 246 10
0 12 990 32
0
i
1
0
2
3
7
7
3
20
270
265
308
251
1094
8
8
10
7
33
7
7
18
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4381
ALL VEHICLES & PEDS
NE 24TH STREET
From East
Peds Right Thru Left
3 11 0
1 9 0
0
0
0
9
9
38
8 8
8 8
9 7
10 8
35 31
1
2
1
0
4
0 1
0 0
0 1
0 2
0 4
BISCAYNE BOULEVARD
From South
Peds Right Thru
0 10 3E2
1 3 336
0 1 3E7
0 1 377
1 15 1482
1 3 365
0 5 397
0 4 361
0 3 352
1 15 1475
Left
5
4
1
4
14
9
9
4
28
Site Code : 00040158
Start Date: 07/13/04
File I.D. : 24STBISC
Page : 1
NE 24TH STREET
From West
Vehicle
Peds Right Thru Left Total
1
4
7
3
15
5
5
2
20
4
1
2
8
15
3
9
3
4
19
1
0
0
0
1
0
0
0
0
2
4
2
9
0
1
0
2
3
661
615
678
658
2612
670
709
707
636
2722
*TOTAL* 2 32 2084
65 1 53 69 0 8
2 30 2957 42 35 34 1 12 1 5334
•
1
0
1 NE 24TH STREET & BISCAYNE BOULEVARD
▪ I41AMI, FLORIDA
• COUNTED BY: LUIS PALOMINO
rALIZBD
0
1
•
BISCAYNE BOULEVARD
From North
Peds
Date 07/13/04
Right Thru Left
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4381
ALL VEHICLES & PEDS
Site Code : O0040158
Start Date: 07/13/04
File I,D. : 24STBISC
Page : 2
NE 24TH STREET
From East
Peds Right Thru Left
BISCAYNE BOULEVARD
From South
Peds Right Thru Left
NE 24TH STREET
From West
Peds Right Thru Left
Vehicle
Total
2
2
NE 24TH STREET
42
0
32
74
oP.
12
12
32
32
BISCAYNE BOULEVARD
2,084
2,084
2,181
1 47
34
34
35
35
65
65
5,219
12
2,957
69
3,038
53
53
ALL VEHICLES & PEDS
21 17
Intersection Total
5,334
8
2,084
34
2,126
5,155
42
42
69
69
77 0
3,029
• 2,957
BISCAYNE BOULEVARD
2,957
0
8
96
NE 24TH STREET
65
1
30
30
30
2
2
•
1 NE 24TH STREET 5 BISCAYNE BOULEVARD
�IIAMI, FLORIDA
1 COUNTED BY: LUIS PALOMINO
2(AL 1 ZED
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561( 272-4381
ALL VEHICLES & PEDS
Site Code : 00040158
Start Date: 07/13/04
File I.D. : 24STBISC
Page : 3
BISCAYNE BOULEVARD
From North
1
Peds Right
Date 07/13/04
Thru Lett
NE 24TH STREET
From East
Peds Right Thru Left
BISCAYNE BOULEVARD
From South
Peds Right Thru
Left
NE 24TH STREET
From West
Peds Right Thru Left
Vehicle
Total
1 Peak Hour Analysis By Entire
Peak start 16:45
1 Volume 19 1089 36
1 Percent 21 951 31
Pk total 1144
1 Highest 17:30
1 Volume 7 308 10
Hi total 325
1 PHF .88
1
1
1
1
1
1
2
NE 24TH STREET
1
28
0
1 19
2
0
2
47
2
Intersection for
16:45
34
16:45
9
.94
19
19
the Period: 16:00 to 18:00 on 07/13/C4
16:45
32 0 2
941 0# 61
9 0 0
13 1500
11 971
1541
17:15
- 5 397
411
.94
BISCAYNE BOULEVARD
• 1,089
1,089
1,144
1
2
0 25
1.
