Loading...
HomeMy WebLinkAboutscope of servicesEXHIBIT B SCOPE OF SERVICES PROGRAM MANAGEMENT SERVICES TO MANAGE CONSTRUCTION PROJECTS PARKS AND FACILITIES The City of Miami Beach (CITY) has developed various programs to improve the quality of Iife of its residents. On November 2, 1999, voters approved the issuance of approximately$92 million in General Obligation (GO) Bonds for Neighborhood, Parks, Beach and Fire Safety Improvements, of which approximately $35 million is allocated for capital parks and facilities projects. These estimated $35 million of parks and facilities projects are to be implemented over the next fifty-nine (59) months (Program). An initial listing of anticipated Projects to be performed under the scope of this Program Management Agreement is included as Exhibit A. As the various parks and facilities projects progress from planning to design, construction and operation, the requirement for oversight of design and construction activities becomes essential to Program success. This need becomes more prevalent when considering the magnitude of the number of Projects being undertaken, the likelihood that individual Project phases will overlap with other improvements, and the potential impacts to the day-to-day operations of the CITY. The Program management team shall provide the necessary administration of planning, design and construction tasks as the Projects proceed concurrently over the course of the next six years. Program management shall further accomplish the CITY's goals by reviewing project implementation priorities and limiting the duplication of efforts through the grouping of Projects into specific packages. In addition, standards shall be established to ensure that all contract documents are uniform, linked, and integrated accordingly with other ongoing and/or future elements of the Program. All of these efforts shall be undertaken with the primary purpose of protecting the interests of the CITY. To this end, it is URS' (CONSULTANT) intent to maintain an office located at Suite 1000, Eastern Financial Building, 700 South Royal Poinciana Boulevard, Miami Springs, Florida 33166. This office shall house the baseline Program management staff including the Program Manager, Engineering / Design Manager, Construction Manager and other key staff. In addition, the CITY shall provide office space for up to 4 of the CONSULTANT'S staff. This office shall serve as the base of operations for the construction observation staff. Files shall be kept for all Program correspondence, meetings and designers. The files shall also include reproductions of original Contract Documents including addenda, _ 06/21 /01 l • • change orders, field orders, field memos, additional drawings issued subsequent to the execution of the construction contracts, clarifications and interpretations of the contract documents, progress reports, and other Project related documents. It is intended that all files shall be turned over to CITY at the completion of the Program. Program management services shall be provided for a variety of administrative duties including, general program management, planning phase program management, design phase program management, construction phase program management, construction observation and miscellaneous (upon request) support services. Each of these types of services shall be provided by the CONSULTANT working in concert with CITY, the CITY's design consultant (AJE), and construction contractor (Contractor) staffs. The following discussion details specific work efforts associated with" the performance of each of these services: TASK 1— GENERAL PROGRAM MANAGEMENT SERVICES (All projects identified in Exhibit A shall be included in Task I Services defined below) CONSULTANT shall coordinate the overall administration of the Program and act as the CITY's representative throughout the Program duration to the extent addressed by this Agreement. This effort shall include the following tasks: Task 1.1 — Development of a Program Work Plan: CONSULTANT shall prepare a Program Work Plan (PWP) detailing procedures and policies for the overall Program. This PWP manual shall dictate the respective responsibilities and levels of authority for all Program team members. Organizational structure flowcharts and team member duties shall be included to establish a working understanding regarding reporting and communication relationships on the Program. The PWP shall also include a listing of design and construction phase deliverables from the various A/E's and Contractors, along with a proposed Program manager duties during the planning, design and construction phases of the Program. CONSULTANT shall meet with CITY representatives to review and receive, comments on the PWP prior to finalization. Once accepted by the CITY, the CONSULTANT shall update the PWP on a quarterly basis to ensure that all lines of communications and responsibilities are kept up to date. One copy of the PWP will be given.to designated CITY staff as well as each A/E and Contractor. Deliverables Develop work plan for all activities. Draft .(I 0 copies) and final (30 copies) of the Program Work Plan. 06/21/01 2 Schedule Meeting to review and receive comments from CITY staff. Meeting agenda and minutes. Draft to be completed with forty-five (45) calendar days from the receipt of the Notice to Proceed and Final to be completed fifteen (i 5) calendar days after receipt of all comments. Task 1.2 — Master Program Schedule: CONSULTANT shall prepare a "rolled -up" Master Program Schedule based on input received from the CITY, A/E firms and/or Contractors. The Master Program Schedule shall be distributed to CITY and other appropriate parties for review. "Primavera Project Planner, version 3.0" software shall be used as the standard scheduling software and shall be specified for use by the selected A/E's and Contractors. CONSULTANT shall review and update the monthly Matter Program Schedule on a monthiy basis. in addition, the Master Program Schedule shad be incorporated into the Monthly Management Status Report as discussed in Task 1.4. Deliverables - Schedule Master Program Schedule consisting of all parks and facilities projects. Attend meeting to receive preliminary schedules from CITY and/or A/E consultants. Meeting agenda and minutes. Draft (10 copies) and final (30 copies) of the Master Program Schedule. Draft to be completed within thirty (30) calendar days from the completion of Task 2 and Final to be completed fifteen (15) calendar days after receipt of all comments and updated on a monthly basis thereafter for the duration of the Program. Task 1.3 — Master Program Costs Model: CONSULTANT shall prepare and maintain a Master Program Cost Model to track funding status, engineering and Program management fees, construction costs, construction contingencies and change order status, throughout the duration of the Program. The model shall be set up using "MS — Excel" software and be updated on a monthly basis. CONSULTANT shall utilize the