HomeMy WebLinkAboutR-05-0213City of Miami
Legislation
Resolution: R-05-0213
City Hall
3500 Pan American
Drive
Miami, FL 33133
www.miamigov.com
File Number: 05-00264 Final Action Date: 4/14/2005
A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH
ATTACHMENT(S), APPROVING AN INCREASE IN THE AMOUNT OF
$200,000, IN THE CONTRACT DATED JUNE 22, 2004, BETWEEN THE CITY OF
MIAMI AND T.J. PAVEMENT CORPORATION, FOR THE PROJECT ENTITLED
"CITYWIDE STORM SEWER REPAIR PROJECT, B-50712,"
AUTHORIZED BY RESOLUTION NO. 04-0262, ADOPTED APRIL 22, 2004;
FURTHER AUTHORIZING THE CITY MANAGER TO EXECUTE AN AMENDMENT
TO THE CONTRACT, IN SUBSTANTIALLY THE ATTACHED FORM; ALLOCATING
FUNDS FROM PUBLIC WORKS GENERAL OPERATING BUDGET ACCOUNT
CODE NO. 001000.311003.6.340.
WHEREAS, pursuant to Resolution No. 04-0262, adopted April 22, 2004, the City of Miami ("City")
entered into a contract with T.J. Pavement Corporation ("Contractor"), for the project entitled
"Citywide Storm Sewer Repair project, B-50712," in the amount of $850,650 ("Contract"); and
WHEREAS, during the course of the approved work, several emergency locations were
discovered by the inlet cleaning contractor that required additional work, thereby requiring
maintenance services to the City stormwater infrastructure ("Additional Work"); and
WHEREAS, the Contractor has estimated the cost of the Additional Work, including labor and
materials, not to exceed $200,000, and funds in that amount are available from Public Works General
Operating Budget Account Code No. 001000.311003.6.340; and
WHEREAS, the Contractor is fully familiar with the work, is qualified and willing to perform the
Additional Work under the terms of the Contract and the Additional Work is within the ambit of the
original Request for Bids pursuant to which the Contract was;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI,
FLORIDA:
Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted by
reference and incorporated as if fully set forth in this Section.
Section 2. The City Commission approves an increase in the amount of $200,000, in the Contract
dated June 22, 2004 between the City and the Contractor, for the Project entitled "Citywide Storm
Sewer Repair Project B-50712," authorized by Resolution No. 04-0262, adopted April 22, 2004, with
funds allocated from Public Works General Operating Budget Account Code No. 001000.311003.6.
340.
Section 3. The City Manager is authorized{2} to execute an amendment to the Contract, in
substantially the attached form.
City of Miami
Page 1 of 2 File Id: 05-00264 (Version: 1) Printed On: 11/3/2016
File Number: 05-00264 Enactment Number: R-05-0213
Section 4. This Resolution shall become effective immediately upon its adoption and signature of
the Mayor.{3}
Footnotes:
{1} Words/and or figures stricken through shall be deleted. Underscored words and/or figures shall be
added. The remaining provisions are now in effect and remain unchanged. Asterisks indicate omitted
and unchanged material.
{2} The herein authorization is further subject to compliance with all requirements that may be
imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter
and Code provisions.
{3} If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar
days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become
effective immediately upon override of the veto by the City Commission.
City of Miami Page 2 of 2 File Id: 05-00264 (Version: 1) Printed On: 11/3/2016