HomeMy WebLinkAboutpre resolution attachmentPROJECT NO. 5
Little River Storm Sewers Retrofitting Project, Phase II
Project Description: This project will provide a modern drainage system for
the area bordered by N.W. 79th Street, Little River Canal, and N. Miami
Avenue.
Fairlawn Storm Sewers Project, Phase ill
Project Description: This project will provide a modern drainage system for
the area bordered by W. Flagler Street, S.W. 8th Street, S.W. 47th Avenue,
and S.W. 57th Avenue.
Kinloch Storm Sewers Project
Project Description: This project will provide additional storm sewers to the
area bounded by N.W. 7th Street, West 42nd Avenue, S.W. 8th Street and
West 42nd Avenue.
Tamiami Storm Sewer Proiect
Project Description: This project consists of the design and construction for
storm sewer improvements within the area bounded by N.W. 7th Street, S.W.
Bth Street, W. 62 Avenue, and W. 57 Avenue.
Englewood Storm Sewers Proiect -Phase III
Project Description: This project will provide a modern drainage system for
the area bordered by S.W. 16th Street, S.W. 22nd Street, S.W. 27t Avenue
and S.W.32"d Avenue.
NorthWest Storm Sewers Project
Project Description: This project involves the design and construction of a
local drainage system in the area bounded by N.W. 7th Avenue, N.W. 71m
Street, N.W. 12th Avenue, and N.W. 62nd Street.
Garden Storm Sewers Prolect -Phase I
Project Description: This project will provide a modern drainage system for
the area bordered by N.W. 28th Street, N.W. 38th Street, N.W. 22nd Avenue
and N.W. 27th Avenue.
Page 1 of 3
Liberty Storm Sewers Proiect
Project Description: This project involves the design and construction of a
local drainage system in the area bounded by N.W. 17th Avenue, N.W. 71`t
Street, N.W. 12th Avenue, and N.W. 62"d Street.
Glenroval Storm Sewers Project
Project Description: This project involves construction of a positive storm
sewer system for the area bounded by W. Flagler Street, and N.W.
22"dAvenue, N.W. 7th Street, and N.W. 17th Avenue.
Lawnview Storm Sewers Proiect
Project Description: This project involves construction of a local drainage
system for the area bounded by S.W. 6th Street, and S.W. 17'h Avenue, W.
Flagler Street, and S.W. 22"d Avenue.
Auburn Storm Sewers Protect -Phase I and Phase II
Project Description: This project involves construction of a local drainage
system for the area bounded by N.W. 7th Street, N.W. 27th Avenue, W. Flagler
Street, and N.W. 37th Avenue.
Reid Acres Storm Sewers Proiect
Project Description: This project will provide a positive drainage system to
the area bounded by N.E. 71't Street, FEC Railroad, N.E. 62 Street and N.E.
2nd Avenue.
Belle Meade Storm Sewers Protect, Phase I
Project Description: This project will provide storm sewers to the area
bounded by N.E. 83rd Street, East Dixie Highway, North City Limits and
Biscayne Boulevard.
Fairway Storm Sewers Proiect
Project Description: This project involves the design and construction of a
local drainage system in the area bounded by N.W. 2"d Avenue, F.E.C.
Railroad, N. 73rd Street, and N. 62nd Street.
Avalon Storm Sewers Protect -Phase III
Project Description: This project will provide a modern drainage system for
the area bordered by S.W. 22nd Street, S.W. 27'h Street, S.W. 27' Avenue
and S.W.32"d Avenue.
Page 2 of 3
Auburn Storm Sewers Project -Phase III
Project Description: This project will provide a modern drainagegsystem for
the area bordered by W. Hagler Street, S.W. soh Street, S.W. 27t Avenue and
S.W.32"d Avenue.
N.W. 71st Street Main Trunk Storm Sewer Proiect
Project Description: This project will provide positive drainage for N. 7181
Street between N.W. 17 Avenue and N. Miami Avenue and also provide a
relief system and overflow connection for the Liberty, Fairway, and Northwest
storm sewer district project. This project is a recommendation of the Storm
Drainage Master Plan. The trunk main will be constructed in N. 71'1 Street to
either N. Miami Avenue or N.E. 2"d Avenue at which point the main will be
extended north to the Little River Canal.
Page 3 of 3