model to track and forecast expenses related to the Bond issues. It is assumed that project -funding source data, including bond funds, interest, grants and other alternative funding sources, will be provided by the CITY Finance Department. CONSULTANT shall review and update the cost 06/21/01 3 • 1 model on a monthly basis with applicable representatives from the CITY. The Master Program Cost Model shall be incorporated into the Monthly Management Status Report as discussed in Task 1.4. Deliverables Schedule Master Program Cost Model consisting of all Infrastructure Improvement projects, internal costs, etc. Monthly meeting with City Finance Department. Meeting agenda and minutes. Draft (10 copies) and final (30 copies) of the Master Program Cost Model. Draft to be completed within thirty (30) calendar days from the completion of Task 2 and Final to be completed fifteen (15) calendar days after receipt of all comments and updated on a monthly basis thereafter for the duration of Program. Task 1.4 Program Management Status Reports: CONSULTANT shall generate and distribute a monthly Program Management Status Report (PMSR) that includes updated design and construction schedules and cost model status updates. Monthly progress schedules and reports, as provided by the various A/E and/or Contractors (developed in accordance with the PWP) shall be used for a portion of these reports. Schedule reporting shall reflect actual against scheduled progress while cost reporting shall reflect current cost and projected cost information. A Program funds draw schedule shall also be included, as developed with input from the CITY Finance Director. The PMSR shall be used to review Program status with the City Commission and G.O. Bond Oversight Committee on a monthly basis. CONSULTANT shall attend Commission and Oversight Committee Meetings accordingly. CONSULTANT's anticipated level of effort includes graphical presentation support for the preparation of graphical materials to aid in G.O. Bond Oversight Committee and City Commission meetings. Deliverables Program Management Status Reports describing and documenting the status of all parks and facilities projects. Thirty (30) copies of the Program Management Status Reports. Attend and participate in monthly G.O. Bond Oversight Committee meetings as appropriate, Attend and participate in bi-weekly Commission Meetings as appropriate. Schedule Copies to be submitted on the final Monday of the month in order to provide seven (7) calendar days of review time to the G.O. Bond Oversight Committee. 06/21/01 4 • • Task 1.5 — Document Control System: CONSULTANT shall establish and maintain an integrated document control system to assure complete control of all engineering and construction records, correspondence, reports, design documents, meeting notes, video tapes, and all other information received or produced by the CONSULTANT. To ensure compatibility with CITY information management systems, "Prolog" software shall be used for document control. In addition, all word processing shall be performed on "MS -Word version 2000" software and spreadsheets shall be developed using "MS -Excel version 2000" software. TASK 2 — PLANNING PHASE PROGRAM MANAGEMENT SERVICES Task 2.1 — Program Planning Services: Program planning analysis is required to ensure that the Program is executed with a minimum amount of impact to the community and at minimal cost to the CITY. Program planning establishes the road map for successful completion of the work. Under this Task, the CONSULTANT shall work with CITY staff to: • Prepare definitive scope of services for the various Projects. • Develop a master schedule illustrating current known Project prioritization parameters. • Coordinate with CITY and its consultants to identify overlapping schedules of known projects being proposed by outside agencies including the Florida Department of Transportation (FDOT), Miami -Dade Water and Sewer Department (MDWASD), Miami - Dade Public Works Department (MDPWD), the Municipal Mobility Plan, Florida Power and Light (FPL), BellSouth, Charter Communications, and others as applicable. • Coordinate with CITY and its consultants to identify additional overlapping schedules of known civic activities such as Convention Center functions, Art Festivals, tourist sensitive areas, and similar activities that could be affected by the Program. Deliverables Utilizing the Master Program Schedule, prepare and update an Overlapping Schedule that identifies known projects and/or activities by other agencies to coordinate overlapping activities. Attend monthly Utility Coordination Meetings sponsored by Sunshine One Call of Florida, Preparation of letters and support materials to agencies and/or entitles, Prepare meeting agendas and minutes with all agencies and/or entities. 06/21 /0 1 5 Schedule Thirty (30) copies of the Overlapping Schedule. Upon completion of planning effort, copies of schedule shall be submitted on the final Monday of the month in order to provide seven (7) calendar days of review time to the G.O. Bond Oversight Committee. Planning services shall be ongoing throughout Program duration. Task 2.2 — Project Prioritization: Task 2.2 is not included in the CONSULTANT'S scope of services for projects identified in Exhibit A. Utilizing the overlapping schedule analysis, CONSULTANT shall establish a project prioritization schedule. CONSULTANT shall evaluate and recommend to the CITY the best procurement strategies in - an eftort to promote competition among bidders, as well as minimize disturbance to the public. Deliverable Schedule Prioritize CITY Projects and develop schedule based on priority. Recommend best procurement pathways available to the CITY. Ten (10) draft copies and Thirty (30) copies of the Project Prioritization Schedule. Draft copies to be submitted for review within thirty (30) calendar days after receiving the Notice to Proceed and final within fifteen (15) calendar days after receipt of comments. TASK 3 — DESIGN PHASE PROGRAM MANAGEMENT SERVICES Task 3.1 — Assist CITY with Development of Architect / Engineer (A/E) Consultant Scope of Services: The Program is to be designed by various outside A!E consultants. The CITY is currently in the process of issuing Requests for Qualifications for selection of these firms. Once the A/E consultants are selected by the CITY, the CONSULTANT shall serve as the primary point of contact for the execution of their work activities. Hence, the CONSULTANT shall attend design Project analysis meetings in conjunction with the A/E consultant and CITY staff for the purpose of defining Project objectives, budgets, schedule constraints and scope of' services. The CONSULTANT shall provide the CITY with technical review as it pertains to the contract agreements and scope of services with the selected A/E firms. CONSULTANT shall ensure that the scope of services for each A/E consultant contains the appropriate scope items to provide a quality product that meets industry standards, including 