23
21
23
21
36
36
2,678
2
1,500
32
1,534
ALL VEHICLES & PEDS
Intersection Total
2,744
2
1,089
23
1,114
2,655
28
28
8
16:45
28 - 23 0 2
2# 921 01 81
25
17:15
9 9 0 1
10
.62
3
1,541
• 1,500
BISCAYNE BOULEVARD
1,500
32
32
32
32
0
0
2
2
49
NE 24TH STREET
IWINEMINOMMEN
13
13
1
1
36
0
13
1
1
1
1
1
1
1
1
1
1
0
1
1
1
1
1
1
1
1
1
•
1
1
1
1
1
I
I
I
wt�a�n� tR..0riicA0,.
Tay 161- 2.04-
clWANI t01%. Lik:S kolivavV0
ukot 1&Uzec
• NE 25TH STREET & BISCAYNE BOULEVARD
MIANI, FLORIDA
r COUNTED BY: MIKE MALONE
SIGRALIZED
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272.4361
ALL VEHICLES & PEDS
Site Code : 00040158
Start Date: 07/13/04
Pile I.D. : 25STBISC
Page :1
r
r
Peds Right Thru Lef
Date 07/13f04
BISCAYNE BOULEVARD
From North
r
■ 16:00 0 4 232
r 16:15 0 5 247
16:30 3 5 258
16:45 3 2 227
Hr Total 6 16 964
i
r
r
r
r
r
17:00
17:15
17:30
17:45
Hr Total
1
1
2
4
8
2
4
3
3
12
282
274
312
263
1131
9
8
3
9
29
10
2
11
6
29
NE 25TH STREET
From East
Peds Right Thru Left
15
a
13
45
17
19
23
29
88
18
20
10
57
5
9
9
10
33
0
2
0
2
13
5
4
30
0 1
0 6
0 9
0 3
0 19
BISCAYNE BOULEVARD
From South
Peds Right Thru Left
2
4
4
2
12
3
2
2
0
7
8
11
3
1
23
6
4
9
7
26
386
333
388
1456
355
394
349
347
1445
2
7
4
7
20
4
9
7
5
25
NE 25TH STREET
From West
Peds Right Thru Left
5
4
3
17
3
4
6
6
19
3
1
2
4
10
1
2
2
1
6
0
0
1
1
0
0
0
1
0
0
0
2
2
0
0
0
2
Vehicle
Total
675
639
681
615
2610
669
704
711
645
2729
*TOTAL* 14 28 2095 58 1 133 90 2 49 ( 19 49 2901 45 f 36 16 2 4 ) 5339
r
r
r NE 25TH STREET & BISCAYNE BOULEVARD
tMIAMI, FLORIDA
r COUNTED BY: NIKKE MALONE
SIGNALIZED
r
•
r
r
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-43381
ALL VEHICLES & PEDS
Site Code : 80040158
Start Date: 07/13/04
File I.D. : 25STBISC
Page : 2
BISCAYNE BOULEVARD
From North
Peds Right Thru Left
Date 07/13/D4
14
14
NE 25TH STREET
From East
Peds Right Thru Left
BISCAYNE BOULEVARD
From South
Peds Right Thru
Left
NE 25TH STREET
From West
Peds Right Thru Left
Vehicle
Total
28
28
NE 25TH STREET
45
2
28
75
4
4
2
BISCAYNE BOULEVARD
• 2,095
2,095
2,181
7
2 22
16
r
16
58
58
5,176
4
2,901
90
2,995
ALL VEHICLES & PEDS
Intersection Total
5,339
49
2,095
16
2,160
5,155
25
141
I--� 2,995
• 45
45
• 2,901
BISCAYNE BOULEVARD
2,901
133
133
90
90
2
2
49
49
109
NE 25TH STREET
58
2
49
49
49
19
19
1
' NE 25TH STREET & BISCAYNE BOULEVARD
MIAMI, FLORIDA
COUNTER BY: MIKE MALONE
rt SIGNALIZED
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4381
ALL VEHICLES & PEDS
Site Code : 00040158
Start Date: 07/13/04
File I.D. : 255T815C
Page : 3
BISCAYNE BOULEVARD
From North
Peds Right Thru
