HomeMy WebLinkAboutArticle III Site Utility Study•
•
•
The Pointe at
Brickell Village
1100 South Miami Avenue
Site Utility Study
CTE Project No. 04111340
Prepared by:
CONSUL -TECH DEVELOPMENT SERVICES, INC.
Florida Certificate of Authorization No. 9008
10570 N.W. 27th Street, Suite 101
Miami, Florida 33172
Tel. 305-599-3141
Fax. 305-599-3143
November, 2004
•
•
. INTRODUCTION
The proposed project site is located on 1100 South Miami Avenue, in the southwest corner of
SW 11`t' Street and South Miami Avenue. The site area is 0..83 acres.
The proposed project will include a 38-story residential tower with a 7 level parking garage
and some retail areas. The tower will have a total of 348 condominium units, 7,576 square foot retail
area and a 55 seats restaurant.
II. DRAINAGE SYSTEM
For drainage design purposes, the site will be considered 100% impervious. Landscape and
green areas are provided, but these areas will not be considered in the calculations in an effort to be
conservative in the storm water management design. Storm water discharge will consist of runoff
from rooftops, roadways, vertical building faces and pedestrian areas. Miami -Dade DERM requires
that the proposed drainage system take into account 1/3 of the largest vertical building face. The
building faces exposed to the south will produce the largest amounts of runoff and will be accounted
for in the calculations. The site land use can be summarized as follows:
Total Net Impervious Vertical Total
Lot Area Area Building Faces Drainage Area
(Acres) (Acres) (33%) (Acres)
(Acres)
0.83 0.83 0.48
1.31
The proposed drainage plan calls for all pavement runoff to be collected in catch basins
capable of detaining the peak inflow from the Miami -Dade County DERM 5-year, 24-hour design
storm for 90 seconds. These basins also contain baffles to prevent all oil, grease and foreign
matter from flowing into the proposed system. The runoff will then flow into two proposed
drainage wells based on calculations found in Table 1. Runoff from building rooftops and
vertical faces are uncontaminated by oil and grease and may be piped directly into to the drainage
wells. The use of drainage wells is permitted by Dade County DERM in this area due to the high
level of salinity found in the groundwater. Since the proposed system is using drainage wells to
dispose of excess runoff, an exfiltration trench system will be designed to treat the larger of the
•
•
•
first inch of runoff generated before disposing of any runoff, or 2.5 inches over the impervious
area. The proposed well and exfiltration trench systems will keep the site dry during the DERM 5
year - 24 hour storm.
III. WATER DISTRIBUTION MASTER PLAN
The Miami -Dade Water and Sewer Department (MD-WASD) provides the water service
in this area. Currently, there is a 12-inch water main on SW 11th Street, and a 16-inch and 6-inch
water mains running along South Miami Avenue. Refer to the attached Water Atlas for
additional information.
The MD-WASD will probably not require the construction of any new water mains for this
project. The water and fire line service connections for this project will be provided from the
existing mains.
The anticipated average daily water consumption for the entire project is 72,729 GPD,
and is calculated as shown in Table 2.
IV. SANITARY SEWER MASTER PLAN
The Miami -Dade Water and Sewer Department (MD-WASD) also provides the sanitary
sewer service in this area. There are two existing 6-inch gravity sanitary sewer mains running
along SW 11th Street and one 8-inch along South Miami Avenue.
The 6-inch sewer along SW 11t' Street is substandard. The slope is very shallow and it
is estimated to handle less than half of this project flow under peak conditions. MD-WASD
will probably require that the project flow be connected to the 8-inch sewer along South
Miami Avenue. However during the permitting process MD-WASD will analize the existing
8-inch sewer line for available capacity. if capacity is not available, MD-WASD will
probably require the construction ofa new 8-inch sewer line along SW 1 1 th Street from
South Miami Avenue to SW lst Avenue
•
•
•
This project is anticipated to generate an average daily sewage flow of 72,729 GPD, an
is calculated as shown in Table 2.