06/2 1/01 6 • • the preparation of cost estimates in compliance with the Association of American Cost Engineers. It is assumed that the CITY shall make all A/E consultant selections and negotiate fees accordingly. CONSULTANT shall transmit proposed A/E contracts to the CITY's Risk Management and Procurement Departments and the City Attorney's Office to verify that appropriate insurance requirements for each A/E consultant selected by the CITY are met. The CONSULTANT shall assist CITY staff with the preparation of requisite documentation (i.e., commission memoranda and resolutions) to process selected A/E firm contracts through the CITY Commission approval process. CITY shall provide CONSULTANT with sample formats of approved commission• memoranda and resolutions for CONSULTANT's use. Deliverable Schedule Meeting agendas and minutes. Review and corninelir of Request fol. Quali icaiions. Review and comment of proposed A/E scope of services 1 and contract agreements, Preparation of requisite documentation to process selected A/E firm. Ongoing throughout Program. Task 3.2 — Design Standards Review: Task 3.2 is not included in CONSULTANT'S scope of services relative to the projects identified in Exhibit A. Task 3.3 — Legal Assistance: CONSULTANT shall retain the services of an attorney to provide technical and legal assistance to CONSULTANT throughout the execution of the Program, as required at no additional cost to the CITY. Task 3.3.1— Front -End Document Review CITY shall provide CONSULTANT with its current front-end contract document utilized for the construction of municipal projects within the City of Miami Beach. CONSULTANT shall evaluate recent suggestions and modifications made to front-end document by Hazen & Sawyer and provide beneficial comments to the CITY. CONSULTANT shall review the front-end documents with respect to non- compensable/excusable delay claims, compensable/excusable delay claims, liquidated damages, calculation of Contractor indirect costs, Request for Payment procedures, bonus incentive clauses, limited and Full Notices to Proceed, change order approval process and such other items as requested by the 06/21 /01 7 • CITY. The intent of this review would be to upgrade the contract documents in an effort to minimize areas that expose the CITY to additional risk. Deliverables Schedule Prepare.meeting agendas and minutes. Review CITY's front-end contract documents for construction of municipal projects and provide CITY with recommendations to their contract document. Prepare recommendation memoranda. Submit draft memoranda and recommended contract document to CITY Administration within one hundred twenty (120) calendar days of receipt of the Notice to Proceed and final memoranda and contract document within fifteen (15) calendar days of receipt of comments. Task 3.3.2 — Front -End Document Workshop Meeting Task 3.3.2 is not included in the CONSULTANT'S scope of services. Task 3.3.3 — Front -End Document Programs Task 3.3.3 is not included in the CONSULTANT'S scope of services. Task 3.4 — Manage A/E Consultant Progress: CONSULTANT shall serve as the focal point of contact with all of the Program A/E consultants and shall track their progress toward the successful completion of the work. In conjunction with CITY staff, CONSULTANT shall meet monthly with each A/E consultant to review the progress and status of its work activities. These meetings shall also serve as a primary method for exchanging information, resolving design decisions, and reviewing design progress. It is assumed that each A/E consultant shall be required, as a part of its contract with the CITY, to develop and maintain a progress schedule of its activities in Primavera Project Planner, version 3.0 format or SureTrak. Should the CONSULTANT determine that an A/E consultant has fallen behind schedule, the A/E consultant shall be required to provide a recovery schedule that will accelerate work and get them back on schedule. The CONSULTANT shall prepare and distribute meeting minutes to all attendees and other appropriate parties. Deliverables Meeting agendas and minutes. Review and comment on A/E design professional schedules, request and review recovery schedules, if required. 06/21/01 8 • • Prepare correspondence between the CONSULTANT, A/£ design professional and CITY, as required. Review and process monthly invoices from A/E design professionals. Schedule Ongoing throughout Program. Task 3.5 — Design Reviews: The CITY prides itself on maintaining open lines of communication with its citizens. Hence, it is anticipated that up to eighteen (18) public meetings will be held for Projects in the CONSULTANT's scope of services during the design phase to ensure that community input is received and that citizens are kept informed on the content and status of the various Projects.. CONSULTANT shall attend these meetings with the respective A/E consultant and appropriate CITY representatives, as required. CONSULTANT shall attend meetings between A/E consultants and internal CITY departments to prepare for these meetings. It is assumed that A/E consultants will develop all graphics, plans and renderings, acceptable to the CITY and CONSULTANT, for review at the public meetings. CONSULTANT can prepare graphics and other materials for such meetings as noted under Task 7. It is assumed that CITY personnel will schedule, coordinate and conduct these meetings and prepare and issue minutes accordingly. In addition, it is anticipated that A/E Consultants will attend Design Review Board, Historic Preservation, Planning Board, G.O. Bond Oversight and Commission Meetings, as required. To verify that all design review meeting comments have been incorporated and design standards have been followed, CONSULTANT shall perform reviews of all design Project documents at the preliminary (30 percent completion), intermediate (60 percent completion) and near final (90 percent completion) design stages. The purpose of these reviews shall be to verify that the documents are consistent with the design intent. The CONSULTANT shall also review AJE Consultant(s) prepared cost estimates for the project at both the 60 and 90 percent submittal stages. CONSULTANT shall forward a copy of each review set of contract documents to relevant CITY Departments for their review and comment. CONSULTANT shall provide comments on the specifications, plans and other supporting materials, as applicable. A meeting shall be held with respective A/E consultant(s) and CITY representatives to discuss these review comments, as required. The preliminary design review shall require that each A/E consultant perform field verifications of existing underground infrastructure conditions, as deemed necessary by CONSULTANT. 