Loading...
HomeMy WebLinkAboutexhibitE4bATTACHMENT E-4B WATERWAYS ASSISTANCE PROGRAM NAVIGATION RELATED DISTRICTS APPLICATION EVALUATION AND RATING FORM INLET MANAGEMENT and PUBLIC NAVIGATION PROJECTS THIS ATTACHMENT IS TO BE COMPLETED IF YOUR PROJECT IS AN INLET MANAGEMENT or PUBLIC NAVIGATION PROJECT. CATEGORY RATING & RATING POINTS POINTS AVAILABLE EVALUATION CRITERIA WATERWAY RELATIONSHIP (For reviewer only) (1-2..5 points) (1-2. 5 points) Describe how the project directly benefits the maintenance of the Atlantic Intracoastal Waterway. Briefly discuss any methods or activities that will address long-term sedimentation problems. (12) Does the project directly benefit the AICW? (13) Will the project inhibit sediment inflow into, or reduce the dredging frequency of the Atlantic Intracoastal Waterway? PUBLIC ACCESS Describe how this project will enhance public navigation and safiaty benefits along the waterway. (For reviewer only) (1-2.5 points) (14) Will the project enhance public benefits on the waterways? PROJECT DESIGN Explain how this project relates to the overall management goals of the inlet or waterway. Briefly spell out any water quality, environmental or habitat benefits to be realized by this project. (For reviewer only) (1-2.5 points) (15) Has the applicant demonstrated additional benefits to be realized by implementing this project ? PROJECT FUNDING List the additional funding sources for this project. What is the status of these funding sources? Explain the funding mechanism for the long-term maintenance of the project. (For reviewer only) (1-2 points) (I6) Has the applicant received other assistance funding and is long-term maintenance incorporated? RATING POINT TOTAL (Note: The total maximum score possible is 50 points and the minimum score possible is 16 points. A score of 35 points or more is required to be considered for funding.) Form No. 93-25b (Effective Date: 3-21-01)