M Date 07/13/04
0 Peak Hour Analysis By Entire
• Peak start 17:00
Volume 12 1131 29
0 Percent 1% 97% 2%
• Pk total 1172
Highest 17:30
0 Volume 3 312 11
Ei total 326
PEE .90
1
8
8
NE 25TH STREET
25
0 37
0 12
2
i 2
0
' • 1
1 9
0
6
r 6
0
O • 19
•
•
19
Left
NB 25TH STREET
From East
Peds Right Thru Left
BISCAYNE BOULEVARD
From South
Peds Right Thru Left
NE 25TH STREET
From nest
Peds Right Thru Left
Vehicle
Total
Intersection for the Period: 16:00 to 1B:00 on 07/13/04
17:00
33 0 19
631 0% 37%
52
17:30
18
.72
12
9 0 9
17:00
1496
17:15
407
92
BISCAYNE BOULEVARD
12 1,131
1,172
6
29
29
2,652
17:10
26 1445 25
2% 971 2t
9
17:00
4 394 9
2
1,445
33
1,480
4
.56
6 1 2
67% 111 221
1 1 2
88
88
ALL VEHICLES & PEDS
Intersection Total
2,729
1,156
2,652
10
33
33
0
52 0
19
19
56
{-- 1,496
25 1,445
25
BISCAYNE BOULEVARD
1,445
NE 25TH STREET
1
29
1
26
26
26
7
7
Y
V
1
t
0
1
` NE 26T6 STREET & BISCAYNE BOULEVARD
MIAMMI, FLORIDA
0 COUNTED BY: ISIDRO GONZALEZ
I. NALIZED
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4381
ALL VEHICLES & PEDS
Site Code : 00040158
Start Date: 07/13/44
File I.D. : 26STBISC
Page : 1
0 BISCAYNE BOULEVARD
From North
Peds Right Thru
Date 07/13/04
1
• 16:00 0 5 224
16:15 0 3 249
0 16:30 0 3 264
16:45 0 2 252
i Hr Total 0 13 989
17:00 0 3 289
0 17:15 0 3 284
17:30 0 9 308
• 17:45 0 4 254
Er Total 0 19 1135
' *TOTAL*
410
•
32 2124
Left
NE 26TE STREET
From East
Peds Right Thru Left
BISCAYNE BOULEVARD
From South
Peds Right Thru Left
NE 26TH STREET
From West
Vehicle
Peds Right Thru Left Total
3
3
11
3
1
7
2
13
0
0
0
0
0
1
0
1
4
3
3
14
4
3
1
9
17
0
1
2
1
5
1
1
8
10
2
5
19
4
3
5
9
21
0
1
0
0
0
0
7
4
4
2
17
4
5
3
14
394
352
392
378
1516
354
418
377
161
1510
5
2
9
24
8
19
6
41
0
0
0
0
0
0
0
0
24 1 1 31 10 40 1 31 3026 65 1 0
4
4
5
22
3
2
5
5
15
4
4
3
15
2
5
5
2
14
2
2
9
19
6
5
5
4
to-
668
629
695
669
2661
681
753
734
659
2827
37 29 39 1 5488
1
NE 26TH STREET & BISCAYNE BOULEVARD
MiAMI, FLORIDA
1 COUNTED BY: ISIDRO GONZALEZ
HALITE➢
i
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4301
ALL VEHICLES Fa PEDS
Site Code : 0004➢150
Start Date: 07/13/04
File I.D. : 26STBISC
Page : 2
1 BISCAYNE BOULEVARD
From North
1
Peds Right Thru Left
1 Date 07/13/04
1
1
1
1 0
1
1 NE 26TH STREET
1
1
1
1
1
1
1
1
1
65
10 107
32
39
39
29
NE 26TR STREET
From East
Peds Right Thru Left
BISCAYNE BOULEVARD
From South
Peds Right Thru Left
NE 26TH STREET
From West
Peds Right Thru Left
Vehicle
Total
32
32
BISCAYNE BOULEVARD
• 2,124
2,124
2,180
24
24
29 105
37
37
1
1
•
•
0
0
5,276
39
3,026
31
3,096
ALL VEHICLES & PEDS
12 16
Intersection Total