06/2 I /01 9 • • CONSULTANT shall ensure that A/E consultants obtain and address all relevant CITY Department, governmental agency and community comments regarding design issues related to the projects. Deliverables Meeting agendas and minutes. Review A/E furnished contract documents at the preliminary, intermediate and near final design completion stages. Provide comments on A/E furnished contract documents. Coordinate and participate in meetings with the A/E design professionals to review comments. Schedule Ongoing throughout Program. Task 3.Sa — Value Engineering: CONSUL I'AN F will perform analysis of projects at both the 60% and 90% design development phases with regard to the comparative value of materials and systems proposed, and functional arrangement of buildings and site space usages. Value engineering and life cycle cost analysis are inter -related and maybe presented as such by the CONSULTANT. Deliverables Meeting agendas and minutes. Perform value engineering of A/E furnished contract documents. Provide recommendation on A/E furnished contract documents. Coordinate and participate in meetings with the A/E consultants to review comments. Provide cost analysis of recommendations. Schedule Ongoing throughout program. Task 3.6 — Permitting Assistance: It is assumed that the respective A/E consultants will be responsible for preparing and submitting permit applications for their Projects, attending all resulting meetings, and for responding to all requests for information (BFI's) from jurisdictional agencies. CONSULTANT does not anticipate attendance at these meetings. However, the CONSULTANT shall be the responsible party for formally transmitting and receiving permits to and from the .respective Agencies. CONSULTANT shall track and monitor progress on the preparation and review of permits and subsequent requests for information. In addition, the CONSULTANT shall develop and maintain a database that identifies all permits that may be needed for all Projects. This database shall identify the specific permit(s) required 06/21/01 10 • • for each Project. the timing for when the permit is needed, the individual responsible for preparing the permit, and the current status of the permit and any related RFI's and responses. Deliverables Receive, log in and transmit permit applications to respective agencies. Prepare a permit tracking database. Receive, log in and transmit agency Requests for Information to appropriate parties. Ensure that agency Requests for Information are responded to in a timely fashion. Schedule Ongoing throughout Program. .. Task 3.7-- Cuustructabiliry Reviews: CONSUL:I AN 1 shall perform constructability reviews of the design documents relative to value, construction sequencing and bid format. The reviews shall be based upon the 60 and 90 percent design submittals received from the A/E consultant(s) and shall be conducted concurrently with the 60 and 90 percent design reviews. Meetings shall be held with respective A/E consultants and CITY representatives to discuss review comments, as required. CONSULTANT shall review construction cost estimates provided by the A/E consultants for their respective Projects. Review of construction cost estimates shall be performed at the 30, 60, 90 and 100 percent design review points. The accuracy of the A/E cost estimate associated with the 30 and 60 percent design reviews shall be +30% to —15% Budget Level Estimates as defined by the American Association of Cost Engineers. The accuracy of the cost estimates associated with the 90 and 100 percent reviews shall be a +15% to —5% Definitive Level Estimate as defined by the American Association of Cost Engineers. In addition, CONSULTANT shall assist the A/E consultants in defining schedule milestones and construction sequencing restrictions. Deliverables Meeting agendas and minutes. Perform constructability reviews of A/E furnished contract documents. Provide comments on A/E furnished contract documents. Coordinate and participate in meetings with the A/E consultants to review comments. Cost estimating services. 06/2 I /01 I 1 • • Schedule Ongoing throughout Program. Task 3.8 — Bid Services: The CONSULTANT'S scope of services relative to Bidding is limited as follows: CONSULTANT shall work with the CITY"s Procurement Department and other applicable staff as required to provide general bid services including the, attendance at pre -bid conferences, and coordination. of award recommendations from A/E consultants. CONSULTANT shall transmit contract documents prepared by the A/E consultants to the CITY's Risk Management and Procurement Departments for verification of appropriate insurance and bonding capacity requirements for each Project prior to bid.. CONSULTANT's anticipated level of effort does not include any allowance of CONSULTANT's time to assist the CITY in the event of a bid protest. To the proportionate extent CONSULTANT's services are required in the event of a bid protest due to_ a direct action or lack thereof by CONSULTANT, CONSULTANT shall participate in such rebidding of the particular Project at no cost to CITY. Deliverables Attend and participate in Pre -bid conferences. Review and distribute questions from prospective bidders to applicable A/E consultants. Review contract document addenda provided by A/E consultants, prior to issuance. Verify bids are responsible and responsive. Prepare correspondence recommending award to CITY Administration. Schedule Ongoing throughout Program. TASK 4 — CONSTRUCTION PHASE PROGRAM MANAGEMENT SERVICES The CONSULTANT shall perform the following tasks associated with office administration activities related to the construction of the various Projects. These tasks shall be performed during the duration of all Projects under construction. Construction phase Program management services are provided for the intent of becoming familiar with the progress of the construction work and to verify that the work is proceeding in general accordance with the requirements of the contract documents, Note that construction observation services are presented under Task S. 06/21 /01 12 • • Task 4.1 — Construction Management Manual: Due to the extensive amount of detailed procedures required to properly manage construction Projects, CONSULTANT shall develop a Construction Management Manual (CMM) for the construction phase of the Program. This manual will augment the general Program guidelines established in the PWP developed under Task 1.1 and shall provide uniform procedures and guidelines for managing the interface between CITY staff, Contractors, A/E consultants, field observation staff and the CONSULTANT. It is assumed that the CITY will utilize the services of the respective A/E consultants for office engineering services (i.e. preparation of contract document clarification, submittal review, responses to questions and clarifications, change order request reviews, progress meeting attendance and specialty site visits, and other required supporting documentation, on an as needed basis) during the construction period. Deliverable Ten (10) draft copies and Thirty (30) copies of the Construction Management Manual. Schedule Draft copies to be submitted for review within one hundred and eighty (180) calendar days after receiving the