Loading...
HomeMy WebLinkAboutSchool Board CommentsMar ill 2005 3 : OOPM SITE PLRNN I NG 305 nR rbu SCHOOL IMPACT REVIEW ANALYSIS March 2, 2005 FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE THE APPLICANT IS NOT REQUESTING ADDITIONAL RESIDENTIAL DENSITY OVER WHAT IS CURRENTLY ALLOWED UNDER EXISTING ZONING CLASSIFICATION FOR SUBJECT PROPERTY. IN ADDITION THE SCHOOLS THAT WOULD SERVE THE PROPOSED DEVELOPMENT ARE UNDER 115° THRESHOLD CAPACITY. APPLICATION: District Lofts REQUEST: Major Use Special Permit ACRES: Approximately 0.647 net acres LOCATION: 2751 Biscayne Blvd. and 328-338 NE 28th Street, Miami CURRENT ZONING: C-1 (Restricted Commercial) and R-4 (Multifamily High Density Residential) with SD-20 Overlay MSA/ MULTIPLIER: 4.7/0.22 Multifamily NUMBER OF UNITS: 64 total multifamily residential units (0,647 net acres x 150 DU/acre = 97 Maximum units allowed) ESTIMATED STUDENT POPULATION: 18 students* ELEMENTARY: 6 MIDDLE: 5 SENIOR: 5 SCHOOLS SERVING AREA OF APPLICATION: ELEMENTARY: Eneida M. Hartner Elementary — 401 NW 29th Street MIDDLE: Jose De Diego Middle — 3100 N.W, 5 Street SENIOR HIGH: Booker T. Washington Senior - 1200 N.W, 6 Street All schools are located in Region IV_ *Based on Census 2000 Information provided by Miami -Dade County Department of Planning and Zoning. Mar 02 2005 3:00PM SITE PLANNING 3059954700 P.19 The following population and facility capacity data are as reported by the Office of Information Technology, as of October 2004: FISH STUDENT DESIGN POPULATION CAPACITY PERMANENT % UTILiZATlON FISH DESIGN CAPACITY PERMANENT N UMBER OF PORTABLE STUDENT STATIONS % UTILIZATION FISH DESIGN CAPACITY PERMANENT AND RELOCATABLE Eneida M. Harmer 818/ 113%1 113%/ Elementary 826" 724 114%* 0 114%' Jose De 1,1 Die o 70/ 113%/ 113%I 9 1,036 114%* 0 114%* Middle 1,184' 57%/ 57%/ Soaker 7. 1,502/ 2,624 5 °f°, 0 58%" Washington Senior 1,518* * Increased student population as a result of the proposed development Note: 1) The cumulative effect of other approved or proposed developments in the vicinity is not included as part of this analysis. 2) Figures above reflect the impact of the class size amendment. 3) Pursuant to the lnterlocal Agreement, none of the schools meet the review threshold. PLANNED RELIEF SCHOOLS IN THE AREA (Information included in proposed 5-Year Capital Plan, 2005-2009, dated January 2005) Projects In Planning, Design or Construction School NIA Proposed Relief Schools School Funding Year New Middle FY 06-Q7 State School "GG-1" (Jose De Diego Middle Relief) (1,241 student stations) OPERATING COSTS: According to Financial Affairs, the average cost for K-12 grade students amounts to $5,833 per student. The total annual operating cost for additional students residing in this development, if approved, would total $104,994 CAPITAL COSTS: Based on the State's March 2005 student station cost factors, capital costs for the estimated additional students to be generated by the proposed development are: ELEMENTARY 8 X $13,518 = $108,128 MIDDLE 5 X $15,497 = $77,485 SENIOR 5 X $20,507 = $102,520 Total Potential Capital cost $288,133 Based on information provided by the Florida Department of Education, Office of Educational Facilities Budgeting. Cost per student station does not include land cost.