5,488
40
2,124
37
2,201
5,323
1
31
31
81 10
3,122
65 • 3,026
65
BISCAYNE BOULEVARD
3,026
10
40
40
24
84 29
31
NE 26TH STREET
1
1
' NE 26TR STREET & BISCAYNE BOULEVARD
MIAMI, FLORIDA
COUNTED BY: ISIDRO GONZALEZ
NALIZED
•
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(5611 272-3255 FAX (561) 272-4381
ALL VEHICLES & PEDS
Site Code : 00040158
Start Date: 07/13/04
File I.D. : 26STBISC
Page : 3
BISCAYNE BOULEVARD
From North
Peds Right Thru Left
Date 07/13/04
NE 26TH STREET
From Bast
Peels Right Thru Left
BISCAYNE BOULEVARD
From South
Peds Right Thru Left
NB 26TH STREET
From Hest
Peds Right Thru Left
Vehicle
Total
Peak Hour Analysis By Entire intersection for the Period: 16:00 to 18:00 on 07/13/04
o Peak start 16:45 16:45 16:45
Volume - 17 1133 14 - 12 7 14 - 14 1527 43
0 Percent 11 971 1# - 361 211 421 1# 961 3t
Pk total 1164 33 1584
Highest 17:30 17:15 17:15
1 Volume - 9 308 7 - 3 5 3 5 418 19
Hi total 324 11 442
0 PHF .90 .75 .90
0
0
26TH STREET
43
7
17
16
15
•
67
25
17
17
BISCAYNE BOULEVARD
1,133
1,133
1,164
16 56
15
0
•
0
14
14
2,728
25
1,527
12
1,564
ALL VEHICLES & PEDS
23 7
Intersection Total
2,837
14
1,133
15
1,162
2,746
43
43
16:45
- 15 16 25
271 29t 451
56
16:45
4 9
18
.78
1
12
12
33 7
1,584
• 1,527
BISCAYNE BOULEVARD
1,527
7
14
14
44
NE 26TH STREET
14
16
14
f
14
14
0
0
•
r
1
1
1
1
•
KFL
1
1
NE 24TH STREET & RE ND COURT
`EAML FLORIDA
O COUNTED BY: LUIS PALOMINO
*SIGNALISED
NE 24TH STREET
From East
Peds Thru Left
(Date 07/14/04
116:00 1 3 5
016:15 0 3 0
'16:3O 0 4 1
▪ 16:45 1 9 3
OHr Total 2 19 9
017:00 0 7 2
117:15 0 8 1
17:30 2 8 5
P 17;45 0 10 3
OEr Total 2 33 11
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
{561} 272-3255 FAX (561) 272-4381
ALL VEHICLES & PEDS
Site Code : 00040158
Start Date: 07/14/O4
File I.D. : 24ST_2CT
Page : 1
NE 2ND COURT
From South
Peds Right Left
HE 24TH STREET
From West
Peds Right Thru
Vehicle Other
Total Total
1 4 0
3 1 3
0 3 1
3 7 1
7 15 5
2 0 2
3 2 3
10 5 4
2 3
18 9 12
0 2 1
0 1 1
0 2 2
0 4 1
0 9 5
2 1 6
0 4 5
2 6 7
1 4 2
5 15 20
15 2
9 3
13 0
25 4
62 9
18 4
23 3
35 14
24 4
100 25
r*TOTAL* 4 52 20 1 25
0
04 I
0
24 17 [ 5 24 25 1 162 34
r
NE 24TH STREET & NE ND COURT"MIAMI, FLORIDA
"COUNTED BY: LUIS PALOMINO
SIGBALISED
r
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4301
ALL VESICLES !< PEDS
Site Code : 00040158
Start Date; 07/14/04
File I.D. 24ST_2CT
Page : 2
NE 24TE STREET
r From East
Peds Thru Left
',Date 07/14/04
NE 2ND COURT
Prom South
Peds Right Left
NE 24TH STREET
From West
Peds Right Thru
Vehicle Other
Total Total
r
r
r
r
r
r
r
r.