Notice to Proceed and final within fifteen (15) calendar days after receipt of comments. Task 4.2 — Pre -Construction Conferences: CONSULTANT shall coordinate and attend pre - construction conferences with each Contractor, A/E consultant and applicable CITY personnel. The Contractors shall furnish preliminary schedules at this meeting. CONSULTANT shall prepare and distribute meeting minutes to all attendees and other appropriate parties. CONSULTANT shall issue a Limited Notice to Proceed at the Pre -Construction Conference. A final Notice to Proceed shall be issued upon receipt of a final schedule and procurement of all applicable construction permits from the Contractor. Deliverables - Meeting agendas and minutes. Attend and participate in pre -construction conferences. Schedule Ongoing throughout Program. Task 4.3 — Manage Construction Progress: CONSULTANT shall meet weekly with the Contractor, A/E consultant and applicable CITY representatives on each Project. The purpose of these meetings shall be to review the status of construction progress, shop drawing submittals and contract document 06/21/01 13 • • clarifications and interpretations. !n addition, the Contractor shall furnish a two -week look ahead work schedule to allow for proper coordination of necessary work efforts. The CONSULTANT shall conduct periodic field visits to the Project site for the purpose of confirming the Contractor's progress. Construction observation services are discussed under Task 5.0. These meetings shall also serve as a forum for discussion of construction issues, potential changes / conflicts and any other applicable matters, The CONSULTANT shall prepare and distribute meeting minutes to all attendees and other appropriate parties. Deliverables Schedule Meeting agendas and minutes. Attend and participate in weekly progress meetings with Contractors. Review Contractor two -week look ahead schedules. Ongoing throughout Program. Task 4.4 — Monthly Construction Progress Meetings: In addition to weekly meetings with the construction Contractors, CONSULTANT shall attend monthly construction progress meetings, as necessary, with the CITY staff. These meetings shall be held for the purpose of reviewing Project schedule, cost and issues of concern. In preparation for these meetings, CONSULTANT shall prepare and distribute to applicable CITY staff the Program Management Status Report (PMSR). CONSULTANT shall meet with appropriate CITY staff to review the PMSR prior to meeting with the G.O. Bond Oversight Committee and CITY Commission, as discussed in Task 1.4 above. Deliverables Meeting agendas and minutes. Attend and participate in monthly Construction Progress Meetings. Schedule Ongoing throughout Program. Task 4.5 — Utility and Permittine Coordination Services: CONSULTANT shall provide ongoing coordination between the A/E consultants, Contractors, local municipal authorities, governmental agencies, utility companies, and other known jurisdictional agencies, to verify that all required permits have been obtained. The Contractor will be responsible for location / verification of existing utilities, as required. Included in this work effort will be verification that the Contractor's traffic control plan has received required jurisdictional agency approvals. CONSULTANT shall work with CITY to establish procedures for monitoring enforcement of the Contractor's traffic control program throughout the duration of the Project. 06/2 1 /0 1 14 • • Deliverable Schedule Verify that all required permits have been obtained. Ongoing throughout Program. Task 4.6 — Review of Contractor's Schedules: CONSULTANT shall review the construction schedules proposed by the Contractors for compatibility with the intent of the contract documents. CONSULTANT shall work with the Contractors to develop acceptable schedules. CONSULTANT shall review schedules with applicable CITY staff. Each Contractor will be required to submit a monthly schedule update, which shall be reviewed by CONSULTANT. Progress payments shall not be approved if the monthly schedule is not submitted. CONSULTANT shall require the Contractor to provide a list of materials and equipment needed over the upcoming 6 month period and proposed delivery dates for such items. Other schedule impact items may include identification of pending labor or material shortages or labor relation problems and monitoring and analyzing actual versus predicted progress information. CONSULTANT shall advise the Contractor of apparent schedule impacts from other Projects including interface requirements and work to be performed by other entities in the area. Should the CONSULTANT determine that an contractor has fallen behind schedule, the Contractor shall be required to provide a recovery schedule that will accelerate work and get them back on schedule. Deliverables Receive, log in and review Contractor's baseline construction schedules. Provide Contractors with schedule comments. Update Master Program Schedule based upon Contractor's approved schedule (baseline and monthly update). Schedule Ongoing throughout Program. Task 4.7 — Requests for Information / Clarification (BFI's): CONSULTANT shall receive, log and process ail RFI's. Whenever an RFI involves the interpretation of design issues or design intent, CONSULTANT shall forward the RFI to the responsible A/E consultant and track a timely response back to the Contractor. CONSULTANT shall prepare and distribute RFI status reports at the weekly meetings with the Contractor. Deliverables Receive, log in and transmit RFI's to appropriate parties. Respond to those RFI's that do not involve design interpretations. 06/21 /01 15 Maintain and distribute RFI Status Report, on a weekly basis. Schedule Ongoing throughout Program. Task 4.8 — Requests for Changes to Construction Cost and/or Schedule: CONSULTANT shall receive, log and evaluate all requests for Project cost and/or schedule changes from the Contractor. Changes may be the result of unforeseen conditions or interferences identified by the Contractor during the routine progress of work, inadvertent omissions (betterment) issues in the contract documents, or additional improvements requested by the CITY or A/E consultant after the Project bid date. Regardless of the source, CONSULTANT shall evaluate the merit of the claim as well as the impact of the potential change in terms of Project cost and the schedule, as acceptable to the CITY. Such evaluation of the claim shall constitute a representation by CONSULTANT to CITY, based on observations and evaluations, that: (a) The work progressed to the point indicated; (b) The work is in substantial accordance with the Contract Documents; and (c) The Contractor is entitled to payment in the recommended amount. CONSULTANT shall coordinate negotiations with the Contractor and corresponding A/E consultant and CITY staff, as applicable. CONSULTANT shall review A/E consultant's recommendations with CITY staff. The A/E consultant shall be responsible for preparation of any