The wastewater produced by the site will travel via the existing sanitary sewer system to
the MD-WASD Regional Pump Station No. 1. According to DERM, the pump station No. 1 is
currently operating for 6.04 hours per day. The additional 72,729 GPD will only increase the
elapsed time by 0.02 hours to 6.06 hours per day. Thus, the pump station is deemed capable of
handling the proposed flow from the project. Pump Station No. 1 transmits all flow directly to
the MD-WASD treatment plant on Virginia Key for final treatment before discharge into the
Atlantic Ocean.
V. SOLID WASTE GENERATION
Solid waste generated will be placed in standardized on -site containers for refuse and
recyclables per the City of Miami Code, for regular pickup by private hauling companies and/or
the City of Miami Solid Waste Department. The solid waste will then be transported to Miami-
Dade's Disposal Facilities. Actual waste pick-up locations will be shown in the architectural
plans.
This project is anticipated to generate an average daily solid waste volume of 498 Cu.
Yd/month, and is calculated as shown in Table 3. Generation rates were determined from data
provided by the Miami -Dade County Department of Solid Waste.
•
•
TABLE 1
THE POINTE cA BRIKELL VILLAGE
DRAINAGE CALCULATIONS
Total Net Lot Area = 0.83 Acres
Total Drainage Area = 1.31 Acres
1. Impervious = 100% or 1.91 Acres
2. Pervious = 0% or 0.00 Acres
2. Average Runoff Coefficient
3. SFWMD Design Storm Information
= 0.98
5-Year 24-Hour Storm (Miami -Dade County W.C. 1.1)
Rainfall Intensity = 6.20 inches per hour
Purpose = Flood Protection
Peak Runoff = CIA = (0.98)(6.20)(1.31)
=7.96cfs
4. Well Data
1. Well Diameter = 24 Inches
2. Assumed Well Capacity = 500 gprnlft. of Available Head
3. Mean High Tide Elevation =1.75 ft. (W.C. 20,034-A & W.C. 2.2)
4. Specific Gravity Head Loss = 2.00'
5. Proposed Number of Wells = 2
5. Hydraulic Grade Line Elevations at Well Structure
1. 5 Year DERM Storm
(7,96 cfs)l(500 gpmlfl head)(0.002228 cfs/gpm)(2 wells)] + (1.75 + 2.00)
= 7.32' NGVD
•
•
•
TABLE 2
THE POINTE (i BRIKELL VILLAGE
ANTICIPAI`ED AVERAGE DAILY FLOW
OF WATER AND WASTEWATER
Residential Towers
348 condo units @ 200 gpd/unit
Retail
7,576 Sq. Ft.
Retail / Restaurant
200 seats
69,600 gpd
@ 0.05 gpd/Sq. Ft. = 379 gpd
@ 50 gpd/seat — 2,750 gpd
Total = 72,729 gpd
ANTICIPATED AVERAGE DAILY FLOW WASTEWATER
Average Flow
= 0.0727 mgd
Peak Flow = 0.2727 mgd
NOTES:
1 Peak flow uses a factor of 3.75 times average flow (Recommended Standards for Wastewater
Facilities, 1990 Edition)
2. gpd = gallons per day
3. No industrial wastewater is anticipated to be generated
4. mgd = million gallons per day
•
•
•
TABLE 3
THE POINTE A BRIKELL VILLAGE
SOLID WASTE GENERATION
Residential Towers
348 units @ 1.25 cu. yds /month per unit = 435 cu. yds./month
Retail
7,576 SF of retail / rest space @ 0.25 cu. yds per 100 SF /month = 18.94 cu. yds/month
Restaurant
55 seat restaurant @ 0.80 cu. yds per seat/month = 44 cu. yds./mnonth
Total anticipated Solid Waste generation = 498 Cu. Yds. /month
•
WATER ATLAS
(MO-WA.SD)
•
SEWER ATLAS
(MD-WASD)
PRO3ccY