ONE 24TH STREET
r 17
r 52 69
r 0
041 0
25
r
r• 24
r
r
r
r
r
r
25
24
5
4
4
18
9
ALL VEHICLES & PEDS
Intersection Total
162
85
20 17
0
24
44 17
NE 2ND COURT
12
0
72 52
41
0
1
24
24
52
20
20
0
49 25
24
NE 24TH STREET
25
25
NE 24TH STREET & NE AD COURT
" MIAMI, FLORIDA
'COUNTED BY: LUIS PALOMINO
�SIGNALIZBD
NB 24TE STREET
r From East
Peds Thru Left
Pate 07/14/04
Peak Hour Analysis By Entire
"Peak start 16:45
Volume - 32 11
Percent - 74i 261
"Pk total 43
'Highest 17:30
Volume 8 5
rHi total 13
'PHF .83
1
r
r
r
r
r
Pt. 24TH STREET
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561} 272-3255 FAX (561) 272-4381
NE 2ND COURT
From South
Peds Right Left
ALL VEHICLES & PEDS
NE 24TH STREET
From Nest
Peds Right Thru
Vehicle Other
Total Total
Site Code : 00040158
Start Date: 07/14/04
File I.D. : 245T_2CT
Page : 3
ntersectioa for the Period: 16:00 to 18:00 on 07/14/04
16:45 16:45
14 10 15 19
581 42t 441 561
24 34
17:30 17:30
5 4 - 6 7
9 13
.67 .65
3
3
r 10
' 32 42
r 0
r
r
r 19
r• 19
r
0
15
4
4
6
4
ALL VEHICLES & PEDS
Intersection Total
101
50
11 10
0
15
26 10
NE 2ND COURT
43
76
24
0
E
14
14
0
32
32
11
11
33
NE 24TH STREET
• 18
18
0
19
14
1
1
1
1
140
� •
1 NE 24 sr
--
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
r
1
1
k t& t4 t frc� ri C
l
1141 0-1Z004--
J riak l boi. (AAI.S P#Loien i Y10
1
1
NE 24TR STREET tx NE 2ND AVENUE
1MIAMI, FLORIDA
ICOUNTED BY: FRANK SANCHEZ
SIGNALIZED E/1V STOP
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4381
ALL VEHICLES 6 PEDS
Site Code : 00040158
Start Date: 07/13/04
File F.D. : 24ST2AVE
Page : 1
NE 2ND AVENUE
1 From North
Peds Right Thru Left
IDate 07/13/04
116:00 1 3 98 6
11.6:15 0 0 108 3
16;30 3 2 118 3
�6:45 2 1 110 4
pOr Total 6 6 434 16
�J7:00 1 4 109 6
117:15 1 4 114 2
17:30 0 3 103 10
1�7:45 0 1 99 4
pr Total 2 12 425 22
NE 74TE STREET
From East
Peds Right Thru Left
NE 2ND AVENUE
From South
Peds Right Thru Left
NE 24TH STREET
From West
Peds Right Thru Left
Vehicle
Total
4 6 1 4
0 7 0 1
3 5 0 1
2 3 0 0
9 22 1 6
0 7 0 5
1 15 1 0
1 5 0 1
1 8 0 1
3 35 1 7
0 3 167 1
0 1 173 5
0 2 240 1
3 j i31
3 10 811 8
4 2 262 1
1 6 274 2
0 0 209 1
0 2 205 1
5 10 950 5
2 1 0 1
1 1 0 3
3 2 0 2
3 1 0 3
9 5 0 9