documentation relative to a change order. Additional claims assistance services are discussed under Task 4.9. Del iverables Perform merit evaluation of claims / change requests. Receive, log in and transmit claim / change requests to appropriate parties for review and action, as applicable. Perform independent review of request for cost increase and/or time extension. Coordinate and participate meetings, as required, with A/E consultants, CITY and Contractor to resolve and/or negotiate the equitable resolution of request. Prepare and distribute project correspondence. Schedule Ongoing throughout Program. Task 4.9 — Construction Claims Assistance: CONSULTANT shall provide assistance in reviewing the legal aspects of Construction Contractor claims as to validity and legal interpretation, on an as needed 06/21 /0 1 16 • • basis. CONSULTANT shall prepare a legal interpretation for each construction claim (if deemed necessary by CONSULTANT) and identify whether the Contractor's claim is valid or invalid, with respect to legal standing. CONSULTANT's level of effort is based upon the review of three (3) construction claims per fiscal year. Deliverable Legal interpretation of construction claims. Schedule Ongoing throughout Program. Task 4.10 — Processing of Shop Drawings: CONSULTANT shall receive, log and distribute shop drawings to the appropriate A/E consultant and track a timely response back to the Contractor. CONSULTANT shall prepare and distribute shop drawing status reports at the weekly meetings with the Contractor. Deliverables Receive, log and distribute shop drawings to the appropriate A/E consultants. Track submittal review time and distribute Shop Drawing Status Reports at weekly meetings. Schedule Ongoing throughout Program. Task 4.11 — Progress Payment Requests: CONSULTANT shall receive and review monthly invoices submitted by the Contractors to ascertain accuracy and prepare payment requests in accordance with CITY procedures. Based upon the Project records, as well as CONSULTANT's observations at the site and evaluations of the data reflected in Contractor's application for payment, CONSULTANT shall render a recommendation to CITY concerning the amount owed to the Contractors and shall forward the Contractor's application for such amount to CITY. Such approval of the application for payment shall constitute a representation by CONSULTANT to CITY, based on observations and evaluations, that: (a) The work has progressed to the point indicated; (b) The work is in substantial accordance with the Contract Documents; and {c) The Contractor is entitled to payment in the recommended amount. CONSULTANT shall assist CITY staff with tracking and expediting of progress payments through the CITY Accounting Department. 06/21/01 17 Deliverables Receive and review Contractor monthly Requests for Payment. Verify that all required supporting documentation, such as record drawing maintenance, monthly progress schedule update, release of liens and certifications are submitted with Contractor's Request for Payment. Schedule Ongoing throughout Program. TASK 5 — FIELD OBSERVATION PROGRAM MANAGEMENT SERVICES CONSULTANT shall provide full-time construction observers to provide adequate quantity and quality of observation personnel to reasonably verify that critical elements of the construction projects are being complied with and that the general intent of the contract documents is being met. The purpose of CONSULTANT'S Construction Observation services is to provide for the CITY a greater degree of confidence that the completed work will conform in general to the construction contract documents and that the integrity of the design concept of the various Projects as indicated in the contract documents has been implemented and preserved by the construction Contractors. On the other hand, CONSULTANT shall not supervise, direct or have control over any construction Contractor's work nor shall CONSULTANT have authority over or responsibility for the means, methods, techniques, sequences or procedures of construction selected by the construction Contractors, for safety precautions and programs incident to the work of any construction Contractor or for any failure of a construction Contractor to comply with laws, rules, regulations, ordinances, codes or orders applicable to the Contractor's furnishing and performing the work. Accordingly, CONSULTANT neither guarantees the performance of any contractor nor assumes responsibility for any Contractor's failure to furnish and perform its work in accordance with the contract documents. CONSULTANT'S level of effort is based upon 14,600 man- hours of field representation. Should this level of effort be exceeded or decreased, same shall be reflected in a written amendment to the Agreement, as provided in Article 7 therein. CONSULTANT'S field staff shall be on -site when the Contractor is on the job, as deemed beneficial by the CONSULTANT. In an effort to minimize the CITY's costs with respect to on -site field representation, the CONSULTANT has anticipated that certain Projects similar in nature and in adjacent geographical areas will be represented by one resident construction observer as identified in Exhibit A. CONSULTANT'S level of effort is based upon the assumption that the contract documents will limit the Contractor's work schedule to one work crew based upon an eight -hour shift Monday through Friday. 06/21 /01 18 • • Task 5.1 — Feld Observation Services: CONSULTANT shall provide field staff to observe the construction of the work and; (a) Conduct on -site observations of the work in progress to assist in determining if the provisions of the contract documents and permit conditions are being fulfilled and to reasonably protect the CITY against defects and deficiencies in the work of the Contractor. CONSULTANT shall timely report, to the CITY in writing, whenever it is believed that work is unsatisfactory, faulty or defective and/or does not conform to the contract documents, does not meet the requirements of inspections, tests, or has been damaged prior to final payment. CONSULTANT shall timely report, to the Contractor and CITY in writing, whenever it is believed that a hazardous condition exists. (b) • . CONSULTANT shall conduct on -site observations of the work in progress to determine if the contract documents and permit requirements are being complied with and to protect the CITY against Contractor work defects and deficiencies. CONSULTANT shall timely advise the CITY, in writing, whenever work is determined to not conform to the contract documents, permit requirements are not being complied with, and/or whenever an observed Contractor's work is determined to be defective/deficient. CONSULTANT's observer shall attend all scheduled meetings with the Contractor. (c) Maintain a log of work performed. The notes shall include records of when the Contractor is on the job -site, weather conditions, change orders, or changed. conditions, list of job side visitors, drilling and testing