HomeMy WebLinkAboutexhibitE4aATTACHMENT E-4A
WATERWAYS ASSISTANCE PROGRAM
NAVIGATION RELATED DISTRICTS
APPLICATION EVALUATION AND RATING FORM
DEVELOPMENT & CONSTRUCTION PROJECTS
THIS ATTACHMENT IS TO BE COMPLETED IF YOUR PROJECT IS A DEVELOPMENT OR
CONSTRUCTION PROJECT BUT IS NOT AN INLET MANAGEMENT OR BEACH
RENOURISHMENT PROJECT.
CATEGORY RATING
& RATING POINTS
POINTS
AVAILABLE
PERMITTING
(For reviewer only)
(1-2 points)
(1-2 points)
EVALUATION CRITERIA
List all of the necessary permits that are required for the project, the
date of application, and the anticipated date of receipt of the required
permits. If permits are NOT required, explain why not.
(12) Have all permits been applied for? Is timing time
sufficient to meet application deadline? (If the project is a
Phase I project a minimum score of 2 points will be awarded)
(13) Has the project received all of the required permits?
(If the project is a Phase I project a minimum score of 2
points will be awarded)
PROJECT DESIGN
(For reviewer only)
(1-2 points)
List the status of the design of this project. Describe any unique design
aspects of this project that enhance public usage or access, decrease
environmental impacts, improve water quality or reduce costs.
(14) Has the design work been completed? (A Phase 1 project
should be evaluated based upon the design work completed to date), Am
there unique beneficial aspects to the proposed design?
CONSTRUCTION TECHNIQUES
Briefly explain the construction techniques to be utilized for this
project.
(For reviewer only)
(1-3 points) (15) Are the construction techniques appropriate for the
project site?
CONSTRUCTION MATERIALS List the materials to be utilized for this project. What Is the design life of
the proposed materials? Describe any recyclable material to be utilized.
(For reviewer only)
(1-3 points) (16) Are the construction materials of lasting quality? Are
recyclables utilized?
RATING POINT
TOTAL
(Note: The total maximum score possible is 50 points and the minimum score possible is 16 points. A score of 35 points or more is
required to be considered for funding.)
Form No. 93-25A
(Effective Date: 3-21-01)