1 7 0 4
1 3 0 6
5 7 0 2
4 2 0 3
11 19 0 15
291
302
376
359
1328
407
427
341
326
1501
1
1'TOTAL{ 8 18 859 38 I 12 57 2 13 8 20 1761 13 1 20 24 0 24 2829
1
1
14 I
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
NE 24TH STREET & NE 2ND AVENUE
'MIAMI, FLORIDA
'COUNTED BY: FRANI SANCHEZ
SIGNALIZED E!If STOP
1411
NE 2ND AVENUE
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4381
ALL VEHICLES & PEDS
Site Code : 03040158
Start Date: 07/13/04
File I.D. : 24ST2AVB
Page : 2
From North
Peds Right Tbru Left
'Date 07/13/04
ONE 24TH STREET
13
2 33
18
24
0
24
1
NE 24TB STREET
From Bast
Peds Right Thru Left
RE 2ND AVENUE
From South
Peds Right Thru Left
NE 24TR STREET
From West
Peds Right Thru Left
Vehicle
Total
18
18
NE 2ND AVENUE
859
859
915
1
0 48
24
1
mummommommommEr
I. 20
20
24
38
38
2, 757
24
1,761
57
1,842
12
12
ALL VEHICLES & PEDS
Intersection Total
2,829
2,690
13 13
859
24
896 13
NE 2ND AVENUE
13
57
57
72 2
1,794
1,761
1,761
t
2
13
13
58
NE 24TH STREET
38
0
20
20
20
. 8
8
r
r
NE 24TH STREET & NE 2ND AVENUE
REAM, FLORIDA
'COUNTED BY: FRANI SANCEEZ
NOT SIGNALIZED E/N STOP
r NE 2ND AVENUE
r Frori North
Peds Right Thru
'Date 07/13/04
Peak Hour Analysis
' Peak start 16:30
MVolume
Percent
' Pk total 477
',Highest 16:30
Volume
rHi total 123
'PHF .97
Left
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX (561) 272-4381
ALL VEHICLES & PEDS
NE 24TE STREET
From East
Peds Right Thru Left
NE 2ND AVENUE
From South
Peds Right Thru Left
Site Code : 40040158
Start Date: 07/13/04
File I.D. : 24ST2AVE
Page : 3
NE 24TE STREET
From Nest
Peds Right Thru Left
Vehicle
Total
By Entire Intersection for the Period: 16:00 to 18:00 on 07/13/04
16:30 16:30 16:30
11 451 15 31 1 6 - 14 1007 5 - 13 0 15
21 95% 31 82t 3% 16% 11 981 0% - 461 04 541
38 1026 28
17:15 17:15 17:00
2 118 3 - 15 1 0 - 6 274 2 - 7 0 4
16 282 11
.59 .91 .64
17
r
r
i
r
15
15
0
11
11
NE 2ND AVENUE
451
451
477
5
0 28
8
r
r
13
8
15
15
1,530
15
1,007
31
1,053
ALL VEHICLES & PEDS
Intersection Total
1, 569
6
451
13
470
1,496
6
3
----- 1,026
5
5
NE 2ND AVENUE
• 1,007
1,007
14
14
6
6
31
31
1
6
6
29
NE 24TH STREET
8
8
15
0
14
r
r.
r40
1
1
1
1
1
1
1
1
1
1
1
1
1
245r
ql‘it
1M1Jl�Q,1N�.1 � Fl-4f i ci0.