activities, observations in general, and specific observations in more detail as in the case of observing test procedures. Record, in writing, the outcome of these observations. CONSULTANT shall identify any utilities damaged and verify that the Contractor has notified the respective utility owner. (d) Verify that tests, equipment and systems start-up are conducted in the presence of appropriate personnel, and that the Contractor maintains adequate records thereof; and observe, record, and report appropriate details relative to the test procedures and start-up. 06/21/01 19 • • (e) Provide a photographic record of the construction, beginning with pre -construction documentation and completing with post -construction photographs. Photographs shall be digital snapshot type taken to define the progress of the Project and shall be labeled as to date, location, view and signed by the CONSULTANT. (f) Review materials and workmanship of the Projects and timely report to CITY in writing any deviations from the contract documents that may come to the CONSULTANT'S attention. Determine the acceptability of the work and materials and make recommendation to CITY to reject items not meeting the requirements of the contract documents. (g) Field observe critical points in the construction process. (h) Coordinate the sampling and testing of materials to be performed by independent testing laboratories under subcontract to the CITY. This task includes the receipt, review and processing of invoices from the independent testing laboratories for payment by the CITY. CONSULTANT shall verify all pay requisition quantities in the field by measurement. CONSULTANT shall develop a Field Measurement Form and utilize such form as verification of pay requisition items. (j) Monitor that record drawing mark-ups are properly maintained by the Contractor. (k) It is assumed that CITY will pay for all material testing services (i.e. densities, compaction testing, etc.) directly. Deliverables Provide full time resident Project representation on Projects, as deemed. beneficial by the CONSULTANT. Prepare Construction Observation Forms and distribute to Program staff. Schedule Ongoing throughout Program. 06/21/01 20 • Task 5.2 — Project Closeout: Upon receiving notice from the Contractor(s) advising the CONSULTANT that the Project is substantially complete, CONSULTANT, in conjunction with appropriate CITY and A/E consultant staff, shall schedule and conduct an overview of the Project. The overview shall include CONSULTANT's development of a "punch list" of items needing completion or correction prior to consideration of final acceptance. The list shall be forwarded to the Contractor. For the purposes of this provision, substantial completion shall be deemed to be the stage in construction of the Project where the Project can be utilized for the purposes for which it was intended, and where minor items may not be fully completed, but all items that affect the operational integrity and function of the Project are capable of continuous use. Upon notification from Contractor(s) that all remaining "punch list" items have been resolved, the CONSULTANT, in conjunction with appropriate CITY and A/E consultant staff, shall perform a final review of the finished Project. Based on successful completion of all outstanding work items by the Contractor, CONSULTANT shall assist CITY in closing out the construction contract. This shall include, but not limited to, providing recommendations concerning acceptance of the Project and preparing / collecting necessary documentation, including but not limited to, lien waivers, Contractor's final affidavit, close-out change orders, and processing of the final payment application. Deliverables Receive Contractor substantial completion notification. Coordinate and attend field meetings to review substantial completion. Prepare and verify that punch lists are completed. Confirm Project completion to appropriate agencies. Schedule Ongoing throughout Program. Task 5.3 — Post Project Services: CONSULTANT shall assist City with the coordination of warranty work requested by the various Project Contractor(s). This assistance shall be provided for the duration of the Project to a period not to exceed the completion date of this Agreement. In addition, CONSULTANT shall transfer all Project files to the CITY at the completion of the Project. It is assumed that the CITY shall make arrangements for placement of files in storage as required. Also, CONSULTANT shall complete CITY furnished A/E consultant and Contractor performance evaluation forms for the Procurement Department. In addition, CONSULTANT shall coordinate the transfer of record drawing mark-ups and applicable test results to the A/E consultants. The A/E consultants shall update CAD files for record purposes and certify Projects as complete, accordingly. 06/21 /01 2I • • Deliverables Assist CITY with warranty work completion. Place all Program files in suitable cardboard containers for transfer to CITY storage facilities. Prepare A/E consultant and Contractor performance evaluations. Schedule Ongoing throughout Program. TASK 6 — OTHER DIRECT COSTS Task 6.1 — Mileage: CONSULTANT anticipates that construction observers shall. utilize their own vehicles to travel between the various job sites. Mileage shall be reimbursed at the United States Internal Revenue Service.established•rate for travel Within the City of Miami Beach limits as well as travel within the Miami -Dade, Broward and Palm Beach County areas to attend meetings with stakeholders, regulatory / permitting agencies, utility owners, and planning organizations. Annual adjustments will be made to the established rate based upon the United States Internal Revenue Service. Task 6.2 — Communications: To facilitate communications between office and field staff, CONSULTANT anticipates the use of Nextel radio cellular phones for office and construction observation staff. Monthly service includes phone, battery, accessories, unlimited radio talk time, and up to 300 minutes of cellular phone use per month. An allowance has also been included for battery replacements, rapid battery chargers, vehicle power cords, and protective covers. Task 6.3 — Software Costs: CONSULTANT shall purchase one (1) software license for the Management Information System which includes Primavera Project Planner, version 3.0, Prolog, and CallTrak software. CONSULTANT shall also purchase Novell software for its program office server (one license for up to 10 users), software for tape backup system, Internet Explorer, Microsoft Office (MS -Word, MS - Excel, MS -Lotus Notes) and Windows operating system software. CONSULTANT shall purchase maintenance service agreements for the software to include software upgrades. At the conclusion of the Program, CITY shall take possession of the software. All software licenses shall be valid through fiscal year 2006. Task 6.4 — Hardware Costs and LAN / WAN Maintenance: CONSULTANT shall purchase computer hardware for