SCHOOL IMPACT REVIEW ANALYSIS
March 2, 2005
FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE INTERLOCAL
AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE THE
APPLICANT IS NOT REQUESTING ADDITIONAL RESIDENTIAL DENSITY OVER WHAT IS
CURRENTLY ALLOWED UNDER EXISTING ZONING CLASSIFICATION FOR SUBJECT
PROPERTY. IN ADDITION THE SCHOOLS THAT WOULD SERVE THE PROPOSED
DEVELOPMENT ARE UNDER 115° THRESHOLD CAPACITY.
APPLICATION: District Lofts
REQUEST: Major Use Special Permit
ACRES: Approximately 0.647 net acres
LOCATION: 2751 Biscayne Blvd. and 328-338 NE 28th Street, Miami
CURRENT
ZONING:
C-1 (Restricted Commercial) and R-4 (Multifamily High Density Residential)
with SD-20 Overlay
MSA/
MULTIPLIER: 4.7/0.22 Multifamily
NUMBER OF
UNITS:
64 total multifamily residential units (0,647 net acres x 150 DU/acre = 97
Maximum units allowed)
ESTIMATED
STUDENT
POPULATION: 18 students*
ELEMENTARY: 6
MIDDLE: 5
SENIOR: 5
SCHOOLS SERVING AREA OF APPLICATION:
ELEMENTARY: Eneida M. Hartner Elementary — 401 NW 29th Street
MIDDLE: Jose De Diego Middle — 3100 N.W, 5 Street
SENIOR HIGH: Booker T. Washington Senior - 1200 N.W, 6 Street
All schools are located in Region IV_
*Based on Census 2000 Information provided by Miami -Dade County Department of Planning and
Zoning.
Mar 02 2005 3:00PM SITE PLANNING 3059954700 P.19
The following population and facility capacity data are as reported by the Office of Information
Technology, as of October 2004:
FISH
STUDENT DESIGN
POPULATION CAPACITY
PERMANENT
% UTILiZATlON
FISH DESIGN
CAPACITY
PERMANENT
N UMBER OF
PORTABLE
STUDENT
STATIONS
% UTILIZATION FISH
DESIGN CAPACITY
PERMANENT AND
RELOCATABLE
Eneida M. Harmer 818/ 113%1 113%/
Elementary
826" 724 114%* 0 114%'
Jose De 1,1
Die o 70/ 113%/ 113%I
9 1,036 114%* 0 114%*
Middle 1,184'
57%/ 57%/
Soaker 7. 1,502/ 2,624 5 °f°, 0 58%"
Washington Senior 1,518*
* Increased student population as a result of the proposed development
Note:
1) The cumulative effect of other approved or proposed developments in the vicinity is not included
as part of this analysis.
2) Figures above reflect the impact of the class size amendment.
3) Pursuant to the lnterlocal Agreement, none of the schools meet the review threshold.
PLANNED RELIEF SCHOOLS IN THE AREA
(Information included in proposed 5-Year Capital Plan, 2005-2009, dated January 2005)
Projects In Planning, Design or Construction
School
NIA
Proposed Relief Schools
School
Funding Year New Middle FY 06-Q7
State School "GG-1"
(Jose De Diego Middle Relief)
(1,241 student stations)
OPERATING COSTS: According to Financial Affairs, the average cost for K-12 grade students
amounts to $5,833 per student. The total annual operating cost for additional students residing in this
development, if approved, would total $104,994
CAPITAL COSTS: Based on the State's March 2005 student station cost factors, capital costs for
the estimated additional students to be generated by the proposed development are:
ELEMENTARY 8 X $13,518 = $108,128
MIDDLE 5 X $15,497 = $77,485
SENIOR 5 X $20,507 = $102,520
Total Potential Capital cost $288,133
Based on information provided by the Florida Department of Education, Office of Educational
Facilities Budgeting. Cost per student station does not include land cost.