z"v,LY 14f4004
cifik.wvx by' Cuti s PAL° vki o
Act snab-zed
:ENE 25TH STREET 6 NE 2ND AVENUE
TAI, FLORIDA
1COUNTID BY: OMR VELEZ
iIGNALIZED
NE 2ND AVENUE
From North
Peds Right
(Date 07/14/04 -
116:00
116:15
16:30
116:45
Fr Total
017:00
117:15
17:30
112:45
IHr Total
8
0
3
0
11
0
2
4
4
10
5
6
3
16
2
0
1
4
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(561) 272-3255 FAX 0561f 272-4381
ALL VEHICLES & PEDS
Site Code : 00040158
Start Date: 07/14/04
File I.D. : 25ST2AVE
Page : 1
Thru Left
NE 25TH STREET
From Bast
Peds Right Thru Left
NE 2ND AVENUE
From South
Peds Right Thru
Left
NE 25TH STREET
From West
Vehicle
Peds Right Thru Left Total
115
100
102
139
456
125
122
125
100
472
1
3
2
2
8
2
1
1
8
1
1
0
3
1
0
3
4
3
1
5
7
16
9
7
6
27
0
0
1
a
1
1
0
1
2
2
2
2
7
1
2
1
0
4
2
0
0
3
1
0
1
1
3
2 1
0 0
2 5
0 1
4 7
193
216
236
;34
879
214
233
214
189
850
3
1
2
5
11
0
1
1
3
5
8
8
1
22
6
1
15
4
26
2
1
2
4
9
2
4
2
9
1 3
1 2
1 3
1 6
4 14
a
1
0
0
1
3
a
3
7
329
333
360
402
1424
360
371
360
305
1396
I*TOTALf 21 20 928 16 j 7
I
43 3 11 f 7 10 1729
16I 48 18 5 21 I 2820
NE 25TH STREET & NE 2ND AVENUE
01 MIAMI, FLORIDA
COUNTED BY: OMAR VELEZ
OT SIGNALIZED
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(5611 272-3255 FAX (561} 272-4381
ALL VEHICLES & PEDS
Site Code : 00040158
Start Date: 07/14/04
File I.D. : 25ST2AVE
Page : 2
NE 2ND AVENUE
From North
Peds Right Thru Left
0 Date 07/14/04
1
21
1
1NE 25TH STREET
1 16
1 3 39
20
S21
21
1
1
1• 18
1
1'
1
1
1
1
1
1
1
1
21
N3 25TH STREET
From East
Peds Right Thru Lef
NE 2ND AVENUE
From South
Peds Right Thru Left
NE 25TH STREET
From West
Peds Right Thru Left
Vehicle
Total
20
20
•
1
1
1
48
5
18
48
1
NE 2ND AVENUE
928
928
964
16
16
3
4
2,757
21
1,729
43
1,793
7
7
ALL VEHICLES & PEDS
Intersection Total
2,820
11
928
18
957
2,712
16
16
NE 2ND AVENUE
8
43
43
57 3
1,755
• 1,729
1,729
3
11
11
31
NE 25TH STREET
10 7
10
7
16
5
10
NE 25TE STREET & NE 2ND AVENUE
/EANI, FLORIDA
'COUNTED BY: O1(AR VELEZ
.SOT SIGNALIZED
TRAFFIC SURVEY SPECIALISTS, INC.
624 GARDENIA TERRACE
DELRAY BEACH, FLORIDA 33444
(5611 272-3255 FAX (561( 272-4381
ALL VEHICLES 6 PEDS
Site Code : 00010158
Start Date: 07/14/01
File I.D. : 25ST2AVE
Page : 3
RE 2ND AVENUE
From North
Peds Right
/Date 07/14/04
'Peak Hour Analysis
Peak start 16:45
'Volume -
Percent
/Pk total 525
'Highest 16:45
Volume
rEi total 143
VHF .92
r
Thru Left
NE 25TH STREET
From East
Peds Right Thru Left
NE 2ND AVENUE
From South
Peds Right Thru
Left
NE 25TH STREET
From West
Peds Right Thru Left
Vehicle
Total
By Entire Intersection for the Period: 16:00 to 18:00 on O7/14/O4
16:45 16:45
5 511 9 29 2 5
11 971 21 811 61 141
2 139 2
6
6
E 25TH STREET
7
2
/ 5
2
23
14
10
36
17:00
11
.82
5
2 23
11
23
5
9
1
909
16:45
240
.95
NE 2ND AVENUE
511
511
525
9
9
37
1,459
7 895 7
11 981 11
1 234 5
10
895
29
934
ALL VEHICLES & PEDS
Intersection Total
1,493
527
1,436
7
7
NE 2ND AVENUE
36
54
909
895
895
16:45
- 11 2 10
48% 91 431
23
16:45
11
.52
4 1 6
5
5
29
29
2
2
5
5
18
NE 25TH STREET
9
2
7
7
7
5
5
•
•
•
•
1
vtokimi (V•oridak,
• TkLt 14( zo04-
1 t�
1 v10.wv1 bud: Wig il4uWtiYt0
1
• Nof S'9nQLizecl
•