the Program office to interface with the CONSULTANT's existing Local Area Network 06/2 1/01 22 • • (LAN). The CONSULTANT's existing Local Area Network in the Miami Springs office will be utilitzed to support this program. Pentium based computers with CD, floppy drives and internal hard drive operating on MS -Windows software shall be purchased with 17-inch color monitors or similarly equipped Laptop computers. At the conclusion of the Program, CITY shall take possession of the hardware purchased under this program as identified in Exhibit D. Task 6.5 — Office Space: CONSULTANT shall maintain office space at the Eastern Financial Building, Suite 1000, 700 South Royal Poinciana Boulevard, Miami Springs, Florida 33166. CITY shall provide office space for up to 4 of the CONSULTANT's employees to serve as a base of operation for field observation services. CONSULTANT anticipates that the CITY shall provide City parking placards/permits for the Program staff (up to 11 staff members) at no charge to the CONSULTANT. Task 6.6 - Rer i oductiin Services: CONSULTANT snail be reimbursed at the usual and customary'rate for reproduction of reports including but not limited to, photocopying, cover laminations, bindings, etc, Reports to be reproduced include the following: • Program Work Plan • Program Master Schedule • Program Cost Model • Program Management Status Reports • Program Delivery Analysis Report • Program Design Standards Manual • Construction Management Manual CONSULTANT shall bear costs for incidental reproduction costs associated with the preparation of draft / final deliverables. TASK 7 — SUPPORT SERVICES If authorized in writing, by the CITY, prior to commencement of same, the CONSULTANT may furnish Support Services for. but not limited to, the types identified below. These services are not included as part of the Scope of Services except to the extent otherwise provided herein. These support services are Task based and are offered for the purpose of supporting the planning, design and construction of the Program. While the extents of these efforts are not fully known at the present time, the principal tasks that may be required during the Program duration include the following: 06/21 /01 23 • • Tasks 7,1 — Public Information Hotline: CONSULTANT shall provide a single telephone number that shall be publicized and made available to the public to obtain information about ongoing construction activities and to voice a concern or complaint. This hotline shall be located in the Program Management Office and be automated to tog all calls. CONSULTANT shall review all calls with appropriate CITY staff and respond to each request for information or complaint within twenty-four (24) hours. A writ -ten report on each request for information or customer complaint shall be prepared and summarized in a monthly report. Task 7.2 — Community Involvement and Public Information Program: In addition to the public meetings specified under the Phase 3 Design Phase Program Management Services, the CONSULTANT, working in concert with CITY staff, shall implement a community involvement program to keep affected stakeholders abreast of Program status. The 'objectives' of the community iri'voivement program are to'. inform and educate the public about Program elements and benefits: This shall allow the CONSULTANT to provide stakeholders with accurate and timely information, and discuss the impact of the Program from the stakeholder's perspective. In addition to these general meetings detailed above, specific detailed meetings shall be held to provide additional information for stakeholders that shall be directly impacted by the Program. Follow up activities may include, but not limited to, phone calls, additional meetings, correspondence or development of additional informational materials. These determinations shall be made on an individual basis for each interest group. CITY shall assign a representative to each geographical area to serve as the focal point to receive and address comments / concerns from CITY residents and./ or business owners. CITY staff shall coordinate responses between the CONSULTANT and concerned citizens. The objective of the community involvement program is to generate community understanding of the Program, and may include, but not limited to the following: (a) Inform and educate the genera! public, visitors and business owners of the overall Program elements and benefits. (b) Prioritize the issues that have direct impact on residents, visitors and businesses. (c) Implement components of an ongoing public information campaign that shall: (I) Keep the public well informed about the Program; 06/21 /0 I 24 (2) (3) Highlight the progress of Program; and Emphasize the importance of the Capital Parks and Facilities program for Miami Beach. (d) Inform the public about construction time lines over the next six years. (e) . Develop materials and information, written in everyday terms, that give the public an accurate picture of the Program's progress. (f) _... .• Deliverabl - Encourage community participation in the planning phases of Parks and Facilities Projects. Public iclatioas campaign fui tilt.. gdrio al puulh. Schedule Ongoing throughout program. 06/21/01 25 Task 7.2.1 —Public Meetings Due to the size and magnitude of the Program, the CONSULTANT shall hold up to 18 public meetings relative to the affected sites (Exhibit A) to inform the public on the Program and to specify work that shall be ongoing in the respective areas at no additional cost to the CITY. The CONSULTANT shall identfl and secure an appropriate meeting location, plan, prepare and produce all handout materials, attend, conduct and prepare minutes and follow-up materials for all meetings. As appropriate, materials shall be printed in both English and Spanish. Meeting minutes shall be prepared which identify the list of speakers, attendees, legal notice documentation (if necessary), brief summary of the topics discussed and the concerns / comments made during the meeting. CONSULTANT shall prepare responses to written comments received by the Program Team, Deifiverables_.._ - -Meeting agenda and minutes. Produce and distribute program materials. Prepare meeting minutes. Schedule Ongoing throughout the Program. Task 7.2.2 — Other Direct Costs Associated with Community Involvement and Public Information Program I. Postage for bulk mail distributions. 2. Supplies for preparation of presentation materials. 3. Supplies required to produce all Program reports, such as covers for comb binding systems, ready index uncollated dividers, plastic binding combs. 4. Costs to produce Television media, newspaper / magazine print ads and reproduction of brochures, handouts, flyers, and door hangers. Task 7.3 — Third Party Cost Estimating Services 1. Detailed Cost Estimates for projects as requested by the CITY shall be provided through the CONSULTANT by a company regularly engaged in the provision of Professional Construction Cost Estimating Services. 06/21/01 26