Loading...
HomeMy WebLinkAboutpre resolution attachmentPROJECT NO. 5 Little River Storm Sewers Retrofitting Project, Phase II Project Description: This project will provide a modern drainage system for the area bordered by N.W. 79th Street, Little River Canal, and N. Miami Avenue. Fairlawn Storm Sewers Project, Phase ill Project Description: This project will provide a modern drainage system for the area bordered by W. Flagler Street, S.W. 8th Street, S.W. 47th Avenue, and S.W. 57th Avenue. Kinloch Storm Sewers Project Project Description: This project will provide additional storm sewers to the area bounded by N.W. 7th Street, West 42nd Avenue, S.W. 8th Street and West 42nd Avenue. Tamiami Storm Sewer Proiect Project Description: This project consists of the design and construction for storm sewer improvements within the area bounded by N.W. 7th Street, S.W. Bth Street, W. 62 Avenue, and W. 57 Avenue. Englewood Storm Sewers Proiect -Phase III Project Description: This project will provide a modern drainage system for the area bordered by S.W. 16th Street, S.W. 22nd Street, S.W. 27t Avenue and S.W.32"d Avenue. NorthWest Storm Sewers Project Project Description: This project involves the design and construction of a local drainage system in the area bounded by N.W. 7th Avenue, N.W. 71m Street, N.W. 12th Avenue, and N.W. 62nd Street. Garden Storm Sewers Prolect -Phase I Project Description: This project will provide a modern drainage system for the area bordered by N.W. 28th Street, N.W. 38th Street, N.W. 22nd Avenue and N.W. 27th Avenue. Page 1 of 3 Liberty Storm Sewers Proiect Project Description: This project involves the design and construction of a local drainage system in the area bounded by N.W. 17th Avenue, N.W. 71`t Street, N.W. 12th Avenue, and N.W. 62"d Street. Glenroval Storm Sewers Project Project Description: This project involves construction of a positive storm sewer system for the area bounded by W. Flagler Street, and N.W. 22"dAvenue, N.W. 7th Street, and N.W. 17th Avenue. Lawnview Storm Sewers Proiect Project Description: This project involves construction of a local drainage system for the area bounded by S.W. 6th Street, and S.W. 17'h Avenue, W. Flagler Street, and S.W. 22"d Avenue. Auburn Storm Sewers Protect -Phase I and Phase II Project Description: This project involves construction of a local drainage system for the area bounded by N.W. 7th Street, N.W. 27th Avenue, W. Flagler Street, and N.W. 37th Avenue. Reid Acres Storm Sewers Proiect Project Description: This project will provide a positive drainage system to the area bounded by N.E. 71't Street, FEC Railroad, N.E. 62 Street and N.E. 2nd Avenue. Belle Meade Storm Sewers Protect, Phase I Project Description: This project will provide storm sewers to the area bounded by N.E. 83rd Street, East Dixie Highway, North City Limits and Biscayne Boulevard. Fairway Storm Sewers Proiect Project Description: This project involves the design and construction of a local drainage system in the area bounded by N.W. 2"d Avenue, F.E.C. Railroad, N. 73rd Street, and N. 62nd Street. Avalon Storm Sewers Protect -Phase III Project Description: This project will provide a modern drainage system for the area bordered by S.W. 22nd Street, S.W. 27'h Street, S.W. 27' Avenue and S.W.32"d Avenue. Page 2 of 3 Auburn Storm Sewers Project -Phase III Project Description: This project will provide a modern drainagegsystem for the area bordered by W. Hagler Street, S.W. soh Street, S.W. 27t Avenue and S.W.32"d Avenue. N.W. 71st Street Main Trunk Storm Sewer Proiect Project Description: This project will provide positive drainage for N. 7181 Street between N.W. 17 Avenue and N. Miami Avenue and also provide a relief system and overflow connection for the Liberty, Fairway, and Northwest storm sewer district project. This project is a recommendation of the Storm Drainage Master Plan. The trunk main will be constructed in N. 71'1 Street to either N. Miami Avenue or N.E. 2"d Avenue at which point the main will be extended north to the Little River Canal. Page 3 of 3